Search NASA⌕ Search

SEARCH · Search NASA

Results for “START Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Optimal design and dispatch of a system of diesel generators, photovoltaics and batteries for remote locations

Renewable energy technologies, specifically, solar photovoltaic cells, combined with battery storage and diesel generators, form a hybrid system capable of independently powering remote locations, i.e., those isolated from larger grids. If sized correctly, hybrid systems reduce fuel consumption compared to diesel generator-only alternatives. We present an optimization model for establishing a hybrid power design and dispatch strategy for remote locations, such as a military forward operating base, that models the acquisition of different power technologies as integer variables and their operation using nonlinear expressions. Our cost-minimizing, nonconvex, mixed-integer, nonlinear program contains a detailed battery model. Due to its complexities, we present linearizations, which include exact and convex under-estimation techniques, and a heuristic, which determines an initial feasible solution to serve as a “warm start” for the solver. We determine, in a few hours at most, solutions within 5% of optimality for a candidate set of technologies; these solutions closely resemble those from the nonlinear model. Lastly, our instances contain real data spanning a yearly horizon at hour fidelity and demonstrate that a hybrid system could reduce fuel consumption by as much as 50% compared to a generator-only solution.

14 SOLAR ENERGY↗

Piecewise linear approximation with minimum number of linear segments and minimum error: A fast approach to tighten and warm start the hierarchical mixed integer formulation

In several areas of economics and engineering, it is often necessary to fit discrete data points or approximate nonlinear functions with continuous functions. Piecewise linear (PWL) functions are a convenient way to achieve this. PWL functions can be modeled in mathematical problems using only linear and integer variables. Moreover, there is a computational benefit in using PWL functions that have the least possible number of segments. This work proposes a novel hierarchical mixed integer linear programming (MILP) formulation that identifies a continuous PWL approximation with minimum number of linear segments for a given target maximum error. The proposed MILP formulation also identifies the solution with the least maximum error among the solutions with minimum number of segments. Then, this work proposes a fast iterative algorithm that identifies non necessarily continuous PWL approximations by solving O(S log N) linear programming (LP) problems, where N is the number of data points and S is the minimum number of segments in the non necessarily continuous case. This work demonstrates that tight bounds for the MILP problem can be derived from these approximations. Next, a fast algorithm is introduced to transform a non necessarily continuous PWL approximation into a continuous one. Finally, the tight bounds and the continuous PWL approximations are used to tighten and warm start the MILP problem. The tightened formulation is shown in experimental results to be more efficient, especially for large data sets, with a solution time that is up to two orders of magnitude less than the existing literature.

97 MATHEMATICS AND COMPUTING↗

140,142 Ce Neutron Cross Section Resolved Resonance Region Evaluation

A resolved resonance region evaluation of 140,142 Ce was conducted by Oak Ridge National Laboratory. Requested by the US Nuclear Criticality Safety Program, this evaluation is based on recent high-resolution transmission and capture high-resolution measurements of nat Ce and 142 Ce conducted at JRC-Geel at the Geel Linear Accelerator facility. It is also based on recently measured thermal constants available from the EX FOR database. Starting from the resonance parameters from the ENDF/B-VIII.0 library and following a preliminary R-matrix analysis, an updated set of resonance parameters and corresponding covariance in formation was derived by the fit of these experimental datasets using the Reich–Moore approximation of the R-matrix theory, as implemented in the SAMMY code system. The resolved resonance region upper energy limit for 140 Ce was kept at 200 keV, whereas the 142 Ce resonance region was extended from 13 to 26 keV. This new evaluation was found to be in good agreement not only with several integral quantities of interest to the reactor physics community, but also with the stellar Maxwellian-averaged cross section.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Searching for gauge theories with the conformal bootstrap

Infrared fixed points of gauge theories provide intriguing targets for the modern conformal bootstrap program. In this work we provide some preliminary evidence that a family of gauged fermionic CFTs saturate bootstrap bounds and can potentially be solved with the conformal bootstrap. We start by considering the bootstrap for SO( N ) vector 4-point functions in general dimension D . In the large N limit, upper bounds on the scaling dimensions of the lowest SO( N ) singlet and traceless symmetric scalars interpolate between two solutions at Δ = D/ 2 – 1 and Δ = D – 1 via generalized free field theory. In 3D the critical O ( N ) vector models are known to saturate the bootstrap bounds and correspond to the kinks approaching Δ = 1 / 2 at large N . We show that the bootstrap bounds also admit another infinite family of kinks \( {\mathcal{T}}_D \) , which at large N approach solutions containing free fermion bilinears at Δ = D – 1 from below. The kinks \( {\mathcal{T}}_D \) appear in general dimensions with a D -dependent critical N * below which the kink disappears. We also study relations between the bounds obtained from the bootstrap with SO( N ) vectors, SU( N ) fundamentals, and SU( N ) × SU( N ) bi-fundamentals. We provide a proof for the coincidence between bootstrap bounds with different global symmetries. We show evidence that the proper symmetries of the underlying theories of \( {\mathcal{T}}_D \) are subgroups of SO( N ), and we speculate that the kinks \( {\mathcal{T}}_D \) relate to the fixed points of gauge theories coupled to fermions.

79 ASTRONOMY AND ASTROPHYSICS↗

A Spitzer search for transits of radial velocity detected super-Earths

Unlike hot Jupiters or other gas giants, super-Earths are expected to have a wide variety of compositions, ranging from terrestrial bodies like our own to more gaseous planets like Neptune. Observations of transiting systems, which allow us to directly measure planet masses and radii and constrain atmospheric properties, are key to understanding the compositional diversity of the planets in this mass range. Although Kepler has discovered hundreds of transiting super-Earth candidates over the past 4 yr, the majority of these planets orbit stars that are too far away and too faint to allow for detailed atmospheric characterization and reliable mass estimates. Ground-based transit surveys focus on much brighter stars, but most lack the sensitivity to detect planets in this size range. One way to get around the difficulty of finding these smaller planets in transit is to start by choosing targets that are already known to host super-Earth sized bodies detected using the radial velocity (RV) technique. Here we present results from a Spitzer program to observe six of the most favorable RV-detected super-Earth systems, including HD 1461, HD 7924, HD 156668, HIP 57274, and GJ 876. We find no evidence for transits in any of their 4.5 μm flux light curves, and place limits on the allowed transit depths and corresponding planet radii that rule out even the most dense and iron-rich compositions for these objects. We also observed HD 97658, but the observation window was based on a possible ground-based transit detection that was later ruled out; thus the window did not include the predicted time for the transit detection recently made by the Microvariability and Oscillations of Stars space telescope.

79 ASTRONOMY AND ASTROPHYSICS↗

Tank 48H Tetraphenylborate Mitigation: Simulant Studies using Sodium Permanganate

Tank 48H currently holds legacy material containing organic tetraphenylborate (TPB) compounds from the operation of the In-Tank Precipitation (ITP) process. TPB was added during the ITP process to precipitate the otherwise soluble cesium as insoluble cesium TPB (CsTPB), but excessive benzene generation from TPB degradation curtailed this treatment method. The contents of Tank 48H, which include approximately 26.000 kg of potassium TPB (KTPB) and trace CsTPB, are not compatible with the waste treatment facilities at the Savannah River Site (SRS) since the organic content and the associated flammability issues pose a challenge to the salt processing and sludge processing facilities within the liquid waste system. An in-tank process to remove (or decompose) TPB safely would be of great value. Previous testing at Savannah River National Laboratory (SRNL) demonstrated the destruction of glycolate via chemical oxidation using sodium permanganate with simulated and radioactive waste. Scoping tests were performed to study the destruction of TPB to determine if the contents of Tank 48H would be amenable to the same type of destruction. Partial destruction of TPB was observed in Tank 48H simulants under mild conditions (e g., pH 11, room temperature) with no definitive indication of benzene generation. To build upon the success of the scoping tests, an additional study was requested to provide a better understanding of the underlying chemistry for Tank 48H content destruction using sodium permanganate. Three experiments were performed with Tank 48H simulants at 40 °C to determine the efficacy of using sodium permanganate for TPB destruction. Three starting pH values were selected: 1) pH 11 for comparison with the previous work at room temperature, 2) pH 10 as the minimum pH recommended by the Corrosion Control Program (CCP) for in-tank processing, and 3) pH 8 to determine the effectiveness of TPB destruction at near neutral pH. While below the allowable pH for the CCP, the experiment at pH 8 was performed to study the TPB-Permanganate reaction under more extreme conditions and further verify the potential for out-of-tank processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Empirical Assessment of the MODIS Land Cover Dynamics and TIMESAT Land Surface Phenology Algorithms

Observations of vegetation phenology at regional-to-global scales provide important information regarding seasonal variation in the fluxes of energy, carbon, and water between the biosphere and the atmosphere. Numerous algorithms have been developed to estimate phenological transition dates using time series of remotely sensed spectral vegetation indices. A key challenge, however, is that different algorithms provide inconsistent results. This study provides a comprehensive comparison of start of season (SOS) and end of season (EOS) phenological transition dates estimated from 500 m MODIS data based on two widely used sources of such data: the TIMESAT program and the MODIS Global Land Cover Dynamics (MLCD) product. Specifically, we evaluate the impact of land cover class, criteria used to identify SOS and EOS, and fitting algorithm (local versus global) on the transition dates estimated from time series of MODIS enhanced vegetation index (EVI). Satellite-derived transition dates from each source are compared against each other and against SOS and EOS dates estimated from PhenoCams distributed across the Northeastern United States and Canada. Our results show that TIMESAT and MLCD SOS transition dates are generally highly correlated (r = 0.51-0.97), except in Central Canada where correlation coefficients are as low as 0.25. Relative to SOS, EOS comparison shows lower agreement and higher magnitude of deviations. SOS and EOS dates are impacted by noise arising from snow and cloud contamination, and there is low agreement among results from TIMESAT, the MLCD product, and PhenoCams in vegetation types with low seasonal EVI amplitude or with irregular EVI time series. In deciduous forests, SOS dates from the MLCD product and TIMESAT agree closely with SOS dates from PhenoCams, with correlations as high as 0.76. Overall, our results suggest that TIMESAT is well-suited for local-to-regional scale studies because of its ability to tune algorithm parameters, which makes it more flexible than the MLCD product. At large spatial scales, where local tuning is not feasible, the MLCD product provides a readily available data set based on a globally consistent approach that provides SOS and EOS dates that are comparable to results from TIMESAT.

47 OTHER INSTRUMENTATION↗

The LSST DESC DC2 Simulated Sky Survey

Here, we describe the simulated sky survey underlying the second data challenge (DC2) carried out in preparation for analysis of the Vera C. Rubin Observatory Legacy Survey of Space and Time (LSST) by the LSST Dark Energy Science Collaboration (LSST DESC). Significant connections across multiple science domains will be a hallmark of LSST; the DC2 program represents a unique modeling effort that stresses this interconnectivity in a way that has not been attempted before. This effort encompasses a full end-to-end approach: starting from a large N-body simulation, through setting up LSST-like observations including realistic cadences, through image simulations, and finally processing with Rubin's LSST Science Pipelines. This last step ensures that we generate data products resembling those to be delivered by the Rubin Observatory as closely as is currently possible. The simulated DC2 sky survey covers six optical bands in a wide-fast-deep area of approximately 300 deg 2 , as well as a deep drilling field of approximately 1 deg 2 . We simulate 5 yr of the planned 10 yr survey. The DC2 sky survey has multiple purposes. First, the LSST DESC working groups can use the data set to develop a range of DESC analysis pipelines to prepare for the advent of actual data. Second, it serves as a realistic test bed for the image processing software under development for LSST by the Rubin Observatory. In particular, simulated data provide a controlled way to investigate certain image-level systematic effects. Finally, the DC2 sky survey enables the exploration of new scientific ideas in both static and time domain cosmology.

79 ASTRONOMY AND ASTROPHYSICS↗

Urban and regional planning proposal no. Y-10-066-001

There are no author-identified significant results in this report. A program has been completed to print out the radiance values for any specified combination of the four MSS bands for a specified sector of an image. A program to map intensities for any band is being written. An investigation of the characteristics of cities in the Brevard County area, as seen by ERTS-1, has been started. Investigation has not been completed, however, results initially obtained are presented. A Digicol viewer was used to determine the relative reflectance of cities (and other developed sectors) in the area. This was done by a combination of two methods: (1) varying the offset control so that the brightest spot appeared first, followed by the second brightest spot; and (2) reading the relative light transmissions at selected positions. A band 5 image was used and the results, in order of maximum reflectance apparent within the sector, are given.

Hannah, J. W.↗

Fuel cell technology program

A fuel cell technology program was established to advance the state-of-the-art of hydrogen-oxygen fuel cells using low temperature, potassium hydroxide electrolyte technology as the base. Program tasks are described consisting of baseline cell design and stack testing, hydrogen pump design and testing, and DM-2 powerplant testing and technology extension efforts. A baseline cell configuration capable of a minimum of 2000 hours of life was defined. A 6-cell prototype stack, incorporating most of the scheme cell features, was tested for a total of 10,497 hours. A 6-cell stack incorporating all of the design features was tested. The DM-2 powerplant with a 34 cell stack, an accessory section packaged in the basic configuration anticipated for the space shuttle powerplant and a powerplant control unit, was defined, assembled, and tested. Cells were used in the stack and a drag-type hydrogen pump was installed in the accessory section. A test program was established, in conjunction with NASA/JSC, based on space shuttle orbiter mission. A 2000-hour minimum endurance test and a 5000-hour goal were set and the test started on August 8, 1972. The 2000-hour milestone was completed on November 3, 1972. On 13 March 1973, at the end of the thirty-first simulated seven-day mission and 5072 load hours, the test was concluded, all goals having been met. At this time, the DM-2 was in excellent condition and capable of additional endurance.

Source record↗

Spacelab - The first mission and beyond

The recent successful flight of Spacelab 1, while being the culmination of over 10 years of international cooperation, is seen as just the start of a new era in manned scientific operations in orbit. This paper highlights the objectives and results of that first mission, as well as describing the international Spacelab program, its concept, and its history. Then looking to the future, the plans for utilizing Spacelab, its versatility and potential to the science community and its continuing evolution are discussed. Plans for substantially improving the cost effectiveness of Spacelab are examined including the use of dedicated discipline laboratories and small payload carriers. Finally, the paper evaluates the importance of incorporating Spacelab technology, concepts, lessons learned, and methodology into the development and utilization of an international Space Station over the next decade.

James, E.↗

Toward full life cycle control: Adding maintenance measurement to the SEL

Organization-wide measurement of software products and processes is needed to establish full life cycle control over software products. The Software Engineering Laboratory (SEL)--a joint venture between NASA GSFC, the University of Maryland, and Computer Sciences Corporation--started measurement of software development more than 15 years ago. Recently, the measurement of maintenance was added to the scope of the SEL. In this article, the maintenance measurement program is presented as an addition to the already existing and well-established SEL development measurement program and evaluated in terms of its immediate benefits and long-term improvement potential. Immediate benefits of this program for the SEL include an increased understanding of the maintenance domain, the differences and commonalities between development and maintenance, and the cause-effect relationships between development and maintenance. Initial results from a sample maintenance study are presented to substantiate these benefits. The long-term potential of this program includes the use of maintenance baselines to better plan and manage future projects and to improve development and maintenance practices for future projects wherever warranted.

Rombach, H. Dieter↗

Report on the special field "Interference" to the wind-tunnel committee in February 1945

Contains an outline of investigations dealing with interference effects on the static stability of various airplane configurations that were conducted, were being conducted, and were started at the time of this report. Results of several investigations are presented and discussed briefly. A supplement is attached showing the configurations tested and outlining the various test programs. Suggestions for future investigations are also included.

AIRFOILS - NACA 0010-0 825-40↗

Computer Simulation of a Digital Global Velocimeter

The objective is to continue the development of a Monte-Carlo simulation of a Doppler Global Velocimetry (DGV) optical system starting with the Mie scattering from the particles in the fluid to the collection optics, through the beamsplitter, Iodine absorption cell and finally to the CCD sensor. The simulation program will read in a configuration file that completely describes the attributes of a DGV system (optical, physical layout, location of detectors, laser properties, CCD sensor noise characteristics...). The simulation program will output a set of images that simulate the data collected from a DGV system. NASA GRC has the DGV software developed at NASA Langley and this simulation program will prove invaluable for determining the accuracy of the DGV technique and provide insight into optimizing the data reduction techniques. The DGV simulation software will also prove valuable in a DDF funded projected entitled Planar Particle Imaging Doppler Velocimetry (PPIDV), which was recently awarded in March 2002.

Cheung, H. Mike↗

The NASA IRTF: Solar System Observations and Mission Support

This report covers the period from 1 July 2002 through 30 June 2003. The NASA Infrared Telescope Facility (IRTF) is a 3.0 m infrared telescope located at an altitude of 4.2 km on the summit of Mauna Kea in Hawaii. It was established by NASA in 1979 primarily to provide infrared observations in support of NASA's programs. The IRTF is managed and operated by the University of Hawaii (UH) Institute for Astronomy (IfA) under a five-year cooperative agreement between NASA and UH that started in February 2001. NASA provides the costs of operation, and NSF provides support for new focal plane instrumentation based on grant applications from IRTF support astronomers. Observing time is open to the entire astronomical community, and 50% of the IRTF observing time is reserved for studies of solar system objects.

Kudritzki, Rolf-Peter↗

Development of the Space Debris Sensor

The Space Debris Sensor (SDS) is a NASA experiment scheduled to fly aboard the International Space Station (ISS) starting in 2017. The SDS is the first flight demonstration of the Debris Resistive/Acoustic Grid Orbital NASA-Navy Sensor (DRAGONS) developed and matured by the NASA Orbital Debris Program Office. The DRAGONS concept combines several technologies to characterize the size, speed, direction, and density of small impacting objects. With a minimum two-year operational lifetime, SDS is anticipated to collect statistically significant information on orbital debris ranging from 50 micron to 500 micron in size. This paper describes the SDS features and how data from the ISS mission may be used to update debris environment models. Results of hypervelocity impact testing during the development of SDS and the potential for improvement on future sensors at higher altitudes will be reviewed.

Hamilton, J.↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A bilevel multistage stochastic self-scheduling model with indivisibilities for trading in the continuous intraday electricity market

In this paper, we study the profit maximization problem of a virtual power plant trading in the continuous intraday electricity market. Our virtual power plant model is compatible with renewable, and thermal assets, covering a range of virtual power plants currently participating in energy markets. We model the trading problem as a bilevel multistage stochastic program. The upper level of the problem accounts for the profit maximization of the virtual power plant with explicit modeling of the technical constraints of the operational status of the thermal power plant including minimum start-up and shut-down times, ramp-up and ramp-down rates, and minimum generation level. The upper level also decides which continuous and indivisible (fill-or-kill) orders are submitted to the market. The lower-level problem accounts for the clearing of the continuous intraday market, i.e., matching of buy and sell orders. Because of the presence of fill-or-kill orders, the lower-level problem is mixed-integer, which prevents its direct conversion to a single-level problem using duality. In order to solve this challenging problem, we develop a convex-hull extended formulation for the lower-level problem, apply duality theory to obtain a single-level stochastic equivalent formulation, and employ McCormick envelopes to turn the problem into a multistage stochastic mixed-integer linear problem, which we solve using the stochastic dual dynamic integer programming algorithm. We conduct numerical experiments and analyze the optimal trading behavior of a virtual power plant trading in an ideal continuous market without arbitrage.

Bilevel multistage stochastic programming problem↗