Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Innovation in Radiological Security, Part 2 of 2 – Insights into Developing a Cloud-hosted Security Technology

A Sentry Remote Monitoring System (Sentry-RMS) is a stand-alone security system that provides detection, assessment, and communication of priority alarms as an additional means of thwarting internal and external threats to sites that maintain radiological material. The SEntry-RMS CommUnications and REsponse (Sentry-SECURE) platform is an optional feature of the Sentry-RMS that relays priority alarm information to the identified response stakeholders. Sentry-SECURE is hosted in a cloud environment that abstracts the data owner’s and data consumer’s platforms to allow for greater information sharing. This promotes situational awareness amongst authorized users and enables future innovation among modern response platforms. When securely architecting a cloud solution such as this, the use of design paradigms can be an effective tool to increase the accuracy and reliability of cyber- and information-security-related decisions made throughout the development process. This approach also supports the categorization of design considerations into three levels: industry concepts, project approaches, and data protections for digital processes. Industry concepts consist of the notional underpinnings that guide or motivate a security process, system, or design but often lack any tangible attributes. Project approaches represent decisions made during the design and development process to prioritize a solution, method, or practice above another that may provide a comparable functional output but lacks a desired security benefit. Data protections for digital processes represent the selection, integration, and implementation of specific controls for a given asset. This paper will explore specific examples of how Sentry-SECURE has been designed to account for considerations at each of these three levels, while balancing the operational intent of the platform with the security enhancements necessary to maintain data integrity, availability, and confidentiality.

assessment, RMS, security, physical, cloud, Cyber ↗

A Nowcasting Approach for Low-Earth-Orbiting Hyperspectral Infrared Soundings within the Convective Environment

Low-Earth-orbiting (LEO) hyperspectral infrared (IR) sounders have significant yet untapped potential for characterizing thermodynamic environments of convective initiation and ongoing convection. While LEO soundings are of value to weather forecasters, the temporal resolution needed to resolve the rapidly evolving thermodynamics of the convective environment is limited. Here, we have developed a novel nowcasting methodology to extend snapshots of LEO soundings forward in time up to 6 h to create a product available within National Weather Service systems for user assessment. Our methodology is based on parcel forward-trajectory calculations from the satellite-observing time to generate future soundings of temperature (T) and specific humidity (q) at regularly gridded intervals in space and time. The soundings are based on NOAA-Unique Combined Atmospheric Processing System (NUCAPS) retrievals from the Suomi National Polar-Orbiting Partnership (Suomi NPP) and NOAA-20 satellite platforms. The tendencies of derived convective available potential energy (CAPE) and convective inhibition (CIN) are evaluated against gridded, hourly accumulated rainfall obtained from the Multi-Radar Multi-Sensor (MRMS) observations for 24 hand-selected cases over the contiguous United States. Areas with forecast increases in CAPE (reduced CIN) are shown to be associated with areas of precipitation. The increases in CAPE and decreases in CIN are largest for areas that have the heaviest precipitation and are statistically significant compared to areas without precipitation. These results imply that adiabatic parcel advection of LEO satellite sounding snapshots forward in time are capable of identifying convective initiation over an expanded temporal scale compared to soundings used only during the LEO satellite overpass time.

54 ENVIRONMENTAL SCIENCES↗

Transmitter experiment package for the communications technology satellite

The operating requirements, system design characteristics, high voltage packaging considerations, nonstandard components development, and test results for the transmitter experiment package (TEP) are described. The TEP is used for broadcasting power transmission from the Communications Technology Satellite. The TEP consists of a 12 GHz, 200-watt output stage tube (OST), a high voltage processing system that converts the unregulated spacecraft solar array power to the regulated voltages required for OST operation, and a variable conductance heat pipe system that is used to cool the OST body.

Farber, B.↗

Infrared Thermography For Welding

Infrared imaging and image-data-processing system shows temperatures of joint during welding and provides data from which rates of heating and cooling determined. Information used to control welding parameters to ensure reliable joints, in materials which microstructures and associated metallurgical and mechanical properties depend strongly on rates of heating and cooling. Applicable to variety of processes, including tungsten/inert-gas welding; plasma, laser, and resistance welding; cutting; and brazing.

Gilbert, Jeffrey L.↗

Landsat-8 TIRS Thermal Radiometric Calibration Status

The Landsat-8 Thermal Infrared Sensor (TIRS) has been acquiring two-band thermal infrared images of the Earth’s surface since 2013. The calibration of the two-band system has been monitored using the on-board calibrator and validated with vicarious calibration performed by NASA/JPL and RIT since launch. Soon after launch, it was discovered that the instrument had a significant stray light effect that was affecting the radiometric calibration. The stray light was corrected in the processing system in 2017. Since then, it has become apparent that there was an additional radiometric error, based on the vicarious calibration results. With a failure within the primary electronic system and subsequent switch to the redundant electronic system, the TIRS instrument effectively has two separate calibration regimes. The vicarious calibration found a statistically significant calibration error, primarily a constant over time, in Band 11 on the primary electronics (Feb 11,2013 through March 5,2015) of about -0.6K at 300K. The calibration error in Band 10 was smaller though still statistically significant at about 0.2K at 300K. On the redundant side(March 5,2015 to present), the calibration error is more signal dependent than time dependent. Both bands are affected, with Band 10 having an error between 1K and -0.4K (between 273-320K) and Band 11 having an error between 0.8K and -1.44K (between 273-320K).This calibration error will be corrected within the USGS Landsat Product Generation System with the release of Landsat Collection-2 products. The Collection-2 release also includes a correction to the relative radiometric calibration of TIRS data. Striping as a result of poor detector-to-detector normalization has been increasing in the imagery since launch. The TIRS relative radiometric calibration will be updated based on internal calibrator data to remove the stripes on a quarterly basis. The visible stripes are generally at 0.1-0.2% level, though there are some detectors in each band that have changed by 1% or more. The Collection-2 release will result in much more uniform TIRS images.

Julia A Barsi↗

Strategies for converting to a DBMS environment

The conversion to data base management systems processing techniques consists of three different strategies - one for each of the major stages in the development process. Each strategy was chosen for its approach in bringing about a smooth evolutionary type transition from one mode of operation to the next. The initial strategy of the indoctrination stage consisted of: (1) providing maximum access to current administrative data as soon as possible; (2) select and developing small prototype systems; (3) establishing a user information center as a central focal point for user training and assistance; and (4) developing a training program for programmers, management and ad hoc users in DBMS application and utilization. Security, the rate of the data dictionary, and data base tuning and capacity planning, and the development of a change of attitude in an automated office are issues meriting consideration.

Durban, D. M.↗

The Design and Evaluation of the Lighting Imaging Sensor Data Applications Display (LISDAD)

The design and evaluation of the Lightning Imaging Sensor Data Applications Display (LISDAD). The ultimate goal of the LISDAD system is to quantify the utility of total lightning information in short-term, severe-weather forecasting operations. To this end, scientists from NASA, NWS, and MIT organized an effort to study the relationship of lightning and severe-weather on a storm-by-storm, and even cell-by-cell basis for as many storms as possible near Melbourne, Florida. Melbourne was chosen as it offers a unique combination of high probability of severe weather and proximity to major relevant sensors - specifically: NASA's total lightning mapping system at Kennedy Space Center (the LDAR system at KSC); a NWS/NEXRAD radar (at Melbourne); and a prototype Integrated Terminal Weather System (ITWS, at Orlando), which obtains cloud-to-ground lightning Information from the National Lightning Detection Network (NLDN), and also uses NSSL's Severe Storm Algorithm (NSSL/SSAP) to obtain information about various storm-cell parameters. To assist in realizing this project's goal, an interactive, real-time data processing system (the LISDAD system) has been developed that supports both operational short-term weather forecasting and post facto severe-storm research. Suggestions have been drawn from the operational users (NWS/Melbourne) in the design of the data display and its salient behavior. The initial concept for the users Graphical Situation Display (GSD) was simply to overlay radar data with lightning data, but as the association between rapid upward trends in the total lightning rate and severe weather became evident, the display was significantly redesigned. The focus changed to support the display of time series of storm-parameter data and the automatic recognition of cells that display rapid changes in the total-lightning flash rate. The latter is calculated by grouping discrete LDAR radiation sources into lightning flashes using a time-space association algorithm. Specifically, the GSD presents the user with the Composite Maximum Reflectivity obtained from the NWS/NEXRAD. Superimposed upon this background image are placed small black circles indicating the locations of storm cells identified by the NSSL/SSA. The circles become cyan if lightning is detected within the storm-cell; if the cell has lightning rates indicative of a severe-storm, the circle turns red. This paper will: (1) review the design of LISDAD system; (2) present some examples of its data display; and shown results of the lightning based severe-weather prediction algorithm.

Boldi, B.↗

Readiness Process and Transition to Operation for a Remote-Handled Transuranic Packaging Facility at Hanford - 19298

CH2M Hill Plateau Remediation Company manages the Sludge Retrieval Project, which has the mission to develop and deploy technologies to safely retrieve and package remote-handled transuranic sludge that is currently stored in the 105K West Reactor Fuel Storage Basin located in the 100-K Area of the U.S. Department of Energy's Hanford Site near Richland, Washington. In 2017, CH2M Hill Plateau Remediation Company installed and commissioned a process for removal of the sludge. A contractor Operational Readiness Review was completed in March 2018, and a U.S. Department of Energy, Richland Operations Office Operational Readiness Review was completed in May. The first sludge transfer was successfully completed on June 12, 2018, proving that the Engineered Container Retrieval and Transfer System process equipment worked as intended. This paper will describe the issues and successes along the path of readiness and startup, as well as the challenges that remain and CH2M Hill Plateau Remediation Company's plan to overcome them. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Influence of process parameter variation on the reflectivity of sputter-deposited W-C multilayer diffraction gratings

Multilayer W-C diffraction gratings with nominal d spacings of 35 A have been fabricated by magnetron sputter deposition. The peak and integrated reflectivities of these films have been measured with Al K-alpha X-rays and compared to theoretical values. The rms surface roughness has been evaluated. The influence of several sputtering-system process parameters on the reflectivities has been investigated.

Sager, B.↗

Landsat Data Continuity Mission Calibration and Validation

The primary payload for the Landsat Data Continuity Mission (LDCM) is the Operational Land Imager (OLI), being built by Ball Aerospace and Technologies, under contract to NASA. The OLI has spectral bands similar to the Landsat-7 ETM+, minus the thermal band and with two new bands, a 443 nm band and 1375 nm cirrus detection band. On-board calibration systems include two solar diffusers (routine and pristine), a shutter and three sets of internal lamps (routine, backup and pristine). Being a pushbroom opposed to a whiskbroom design of ETM+, the system poses new challenges for characterization and calibration, chief among them being the large focal plane with 75000+ detectors. A comprehensive characterization and calibration plan is in place for the instrument and the data throughout the mission including Ball, NASA and the United States Geological Survey, which will take over operations of LDCM after on-orbit commissioning. Driving radiometric calibration requirements for OLI data include radiance calibration to 5% uncertainty (1 q); reflectance calibration to 3% uncertainty (1 q) and relative (detector-to-detector) calibration to 0.5% (J (r). Driving geometric calibration requirements for OLI include bandto- band registration of 4.5 meters (90% confidence), absolute geodetic accuracy of 65 meters (90% CE) and relative geodetic accuracy of 25 meters (90% CE). Key spectral, spatial and radiometric characterization of the OLI will occur in thermal vacuum at Ball Aerospace. During commissioning the OLI will be characterized and calibrated using celestial (sun, moon, stars) sources and terrestrial sources. The USGS EROS ground processing system will incorporate an image assessment system similar to Landsat-7 for characterization and calibration. This system will have the added benefit that characterization data will be extracted as part of the normal image data processing, so that the characterization data available will be significantly larger than for Landsat-7 ETM+.

Markham, Brian L.↗

Formulation of consumables management models. Guidelines for the development of consumables subsystem redlines for advanced spacecraft

Techniques developed for determining the safe operating range or condition of past space programs are inadequate to support requirements of highly repetitive and routine earth orbit operations of advanced spacecraft systems. General concepts are presented for establishing maximum and minimum limits (redlines) for the consumables subsystems of the space shuttle orbiter. Implementation of a redline status subprocessor is recommended as a substitute for methods employed in past programs. The algorithms developed are amenable for use in the Mission Control Center, the launch processing system, and the space shuttle onboard computer.

Zamora, M. A.↗

Satellite temperature monitoring and prediction system

The paper describes the Florida Satellite Freeze Forecast System (SFFS) in its current state. All data collection options have been demonstrated, and data collected over a three year period have been stored for future analysis. Presently, specific minimum temperature forecasts are issued routinely from November through March. The procedures for issuing these forecast are discussed. The automated data acquisition and processing system is described, and the physical and statistical models employed are examined.

Barnett, U. R.↗

NASA Procurement Career Development Program

The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

Source record↗

Scientific Software

The Interactive Data Language (IDL), developed by Research Systems, Inc., is a tool for scientists to investigate their data without having to write a custom program for each study. IDL is based on the Mariners Mars spectral Editor (MMED) developed for studies from NASA's Mars spacecraft flights. The company has also developed Environment for Visualizing Images (ENVI), an image processing system for easily analyzing remotely sensed data written in IDL. The Visible Human CD, another Research Systems product, is the first complete digital reference of photographic images for exploring human anatomy.

Source record↗

Regulation of sympathetic nervous system function after cardiovascular deconditioning

Humans subjected to prolonged periods of bed rest or microgravity undergo deconditioning of the cardiovascular system, characterized by resting tachycardia, reduced exercise capability, and a predisposition for orthostatic intolerance. These changes in cardiovascular function are likely due to a combination of factors, including changes in control of body fluid balance or cardiac alterations resulting in inadequate maintenance of stroke volume, altered arterial or venous vascular function, reduced activation of cardiovascular hormones, and diminished autonomic reflex function. There is evidence indicating a role for each of these mechanisms. Diminished reflex activation of the sympathetic nervous system and subsequent vasoconstriction appear to play an important role. Studies utilizing the hindlimb-unloaded (HU) rat, an animal model of deconditioning, evaluated the potential role of altered arterial baroreflex control of the sympathetic nervous system. These studies indicate that HU results in blunted baroreflex-mediated activation of both renal and lumbar sympathetic nerve activity in response to a hypotensive stimulus. HU rats are less able to maintain arterial pressure during hemorrhage, suggesting that diminished ability to increase sympathetic activity has functional consequences for the animal. Reflex control of vasopressin secretion appears to be enhanced following HU. Blunted baroreflex-mediated sympathoexcitation appears to involve altered central nervous system function. Baroreceptor afferent activity in response to changes in arterial pressure is unaltered in HU rats. However, increases in efferent sympathetic nerve activity for a given decrease in afferent input are blunted after HU. This altered central nervous system processing of baroreceptor inputs appears to involve an effect at the rostral ventrolateral medulla (RVLM). Specifically, it appears that tonic GABAA-mediated inhibition of the RVLM is enhanced after HU. Augmented inhibition apparently arises from sources other than the caudal ventrolateral medulla. If similar alterations in control of the sympathetic nervous system occur in humans in response to cardiovascular deconditioning, it is likely that they play an important role in the observed tendency for orthostatic intolerance. Combined with potential changes in vascular function, cardiac function, and hypovolemia, the predisposition for orthostatic intolerance following cardiovascular deconditioning would be markedly enhanced by blunted ability to reflexly activate the sympathetic nervous system.

Review, Tutorial↗

RESOLVE's Field Demonstration on Mauna Kea, Hawaii 2010

In cooperation with the Canadian Space Agency, and the Northern Centre for Advanced Technology, Inc., NASA has undertaken the In-Situ Resource Utilization (ISRU) project called RESOLVE (Regolith and Environment Science & Oxygen and Lunar Volatile Extraction). This project is an Earth-based lunar precursor demonstration of a system that could be sent to explore permanently shadowed polar lunar craters, where it would drill into regolith, quantify the volatiles that are present, and extract oxygen by hydrogen reduction of iron oxides. The resulting water could be electrolyzed into oxygen to support exploration and hydrogen, which would be recycled through the process. The RESOLVE chemical processing system was mounted on a Canadian Space Agency mobility chasis and successfully demonstrated on Hawaii's Mauna Kea volcano in February 2010. The RESOLVE unit is the initial prototype of a robotic prospecting mission to the Moon. RESOLVE is designed to go to the poles of the Moon to "ground truth" the form and concentration of the hydrogen/water/hydroxyl that has been seen from orbit (M3, Lunar Prospector and LRO) and to test technologies to extract oxygen from the lunar regolith. RESOLVE has the ability to capture a one-meter core sample of lunar regolith and heat it to determine the volatiles that may be released and then demonstrate the production of oxygen from minerals found in the regolith. The RESOLVE project, which is led by KSC, is a multi-center and multi-organizational effort that includes representatives from KSC, JSC, GRC, the Canadian Space Agency, and the Northern Center for Advanced Technology (NORCAT). This paper details the results obtained from four days of lunar analog testing that included gas chromatograph analysis for volatile components, remote control of chemistry and drilling operations via satalite communications, and real-time water quantification using a novel capacitance measurement technique.

Captain, Janine↗

High-Speed On-Board Data Processing for Science Instruments

A new development of on-board data processing platform has been in progress at NASA Langley Research Center since April, 2012, and the overall review of such work is presented in this paper. The project is called High-Speed On-Board Data Processing for Science Instruments (HOPS) and focuses on a high-speed scalable data processing platform for three particular National Research Council's Decadal Survey missions such as Active Sensing of CO2 Emissions over Nights, Days, and Seasons (ASCENDS), Aerosol-Cloud-Ecosystems (ACE), and Doppler Aerosol Wind Lidar (DAWN) 3-D Winds. HOPS utilizes advanced general purpose computing with Field Programmable Gate Array (FPGA) based algorithm implementation techniques. The significance of HOPS is to enable high speed on-board data processing for current and future science missions with its reconfigurable and scalable data processing platform. A single HOPS processing board is expected to provide approximately 66 times faster data processing speed for ASCENDS, more than 70% reduction in both power and weight, and about two orders of cost reduction compared to the state-of-the-art (SOA) on-board data processing system. Such benchmark predictions are based on the data when HOPS was originally proposed in August, 2011. The details of these improvement measures are also presented. The two facets of HOPS development are identifying the most computationally intensive algorithm segments of each mission and implementing them in a FPGA-based data processing board. A general introduction of such facets is also the purpose of this paper.

Beyon, Jeffrey Y.↗

The Development of the Ares I-X Flight Test

The National Aeronautics and Space Administration (NASA) Constellation Program (CxP) has identified a series of tests to provide insight into the design and development of the Ares I Crew Launch Vehicle (CLV) and the Orion Crew Exploration Vehicle (CEV). Ares I-X was created as the first suborbital development flight test to help meet CxP objectives. The Ares I-X flight vehicle is an early operational model of Ares, with specific emphasis on Ares I and ground operation characteristics necessary to meet Ares I-X flight test objectives. Ares I-X will encompass the design and construction of an entire system that includes the Flight Test Vehicle (FTV) and associated operations. The FTV will be a test model based on the Ares I design. Select design features will be incorporated in the FTV design to emulate the operation of the CLV in order to meet the flight test objectives. The operations infrastructure and processes will be customized for Ares I-X, while still providing data to inform the developers of the launch processing system for Ares/Orion. The FTV is comprised of multiple elements and components that will be developed at different locations. The components will be delivered to the launch/assembly site, Kennedy Space Center (KSC), for assembly of the elements and components into an integrated, flight-ready, launch vehicle. The FTV will fly a prescribed trajectory in order to obtain the necessary data to meet the objectives. Ares I-X will not be commanded or controlled from the ground during flight, but the FTV will be equipped with telemetry systems, a data recording capability and a flight termination system (FTS). The in-flight part of the test includes a trajectory to simulate maximum dynamic pressure during flight and perform a stage separation representative of the CLV. The in-flight test also includes separation of the Upper Stage Simulator (USS) from the First Stage and recovery of the First Stage. The data retrieved from the flight test will be analyzed and used in the design and development of the Ares I vehicle. This paper will discuss the challenges in developing a new launch vehicle in a very short timeframe. The duration from formal Authority to Proceed to launch is 32 months with launch scheduled for April, 2009. The discussion will include changes to organizational structure, system engineering approaches, and early lessons learned for a fast tracked and highly visible project.

Ess, Robert H.↗