Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch control systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

Shuttle-C auxiliary propulsion system certification approach and low-cost evolution concepts

Shuttle-C provides NASA with a heavy-lift cargo capability that is a low-cost derivative of the current Space Shuttle. This system can deliver 80,000 to 140,000 pounds of payload to low earth orbit within 4 years of authority to proceed. Shuttle-C will share th existing Shuttle launch facilities at Kennedy Space Center (KSC). The Shuttle-C vehicle incorporates an auxiliary propulsion system (APS) which provides separation from the external tank (ET), orbit circularization, on-orbit attitude hold, and deorbit capability. The APS is derived from the Shuttle orbiter aft reaction control system (ARCS) and orbital maneuvering system (OMS) with the objective of achieving minimum life cycle cost for this expendable vehicle. The resulting APS system will be described, its plan for a minimum-cost flight certification utilizing a cold-flow test program explained, and low-cost evolution by component design modification and part substitution presented.

Harsh, M. George↗

KATE: From the lab to the firing room

For the past 9 years, the AI group at NASA's Kennedy Space Center (KSC) has been developing a real-time model-based reasoning (MBR) system that can diagnose faults and provide control advisories. The system resulting from this effort is called KATE (Knowledge-based Autonomous Test Engineer). This article describes the transition of KATE from the applied research lab to the firing room (the firing room is the main control and monitoring center for all Shuttle ground support and launch processing). Because the problems that were countered along the way are not unique, we decided to share some of our experiences. This article also includes a brief overview of the latest application of KATE.

Pepe, Charles↗

ACTS Multibeam Antenna On-Orbit Performance

The Advanced Communications Technology Satellite (ACTS) launched in September 1993 introduces several new technologies including a multibeam antenna (MBA) operating at Ka-band. The MBA with fixed and rapidly reconfigurable spot beams serves users equipped with small aperture terminals within the coverage area. The antenna produces spot beams with approximately 0.3 degrees beamwidth and gains of approximately 50 dBi. A number of MBA performance evaluations have been performed since the ACTS launch. These evaluations were designed to assess MBA performance (e.g., beam pointing stability, beam shape, gain, etc.) in the space environment. The on-orbit measurements found systematic environmental perturbation to the MBA beam pointing. These perturbations were found to be imposed by satellite attitude control system, antenna and spacecraft mechanical alignments, on-orbit thermal effects, etc. As a result, the footprint coverage of the MBA may not exactly cover the intended service area at all times. This report describes the space environment effects on the ACTS MBA performance as a function of time of the day and time of the year and compensation approaches for these effects.

Acosta, R.↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

The Lunar Prospector Mission: Final Results of Trajectory Design, Quasi-Frozen Orbits, Extended Mission Targeting, and Lunar Topography and Potential Models

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission was NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control will focus on the use of innovative and proven trajectory analysis programs. As part of this effort, the Goddard Space Flight Center and the Ames Research Center became partners in the Lunar Prospector trajectory team to provide the trajectory analysis and orbit determination support. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100-km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered its extended mission phase. The mission orbit was lowered from 100 km to a mean altitude of 40 km. Due to lunar potential effects, the altitude of Lunar Prospector varied from 25 to 55 km above the mean lunar geoid. After one month at 40 km, the lunar potential model was updated based upon the new tracking data at 40 km. On January 15, 1999, the altitude was lowered again to a mean altitude of 30 km. The spherical altitude varied between 15 km and 45 km above the mean lunar geoid while the topographical altitude varied between 10 km and 50 km. Various means were employed to get accurate lunar surface elevation including Clementine altimetry and LOS analysis. Based upon the best available terrain maps, Lunar Prospector reached actual altitudes of 8 km above lunar mountains in the southern polar region. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. At the end of the operations mission, LP was targeted for impact at a chosen location that allowed optical observation of the lunar ejecta as LP ended its mission at 1.6 km/sec. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector nominal and extended mission including maneuver design, eccentricity vs. argument of perigee evolution, topographical altitude estimation, and lunar potential modeling. This paper provides understanding of the quasi-frozen orbit design of the LP mission, the optimization process of lunar orbit targets, the impacts that the selected lunar potential models play, and discusses the feasibility of meeting the mission goals. Observed evolution of the Keplerian orbit elements are compared to the theoretical predictions using the latest lunar potential model available which incorporates the Lunar Prospector Doppler data. Mapping orbit maintenance maneuver design along with results of the actual maneuvers to maintain the orbital requirements are also presented.

Folta, David↗

X-43C Plans and Status

X-43C Project is a hypersonic flight demonstration being executed as a collaboration between the National Aeronautics and Space Administration (NASA) and the United States Air Force (USAF). X-43C will expand the hypersonic flight envelope for air breathing engines beyond the history making efforts of the Hyper-X Program (X-43A). X-43C will demonstrate sustained accelerating flight during three flight tests of expendable X-43C Demonstrator Vehicles (DVs). The approximately 16-foot long X-43C DV will be boosted to the starting test conditions, separate from the booster, and accelerate from Mach 5 to Mach 7 under its own power and autonomous control. The DVs are to be powered by a liquid hydrocarbon-fueled, fuel-cooled, dual-mode, airframe integrated scramjet engine system developed under the USAF HyTech Program. The Project is managed by NASA Langley Research Center as part of NASA s Next Generation Launch Technology Program. Flight tests will be conducted by NASA Dryden Flight Research Center over water off the coast of California in the Pacific Test Range. The NASA/USAF/industry project is a natural extension of the Hyper-X Program (X-43A), which will demonstrate short duration (~ 10 seconds) gaseous hydrogen-fueled scramjet powered flight at Mach 7 and Mach 10 using a heavyweight, largely heat sink construction, experimental engine. The X-43C Project will demonstrate sustained accelerating flight from Mach 5 to Mach 7 (~ 4 minutes) using a flight-weight, fuel-cooled, scramjet engine powered by much denser liquid hydrocarbon fuel. The X-43C DV design flows from integrating USAF HyTech developed engine technologies with a NASA Air Breathing Launch Vehicle accelerator-class configuration and Hyper-X heritage vehicle systems designs. This paper describes the X-43C Project and provides background for NASA s current hypersonic flight demonstration efforts.

Moses, Paul L.↗

CEV Seat Attenuation System System Design Tasks

The Apollo crew / couch restraint system was designed to support and restrain three crew members during all phases of the mission from launch to landing. The crew couch used supported the crew for launch, landing and in-flight operations, and was foldable and removable for EVA ingress/egress through side hatch access and for in-flight access under the seat and in other areas of the crew compartment. The couch and the seat attenuation system was designed to control the impact loads imposed on the crew during landing and to remain non-functional during all other flight phases.

Goodman, Jerry R.↗

Onboard Short Term Plan Viewer

Onboard Short Term Plan Viewer (OSTPV) is a computer program for electronic display of mission plans and timelines, both aboard the International Space Station (ISS) and in ISS ground control stations located in several countries. OSTPV was specifically designed both (1) for use within the limited ISS computing environment and (2) to be compatible with computers used in ground control stations. OSTPV supplants a prior system in which, aboard the ISS, timelines were printed on paper and incorporated into files that also contained other paper documents. Hence, the introduction of OSTPV has both reduced the consumption of resources and saved time in updating plans and timelines. OSTPV accepts, as input, the mission timeline output of a legacy, print-oriented, UNIX-based program called "Consolidated Planning System" and converts the timeline information for display in an interactive, dynamic, Windows Web-based graphical user interface that is used by both the ISS crew and ground control teams in real time. OSTPV enables the ISS crew to electronically indicate execution of timeline steps, launch electronic procedures, and efficiently report to ground control teams on the statuses of ISS activities, all by use of laptop computers aboard the ISS.

Hall, Tim↗

STRS Radio Service Software for NASA's SCaN Testbed

NASAs Space Communication and Navigation(SCaN) Testbed was launched to the International Space Station in 2012. The objective is to promote new software defined radio technologies and associated software application reuse, enabled by this first flight of NASAs Space Telecommunications Radio System(STRS) architecture standard. Pre-launch testing with the testbeds software defined radios was performed as part of system integration. Radio services for the JPL SDR were developed during system integration to allow the waveform application to operate properly in the space environment, especially considering thermal effects. These services include receiver gain control, frequency offset, IQ modulator balance, and transmit level control. Development, integration, and environmental testing of the radio services will be described. The added software allows the waveform application to operate properly in the space environment, and can be reused by future experimenters testing different waveform applications. Integrating such services with the platform provided STRS operating environment will attract more users, and these services are candidates for interface standardization via STRS.

Mortensen, Dale J.↗

IRVE-3 Post-Flight Reconstruction

The Inflatable Re-entry Vehicle Experiment 3 (IRVE-3) was conducted from the NASA Wallops Flight Facility on July 23, 2012. Launched on a Black Brant XI sounding rocket, the IRVE-3 research vehicle achieved an apogee of 469 km, deployed and inflated a Hypersonic Inflatable Aerodynamic Decelerator (HIAD), re-entered the Earth's atmosphere at Mach 10 and achieved a peak deceleration of 20 g's before descending to splashdown roughly 20 minutes after launch. This paper presents the filtering methodology and results associated with the development of the Best Estimated Trajectory of the IRVE-3 flight test. The reconstructed trajectory is compared against project requirements and pre-flight predictions of entry state, aerodynamics, HIAD flexibility, and attitude control system performance.

Olds, Aaron D.↗

An Integrated Platform for Mission Performance: Goddard Space Flight Center's Meta Information System

Successful management of NASA Goddard Space Flight Centers portfolio of mission projects (i.e. spacecraft, spacecraft instruments / subsystems, and ground systems) depends upon numerous processes, data and information resources coming together throughout the life-cycle of the projects to enable sound decision-making, risk reduction, conformance with requirements and continual improvement. In the summer of 2012, GSFC SMA management recognized that the set of legacy data systems used to support the SMA mission and responsibilities at GSFC were not effective, integrated nor on par with best practices. Accordingly, GSFC SMA management launched a project to transform the GSFC electronic management system to create and deploy an integrated, state-of-the-market information system for process performance, data management and analytics that is currently operating in support of GSFC overall mission performance. The information system, known as Meta, provides controlled, process-based applications, integrated data management, and analytics for a robust set of integrated applications. Since the inception of the project, a lean, award-winning SMA project team has thus far designed, configured and managed the system to serve as an integrated platform for 18 applications that support key processes for GSFC and the Science Mission Directorate at NASA headquarters, such as internal Management System assessments, Supplier Assessments, Supplier Research & Analysis, Problem Reporting for in-house mission projects, On-orbit Anomaly Reporting for GSFC-operated spacecraft, GSFC Project Life-Cycle Reviews, Risk Management and Reporting, and SMA Project Team Reporting. The system has experienced steady growth in utilization with 1,917 users (NASA employees and support contractor personnel) and 44 gigabytes of data and related files managed by the system as of the end of April 2018. Overall, Meta has achieved increasing levels of process management and real-time data / information integration to enable improved process performance, richer analytics and informed decision-making. This paper will present and examine the need, goals, approach and design driving the management and operation of the Meta information system and its ongoing growth as an integrated platform for advancing NASA mission performance.

Integration↗

Energy Efficient Large-Scale Storage of Liquid Hydrogen

World’s largest LH2storage tanks constructed in mid-1960s at NASA/KSC. These vacuum-perlite insulated tanks, still in service today, are 3,200 m3capacity (ea.). In 2018, construction began on an additional 4,700 m3LH2storage tank at LC-39B•NASA’s new Space Launch System (SLS) heavy lift rocket for Artemis program holds 2,033 m3of LH2in its 8.4-m diameter by 40-m height. Two new energy-efficient technologies are included: glass bubbles insulation system and an Integrated Refrigeration and Storage (IRAS) heat exchanger for passive + active thermal control:•Evacuated glass bubbles insulation system has been shown to reduce LH2boiloff by 46% versus perlite in field demonstrations. Controlled storage via IRAS, when fully implemented, will provide full control of ullage pressure, zero boiloff, and even production of densified LH22CEC-2021

cryogenics↗

Space Launch System Core Stage Green Run Base Heating: Anomaly, Mitigation and Flight Redesign

The NASA Space Launch System (SLS) vehicle is composed of four RS-25 liquid oxygen and hydrogen rocket engines in the Core Stage (CS). The SLS Core Stage went through Green Run hot-fire testing at NASA Stennis Space Center’s B-2 test facility in 2021. The main goal of this testing was to confirm Core Stage tanking, propulsion and thrust vector control systems operations and performance to verify with predicted models. Two hot-fire (HF) test sequences were performed with the first one (HF1) in January for a test duration of 70 seconds and the second (HF2) testing completed in March for a test duration of 500 seconds. This paper focuses on the base heating anomalies observed during HF1 and HF2 where an extensive fire was observed along the Core Stage base heat shield during test operations. This environment was not anticipated and led to extensive unplanned damage to the thermal protection system which was augmented for flight. Green Run observations also led to a reassessment of flight environments for Artemis I. This paper discusses the potential cause of the anomalies, the flow physics, the reconstructed base environments, and mitigation plans for HF2 and flight.

aerothermodynamics↗

Solar System Exploration Augmented by In-Situ Resource Utilization: Human Planetary Base Issues for Mercury and Saturn

Establishing a lunar presence and creating an industrial capability on the Moon may lead to important new discoveries for all of human kind. Historical studies of lunar exploration, in-situ resource utilization (ISRU) and industrialization all point to the vast resources on the Moon and its links to future human and robotic exploration. In references 1 through 9, a broad range of technological innovations are described and analyzed. Figures 1 depicts program planning for future human missions throughout the solar system which included lunar launched nuclear rockets, and future human settlements on the Moon. Figures 2 and 3 present the results for human Mercury missions, including LEO departure masses and round trip Mercury lander masses. Using in-situ resources, the missions become less burdensome to the LEO launch infrastructure. In one example using Mercury derived hydrogen, the LEO mass of the human Mercury missions can be reduced from 2,800 MT to 1,140 MT (Ref. 15). Additional analyses of staging options for human Mercury missions will be presented. Figures 4 shows an option for thermal control for long term in-space cryogenic storage and Figure 5 depicts the potentially deleterious elements emanating from Mercury that must be addressed, respectively. Updated analyses based on the visions presented will be presented. While advanced propulsion systems were proposed in these historical studies, further investigation of nuclear options using high power nuclear thermal and nuclear electric propulsion as well as advanced chemical propulsion can significantly enhance these scenarios. Human bases at Mercury may have to be resupplied from resources from regolith and water resources in permanently shadowed craters at its northern pole.

Mercury↗

Cryogenic On-Orbit Liquid Depot Storage, Acquisition, and Transfer Satellite (COLD-SAT)

The Cryogenic On-Orbit Liquid Depot Storage, Acquisition, and Transfer Satellite (COLD-SAT) will perform subcritical liquid hydrogen handling experiments under low gravity conditions to provide engineering data for future space transportation missions. Comprising the four Class 1 enabling experiments are tank press control, tank chilldown, tank no-vent fill, and liquid acquisition device fill/refill. The nine Class 2 enhancing experiments are tanker thermal performance, pressurization, low-gravity setting and outflow, liquid acquisition device performance, transfer line chilldown, outflow subcooling, low-gravity vented fill, fluid dumping, and advanced instrumentation. Consisting of an experiment module mated to a spacecraft bus, COLD-SAT will be placed in an initial 1300 km circular orbit by an Atlas commercial launch vehicle, and will perform experiments in a semi-autonomous mode for a period of up to six months. The three-axis controlled spacecraft bus provides electric power, control and data management, communications, and attitude control along with propulsive acceleration levels ranging from 10(exp -6) to 10(exp -4) g. It is desired to understand the effects that low acceleration levels might have on the heat and mass transfer processes involved in some of the experiments. The experiment module contains the three liquid hydrogen tanks, valves, pressurization and pumping equipment, and instrumentation. Within the highly insulated tanks are specialized fluid management equipment that might be used in future space transportation systems. At launch all the liquid hydrogen for the experiments is contained in the largest tank, which has helium-purged insulation to prevent cryo-pumping of air on the launch pad. The tank is loaded by the hydrogen tanking system used for the Centaur upper stage of the Atlas. After reaching orbit the two smaller tanks become receivers for fluid transfers, and when tanked, become the vessels for performing many of the experiments.

Schuster, John R.↗

Method for Producing Launch/Landing Pads and Structures Project

Current plans for deep space exploration include building landing-launch pads capable of withstanding the rocket blast of much larger spacecraft that that of the Apollo days. The proposed concept will develop lightweight launch and landing pad materials from in-situ materials, utilizing regolith to produce controllable porous cast metallic foam brickstiles shapes. These shapes can be utilized to lay a landing launch platform, as a construction material or as more complex parts of mechanical assemblies.

Technology Portfolio System↗

Mechanical design and stress analysis challenges overcome to ensure the structural integrity of Europa Clipper's mechanical pumped fluid loop Heat Redistribution System (HRS)

Launching in 2023, NASA’s Europa Clipper mission will place a spacecraft into a long, looping orbit around Jupiter to perform a series of close flyby investigations of its moon Europa. Strong evidence suggests that Europa hosts an ocean of liquid water beneath its icy crust that could harbor conditions favorable for life. The spacecraft is currently under development by the Jet Propulsion Laboratory (JPL) and the Applied Physics Laboratory (APL) and nearing completion of its Detailed Design Phase. A Mechanical Pumped Fluid Loop (MPFL) architecture known as the Heat Redistribution System (HRS) has been baselined to provide power efficient thermal control of the sensitive components within the Avionics, Radio Frequency (RF), and Propulsion Modules. Principally, the HRS harvests waste heat from the onboard dissipating equipment and distributes it to a 1.4 m diameter by 3 m tall cylindrical structure that cocoons and keeps the propulsion subsystem warm. Numerous technical issues had to be resolved in order to securely attach nearly 100 m of HRS tubing to the spacecraft, which is predicted to experience high launch loads. This paper will review the relevant environments and mission constraints as well as outline the stress and fatigue analysis approach taken to verify the detailed mechanical design of the HRS.

Kolenz, Daniel↗