Search NASA⌕ Search

SEARCH · Search NASA

Results for “program implementation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

The RANDOM computer program: A linear congruential random number generator

The RANDOM Computer Program is a FORTRAN program for generating random number sequences and testing linear congruential random number generators (LCGs). The linear congruential form of random number generator is discussed, and the selection of parameters of an LCG for a microcomputer described. This document describes the following: (1) The RANDOM Computer Program; (2) RANDOM.MOD, the computer code needed to implement an LCG in a FORTRAN program; and (3) The RANCYCLE and the ARITH Computer Programs that provide computational assistance in the selection of parameters for an LCG. The RANDOM, RANCYCLE, and ARITH Computer Programs are written in Microsoft FORTRAN for the IBM PC microcomputer and its compatibles. With only minor modifications, the RANDOM Computer Program and its LCG can be run on most micromputers or mainframe computers.

Miles, R. F., Jr.↗

Interferometry

The following recommended programs are reviewed: (1) infrared and optical interferometry (a ground-based and space programs); (2) compensation for the atmosphere with adaptive optics (a program for development and implementation of adaptive optics); and (3) gravitational waves (high frequency gravitational wave sources (LIGO), low frequency gravitational wave sources (LAGOS), a gravitational wave observatory program, laser gravitational wave observatory in space, and technology development during the 1990's). Prospects for international collaboration and related issues are also discussed.

Ridgway, Stephen↗

Expendable launch vehicles technology: A report to the US Senate and the US House of Representatives

As directed in Public Law 100-657, Commercial Space Launch Act Amendments of 1988, and consistent with National Space Policy, NASA has prepared a report on a potential program of research on technologies to reduce the initial and recurring costs, increase reliability, and improve performance of expendable launch vehicles for the launch of commercial and government spacecraft into orbit. The report was developed in consultation with industry and in recognition of relevant ongoing and planned NASA and DoD technology programs which will provide much of the required launch systems technology for U.S. Government needs. Additional efforts which could be undertaken to strengthen the technology base are identified. To this end, focus is on needs for launch vehicle technology development and, in selected areas, includes verification to permit private-sector new technology application at reduced risk. If such a program were to be implemented, it would entail both government and private-sector effort and resources. The additional efforts identified would augment the existing launch vehicle technology programs. The additional efforts identified have not been funded, based upon agency assessments of relative priority vis-a-vis the existing programs. Throughout the consultation and review process, the industry representatives stressed the overriding importance of continuing the DoD/NASA Advanced Launch Development activity and other government technology programs as a primary source of essential launch vehicle technology.

Source record↗

A Quantitative Reliability, Maintainability and Supportability Approach for NASA's Second Generation Reusable Launch Vehicle

The United States National Aeronautics and Space Administration (NASA) is in the midst of a 10-year Second Generation Reusable Launch Vehicle (RLV) program to improve its space transportation capabilities for both cargo and crewed missions. The objectives of the program are to: significantly increase safety and reliability, reduce the cost of accessing low-earth orbit, attempt to leverage commercial launch capabilities, and provide a growth path for manned space exploration. The safety, reliability and life cycle cost of the next generation vehicles are major concerns, and NASA aims to achieve orders of magnitude improvement in these areas. To get these significant improvements, requires a rigorous process that addresses Reliability, Maintainability and Supportability (RMS) and safety through all the phases of the life cycle of the program. This paper discusses the RMS process being implemented for the Second Generation RLV program.

Fayssal M. Safie↗

Performance Confirmation Strategies for the Waste Isolation Pilot Plant - A Historical Perspective from an Operating Disposal Facility - 12248

Performance confirmation is an important element of the Waste Isolation Pilot Plant (WIPP) program. Performance confirmation was first used during the early WIPP site characterization phase to focus experimental activities that address the development of probabilistic repository performance models and to address stakeholder assurance needs. The program is currently used to analyze the conditions of the repository and its surroundings to ensure that the basis for the repository's long-term radioactive waste containment predictions is valid. This basis is related to the parameters, assumptions, conceptual and numerical models that are used to predict or validate the potential radioactive waste containment performance of the system. The concept of performance confirmation for the WIPP is one that has evolved since the first repository work was initiated decades ago and plays an important role in assuring adequate repository performance both now and in the long-term. The WIPP mission has progressed from a pilot project to an operational disposal facility and will progress to eventual site closure when disposal operations are completed. Performance confirmation is an important part of each of these progressions. The concept of disposing radioactive waste in a geologic repository today involves a complete understanding of many technical, political, regulatory, societal and economic elements. Many of these elements overlap and solving all relevant issues necessary to site, operate and decommission a disposal facility should be done with knowledge of each element's requirements and impacts. Performance confirmation is one tool that can help to coordinate many of these elements into a program that actively investigates what is thought to be adequately understood about the system and what information is lacking. A performance confirmation program is used to determine ways to challenge and verify those areas that are thought to be understood and to find ways to understand those areas that are not well understood. Performance confirmation programs have been used twice at WIPP, first during site characterization and PA development and later in a Compliance Monitoring program. At first, only certain technical aspects of the system were deemed important because it was a scientifically-based, government project. Early site characterization work was design to gather information about the geology and hydrology of the area and the mechanical properties of the natural barrier. The information would be used in a PA to determine the long-term containment performance of the disposal system. A performance confirmation element was used to identify the sensitive elements of the system that were certain, well understood or justified and those that were not. It identified experimental and analytical programs that could be used to reduce uncertainty, confirm sensitive assumptions and provide useful data. This performance confirmation program provided data to justify the adequacy of the information used in PA to demonstrate compliance with EPA's containment requirements. Performance confirmation will continue to be used in the post-closure period for at least 30 years and likely up to the end of the 100-year institutional controls period. As the technical basis for the repository matures throughout the operational period, the currently planned post-closure monitoring program will need to be reassessed prior to implementation. However, the intent of the program will be the same as it was for the previous programs, to ensure the ultimate goal of the repository. This goal is to safely isolate waste from the accessible environment and ensure public and environmental safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Center Energy Efficiency

Fact sheet describes how the Federal Energy Management Program helps federal agencies implement data center energy efficiency projects.

Kam, Kendall [US Department of Energy (USDOE) Fede↗

Identifying Geographic Areas at Risk of Soil-transmitted Helminthes Infection Using Remote Sensing and Geographical Information Systems: Boaco, Nicaragua as a Case Study

Several types of intestinal nematodes, that can infect humans and specially school-age children living in poverty, develop part of their life cycle in soil. Presence and survival of these parasites in the soil depend on given environmental characteristics like temperature and moisture that can be inferred with remote sensing (RS) technology. Prevalence of diseases caused by these parasitic worms can be controlled and even eradicated with anthelmintic drug treatments and sanitation improvement. Reliable and updated identification of geographic areas at risk is required to implement effective public health programs; to calculate amount of drug required and to distribute funding for sanitation projects. RS technology and geographical information systems (GIS) will be used to analyze for associations between in situ prevalence and remotely sensed data in order to establish RS proxies of environmental parameters that indicate the presence of these parasits. In situ data on helminthisasis will be overlaid over an ecological map derived from RS data using ARC Map 9.3 (ESRI). Temperature, vegetation, and distance to bodies of water will be inferred using data from Moderate-Resolution Imaging Spectroradiometer (MODIS) and Landsat TM and ETM+. Elevation will be estimated with data from The Shuttle Radar Topography Mission (SRTM). Prevalence and intensity of infections are determined by parasitological survey (Kato Katz) of children enrolled in rural schools in Boaco, Nicaragua, in the communities of El Roblar, Cumaica Norte, Malacatoya 1, and Malacatoya 2). This study will demonstrate the importance of an integrated GIS/RS approach to define clusters and areas at risk. Such information will help to the implementation of time and cost efficient control programs and sanitation efforts.

Moreno, Max J.↗

Evaluation of the Initial Isothermal Physics Measurements at the Fast Flux Test Facility, a Prototypic Liquid Metal Fast Breeder Reactor

The Fast Flux Test Facility (FFTF) was a 400-MWt, sodium-cooled, low-pressure, high-temperature, fast-neutron flux, nuclear fission reactor plant designed for the irradiation testing of nuclear reactor fuels and materials for the development of liquid metal fast breeder reactors (LMFBRs). The FFTF was fueled with plutonium-uranium mixed oxide (MOX) and reflected by Inconel-600. Westinghouse Hanford Company operated the FFTF as part of the Hanford Engineering Development Laboratory (HEDL) for the U.S. Department of Energy on the Hanford Site near Richland, Washington. Although the FFTF was a testing facility not specifically designed to breed fuel or produce electricity, it did provide valuable information for LMFBR projects and base technology programs in the areas of plant system and component design, component fabrication, prototype testing, and site construction. The major objectives of the FFTF were to provide a strong, disciplined engineering base for the LMFBR program, provide fast flux testing for other U.S. programs, and contribute to the development of a viable self-sustaining competitive U.S. LMFBR industry. During its ten years of operation, the FFTF acted as a national research facility to test advanced nuclear fuels, materials, components, systems, nuclear power plant operating and maintenance procedures, and active and passive reactor safety technologies; it also produced a large number of isotopes for medical and industrial users, generated tritium for the U.S. fusion research program, and participated in cooperative, international research work. Prior to the implementation of the reactor characterization program, a series of isothermal physics measurements were performed; this acceptance testing program consisted of a series of control rod worths, critical rod positions, subcriticality measurements, maximum reactivity addition rates, shutdown margins, excess reactivity, and isothermal temperature coefficient reactivity. The results of these experiments were of particular importance because they provide extensive information which can be directly applied to the design of large LMFBR’s. It should be recognized that the data presented in the initial report were evaluated only to the extent necessary to ensure that adequate data were obtained. Later reports provided further interpretation and detailed comparisons with prediction techniques. The conclusion of the isothermal physics measurements was that the FFTF nuclear characteristics were essentially as designed and all safety requirements were satisfied. From a nuclear point of view, the FFTF was qualified to proceed into power operation mode. The FFTF was completed in 1978 and first achieved criticality on February 9, 1980. Upon completion of the isothermal physics and reactor characterization programs, the FFTF operated for ten years from April 1982 to April 1992. Reactor operations of the FFTF were terminated and the reactor facility was then defueled, deactivated, and placed into cold standby condition. Deactivation of the reactor was put on hold from 1996 to 2000 while the U.S. Department of Energy examined alternative uses for the FFTF but then announced the permanent deactivation of the FFTF in December 2001. Its core support basket was later drilled in May 2005, so as to remove all remaining sodium coolant. On April 17, 2006, the American Nuclear Society designated the FFTF as a “National Nuclear Historic Landmark”.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

State reduction for semi-Markov reliability models

Semi-Markov processes have proved to be an effective and convenient tool to construct models of systems that achieve reliability by redundancy and reconfiguration. These models are able to depict complex system architectures and to capture the dynamics of fault arrival and system recovery. A disadvantage of this approach is that the models can be extremely large, which poses both a model construction and a computational problem. Techniques are needed to reduce the model size. Because these systems are used in critical applications where failure can be expensive, there must be an analytically derived bound for the error produced by the model reduction technique. Automatic model generation programs have been written to help the reliability analyst produce models of complex systems. Because of the importance of these programs, the model reduction technique needs to be precise and easily implemented. This paper presents a model reduction technique called trimming that can be applied to a popular class of systems. An error bound for the trimming procedure is derived that uses readily available system parameters. The trimming procedure is precisely described and appears easy to implement in a model generation program.

Reduced order systems↗

Trend analysis for large solid rocket motors - A program level approach

This paper defines a program-level trend analysis effort that can be applied to large solid rocket motors. The effort is especially applicable to large segmented rocket motors such as the Space Transportation System's solid rocket boosters. Five types of trend analysis are discussed for different aspects of a rocket motor program, (performance, reliability, problem, supportability, and programmatic). Ideas are offered for implementing and performing a program-level trend analysis effort by giving suggestions for selecting computer capabilities, choosing parameters, selecting statistical processes, routine screening for trends, analyzing significant trends (for example, looking for related trends and determining if adverse trends are resolved), and reporting results of trend analysis. The use of program-level trending allows for the ability to easily transfer data between organizations and easily use the data to correlate trends from the various organizations to find causal relationships. Efficiency is enhanced from upper level management to the shop floor at vendor locations by using the same trend analysis software and methodology at all organizations.

Babbitt, Norman E., III↗

Challenges in Clinical Trial Implementation: Results from a Survey of the National Accreditation Program of Breast Centers (NAPBC)

Background: Although the results of clinical trials often guide best practices, changing clinical practice based on clinical trial results can be challenging. The objective of this study was to examine provider-reported barriers to adopting best clinical practices according to clinical trial data. Methods: A cross-sectional survey was conducted of providers from the National Accreditation Program for Breast Centers about barriers that prevent the incorporation of trial findings. Descriptive analyses and multivariable analyses were performed to determine provider characteristics that were significantly associated with reported barriers. Results: Overall, 383 institutions participated (63.5% response rate), with a total of 1226 physicians responding to the survey (80% response rate). Providers identified national guidelines and meetings as the most compelling way to receive practice-changing information. They reported the following internal barriers to trial implementation: patient preference (45%), strongly held beliefs by partners/colleagues (37%), and insufficient time to discuss new practices (30%). External barriers preventing trial implementation included a lack of agreement from multidisciplinary tumor boards (32%), fear of reimbursement loss (23%), and resistance from clinical staff (20%). Reported barriers differed by provider specialty, with plastic surgeons and radiation oncologists reporting that strongly held beliefs by partners/colleagues and disagreement from multidisciplinary tumor boards were the most significant factors preventing clinical trial implementation. Conclusions: Physician beliefs and patient preferences are the most frequently reported barriers to clinical trial implementation. Tactics to better educate providers about how to explain new clinical trial data to their patients and colleagues are needed.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Managing radiation degradation of CCDs on the Chandra X-ray Observatory II

The CCDs on the Chandra X-ray Observatory are vulnerable to radiation damage from low-energy protons scattered off the telescope's mirrors onto the focal plane. Following unexpected damage incurred early in the mission, the Chandra Team developed, implemented, and maintains a radiation-protection program. This program - involving scheduled radiation safing during radiation-belt passes, intervention based upon real-time space-weather conditions and radiation-environment modeling, and on-board radiation monitoring with autonomous radiation safing - has successfully managed the radiation damage to the CCDs. Since implementing the program, the charge-transfer inefficiency (CTI) has increased at an average annual rate of only 2.9x10^-6 (2.3%) for the front- illuminated CCDs and 0.95x10^-6 (6.5%) for the back-illuminated CCDs. This paper describes the current status of Chandra radiation-management program.

O'Dell, Stephen L.↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MIRACAL: A mission radiation calculation program for analysis of lunar and interplanetary missions

A computational procedure and data base are developed for manned space exploration missions for which estimates are made for the energetic particle fluences encountered and the resulting dose equivalent incurred. The data base includes the following options: statistical or continuum model for ordinary solar proton events, selection of up to six large proton flare spectra, and galactic cosmic ray fluxes for elemental nuclei of charge numbers 1 through 92. The program requires an input trajectory definition information and specifications of optional parameters, which include desired spectral data and nominal shield thickness. The procedure may be implemented as an independent program or as a subroutine in trajectory codes. This code should be most useful in mission optimization and selection studies for which radiation exposure is of special importance.

Nealy, John E.↗

(abstract) JPL Cryocooler Development and Test Program Overview

Many near-term and future space-instrument programs within NASA and the Ballistic Missile Defense Organization (BMDO) depend on the successful development of long-life, low-vibration space cryocoolers. The most demanding near-term programs include a number of science instruments selected for NASA's Earth Observing System (Eos) program, and a number of space reconnaissance instruments associated with the BMDO's Brilliant Eyes program; both of these programs require delivery of similar types of flight coolers in the next few years. To help ensure the success of these cooler commitments, JPL has implemented an extensive cryocooler program in support of the NASA/JPL AIRS project, the Air Force Phillips Laboratory (AFPL), and the Air Force Space and Missiles Systems Division (SMC). This program is directed at assisting industry in developing advanced cryocoolers that successfully address the broad array of complex performance requirements needed for NASA and BMDO long-life space instruments. The JPL cryocooler program includes extensive characterization and life testing of industry-developed cryocoolers, development and flight testing of advanced sorption cooler systems for detector cooling to 10 K , development of mechanical cryocooler enhancement technologies, and flight tests of advanced low-vibration Stirling-cooler systems.

development design testing↗

Environmentally Preferable Coatings for Structural Steel Project

The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described a the "launch support and infrastructure modernization program" in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion resistant coatings for launch facilities and ground support equipment. The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. Number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of corrosion protective coating system.

Technology Portfolio System↗

Citric Acid Alternative to Nitric Acid Passivation

The Ground Systems Development and Operations GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the purpose of this project is to demonstratevalidate citric acid as a passivation agent for stainless steel. Successful completion of this project will result in citric acid being qualified for use as an environmentally preferable alternative to nitric acid for passivation of stainless steel alloys in NASA and DoD applications.

Technology↗

Fungal Exposure to Meteorite Thin Sections: Developing an Experimental to Observe Biogeochemical Changes

The Astromaterials Acquisition & Curation Office maintains collections of meteorite samples collected as part of the Antarctic Search for Meteorites (ANSMET) program. The chief goal of the curation department is to maintain these meteorites in pristine condition. The Astromaterials Research and Exploration Science (ARES) Directorate has implemented a microbial monitoring program for the meteorite collections that has resulted in the isolation of >100 fungal isolates [1], however it is currently unknown if these isolates could present danger to the collections through bioweathering or secretion of organic compounds. We grew a strain of Fusarium oxysporium isolated from nitrogen gas filters feeding the Meteorite Lab nitrogen gas in the presence of a H5 meteorite thin section to determine if this fungus has the capability of altering the mineral structure of this common meteorite. This first trial was to determine and understand the effects of Fusarium oxysporum growth on the iron content within H5 chondrites and evaluate what additional components are needed in the development of future trial runs. This experiment determined new considerations for handling samples, the nature of microscopic scans before and after the incubation period, and the quality of the samples utilized for the experiment. The results of this experiment were promising and warrant further investigation with a more refined process and timeline.

Barbre, K. S. R.↗