Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical issues”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,549 records · Page 86

A toolkit for detecting technical surprise.

The detection of a scientific or technological surprise within a secretive country or institute is very difficult. The ability to detect such surprises would allow analysts to identify the capabilities that could be a military or economic threat to national security. Sandia's current approach utilizing ThreatView has been successful in revealing potential technological surprises. However, as data sets become larger, it becomes critical to use algorithms as filters along with the visualization environments. Our two-year LDRD had two primary goals. First, we developed a tool, a Self-Organizing Map (SOM), to extend ThreatView and improve our understanding of the issues involved in working with textual data sets. Second, we developed a toolkit for detecting indicators of technical surprise in textual data sets. Our toolkit has been successfully used to perform technology assessments for the Science & Technology Intelligence (S&TI) program.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Socio-Technical Perspective on Interdisciplinary Interactions During the Development of Complex Engineered Systems

This study investigates interdisciplinary interactions that take place during the research, development, and early conceptual design phases in the design of large-scale complex engineered systems (LaCES) such as aerospace vehicles. These interactions, that take place throughout a large engineering development organization, become the initial conditions of the systems engineering process that ultimately leads to the development of a viable system. This paper summarizes some of the challenges and opportunities regarding social and organizational issues that emerged from a qualitative study using ethnographic and survey data. The analysis reveals several socio-technical couplings between the engineered system and the organization that creates it. Survey respondents noted the importance of interdisciplinary interactions and their benefits to the engineered system as well as substantial challenges in interdisciplinary interactions. Noted benefits included enhanced knowledge and problem mitigation and noted obstacles centered on organizational and human dynamics. Findings suggest that addressing the social challenges may be a critical need in enabling interdisciplinary interactions

McGowan, Anna-Maria R.↗

Reforming EIA systems: A critical review of proposals in Brazil

Environmental Impact Assessment (EIA) systems are under pressure in many countries, driven by a call for efficiency and streamlining. Such a phenomenon is particularly clear in Brazil, where, in the past few years, a number of influential associations put forward documents proposing significant changes to environmental licensing and impact assessment regulations. So far, there is no publicly available information about any initiative towards scrutinizing those proposals. The objective of this study was to critically review the merits and drawbacks of the changes proposed in those documents. The analysis triangulated content analysis, focus group and online survey data. The focus group included ten seasoned Brazilian EIA specialists; the survey, based on Likert-scale and open-ended questions, resulted in 322 valid responses from EIA professionals. Results show that the proposals generally agree that the current EIA system, while playing a key role in mitigating impacts and enhancing project design, needs many changes. Nonetheless, the proposals neither offered solutions to overcome political, technical and budget barriers, nor established a sense of priority of the most urgent issues. Findings from the focus group and the survey signaled that a number of proposed actions might face public outcry, and that those changes that do not depend on legislative action are more likely to be implementable. Previous studies about EIA reform focused mostly on the context of developed countries after changes had taken place. This study, while addressing the perspective of a large developing country in a “before-reform” stage, shows that capacity-building is a key requirement in EIA reform. - Highlights: • Brazil's EIA system is under strong pressure for change. • Findings corroborate ineffectiveness in current system. • There are tensions as to the best approaches to overcome problems. • Exact effects of proposals are uncertain. • Low institutional capacity can play strong role in driving EIA reform.

54 ENVIRONMENTAL SCIENCES↗

An ultra-compact x-ray free-electron laser

In the field of beam physics, two frontier topics have taken center stage due to their potential to enable new approaches to discovery in a wide swath of science. These areas are: advanced, high gradient acceleration techniques, and x-ray free electron lasers (XFELs). Further, there is intense interest in the marriage of these two fields, with the goal of producing a very compact XFEL. In this context, recent advances in high gradient radio-frequency cryogenic copper structure research have opened the door to the use of surface electric fields between 250 and 500 MV m -1 . Such an approach is foreseen to enable a new generation of photoinjectors with six-dimensional beam brightness beyond the current state-of-the-art by well over an order of magnitude. This advance is an essential ingredient enabling an ultra-compact XFEL (UC-XFEL). In addition, one may accelerate these bright beams to GeV scale in less than 10 m. Such an injector, when combined with inverse free electron laser-based bunching techniques can produce multi-kA beams with unprecedented beam quality, quantified by 50 nm-rad normalized emittances. The emittance, we note, is the effective area in transverse phase space (x, p x /m e c) or (y, p y /m e c) occupied by the beam distribution, and it is relevant to achievable beam sizes as well as setting a limit on FEL wavelength. These beams, when injected into innovative, short-period (1–10 mm) undulators uniquely enable UC-XFELs having footprints consistent with university-scale laboratories. We describe the architecture and predicted performance of this novel light source, which promises photon production per pulse of a few percent of existing XFEL sources. We review implementation issues including collective beam effects, compact x-ray optics systems, and other relevant technical challenges. To illustrate the potential of such a light source to fundamentally change the current paradigm of XFELs with their limited access, we examine possible applications in biology, chemistry, materials, atomic physics, industry, and medicine—including the imaging of virus particles—which may profit from this new model of performing XFEL science.

47 OTHER INSTRUMENTATION↗

Applying Human-performance Models to Designing and Evaluating Nuclear Power Plants: Review Guidance and Technical Basis

Human performance models (HPMs) are simulations of human behavior with which we can predict human performance. Designers use them to support their human factors engineering (HFE) programs for a wide range of complex systems, including commercial nuclear power plants. Applicants to U.S. Nuclear Regulatory Commission (NRC) can use HPMs for design certifications, operating licenses, and license amendments. In the context of nuclear-plant safety, it is important to assure that HPMs are verified and validated, and their usage is consistent with their intended purpose. Using HPMs improperly may generate misleading or incorrect information, entailing safety concerns. The objective of this research was to develop guidance to support the NRC staff's reviews of an applicant's use of HPMs in an HFE program. The guidance is divided into three topical areas: (1) HPM Verification, (2) HPM Validation, and (3) User Interface Verification. Following this guidance will help ensure the benefits of HPMs are achieved in a technically sound, defensible manner. During the course of developing this guidance, I identified several issues that could not be addressed; they also are discussed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Temperature Gas-Cooled Reactors Lessons Learned Applicable to the Next Generation Nuclear Plant

The purpose of this report is to identify possible issues highlighted by these lessons learned that could apply to the NGNP in reducing technical risks commensurate with the current phase of design. Some of the lessons learned have been applied to the NGNP and documented in the Preconceptual Design Report. These are addressed in the background section of this document and include, for example, the decision to use TRISO fuel rather than BISO fuel used in the Peach Bottom reactor; the use of a reactor pressure vessel rather than prestressed concrete found in Fort St. Vrain; and the use of helium as a primary coolant rather than CO2. Other lessons learned, 68 in total, are documented in Sections 2 through 6 and will be applied, as appropriate, in advancing phases of design. The lessons learned are derived from both negative and positive outcomes from prior HTGR experiences. Lessons learned are grouped according to the plant, areas, systems, subsystems, and components defined in the NGNP Preconceptual Design Report, and subsequent NGNP project documents.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Spallation Neutron Source Second Target Station Integrated Systems Update

The Spallation Neutron Source (SNS) was designed from the beginning to accommodate both an accelerator upgrade to increase the proton power and a second target station (STS). Four workshops were organized in 2013 and 2014 to identify key science areas and challenges where neutrons will play a vital role [1-4]. Participants concluded that the addition of STS to the existing ORNL neutron sources was needed to complement the strengths of High Flux Isotope Reactor (HFIR) and the SNS first target station (FTS). To address the capability gaps identified in the workshops, a study was undertaken to identify instrument concepts that could provide the required new science capabilities. The study outlined 22 instrument concepts and presented an initial science case for STS [5]. These instrument concepts formed the basis of a planning suite of instruments whose requirements determined an initial site layout and moderator selection. An STS Technical Design Report (TDR) documented the STS concept based on those choices [6]. Since issue of the TDR, the STS concept has significantly matured as described in this document.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Assessing Strategic Effects of Artificial Intelligence

This workshop examines the implications of advances in artificial intelligence (AI) on international security, discussing the question of whether we will have to rethink, by the end of the next decade, how we practice nuclear deterrence and ensure strategic stability. Hosted by the Center for Global Security Research (CGSR) at Lawrence Livermore National Laboratory (LLNL), the workshop is part of a collaboration between CGSR and Technology for Global Security (T4GS) to engage policy-makers, scholars, technical experts, and the private sector to address emerging challenges in AI and related issues. The workshop engages with the current literature pointing to the risks and opportunities presented by AI and attempts to assess which are legitimate and which might be exaggerated.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Systematic Technology Evaluation Program for SiC-based BWR Channel Box

Silicon carbide (SiC) –based accident-tolerant fuel (ATF) cladding of light water reactors (LWRs) has become a topic of great interest in nuclear material development since the Fukushima Dai-ichi Nuclear Power Plant accident. Extensive development of SiC cladding has identified benefits of the concept, including its inherent accident resistance and neutronic performance. Advancements achieved during the development of SiC-based ATF cladding have made it attractive for use in accident-tolerant cores of LWRs. In this document, we consider the use of SiC-based materials to replace the zirconium alloy used for the channel boxes of boiling water reactors. Both accident resistance and prevention of the bowing observed in current grades of channel boxes are needs driving the exploration of a new channel box system. To provide a pathway for channel box development, this document lays out (1) a current technology overview, (2) the technology gap, and (3) a systematic technology evaluation plan. The objectives of the technology evaluation plan are to address key feasibility issues revealed by the knowledge gap analysis and to contribute to advancing the technology readiness level. Further development will be required in the technology implementation phase. The technology evaluations include understanding the behavior of channel boxes under both normal and off-normal conditions, identifying potential mitigation strategies for the issues if necessary, and improving channel box performance based on the knowledge obtained. The structure of the technology evaluation plan and each task are shown in Figure S.1. The knowledge gap analysis identified key research areas, including irradiation effects, hydrothermal corrosion, accident behavior, and design and manufacture. These are common issues between SiC-based channel boxes and SiC-based fuel cladding, although technical evaluations specific for the channel box components are required. This document also describes details of the technical feasibility evaluation methods and plans.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integration Plan for NEAMS Structural Materials and Chemistry MSR Modeling

As part of its broad objective to support advanced reactor development, the US Department of Energy’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program has a strong interest in developing simulation capabilities to address chemistry and corrosion issues for molten salt reactors (MSRs). To that end, the Structural Materials & Chemistry (SMC) technical area within the NEAMS program is developing a set of codes and databases to describe the behavior of molten salts and their interactions with structural materials. This document reviews the current activities with respect to MSR-relevant codes and is an effort to improve their integration in simulating MSR systems. Interoperability between the codes being developed is critical for the success of the NEAMS-developed MSR simulation capability. This is greatly facilitated by having codes based on the MOOSE framework when possible, and by developing interfaces to MOOSE-based tools for those tools that are not based on that framework.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Independent Review of Non-Destructive Assay for the K-25/K-27 D&D Project: November 30-December 3, 2004, Oak Ridge, TN

The DOE with concurrence from the D&D contractor has chartered an assessment of the methods and procedures used to obtain the original NDA results of holdup deposits at the K-25 and K-27 uranium gaseous diffusion facilities in Oak Ridge. The assessment has been performed by an external review team with the participation of the D&D contractor, DOE, and DOE/OR. This document is the final report for the assessment. The DOE provided the charter for this review. The review team spent a week in Oak Ridge attending meetings and participating in discussions with expert contractor staff. Substantial additional input for the review came from numerous written materials, unpublished and published. This final report of observations, findings, and recommendations in areas defined by the charter is based on information from the meetings, discussions, and documents. The assessment of the Review Team is that the DOE/OR and BJC approach in using historical NDA data for the D&D of K-25 and K-27 is appropriate and generally acceptable. Resolving issues, addressing findings, and implementing the recommendations documented in this report will reconcile specific technical concerns.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project X Accelerator R&D Plan

Project X is a high intensity proton facility conceived to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report. Project X is based on an 8 GeV superconducting H-linac, paired with the existing (but modified) Main Injector and Recycler Ring, to provide in excess of 2 MW of beam power throughout the energy range 60-120 GeV, simultaneous with at least 100 kW of beam power at 8 GeV. The linac utilizes technology in common with the ILC over the energy range 0.6-8.0 GeV. Beam current parameters can be made identical to ILC resulting in identical rf generation and distribution systems. This alignment of ILC and Project X technologies allows for a shared development effort. The initial 0.6 GeV of the linac draws heavily on technology developed by Argonne National Laboratory for a facility for rare isotope beams. It is anticipated that the exact configuration and operating parameters of the linac will be defined through the R&D program and will retain alignment with the ILC plan as it evolves over this period. Utilization of the Recycler Ring as an H{sup -} stripper and accumulator ring is the key element that provides the flexibility to operate the linac with the same beam parameters as the ILC. The linac operates at 5 Hz with a total of 5.6 x 10{sup 13} H{sup -} ions delivered per pulse. H{sup -} are stripped at injection into the Recycler in a manner that 'paints' the beam both transversely and longitudinally to reduce space charge forces. Following the 1 ms injection, the orbit moves off the stripping foil and circulates for 200 msec, awaiting the next injection. Following three such injections a total of 1.7 x 10{sup 14} protons are transferred in a single turn to the Main Injector. These protons are then accelerated to 120 GeV and fast extracted to a neutrino target. The Main Injector cycle takes 1.4 seconds, producing approximately 2.3 MW of beam power at 120 GeV. At lower proton energies Main Injector cycle times can be shorter, allowing a beam power above 2 MW in the range of proton energy between 60 GeV and 120 GeV. In parallel, because the loading of the Recycler only requires 0.6 seconds, up to four linac cycles are available for accumulation and distribution of 8 GeV protons from the Recycler. Total available 8 GeV beam power lies in the range of 100-200 kW, depending on the energy in the Main Injector. Primary modifications to the existing accelerator complex to support Project X include integration of an H{sup -} injection system, a new RF system, a new extraction system, and measures to mitigate electron cloud effects, in the Recycler Ring. The Main Injector would need a new RF system, measures to preserve beam stability through transition, and measures to mitigate electron cloud effects. Finally, substantial modifications to the existing NuMI target station will be required to support >2 MW operations. It is anticipated that Project X configured as described above would initially support high intensity neutrino beams to the NOvA experiment, in parallel with at least one new 8 GeV based flavor/rare decay experiment. Depending upon future directions flexibility is retained for delivering neutrinos toward the DUSEL site and/or protons into the Tevatron. The purpose of this document is to describe an R&D plan that would position the U.S. to initiate construction of Project X in the 2012 time frame, assuming a go ahead decision in roughly 2010. The organization of this document is as follows: (1) Goals - Describes goals of the R&D and preliminary design period (2008-2011). Included are design, technical development, project documentation, and organizational goals. These are described in the context of an overall set of performance goals for Project X. (2) R&D Plan Elements - Describes the essential technical elements of the plan, including major subsystem performance requirements, associated accelerator and technology issues, and the plans for addressing these issues. (3) R&D Plan - Describes how the plan elements are assembled into a time-ordered plan, defines the associated resources required to support this plan, and describes the alignment of activities undertaken within the Project X, SRF/ILC, and HINS programs. Also describes how the R&D plan will be organized and executed by the prospective participating institutions.

43 PARTICLE ACCELERATORS↗

Advanced Transportation System Studies Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development Contract: Technical Results - Volume 2

The sections in this report include: Single Stage to Orbit (SSTO) Design Ground-rules; Operations Issues and Lessons Learned; Vertical-Takeoff/Landing Versus Vertical-Takeoff/Horizontal-Landing; SSTO Design Results; SSTO Simulation Results; SSTO Assessment Results; SSTO Sizing Tool User's Guide; SSto Turnaround Assessment Report; Ground Operations Assessment First Year Executive Summary; Health Management System Definition Study; Major TA-2 Presentations; First Lunar Outpost Heavy Lift Launch Vehicle Design and Assessment; and the section, Russian Propulsion Technology Assessment Reports.

Source record↗

Contracting Officer's Technical Representatives

The Breakout Session is a traditional conference instrument used by the NASA Occupational Health Program (OHP) as a method to convene people with common interests. Typically these sessions provide discussion of current topics of high priority and currency and allow multiple views and opinions to be shared and evaluated by all participants. Since the Contracting Officer's Technical Representatives (COTRs) occupy the technical focus of support contract management, this particular group, attended by 20 representatives, addressed issues and topics at the forefront of operational concerns.

Brisbin, Steve↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Performance Testing of Thermal Interface Filler Materials in a Bolted Aluminum Interface Under Thermal/Vacuum Conditions

A thermal interface material is one of the many tools often used as part of the thermal control scheme for space-based applications. Historically, at Marshall Space Flight Center, CHO-THERM 1671 has primarily been used for applications where an interface material was deemed necessary. However, numerous alternatives have come on the market in recent years. It was decided that a number of these materials should be tested against each other to see if there were better performing alternatives. The tests were done strictly to compare the thermal performance of the materials relative to each other under repeatable conditions and do not take into consideration other design issues, such as off-gassing, electrical conduction, isolation, etc. The purpose of this Technical Memorandum is to detail the materials tested, test apparatus, procedures, and results of these tests. The results show that there are a number of better performing alternatives now available.

Glasgow, S. D.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗