Search NASA⌕ Search

SEARCH · Search NASA

Results for “Data Management Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

Behavioral health in Antarctica: implications for long-duration space missions

Ideally, evidence from long-duration spaceflight should be used to predict likely occurrences of behavioral health events and for planning management strategies for such events. With small numbers of space travelers, and limited long-duration missions of a year or more, Earth analogues and simulations must be used as the evidence base, despite such analogues lacking microgravity, radiation, rapidly altering photoperiodicity, and fidelity to space. Antarctic health data are reviewed and an assessment made of the likely frequency of behavioral health events. Based on the Antarctic evidence, the likelihood of behavioral health problems in space is low. However, such cases may be serious and of high consequence, placing considerable demands on the mission crew and ground support to achieve a successful outcome, given the availability of pharmaceuticals and resources.

Review↗

NASA/SPoRT's GOES-R Activities in Support of Product Development, Management, and Training

The NASA Short-term Prediction Research and Transition (SPoRT) Center supports many activities within the GOES-R Proving Grounds (PG). These include the development of imagery from existing instrumentation as a proxy to future Advanced Baseline Imager (ABI) capabilities on GOES-R. The Moderate Resolution Imaging Spectroradiometer (MODIS) and the Visible/Infrared Imager/Radiometer Suite (VIIRS) instruments are used to provide a glimpse of the multi-spectral capabilities that will become the norm as the number of channels and data rate dramatically increase with GOES-R. The NOAA/NWS has plans to provide operational users with all ABI channels at the highest resolution. Data fusion of individual channels into composite red, green, and blue imagery products will assist the end user with this future wave of information. While increasing the efficiency in the operational use of ABI channels, these composites provide only qualitative information. Within the GOES-R PG, SPoRT and other partners are exploring ways to include quantitative information as part of the composite imagery. However, limitations in local hardware processing and/or data bandwidth for users of the GOES-R data stream are challenges to overcome. This presentation will discuss the creation of these composite images as well as possible solutions to address these processing challenges. In a similar manner the Geostationary Lightning Mapper (GLM) to be launched on GOES-R presents several data management challenges. The GLM is a pioneering instrument to quantify total lightning from a geostationary platform. The expected data frequency from the GLM is to be at a sub-minute interval. Users of such a data set may have little experience in handling such a rapid update of information. To assist users, SPoRT is working with the NWS to develop tools within the user fs decision support system to allow tracking and analysis of total lightning from a storm-based perspective. This presentation will discuss the challenges and progress of this tool development work. With new data and products comes the need for user Training. Within the GOES-R PG SPoRT is supporting the demonstration of these future products by providing various training materials to end users. A summary of training provided to operational users will be discussed.

Fuell, Kevin K.↗

Modeling Constellation Virtual Missions Using the Vdot(Trademark) Process Management Tool

The authors have identified a software tool suite that will support NASA's Virtual Mission (VM) effort. This is accomplished by transforming a spreadsheet database of mission events, task inputs and outputs, timelines, and organizations into process visualization tools and a Vdot process management model that includes embedded analysis software as well as requirements and information related to data manipulation and transfer. This paper describes the progress to date, and the application of the Virtual Mission to not only Constellation but to other architectures, and the pertinence to other aerospace applications. Vdot s intuitive visual interface brings VMs to life by turning static, paper-based processes into active, electronic processes that can be deployed, executed, managed, verified, and continuously improved. A VM can be executed using a computer-based, human-in-the-loop, real-time format, under the direction and control of the NASA VM Manager. Engineers in the various disciplines will not have to be Vdot-proficient but rather can fill out on-line, Excel-type databases with the mission information discussed above. The author s tool suite converts this database into several process visualization tools for review and into Microsoft Project, which can be imported directly into Vdot. Many tools can be embedded directly into Vdot, and when the necessary data/information is received from a preceding task, the analysis can be initiated automatically. Other NASA analysis tools are too complex for this process but Vdot automatically notifies the tool user that the data has been received and analysis can begin. The VM can be simulated from end-to-end using the author s tool suite. The planned approach for the Vdot-based process simulation is to generate the process model from a database; other advantages of this semi-automated approach are the participants can be geographically remote and after refining the process models via the human-in-the-loop simulation, the system can evolve into a process management server for the actual process.

Hardy, Roger↗

Verification and Analysis of Spent Fuel Safety Information Database in Korea - 18252

The Public Engagement Commission on SNF management (PECOS) published the recommendation report on the spent fuel management of Korea in June, 2015. Based on this report, the national basic policy for high level radioactive waste management of Korea was established and promulgated, taking into consideration the national/international trends on policy and technology development. According to the national plan, the siting for deep geological disposal facility of high level radioactive waste will be proceeded by 2028. Once the site is selected at somewhere, centralized spent fuel storage facility will be constructed by 2035 at the same site while research program is ongoing to determine the compatibility of the site for disposal facility. According to the enforcement decree of the nuclear safety act, the definition of 'interim storage' is that a safe storage of spent fuel which is received from NPP operator for a specified period, until it is processed or permanently disposed of. It means that spent fuels should be taken over with integrated information of spent fuel from NPP operator to the KORAD (Korea Radioactive waste agency). The aim of this study is to confirm and analyze present and future spent fuel data in order to provide the basic information to the safety research on the transport and storage of spent fuel in Korea. AMORES (Automatic Multi-batch ORIGEN Runner for Evaluation of Spent fuel) was used for the aim of this study. All 16,160 bundles of PWR spent fuel database as of the end of 2015 and the expected spent fuel which will be generated from 2016 to 2053 are evaluated and verified based on national basic plan. Through scenario analysis, it was estimated that approximately 15,000 MTU of spent fuel will be transported to intermediate storage facilities by 2052. Therefore, 44%, 6%, and 33% of spent fuel will be left in Kori, Hanbit and Hanul sites, respectively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TU-C-9A-01: IROC Organization and Clinical Trial Credentialing

As a response to recommendations from a report from the Institute of Medicine, NCI is reorganizing it clinical trial groups into a National Clinical Trial Network (NCTN) that consists of four adult groups (Alliance, ECOGACRIN, NRG, and SWOG) and one children’s group (COG). NRG will house CIRO, a center to promote innovative radiation therapy research and intergroup collaboration in radiation. The quality assurance groups that support clinical trials have also been restructured. ITC, OSU Imaging corelab, Philadelphia Imaging core-lab, QARC, RPC, and RTOGQA have joined together to create the Imaging and Radiation Oncology Core (IROC) Group. IROC’s mission is to provide integrated radiation oncology and diagnostic imaging quality control programs in support of the NCI’s NCTN thereby assuring high quality data for clinical trials designed to improve the clinical outcomes for cancer patients worldwide. This will be accomplished through five core services: site qualification, trial design support, credentialing, data management, case review.These changes are important for physicist participating in NCI clinical trials to understand. We will describe in detail the IROC’s activities and five core services so that as a user, the medical physicist can learn how to efficiently utilize this group. We will describe common pitfalls encountered in credentialing for current protocols and present methods to avoid them. These may include the which benchmarks are required for NSABP B-51/RTOG 1304 and how to plan them as well as tips for phantom planning. We will explain how to submit patient and phantom cases in the TRIAD system used by IROC. Learning Objectives: To understand the basic organization of IROC, its mission and five core services To learn how to use TRIAD for patient and phantom data submission To learn how to avoid common pitfalls in credentialing for current trials.

60 APPLIED LIFE SCIENCES↗

ENVIRONMENTAL SAMPLING AND ANALYSIS - GETTING IT RIGHT

The Department of Energy's Hanford Site in southeastern Washington State was established in the 1940s as part of the Manhattan Project. Hanford's role was to produce weapons-grade nuclear material for defense, and by 1989, when the Site's mission changed from operations to cleanup, Hanford had produced more than 60 percent of the nation's plutonium. The legacy of Hanford's production years is enormous in terms of nuclear and hazardous waste, especially the 270 billion gallons of contaminated groundwater and the 5 million cubic yards of contaminated soil. Managing the contaminated soil and groundwater are particularly important because the Columbia River, the lifeblood of the northwest and the nation's eighth largest river, bounds the Site. Fluor Hanford's Soil & Groundwater Remediation Project (S&GRP) integrates all of the activities that deal with remediating and monitoring the groundwater across the Site. The S&GRP uses a detailed series of steps to record, track, and verify information. The Sample and Data Management (SDM) Process consists of 10 integrated steps that start with the data quality objectives process that establishes the mechanism for collecting the right information with the right people. The process ends with data quality assessment, which is used to ensure that all quantitative data (e.g., field screening, fixed laboratory) are the right type, and of adequate quality to support the decision-making process. Steps 3 through 10 of the process are production steps and are integrated electronically. The detailed plans, procedures, and systems used day-to-day by the SDM process require a high degree of accuracy and reliability. Tools must be incorporated into the processes that minimize errors. This paper discusses all of the elements of the SDM process in detail.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Implementation of 10 CFR 20.1406 Through Life Cycle Planning for Decommissioning

The focus of this paper is on a regulatory guide (draft guide DG-4012) being developed by the Office of Nuclear Regulatory Research for the implementation of 10 CFR 20.1406. The draft guide was published in the Federal Register on July 31, 2007 for a 90 day public comment period. Besides being available in the Federal Register, it is also available electronically in NRC's agency data management system (ADAMS). The accession number is ML0712100110. 10 CFR 20.1406 requires license applicants, other than renewals, after August 20, 1997, '..to describe in the application how facility design and procedures for operation will minimize, to the extent practicable, contamination of the facility and the environment, facilitate eventual decommissioning, and minimize to the extent practicable, the generation of radioactive waste'. The intent of the regulation is to diminish the occurrence and severity of 'legacy sites' by taking measures that will reduce and control contamination and facilitate eventual decommissioning. 10 CFR 20.1406 is significant because it applies to all new facilities and in the very near future (perhaps as soon as the fall of 2007), the U.S. Nuclear Regulatory Commission (NRC) anticipates receiving one or more license applications for new nuclear power plants. The regulatory guide is intended to facilitate that licensing by providing suggestions of things an applicant can do to minimize contamination of the facility and the environment, minimize generation of waste, and to facilitate decommissioning. Over 100 different kinds of activities are covered by license applications submitted to the NRC. They do not all reflect the same potential for contamination of a facility and the environment, or for the generation of radioactive waste. Therefore, an applicant should use sound judgment to evaluate the potential for contamination and the consequences of such contamination in deciding on the extent to which this guide applies to any given facility or activity. Factors which may enter into this decision include form (e.g., dry solids, liquids, gases), inventory, and environmental mobility of unintended releases. The bulk of the guidance presented in the guide will consist of specific design considerations drawn from nuclear industry experience and lessons learned from decommissioning. These design suggestions provide examples of measures which can be combined to support a contaminant management philosophy for a new facility. The principles embodied in this philosophy are threefold: (1) prevention of unintended release, (2) early detection if there is unintended release of radioactive contamination, and (3) prompt and aggressive clean-up should there be an unintended release of radioactive contamination. If the guiding principles are followed through the use of 'good' engineering and science, as well as careful attention to operational practices, it should result in meeting the requirements of 10 CFR 20.1406. All this should be considered in the context of the life cycle of the facility from the early planning stages through the final plans for decommissioning and waste disposal. Some of the mechanisms which can be employed for life cycle planning are described further in the Discussion section. In summary: The principles of the guide are threefold: prevention, early detection, and prompt response. If these guiding principles are followed through the use of 'good' engineering and science, as well as careful attention to operational practices, it should result in meeting the requirements of 10 CFR 20 In summary, the thrust of this guide is for an applicant to use technically sound engineering judgment and a practical risk-informed approach to achieve the objectives of 10 CFR 20.1406. This approach should consider the materials and processes involved (e.g., solids, liquids, gases) and focus on: (1) the relative significance of potential contamination; (2) areas most susceptible to leaks; and (3) the appropriate level of consideration to prevention and control of contamination that should be incorporated in facility design. Since the applicability of the guidance is a facility-by-facility decision, early consultation with the NRC is strongly suggested.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through. FY 2013 • Evaluation of new or revised waste streams by special analysis. • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concept of Operations for Management by Trajectory

This document describes Management by Trajectory (MBT), a concept for future air traffic management (ATM) in which every flight operates in accordance with a four-dimensional trajectory (4DT) that is negotiated between the airspace user and the Federal Aviation Administration (FAA) to respect the airspace user's goals while complying with National Airspace System (NAS) constraints. In the present-day NAS, the ATM system attempts to predict the trajectory for each flight based on the approved flight plan and scheduled or controlled departure time. However, once the aircraft starts to move, controllers tactically manage the aircraft to implement traffic management restrictions, separate otherwise conflicting aircraft, and address arising NAS constraints. Tactical controller actions are not directly communicated to the automation systems or other stakeholders. Furthermore, the initial trajectory prediction does not anticipate these disruptions or how they will impact the flight. Consequently, and compounded by gaps in required data and models, trajectory predictions are less accurate than possible, which affects Traffic Flow Management (TFM) performance. A cornerstone of the MBT concept is that all air vehicles have, at all times, an assigned 4DT from their current state to their destination. These assigned trajectories consist of trajectory constraints and descriptions. Pilots and air traffic controllers, with the aid of automation, operate the aircraft to comply with the assigned trajectory, unless first negotiating a revision. Equipped aircraft have substantial responsibility for complying with the assigned trajectory without controller intervention. To maximize the operational flexibility available to the airspace user, the assigned trajectory only imposes trajectory constraints as required to achieve the ATM goals of NAS constraint compliance and aircraft separation. Trajectory descriptions are added to the assigned trajectory to ensure sufficient predictability. To further improve trajectory prediction accuracy, airspace users supplement the assigned trajectory by broadcasting intent information and updating it as necessary. Air vehicle intent is a more detailed description of the airspace user's plan for how the flight will fly the assigned trajectory. Air vehicle intent can change freely, without negotiation, as long as it remains in compliance with the assigned trajectory. Aircraft assigned trajectories, air vehicle intent, and predicted trajectories are shared, creating a common view among stakeholders. A NAS Constraint Service gathers and publishes information about all known NAS constraints, enabling airspace users to be informed participants in trajectory negotiation. Trajectory constraints in the assigned trajectory are mapped to NAS constraints to facilitate identifying which aircraft are affected when NAS constraints change. To support efficient trajectory negotiation, all aircraft provide current information about air vehicle capabilities. Assigned trajectories are constructed to satisfy all known NAS constraints, improving trajectory stability and predictability. Uncertainty and disruptions are handled by modifying the assigned trajectory as far in advance as possible. By proactively negotiating changes to the assigned trajectory, rather than relying on controller-selected tactical actions such as vectors to resolve traffic conflicts or implement miles-in-trail restrictions, MBT keeps aircraft on closed trajectories that are fully known to all stakeholders. Since reactive air traffic control actions cannot be predicted in advance, the downstream trajectory cannot be accurately predicted until they happen. Reliable trajectory predictions allow the system to identify needed modifications to trajectories further in advance, where they can be negotiated and communicated as amendments (i.e., additional or altered trajectory constraints) to the assigned trajectory. Decision Support Tools (DSTs) aid controllers in rapidly defining and communicating closed trajectories to the aircraft and support all stakeholders in trajectory negotiation. Anticipated MBT benefit mechanisms include more accurate trajectory predictions, improved ATM performance and robustness to off-nominal conditions, increased flexibility and operational efficiency, reduced impediments to emerging classes of airspace users accessing NAS resources, reduced environmental impacts, and enhanced safety.

ConOps↗

Predicting the effectiveness of different mulching techniques in reducing post-fire runoff and erosion at plot scale with the RUSLE, MMF and PESERA models

Highlights: • RUSLE, MMF and PESERA, were able to predict the erosive response in burned areas and their mitigation. • These models can be calibrated at a small spatial scale and provide accurate results at greater spatial scales. • RUSLE model ideal for fast and simple risk assessment. • MMF or PESERA models could be the base of a post-fire management decision tool. Wildfires have become a recurrent threat for many Mediterranean forest ecosystems. The characteristics of the Mediterranean climate, with its warm and dry summers and mild and wet winters, make this a region prone to wildfire occurrence as well as to post-fire soil erosion. This threat is expected to be aggravated in the future due to climate change and land management practices and planning. The wide recognition of wildfires as a driver for runoff and erosion in burnt forest areas has created a strong demand for model-based tools for predicting the post-fire hydrological and erosion response and, in particular, for predicting the effectiveness of post-fire management operations to mitigate these responses. In this study, the effectiveness of two post-fire treatments (hydromulch and natural pine needle mulch) in reducing post-fire runoff and soil erosion was evaluated against control conditions (i.e. untreated conditions), at different spatial scales. The main objective of this study was to use field data to evaluate the ability of different erosion models: (i) empirical (RUSLE), (ii) semi-empirical (MMF), and (iii) physically-based (PESERA), to predict the hydrological and erosive response as well as the effectiveness of different mulching techniques in fire-affected areas. The results of this study showed that all three models were reasonably able to reproduce the hydrological and erosive processes occurring in burned forest areas. In addition, it was demonstrated that the models can be calibrated at a small spatial scale (0.5 m{sup 2}) but provide accurate results at greater spatial scales (10 m{sup 2}). From this work, the RUSLE model seems to be ideal for fast and simple applications (i.e. prioritization of areas-at-risk) mainly due to its simplicity and reduced data requirements. On the other hand, the more complex MMF and PESERA models would be valuable as a base of a possible tool for assessing the risk of water contamination in fire-affected water bodies and for testing different land management scenarios.

54 ENVIRONMENTAL SCIENCES↗

California Natural and Working Lands Carbon and Greenhouse Gas Model (CALAND) v3.0.0

CALAND is a system of algorithms (.r files) and data developed to quantify the impacts of various suites of California State-supported land use and land management strategies on landscape carbon and greenhouse gas emissions (CO2, CH4, and optional black carbon) relative to a baseline scenario for the Draft California 2030 Natural and Working Lands Climate Change Implementation Plan (2019).

Di Vittorio, Alan↗

User's manual for the BROOM decision support system

The Building Restoration Operations Optimization Model (BROOM) software system, developed by Sandia National Laboratories, is a comprehensive system designed to improve the efficiency and quality of sample collection, data management, and interpretation. Currently, BROOM is capable of supporting sampling efforts at facilities contaminated with chemical and/or biological agents. BROOM provides advanced visualization, analysis, and sampling optimization functions, which speed up the sampling process and lower the associated sampling costs. BROOM enables the user to develop a defensible sampling plan based on statistical analysis of sample results. BROOM consists of two applications: one that runs on a hand-held PDA and one that runs on a Windows desktop/laptop. This document covers the installation and basic operation of both components and provides examples of the application of these tools during and following an actual field exercise.

Knowlton, Robert G.↗

Scoping Sampling at the Site 300 Water Line Project: Soil Sampling and Analysis Plan/Quality Assurance Plan

Lawrence Liverniore National Laboratory’s (LLNL) Mechanical Utilities Division (MUD) is currently scoping a project with the Project Management Office (PMO) Experimental Test Site 300 (S300) to install/upgrade roughly six miles of water line along established roads within the complex. This Sampling and Analysis Plan (SAP) outlines the requirements to collect an initial round of soil samples from the proposed alignment of the water line to provide preliminary data and information that can be used during project design. The samples will be submitted to an offsite contract laboratory for analysis.

54 ENVIRONMENTAL SCIENCES↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Practical applications of low, medium, and high altitude aircraft remote sensing data to land use planning

Remotely sensed data is gaining wider acceptance in land use planning activities because of several inherent advantages offered by the technology. Scope of applications have increased to meet planners broadening responsibilities and needs for more comprehensive and specific information in response to new legislative mandates. Specific data needs associated with the land use planning process are varied. To illustrate how remote sensing surveys can be designed to meet a variety of goals at several planning levels, specific examples of the use of remotely sensed data and analysis techniques in four planning oriented land use surveys are discussed. These examples illustrate the use of aerial photography at the state planning level in Maryland and county level in Jefferson Parish, Louisiana. Special applications of aerial photography are demonstrated by energy planning in San Bernardino County, California and water management planning in New Castle County, Delaware.

Drackett, K.↗

Remote sensing in the coastal and marine environment. Proceedings of the US North Atlantic Regional Workshop

Presentations were grouped in the following categories: (1) a technical orientation of Earth resources remote sensing including data sources and processing; (2) a review of the present status of remote sensing technology applicable to the coastal and marine environment; (3) a description of data and information needs of selected coastal and marine activities; and (4) an outline of plans for marine monitoring systems for the east coast and a concept for an east coast remote sensing facility. Also discussed were user needs and remote sensing potentials in the areas of coastal processes and management, commercial and recreational fisheries, and marine physical processes.

Zaitzeff, J. B.↗

A development of logistics management models for the Space Transportation System

A new analytic queueing approach was described which relates stockage levels, repair level decisions, and the project network schedule of prelaunch operations directly to the probability distribution of the space transportation system launch delay. Finite source population and limited repair capability were additional factors included in this logistics management model developed specifically for STS maintenance requirements. Data presently available to support logistics decisions were based on a comparability study of heavy aircraft components. A two-phase program is recommended by which NASA would implement an integrated data collection system, assemble logistics data from previous STS flights, revise extant logistics planning and resource requirement parameters using Bayes-Lin techniques, and adjust for uncertainty surrounding logistics systems performance parameters. The implementation of these recommendations can be expected to deliver more cost-effective logistics support.

Carrillo, M. J.↗

Development and implementation of the verification process for the shuttle avionics system

The background of the shuttle avionics system design and the unique drivers associated with the redundant digital multiplexed data processing system are examined. With flight software pervading to the lowest elements of the flight critical subsystems, it was necessary to identify a unique and orderly approach of verifying the system as flight ready for STS-1. The approach and implementation plan is discussed, and both technical problems and management issues are dealt with.

Smith, H. E.↗