Search NASA⌕ Search

SEARCH · Search NASA

Results for “LINAC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

RECENT PROGRESS TOWARD A MUON RECIRCULATING LINEAR ACCELERATOR

Both Neutrino Factories (NF) and Muon Colliders (MC) require very rapid acceleration due to the short lifetime of muons. After a capture and bunching section, a linac raises the energy to about 900 MeV, and is followed by one or more Recirculating Linear Accelerators (RLA), possibly followed by a Rapid Cycling Synchnotron (RCS) or Fixed-Field Alternating Gradient (FFAG) ring. A RLA reuses the expensive RF linac section for a number of passes at the price of having to deal with different energies within the same linac. Various techniques including pulsed focusing quadruopoles, beta frequency beating, and multipass arcs have been investigated via simulations to improve the performance and reduce the cost of such RLAs.

43 PARTICLE ACCELERATORS↗

LCLS-II high power RF system overview and progress

A second X-ray free electron laser facility, LCLS-II, will be constructed at SLAC. LCLS-II is based on a 1.3 GHz, 4 GeV, continuous-wave (CW) superconducting linear accelerator, to be installed in the first kilometer of the SLAC tunnel. Multiple types of high power RF (HPRF) sources will be used to power different systems on LCLS-II. The main 1.3 GHz linac will be powered by 280 1.3 GHz, 3.8 kW solid state amplifier (SSA) sources. The normal conducting buncher in the injector will use four more SSAs identical to the linac SSAs but run at 2 kW. Two 185.7 MHz, 60 kW sources will power the photocathode dual-feed RF gun. A third harmonic linac section, included for linearizing the bunch energy spread before the first bunch compressor, will require sixteen 3.9 GHz sources at about 1 kW CW. A description and an update on all the HPRF sources of LCLS-II and their implementation is the subject of this paper.

43 PARTICLE ACCELERATORS↗

Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade

Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector accelerators, namely, the current 400 MeV LINAC and the Booster, are in progress under the Proton Improvement Plan (PIP). Proton Improvement Plan-II (PIP-II) proposes to replace the existing 400 MeV LINAC by a new 800 MeV LINAC, as an injector to the Booster which will increase Booster output power by nearly a factor of two from the PIP design value by the end of its completion. In any case, the Fermilab Booster is going to play a very significant role for nearly next two decades. In this context, I have developed and investigated a new beam injection scheme called "early injection scheme" (EIS) for the Booster with the goal to significantly increase the beam intensity output from the Booster thereby increasing the beam power to the HEP experiments even before PIP-II era. The scheme, if implemented, will also help improve the slip-stacking efficiency in the MI/RR. Here I present results from recent simulations, beam studies, current status and future plans for the new scheme.

43 PARTICLE ACCELERATORS↗

R & D on Beam Injection and Bunching Schemes in the Fermilab Booster

Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the next decade, the current 400 MeV normal conducting LINAC will be replaced by an 800 MeV superconducting LINAC (PIP-II) with an increased beam power >50% of the PIP design goal. Both in PIP and PIP-II era, the existing Booster is going to play a very significant role, at least for next two decades. In the meanwhile, we have recently developed an innovative beam injection and bunching scheme for the Booster called "early injection scheme" that continues to use the existing 400 MeV LINAC and implemented into operation. This scheme has the potential to increase the Booster beam intensity by >40% from the PIP design goal. Some benefits from the scheme have already been seen. In this paper, I will describe the basic principle of the scheme, results from recent beam experiments, our experience with the new scheme in operation, current status, issues and future plans. This scheme fits well with the current and future intensity upgrade programs at Fermilab.

Bhat, C. M.↗

RESULTS OF THE 2015 HELIUM PROCESSING OF CEBAF CRYOMODULES

Many conference series have adopted the same The CEBAF accelerator at Jefferson Lab consists of an injec-tor and two linacs connected by arcs. Each linac contains 25 cryomodules that are designed to deliver an integrated energy of 2.2 GeV per pass to an electron beam in order to meet 12 GeV energy requirements. Helium processing is a processing technique that is used to reduce field emis-sion (FE) in SRF cavities. Helium processing of the 50 installed linac cryomodules was seen as necessary to support 12 GeV energy requirements. This paper will describe the processing procedure and summarize the results of this effort.

Drury, Michael A.↗

LCLS-II SRF Cavity Processing Protocol Development and Baseline Cavity Performance Demonstration

The ”Linac Coherent Light Source-II” Project will construct a 4 GeV CW superconducting RF linac in the first kilometer of the existing SLAC linac tunnel. The baseline design calls for 280 1.3 GHz nine-cell cavities with an average intrinsic quality factor Q0 of 2.7·1010 at 2K and 16 MV/m accelerating gradient. The LCLS-II high Q0 cavity treatment protocol utilizes the reduction in BCS surface resistance by nitrogen doping of the RF surface layer, which was discovered originally at FNAL. Cornell University, FNAL, and TJNAF conducted a joint high Q0 R&D program with the goal of (a) exploring the robustness of the N-doping technique and establishing the LCLS-II cavity high Q0 processing protocol suitable for production use, and (b) demonstrating that this process can reliably achieve LCLS-II cavity specification in a production acceptance testing setting. In this paper we describe the LCLS-II cavity protocol and analyze combined cavity performance data from both vertical and horizontal testing at the three partner labs, which clearly shows that LCLS-II specifications were met, and thus demonstrates readiness for LCLS-II cavity production.

Liepe, M.↗

Commissioning the JLab LERF Cryomodule Test Facility

The JLab Low Energy Recirculating Facility, LERF, has been modified to support concurrent testing of two LCLS-II cryomodules. The cryomodules are installed in a similar fashion as they would be in the L1 section of the LCLS-II linac, including the floor slope and using all of the LCLS-II hardware and controls for cryomodule cryogenics, vacuum, and RF (SSA and LLRF). From the start, it was intended to use LCLS-II electronics and EPICS software controls for cryomodule testing. In affect the LERF test facility becomes the first opportunity to commission and operate the LCLS-II LINAC hardware and software controls. Support for specific cryomodule high level test applications like Q0 and HOMs measurements, are being developed from the basic cryomodule control suite. To support the testing, 2 K He is supplied from the CEBAF south linac cryogenic system, where care must be taken when using the LERF test facility to not upset the CEBAF cryogenics plant. This paper discusses the commissioning of the hardware and software development for testing the first two LCLS-II cryomodules.

Hovater, C.↗

ERL-BASED COMPACT X-RAY FEL

We propose to develop an energy-recovery-linac (ERL)- based X-ray free-electron laser (XFEL). Taking advantage of the demonstrated high-efficiency energy recovery of the beam power in the ERL, the proposed concept offers the following benefits: i) recirculating the electron beam through high-gradient superconducting RF (SRF) cavities shortens the linac, ii) energy recovery in the SRF linac saves the klystron power and reduces the beam dump power, iii) the high average beam power produces a high average photon brightness. In addition, such a concept has the capability of delivering optimized high-brightness CW X-ray FEL performance at different energies with simultaneous multipole sources. In this paper, we will present the preliminary results on the study of feasibility, optics design and parameter optimization of such a device.

Lin, Fanglei↗

Linear Vlasov Solver For Microbunching Gain Estimation With Inclusion of CSR, LSC And Geometric Impedances

As is known, microbunching instability (MBI) has been one of the most challenging issues in designs of magnetic chicanes for short-wavelength free-electron lasers or linear colliders, as well as those of transport lines for recirculating or energy recovery linac machines. To more accurately quantify MBI in a single-pass system and for more complete analyses, we further extend and continue to increase the capabilities of our previously developed linear Vlasov solver [1] to incorporate more relevant impedance models into the code, including transient and steady-state free-space and/or shielding coherent synchrotron radiation (CSR) impedances, the longitudinal space charge (LSC) impedances, and the linac geometric impedances with extension of the existing formulation to include beam acceleration [2]. Then, we directly solve the linearized Vlasov equation numerically for microbunching gain amplification factor. In this study we apply this code to a beamline lattice of transport arc [3] following an upstream linac section. The resultant gain functions and spectra are presented here, and some results are compared with particle tracking simulation by ELEGANT [4]. We also discuss some underlying physics with inclusion of these collective effects and the limitation of the existing formulation. It is anticipated that this more thorough analysis can further improve the understanding of MBI mechanisms and shed light on how to suppress or compensate MBI effects in lattice designs.

Tsai, C. -Y.↗

Start-to-End Tracking Simulations of the Compact Linear Collider

We present the current status of the beam tracking simulations of the Compact Linear Collider (CLIC) from the exit of the damping ring to the interaction point, including the ring to main linac (RTML) section, main linac, beam delivery system (BDS) and beam-beam interactions. This model introduces realistic alignment survey errors, dynamic imperfections and also the possibility to study collective effects in the main linac and the BDS. Special emphasis is put on low emittance transport and beam stabilisation studies, applying beam based alignment methods and feedback systems. The aim is to perform realistic integrated simulations to obtain reliable luminosity predictions.

43 PARTICLE ACCELERATORS↗

Warm Compressor system Overview and status of the PIP-II cryogenic system

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.

43 PARTICLE ACCELERATORS↗

Electro-Mechanical Properties of Spoke-Loaded Superconducting Cavities

This paper presents experimental data characterizing the electro-mechanical properties of superconducting spoke-loaded cavities developed for high-intensity ion-linac applications, such as the cw ANL Advanced Exotic Beams Laboratory (AEBL) driver linac and the pulsed FNAL High Intensity Neutrino Source (HINS, now project X) proton driver linac. High-gradient cw operation at 4.2 K can produce violent boiling in the liquid helium coolant causing microphonic frequency noise. A spoke cavity designed to minimize the effects of helium pressure on RF eigenfrequency, the total microphonic induced RF frequency variations, were found to be on the level of the phase noise in the reference oscillator. To determine the pulsed cavity RF performance, the Lorentz transfer function was measured and used to predict the dynamic detuning in pulsed operation. There is good agreement between the predicted fit and the measured data, demonstrating the utility of the Lorentz transfer function, which can completely characterize the dynamics of the coupling between the mechanical cavity structure and the cavity RF field due to the Lorentz force.

Conway, Z.↗

A Simulation of the Photoionization of H- Together with the Subsequent Tracking of the Liberated Electrons

The Proton Improvement Plan - II (PIP-II) is a new linear accelerator (LINAC) complex being built at Fermilab. It is based on superconducting radiofrequency cavities and will accelerate H- ions to 800 MeV kinetic energy before injection into the existing Booster ring. Measurements of the profile of the beam along the LINAC must be done by non-intercepting methods due to the superconducting cavities. The method chosen is photoionization of a small number of H- by a focused infrared laser, aka laserwire. The number of ionized electrons is measured as a function of laser position within the H- beam. To aid in the design of the collection mechanism, a simulation was written in MATLAB with input from the commercial electromagnetic simulation, CST. This simulation calculates the number and positions of the liberated electrons and tracks them through the magnetic collection and H- beam fields to the collection point. Results from this simulation for various points along the LINAC will be shown.

43 PARTICLE ACCELERATORS↗

Design of Single Spoke Resonators for Project X

Project X is based on a 3 GeV CW superconducting linac and is currently in the R&D phase awaiting CD-0 approval. The low-energy section of the Project X H-linac includes three types of super-conducting single spoke cavities operating at 325 M Hz. SSR0 (26 cavities), SSR1 (18 cavities) and SSR2 (44 cavities) have a geometrical beta of = 0.11, 0.21 and 0.4 respectively. Single spoke cavities were selected for the linac in virtue of their higher r/Q. In this paper we present the decisions and ana lyses that lead to the final designs. Electro-magnetic and mechanical finite element analyses were performed with the purpose of optimizing the electro-magnetic design, minimizing frequency shifts due to Helium bath pressure fluctuations and providing a p ressure rating for the resonators that allow their use in the cryomodules.

43 PARTICLE ACCELERATORS↗

Optics Design for FACET

FACET is a proposed facility at SLAC National Accelerator Laboratory. It will provide high energy, tightly focused and compressed electron and positron bunches for beam driven plasma wakefield acceleration research and other experiments. FACET will be built in the SLAC linac sector 20, where it will be separated from the LCLS located immediately downstream and will take advantage of the upstream 2 km linac for up to 23 GeV beam acceleration. FACET will also include an upgrade to linac sector 10, where a new e+ compressor chicane will be installed. The sector 20 will contain a new optics consisting of two chicanes for e+ and ebunch length compression, a final focus and an experimental line with a dump. The e+ and e- chicanes will allow the transport of e+ and ebunches together, their compression and proper positioning of e+ witness bunch behind the e- drive bunch at the plasma Interaction Point. The new optics will mostly use the existing SLAC magnets to minimize the project cost. Details of the FACET optics design and results of particle tracking simulations are presented.

43 PARTICLE ACCELERATORS↗

Conceptual Design of the Drive Beam for a PWFA-LC

Plasma Wake-Field Acceleration (PWFA) has demonstrated acceleration gradients above 50 GeV/m. Simulations have shown drive/witness bunch configurations that yield small energy spreads in the accelerated witness bunch and high energy transfer efficiency from the drive bunch to the witness bunch, ranging from 30% for a Gaussian drive bunch to 95% for bunch with triangular shaped longitudinal profile. These results open the opportunity for a linear collider that could be compact, efficient and more cost effective than the present microwave technologies. A concept of a PWFA-based Linear Collider (PWFA-LC) has been developed by the PWFA collaboration. Here we will describe the conceptual design and optimization of the drive beam, which includes the drive beam linac and distribution system. We apply experience of the CLIC drive beam design and demonstration in the CLIC Test Facility (CTF3) to this study. We discuss parameter optimization of the drive beam linac structure and evaluate the drive linac efficiency in terms of the drive beam distribution scheme and the klystron/modulator requirements.

43 PARTICLE ACCELERATORS↗

Electron pinch effect in beam-beam interaction of ERL based eRHIC

Beam-beam effects present one of major factors limiting the luminosity of colliders. In the linac-ring option of the eRHIC design, an electron beam accelerated in a superconducting energy recovery linac(ERL) collides with a proton beam circulating in the Rille ring. Some specific features of beam-beam interactions should be carefully evaluated for the linac-ring configuration. One of the most important effects on the ion beam stability originates from a strongly focus ed electron beam because of the beam-beam force. This electron pinch effect makes the beam-beam parameter of the ion beam several times larger than the design value, and leads to a fast emittance grow th of the ion beam. The electron pinch effect can be controlled by adjustments of the electron lattice and the incident emittance. We present results of simulations optimizing the ion beam parameters in the presence of this pinch effect.

43 PARTICLE ACCELERATORS↗

CW RF system of the Project-X accelerator front end

Front end of a CW linac of the Project X contains an H{sup -} source, an RFQ, a medium energy transport line with the beam chopper, and a SC low-beta linac that accelerates H{sup -} from 2.5 MeV to 160 MeV. SC Single Spoke Resonators (SSR) will be used in the linac, because Fermilab already successfully developed and tested a SSR for beta = 0.21. Two manufactured cavities achieve 2.5 times more than design accelerating gradients. One of these cavities completely dressed, e.g. welded to helium vessel with integrated slow and fast tuners, and tested in CW regime. Successful tests of beta = 0.21 SSR give us a confidence to use this type of cavity for low beta (0.117) and for high-beta (0.4) as well. Both types of these cavities are under development. In present report the basic constrains, parameters, electromagnetic and mechanical design for all the three SSR cavities, and first test results of beta = 0.21 SSR are presented.

43 PARTICLE ACCELERATORS↗