Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

Hybrid PDES Simulation of HPC Networks Using Zombie Packets

Although high-fidelity network simulations have proven to be reliable and cost-effective tools to peer into architectural questions for high-performance computing (HPC) networks, they incur a high resource cost. The time spent in simulating a single millisecond of network traffic in the highest detail can take hours, even for static, well-behaved traffic patterns such as uniform random. Surrogate models offer a significant reduction in runtime, yet they cannot serve as complete replacements and should only be used when appropriate. Thus, there is a need for hybrid modeling, where high-fidelity simulation and surrogates run side-by-side. Here, we present a surrogate model for HPC networks in which: packets bypass the network, while the network state is left untouched, i.e., suspended. To bypass the network, we use historical data to estimate the arrival time at which every packet should be scheduled at; to suspend the network, all in-flight packets are scheduled to arrive at their destinations, and are kept in the system to awaken as zombies when switching back to high-fidelity. Speedup for a hybrid model is relative to the proportion of surrogate to high-fidelity. This light-weight surrogate obtained up to 76× speedup. Keeping the zombies in the network showed an increase in the accuracy of the high-fidelity simulation on restart when compared to restarting the network from an empty state.

HPC networks↗

Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

STATE RESEARCH, OUTREACH AND TECHNICAL ASSISTANCE TO IMPROVE THE NATION’S TRANSMISSION AND DISTRIBUTION SYSTEMS

The goal of the project 'State Research, Outreach and Technical Assistance to Improve the Nation's Transmission and Distribution Systems' was for the National Association of State Energy Officials (NASEO) to partner with the National Governors Association (NGA) Center for Best Practices, the National Conference of State Legislators (NCSL), and the National Association of Regulatory Utility Commissioners (NARUC) to assist DOE's Office of Electricity Delivery and Energy Reliability (OE) in its effort to modernize and expand America's electric delivery system. NASEO focused on key transmission and distribution issues where coordination between the federal and state governments was critical. Throughout the duration of this program, NASEO engaged in monthly coordination - occasionally more often - with NGA, NCSL and NARUC. NASEO staff and General Counsel Jeff Genzer also had regular face-to-face meetings, phone calls and emails with OE staff to learn from DOE and share information and feedback from the state energy offices on transmission and distribution. To commence work on this project, NASEO met with OE, NGA, NCSL and NARUC in January 2005 and remained committed to regular communications with all involved entities throughout the duration of this project. NASEO provided comments and analysis to the other partners on deliverable reports under this award. This award provided support to NASEO's Energy Production Committee (chaired by Dub Taylor of Texas, followed by Tom Fuller of Wyoming) to plan and host sessions at NASEO's Annual Meeting and Energy Outlook Conferences. Sessions included presentations from state, DOE, national laboratory and private sector experts on transmission, distribution, distributed energy resources, integrating renewable resources into the electricity grid. NASEO disseminated information to its members through emails and its website on transmission and distribution technology and policy. NASEO was an active member of the National Council on Electricity Policy as part of its transmission and distribution work. The National Council on Electricity Policy (National Council) is a venture between NASEO, NARUC, NCSL, National Association of Clean Air Agencies (NACAA) and the National Governors Association (NGA). The National Council also includes several federal members including FERC, DOE, and the U.S. Environment Protection Agency (EPA). NASEO members serve on the policy committee and NASEO General Council Jeff Genzer is a member of the National Council's Executive Committee. NASEO staff participated on regularly scheduled policy committee and executive committee calls and helped to plan agendas and publications for various state decision-makers. Specifically, NASEO organized state energy officials and participating in formulating the agenda for meetings, including the Mid-Atlantic Distributed Generation Workshop in New Jersey in September 2007. NASEO shared the results of these meetings through its website, email communications and direct conversations with state energy officials. NASEO participated as a member of the National Action Plan for Energy Efficiency (NAPEE) Leadership Committee, representing the interests and expertise of the state energy offices. In addition, NASEO was part of the Long-Term Vision Committee. NASEO members also participated in these activities and NASEO has encouraged further efforts of its membership with regards to NAPEE. NASEO has worked to ensure that its membership has the most timely and accurate information about transmission and distribution technology and policy. Its work with other associations has facilitated greater partnerships to enhance activities across the nation and encourage state energy offices to collaborate with public utility commissions, legislatures and executives to improve modern transmission and distribution. NASEO has identified transmission and distribution as a key area for further action.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Increasing the Cost-efficiency of the DSN

JPL has operated the Deep Space Network (DSN) on behalf of NASA since the 1960's. Over the last two decades, the DSN budget has generally declined in real-year dollars while the aging assets required more attention, and the missions became more complex. As a result, the budget has been increasingly consumed by Operations and Maintenance (O and M), significantly reducing the funding wedge available for technology investment and for enhancing the DSN capability and capacity. Responding to this budget squeeze, the DSN launched an effort to improve the cost-efficiency of the O and M. In this paper we: Analyze the components of O&M. We note for example that, for the DSN, less than 20% of the staff engage in the traditional human-in-front-a-console role, so any effort to increase the cost efficiency must go beyond reducing the number of "Real-time operators." Explain the underlying organizational and cultural structures. Any cost-efficiency activities changes either accept, or carefully modify these structures. For example, the DSN O&M is based on the concept that there are three nearly identical antenna complexes separated by approximately 1200 in latitude and that each antenna complex is operated by a different contractor (driven by international agreements). Explore planned changes in the customer interface, e.g. web-based automated scheduling, and the processes required for a transition. Changes have to be evaluated in the larger end-to-end context, e.g. do the changes provide a net cost-efficiency for the DSN and the missions, or do they merely shift cost from the DSN to the missions. Consider possible significant changes in real-time pass management, e.g. full-remoting of operations, and lights-dim operations, while maintaining (or improving) the performance metrics of the DSN. Investigate how procedural and administrative changes could increase cost-efficiency, in conjunction with changes in the customer interfaces and real-time pass management. Examples would be handling of inter-governmental agreements, improved sharing of resources with other agencies, and better use of commercial (rather than government) resources

Deep Space Network (DSN)↗

Vehicle-to-manufacturing (V2M) system: A novel approach to improve energy demand flexibility for demand response towards sustainable manufacturing

The U.S. manufacturing sector accounts for 77% of the industrial energy consumption, but its participation in demand response (DR) programs is largely lagged behind. The limited flexibility in production scheduling under high capacity utilization and the lack of DR schemes that incorporate energy demand flexibility measures are deemed as major barriers. In this study, a framework of the interactive vehicles-to-manufacturing (V2M) energy sharing system is proposed to improve the energy demand flexibility of the aggregated system and enhance the DR effectiveness for manufacturers. The V2M-based DR scheme aims to reduce the energy cost by load shifting through joint production and energy sharing control, which can eventually promote manufacturing DR implementation even under high capacity utilization requirements and dynamic real-time electricity prices. The V2M system is modeled based on a discrete-Markov chain considering the complex interconnections among various manufacturing resources and multi-directional energy flows among manufacturing facilities, electric vehicles, and the power grid. Based on the system model, a mixed-integer nonlinear programming (MINLP) problem is formulated to identify the optimal DR scheme. The effectiveness of the proposed approach is validated through comparisons with traditional manufacturing DR schemes. Finally, the results show that a 2.1 to 6.5 times energy demand flexibility improvement and an additional 4.7% to 6.9% energy cost reduction can be achieved by the proposed approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

User-Oriented Modeling Tools for Advanced Hybrid and Climate-Appropriate Rooftop Air Conditioners

Hybrid unitary air conditioning systems offer a pathway to substantially reduce energy use and peak electrical demand for cooling, heating, and ventilation in commercial buildings. Hybrid air conditioners incorporate multiple subsystems that are carefully orchestrated to provide climate- and application-specific efficiency advantages. There are a multitude of hybrid system architectures, but common subsystems include: heat recovery ventilation, indirect evaporative cooling, desiccant dehumidification, variable speed fans, modulating dampers, and multi-stage or variable-speed vapor compression cooling. Categorically, hybrid systems can operate in numerous discrete modes. For example: indirect evaporative cooling may operate for periods when the subsystem provides adequate sensible cooling, then vapor compression cooling will be included when more cooling or dehumidification is necessary. Laboratory assessments, field studies, and simulations have demonstrated that hybrid unitary air conditioners could reduce energy use for cooling and ventilation by 30-90% depending on climate and application. Heretofore, it has been challenging - if not impossible - for practitioners to model hybrid air conditioners as part of building energy simulations; and the limitation has severely obstructed broader adoption of technologies in this class. In this project, we developed a new feature for EnergyPlus that enables modeling hybrid unitary air conditioning equipment for building energy simulations. This is a significant advancement for both theory and practice, and confers public benefit by enabling practitioners to evaluate this compelling efficiency technology as a part of building energy simulations. The feature is a black-box model that requires extensive performance data for each hybrid unitary product. In parallel, we also developed new features for the Technology Performance Exchange to enable manufacturers to submit performance data in a standard format that can be used with the hybrid unitary model in EnergyPlus. Additionally, through this project we expanded university educational resources, and university- manufacturing industry collaborations in the field of energy efficiency technology. Over two years, we involved 20 undergraduate students in ambitious research projects focused on modeling complex multi-mode mechanical systems, supported three mechanical engineering bachelor theses, established undergraduate apprenticeships with multiple industry partners, and involved those partners in the process of design, validation, and debugging for the new EnergyPlus feature. The EnergyPlus feature is described and discussed in an academic article, as well as in an engineering reference, and input/output reference documentation for EnergyPlus. The Technology Performance Exchange features are live and publicly accessible, our manufacturer partners are primed to submit initial product information and performance data to the exchange, and the EnergyPlus feature is scheduled for public release in Spring 2018 as a part of EnergyPlus v8.9.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The California Cooperative Remote Sensing Project

The USDA, the California Department of Water Resources (CDWR), the Remote Sensing Research Program of the University of California (UCB) and NASA have completed a 4-yr cooperative project on the use of remote sensing in monitoring California agriculture. This report is a summary of the project and the final report of NASA's contribution to it. The cooperators developed procedures that combined the use of LANDSAT Multispectral Scanner imagery and digital data with good ground survey data for area estimation and mapping of the major crops in California. An inventory of the Central Valley was conducted as an operational test of the procedures. The satellite and survey data were acquired by USDA and UCB and processed by CDWR and NASA. The inventory was completed on schedule, thus demonstrating the plausibility of the approach, although further development of the data processing system is necessary before it can be used efficiently in an operational environment.

Hlavka, Christine A.↗

An expert system for shuttle and satellite radar tracker scheduling

This expert system automates and optimizes radar tracker selection for shuttle missions. The expert system is written in the FORTRAN and C languages on an HP9000. It is portable to any UNIX machine having both ANSI-77 FORTRAN and C language compilers. It is a rule based expert system that selects tracking stations from the S-band and C-band radar stations and the TDRSS east and TDRSS west satellites under a variety of conditions. The expert system was prototyped on the Symbolics in the Automated Reasoning Tool (ART) and ZetaLisp. After the prototype demonstrated an acceptable automation of the process of selecting tracking stations to support the orbit determination requirements of Shuttle missions, the basic ART rules of the prototype were ported to the HP9000 computer using the CLIPS language. CLIPS is a forward-chaining rule-based expert system language written in C. Prior to the development of this expert system the selection process was a tedious manual process and expensive in terms of human resources. Manual tracking station selection required from 1 to 2 man weeks per mission; whereas the expert system can complete the selection process in about 2 hours.

Mitchell, Paul↗

LAI Assimilation Schedules to Constrain Uncertain Cultivars and Soils in CERES-Maize

In anticipation of large-domain crop model applications where precise local configuration and calibration is not possible, we describe benefits and potential drawbacks of employing a crop pest module to achieve leaf area index (LAI) assimilation into a high performing CERES-Maize crop model configuration at a field experiment site in Perry, Iowa. Simulation experiments explore the use of MODIS satellite-derived LAI to constrain and adjust LAI to counter imprecise cultivar and soil configurations often occurring in the absence of high-quality local information. Simulations using single-day, window, and continuous LAI replacement across 5 cultivars and 2 soil calibration approaches for nine corn rotation years from 2004 to 2020 led to different yield outcomes and reverberations throughout the field environment. Evaluating variance and mean bias, results indicate minimal interventions in early vegetative and grain-filling stages were more beneficial than use of continuous LAI adjustments, as they minimized disruptions to the internal resource balances governing plant stresses and grain production. LAI adjustment was particularly helpful in constraining growth related to uncertain thermal unit requirements and leaf tip appearance rates (P1 and PHINT cultivar parameters, respectively). Findings underscore the need to assimilate additional state variables to ensure internal biophysical coherence. This approach shows promise for applications spanning wider domains with prediction time pressure where detailed configuration, more complex assimilation methods, or recalibration of crop model parameters may not be practical.

Phenology↗

Decision theory for computing variable and value ordering decisions for scheduling problems

Heuristics that guide search are critical when solving large planning and scheduling problems, but most variable and value ordering heuristics are sensitive to only one feature of the search state. One wants to combine evidence from all features of the search state into a subjective probability that a value choice is best, but there has been no solid semantics for merging evidence when it is conceived in these terms. Instead, variable and value ordering decisions should be viewed as problems in decision theory. This led to two key insights: (1) The fundamental concept that allows heuristic evidence to be merged is the net incremental utility that will be achieved by assigning a value to a variable. Probability distributions about net incremental utility can merge evidence from the utility function, binary constraints, resource constraints, and other problem features. The subjective probability that a value is the best choice is then derived from probability distributions about net incremental utility. (2) The methods used for rumor control in Bayesian Networks are the primary way to prevent cycling in the computation of probable net incremental utility. These insights lead to semantically justifiable ways to compute heuristic variable and value ordering decisions that merge evidence from all available features of the search state.

Linden, Theodore A.↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Improving Project Management with Simulation and Completion Distribution Functions

Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

Cates, Grant R.↗

Vertiport Dynamic Density

Advanced Air Mobility (AAM) is envisioned to be another spoke in a region’s transportation system, supplementing ground-based travel with air-based travel. Eventually, air taxis will be pervasive, convenient, and affordable. As demand and operations tempo increase, congestion may arise. Several characteristics of AAM reduce the applicability of techniques used in today’s National Airspace System (NAS) to manage congestion. AAM will include both scheduled and non-scheduled, on-demand operations, challenging strategic deconfliction algorithms. Flights will be fairly short, traversing an urban area, not hundreds or thousands of miles, with corresponding low energy reserves, prohibiting excessive delays. Flight operators will need flexibility in operations, scheduling a flight only minutes before departure, or diverting to an alternate vertiport if it becomes advantageous, further adding to trajectory uncertainty that would challenge strategic deconfliction. Finally, operators will desire privacy to protect sensitive information or preserve competitive advantage, limiting early access to intent information. In this paper, we present an approach for managing congestion at vertiports by providing insight into the traffic situation to support operationally-advantageous and safe land or divert decisions. We propose a metric designed with usefulness and usability in AAM operations in mind. The metric uses the sociology concept of dynamic density (DD) that takes into consideration not only number of flights, but also the interaction of those flights with the vertiport’s limited resources, namely the landing pads and the parking spots. DD supports a Pilot in Command (PIC) with decisions about whether to proceed, expedite, delay, or divert; and supports air traffic control (ATC) and vertiport operators in airspace management and vertiport usage. We demonstrate the metric on a notional vertiport scenario. We also show that DD provides better insight into congestion and resulting flight delays than an aircraft count metric used in traditional air traffic management.

Lilly Spirkovska↗

Distributed Energy Resource Optimization Using a Software as Service (SaaS) Approach at the University of California, Davis Campus

Together with OSIsoft LLC as its private sector partner and matching sponsor, the Lawrence Berkeley National Laboratory (Berkeley Lab) won an FY09 Technology Commercialization Fund (TCF) grant from the U.S. Department of Energy. The goal of the project is to commercialize Berkeley Lab's optimizing program, the Distributed Energy Resources Customer Adoption Model (DER-CAM) using a software as a service (SaaS) model with OSIsoft as its first non-scientific user. OSIsoft could in turn provide optimization capability to its software clients. In this way, energy efficiency and/or carbon minimizing strategies could be made readily available to commercial and industrial facilities. Specialized versions of DER-CAM dedicated to solving OSIsoft's customer problems have been set up on a server at Berkeley Lab. The objective of DER-CAM is to minimize the cost of technology adoption and operation or carbon emissions, or combinations thereof. DER-CAM determines which technologies should be installed and operated based on specific site load, price information, and performance data for available equipment options. An established user of OSIsoft's PI software suite, the University of California, Davis (UCD), was selected as a demonstration site for this project. UCD's participation in the project is driven by its motivation to reduce its carbon emissions. The campus currently buys electricity economically through the Western Area Power Administration (WAPA). The campus does not therefore face compelling cost incentives to improve the efficiency of its operations, but is nonetheless motivated to lower the carbon footprint of its buildings. Berkeley Lab attempted to demonstrate a scenario wherein UCD is forced to purchase electricity on a standard time-of-use tariff from Pacific Gas and Electric (PG&E), which is a concern to Facilities staff. Additionally, DER-CAM has been set up to consider the variability of carbon emissions throughout the day and seasons. Two distinct analyses of value to UCD are possible using this approach. First, optimal investment choices for buildings under the two alternative objectives can be derived. Second, a week-ahead building operations forecaster has been written that executes DER-CAM to find an optimal operating schedule for buildings given their expected building energy services requirements, electricity prices, and local weather. As part of its matching contribution, OSIsoft provided a full implementation of PI and a server to install it on at Berkeley Lab. Using the PItoPI protocol, this gives Berkeley Lab researchers direct access to UCD's PI data base. However, this arrangement is in itself inadequate for performing optimizations. Additional data not included in UCD's PI database would be needed and the campus was not able to provide this information. This report details the process, results, and lessons learned of this commercialization project.

25 ENERGY STORAGE↗

Galileo mission planning for Low Gain Antenna based operations

The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

Gershman, R.↗

Simple, Scalable, Script-Based Science Processor (S4P)

The development and deployment of data processing systems to process Earth Observing System (EOS) data has proven to be costly and prone to technical and schedule risk. Integration of science algorithms into a robust operational system has been difficult. The core processing system, based on commercial tools, has demonstrated limitations at the rates needed to produce the several terabytes per day for EOS, primarily due to job management overhead. This has motivated an evolution in the EOS Data Information System toward a more distributed one incorporating Science Investigator-led Processing Systems (SIPS). As part of this evolution, the Goddard Earth Sciences Distributed Active Archive Center (GES DAAC) has developed a simplified processing system to accommodate the increased load expected with the advent of reprocessing and launch of a second satellite. This system, the Simple, Scalable, Script-based Science Processor (S42) may also serve as a resource for future SIPS. The current EOSDIS Core System was designed to be general, resulting in a large, complex mix of commercial and custom software. In contrast, many simpler systems, such as the EROS Data Center AVHRR IKM system, rely on a simple directory structure to drive processing, with directories representing different stages of production. The system passes input data to a directory, and the output data is placed in a "downstream" directory. The GES DAAC's Simple Scalable Script-based Science Processing System is based on the latter concept, but with modifications to allow varied science algorithms and improve portability. It uses a factory assembly-line paradigm: when work orders arrive at a station, an executable is run, and output work orders are sent to downstream stations. The stations are implemented as UNIX directories, while work orders are simple ASCII files. The core S4P infrastructure consists of a Perl program called stationmaster, which detects newly arrived work orders and forks a job to run the appropriate executable (registered in a configuration file for that station). Although S4P is written in Perl, the executables associated with a station can be any program that can be run from the command line, i.e., non-interactively. An S4P instance is typically monitored using a simple Graphical User Interface. However, the reliance of S4P on UNIX files and directories also allows visibility into the state of stations and jobs using standard operating system commands, permitting remote monitor/control over low-bandwidth connections. S4P is being used as the foundation for several small- to medium-size systems for data mining, on-demand subsetting, processing of direct broadcast Moderate Resolution Imaging Spectroradiometer (MODIS) data, and Quick-Response MODIS processing. It has also been used to implement a large-scale system to process MODIS Level 1 and Level 2 Standard Products, which will ultimately process close to 2 TB/day.

Lynnes, Christopher↗