Search NASA⌕ Search

SEARCH · Search NASA

Results for “Shuttle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

Space Shuttle program orbital flight test program results and implications

The Space Shuttle System Orbital Flight Test (OFT) program results are described along with an overview of significant development issues and their resolution. In addition, an overall summary of the development status and the follow-on flight demonstrations of Shuttle improvements such as Lightweight External Tank, High Performance SRBs, Full Power Level (109%) Main Engine Operation, and the SRB Filament Wound Case (FWC) will be discussed.

Kohrs, R. H.↗

The Shuttle Student Involvement Project for Secondary Schools - Reports on first flights

During the 1980-81 academic year, NASA established the Shuttle Student Involvement Project for Secondary Schools (SSIP), an annual competition which invites students to propose experiments suitable for flight aboard the Space Shuttle. The purpose of the project is to stimulate the teaching and study of science and engineering among students in grades 9 through 12. Results of the first year of the project have been reported. The second competition was announced in September 1981. With a February 1, 1982 deadline, 2,800 proposals were submitted. Twenty national winners were announced in May 1982. NASA is now pairing the 20 winners with a corporate sponsor and with a NASA scientist or engineer to work with the student. Most SSIP experiments are performed in the Orbiter's mid-deck, and receive up to one hour of crew time. Attention is given to the desired outcomes of SSIP, and the SSIP experiments.

Ladwig, A.↗

Capabilities and limitations of the Shuttle for future cargo programs

This paper presents a view of future Shuttle cargo operations. Planned and potential performance improvements are addressed. On-orbit operations, performance and experience are discussed with a view of anticipated changes. Current and future cargo integration activities are also addressed. The future Shuttle user is provided a projection to assist in planning and payload development.

Williams, L. G.↗

Shuttle for the 21st Century

A range of mission requirement, economic, system concept, and technology issues relating to a 21st-Century launch vehicle replacement for the Space Shuttle are examined. Issues addressed include: future space scenarios and traffic demands; the economics of both development and operations; potential developers, operators, and users; probable vehicle system concepts; and needed technologies. A broad data base of advanced systems studies, primarily over the past 10 years, along with experience drawn from the Space Shuttle provide the basis for this review.

Eldred, C. H.↗

Small payloads for the Shuttle

The Goddard Space Flight Center, Special Payloads Division (sounding rockets) experience in applying rocket mechanical experience and technology to the Shuttle is presented. While the mechanical design loads are similar, new considerations for thermal extremes, material control and attachment structures must be included. These additional requirements have been successfully introduced in the free flyer class of payloads, Shuttle Pointed Automonous Research Tool for Astronomy (SPARTAN), and a motorized door for the Get Away Special (GAS) payloads.

Nygaard, M. A.↗

Atmospheric environment for Space Shuttle (STS-4) launch

Selected atmospheric conditions observed near space shuttle STS-4 launch time on June 27, 1982, at Kennedy Space Center, Florida are summarized. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given as well as the wind and thermodynamic parameters measured at the surface and aloft in the SRB descent/impact ocean area. Final meteorological tapes, which consist of wind descent were constructed. The STS-4 ascent meteorological data tape was constructed by Marshall Space Flight Center in response to shuttle task agreement No. 989-13-22-368 with Johnson Space Center.

Johnson, D. L.↗

Data Announcement Bulletin: Space Shuttle OSTA 1 payload data

Data from the scientific payload, OSTA 1, is available. Images of the Earth's surface taken from the Shuttle Imaging Radar-A were processed, and can be obtained in the form of photographic prints, negatives, or positive transparencies. Magnetic tapes containing data for the ocean color experiment and the Shuttle multispectral infrared radiometer are also available.

Source record↗

Airborne measurements of launch vehicle effluent: Launch of Space Shuttle (STS-1) on 12 April 1981

Launch vehicle effluent environmental impact activities from the first space shuttle (STS-1) included airborne measurements within the exhaust cloud from about 9 min after launch (T + 9) to T + 120 min. Measurements included total hydrogen chloride (gaseous plus aqueous) concentrations, particulate concentrations, temperature, and dewpoint temperature. The airborne measurements are summarized. The physical growth and behavior of exhaust clouds is presented as well as the results of laboratory analysis of elemental composition of particulate samples collected by the aircraft. Observed results from the STS-1 launch are compared with earlier Titan III results. Shuttle effluent concentrations are found to be within the range of Titan III observations.

Gregory, G. L.↗

A study of aerodynamic heating distributions on a tip-fin controller installed on a Space Shuttle Orbiter model

The aerodynamic heating of a tip-fin controller mounted on a Space Shuttle Orbiter model was studied experimentally in the Calspan Advanced Technology Center 96 inch Hypersonic Shock Tunnel. A 0.0175 scale model was tested at Mach numbers from 10 to 17.5 at angles of attack typical of a shuttle entry. The study was conducted in two phases. In phase 1 testing a thermographic phosphor technique was used to qualitatively determine the areas of high heat-transfer rates. Based on the results of this phase, the model was instrumented with 40 thin-film resistance thermometers to obtain quantitative measurements of the aerodynamic heating. The results of the phase 2 testing indicate that the highest heating rates, which occur on the leading edge of the tip-fin controller, are very sensitive to angle of attack for alpha or = 30 deg. The shock wave from the leading edge of the orbiter wing impinges on the leading edge of the tip-fin controller resulting in peak values of h/h(Ref) in the range from 1.5 to 2.0. Away from the leading edge, the heat-transfer rates never exceed h/h(Ref) = 0.25 when the control surface, is not deflected. With the control surface deflected 20 deg, the heat-transfer rates had a maximum value of h/h(Ref) = 0.3. The heating rates are quite nonuniform over the outboard surface and are sensitive to angle of attack.

Wittliff, C. E.↗

Effects of Shuttle environment on instrument performance

Examination of the OSTA-1 payload instruments carried in the shuttle bay during the 54.25 hour mission of STS-2 indicates that the shuttle environment has no measurable effect on the Earth-viewing experiments. Operation of the payload shows that flight simulations are essential and experiment replanning practice is needed. Ground control of experiments is desirable since malfunctions of totally automated experiments cannot be fixed in flight. Alarm limits for experiments must be realistic since the crew loses interest after a few alarms. The quality and number of hours of data obtained for each experiment are listed.

Potter, A. E.↗

Atmospheric environment for Space Shuttle (STS-5) launch

This report presents a summary of selected atmospheric conditions observed near Space Shuttle STS-5 launch time on November 11, 1982, at Kennedy Space Center, Florida. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given in this report. Also presented are the wind and thermodynamic parameters measured at the surface and aloft in he SRB descent/impact ocean area. Final meteorological tapes, which consist of wind and thermodynamic parameters versus altitude, for STS-5 vehicle ascent and SRB descent have been constructed. The STS-5 ascent meteorological data tape has been constructed by Marshall Space Flight Center in response to Shuttle task agreement No. 936-53-22-368 with Johnson Space Center.

Johnson, D. L.↗

Second Shuttle Join NASA's STS Fleet: Challenger Launches First New Tracking Satellite

NASA made a major stride in readying a second delivery vehicle for its Space Transportation System (STS) fleet with the perfect landing of Shuttle Orbiter Challenger at Edwards Air Force Base, California, April 9, 1983. Besides being the first flight test of Challenger's performance, the mission marked the orbiting of the first spacecraft in NASA's new Tracking and Data Relay Satellite System (TDRSS). The new family of orbiting space communications platforms is essential to serve future Shuttle missions. Although the Inertial Upper Stage (IUS) second stage engine firing failed to place TDRS in its final 35,888 kilometer (22,300 mile) geosynchronous orbit, its release from the orbiter cargo bay went as planned. Launch officials were confident they can achieve its planned orbit in a matter of weeks.

Source record↗

Application of Calspan pitch rate control system to the Space Shuttle for approach and landing

A pitch rate control system designed for use in the shuttle during approach and landing was analyzed and compared with a revised control system developed by NASA and the existing OFT control system. The design concept control system uses filtered pitch rate feedback with proportional plus integral paths in the forward loop. Control system parameters were designed as a function of flight configuration. Analysis included time and frequency domain techniques. Results indicate that both the Calspan and NASA systems significantly improve the flying qualities of the shuttle over the OFT. Better attitude and flight path control and less time delay are the primary reasons. The Calspan system is preferred because of reduced time delay and simpler mechanization. Further testing of the improved flight control systems in an in-flight simulator is recommended.

Weingarten, N. C.↗

Calculation of inviscid flow over shuttle-like vehicles at high angles of attack and comparisons with experimental data

A computer code HALIS, designed to compute the three dimensional flow about shuttle like configurations at angles of attack greater than 25 deg, is described. Results from HALIS are compared where possible with an existing flow field code; such comparisons show excellent agreement. Also, HALIS results are compared with experimental pressure distributions on shuttle models over a wide range of angle of attack. These comparisons are excellent. It is demonstrated that the HALIS code can incorporate equilibrium air chemistry in flow field computations.

Weilmuenster, K. J.↗

Space Shuttle payload bay acoustics prediction study. Volume 3A: Addendum to computer users' manual

Since the publication of the Computer User's Manual for Payload Acoustics Environment for Shuttle (PACES), the analytical model was validated by means of measured data from the first three shuttle lift-offs. During the validation process, new information became available and five changes were made to the input data and the computer program. Three changes affect the user. They are: a revision to the recommended exterior sound pressure levels, a revision to the recommended payload bay acoustic absorption coefficients, and a revision to the vertical station datum for the payload bay. The two other changes do not involve the user. The changes are associated with the output of confidence limits for the predicted space-average sound pressure levels in the payload bay, and a modification to the analytical representation of the payload bay door. The changes are discussed briefly in this Addendum to the Computer User's Manual.

Wilby, J. F.↗

Evaluation of mounting bolt loads for Space Shuttle Get Away Special (GAS) adapter beam

During the prototype vibration tests of the GAS adapter beam, significant impacting of the beam at its support points was observed. The cause of the impacting was traced to gaps under the mounting bolt heads. Because of the nonlinear nature of the response, it was difficult to evaluate the effects which Shuttle launch dynamics might have on the mounting bolt loads. A series of tests were conducted on an electrodynamic exciter in which the transient acceleration time histories, which had been measured during the Space Transportation System-1 (STS-1; Space Shuttle mission 1) launch, were simulated. The actual flight data had to be filtered and compensated so that it could be reproduced on the shaker without exceeding displacement and velocity limitations. Mounting bolt loads were measured directly by strain gages applied to the bolts. Various gap thicknesses and bolt torques were investigated. Although increased gap thickness resulted in greater accelerations due to impacting, the bolt loads were not significantly affected. This is attributed to the fact that impacting excited mostly higher frequency modes which do not have significant modal mass.

Talapatra, D. C.↗

Atmospheric environment for Space Shuttle (STS-6) launch

Selected atmospheric conditions observed near Space Shuttle STS-6 launch time on April 4, 1983, at Kennedy Space Center, Florida are summarized. Values of ambient pressure, temperature, moisture, ground winds, visual observations (cloud), and winds aloft are included. The sequence of prelaunch Jimsphere measured vertical wind profiles is given. Also presented are the wind and thermodynamic parameters measured at the surface and aloft in the SRB descent/impact ocean area. Final meteorological tapes, which consist of wind and thermodynamic parameters versus altitude, for STS-6 veicle ascent and SRB descent were constructed. The STS-6 ascent meteorological data tape was constructed by Marshall Space Flight Center in response to Shuttle task agreement No. 936-53-22-368 with Johnson Space Center.

Johnson, D. L.↗

Buffet loads on shuttle thermal-protection-system tiles

This paper presents results of wind-tunnel and acoustic tests to investigate buffet loads on Shuttle Thermal-Protection-System (TPS) tiles, It also describes the application of these results to the prediction of tile buffet loads for the first shuttle flight into orbit (STS-I). The wind-tunnel tests of tiles were conducted at transonic and supersonic Math numbers simulating flow regions on the Orbiter where shock waves and boundary-layer separations occur. The acoustic tests were conducted in a progressive wave tube at an overall sound pressure level (OASPL) approximately equal to the maximum OASPL measured during the wind-tunnel tests in a region of flow separation. The STS-I buffet load predictions yielded peak tile stresses due to buffeting, that were as much as 20 percent of the total stress for the design-load case when a shock wave was on a tile.

Charles F. Coe↗