Search NASA⌕ Search

SEARCH · Search NASA

Results for “optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

On optimizing the sensor spacing for pressure measurements on wind turbine airfoils

This research article presents a robust approach to optimizing the layout of pressure sensors around an airfoil. A genetic algorithm and a sequential quadratic programming algorithm are employed to derive a sensor layout best suited to represent the expected pressure distribution and, thus, the lift force. The fact that both optimization routines converge to almost identical sensor layouts suggests that an optimum exists and is reached. By comparing against a cosine-spaced sensor layout, it is demonstrated that the underlying pressure distribution can be captured more accurately with the presented layout optimization approach. Conversely, a 39 %–55 % reduction in the number of sensors compared to cosine spacing is achievable without loss in lift prediction accuracy. Given these benefits, an optimized sensor layout improves the data quality, reduces unnecessary equipment and saves cost in experimental setups. While the optimization routine is demonstrated based on the generic example of the IEA 15 MW reference wind turbine, it is suitable for a wide range of applications requiring pressure measurements around airfoils.

17 WIND ENERGY↗

Optimal Design of Intensified Towers for CO2 Capture with Internal, Printed Heat Exchangers

Solvent-based carbon capture processes typically suffer from the temperature rise of the solvent due to the heat of absorption of CO2. This increased temperature is not thermodynamically favor-able and results in a significant reduction in performance in the absorber column. As opposed to interstage coolers, which only remove, cool, and return the solvent at discrete locations in the column, internal coolers that are integrated with the packing can cool the process inline, which can result in improved efficiency. This work presents the modeling of these internal coolers within an existing generic, equation-oriented absorber column model that can cool the process while allowing for simultaneous mass transfer. Optimization of this model is also performed, which is capable of optimally choosing the best locations to place these devices, such that heat removal and mass transfer area are balanced. Results of the optimization have shown that optimally placed cooling elements result in a significant increase in the capture efficiency of the process, compared to a similar column with no internal cooling, with a common trend being the cooling of the column in the temperature bulge region. It is observed that by optimally placing an internal cooler, the solvent flow rate can be decreased, and the CO2 lean loading can be increased while still maintaining the same efficiency. These process changes can lead to a substantial reduction in costs due to lower reboiler duty.

Summits, Stephen↗

Optimized Parameters for a Mercury Jet Target

A study of target parameters for a high-power, liquid mercury jet target system for a neutrino factory or muon collider is presented. Using the MARS code, we simulate particle production initiated by incoming protons with kinetic energies between 2 and 100 GeV. For each proton beam energy, we maximize production by varying the geometric parameters of the target: the mercury jet radius, the incoming proton beam angle, and the crossing angle between the mercury jet and the proton beam. The number of muons surviving through an ionization cooling channel is determined as a function of the proton beam energy. We optimize the mercury jet target parameters: the mercury jet radius, the incoming proton beam angle and the crossing angle between the mercury jet and the proton beam for each proton beam energy. The optimized target radius varies from about 0.4 cm to 0.6 cm as the proton beam energy increases. The optimized beam angle varies from 75 mrad to 120 mrad. The optimized crossing angle is near 20 mrad for energies above 5 GeV. These values differ from earlier choices of 67 mrad for the beam angle and 33 mrad for the crossing angle. These new choices for the beam parameters increase the meson production by about 20% compared to the earlier parameters. Our study demonstrates that the maximum meson production efficiency per unit proton beam power occurs when the proton kinetic energy is in the range of 5-15 GeV. Finally, the dependence on energy of the number of muons at the end of the cooling channel is nearly identical to the dependence on energy of the meson production 50 m from the target. This demonstrates that the target parameters can be optimized without the additional step of running the distribution through a code such as ICOOL that simulates the bunching, phase rotation, and cooling.

43 PARTICLE ACCELERATORS↗

Auto-Calibration and Control Strategy Determination for a Variable-Speed Heat Pump Water Heater Using Optimization

This paper introduces applications of the GenOpt optimizer coupled with a vapor compression system model for auto-calibration and control strategy determination towards the development of a variable-speed ground-source heat pump water heating unit. The GenOpt optimizer can be linked with any simulation program using input and output text files. It effectively facilitates optimization runs. Using our GenOpt wrapper program, we can flexibly define objectives for optimizations, targets, and constraints. Those functionalities enable running extensive optimization cases for model calibration, configuration design and control strategy determination. In addition, we describe a methodology to improve prediction accuracy using functional calibration curves. Using the calibrated model, we investigated control strategies of the ground-source heat pump water heater, considering multiple control objectives, covering the entire operation range.

Shen, Bo↗

Existing Whole-House Case Study: Evaluation of Missed Energy Saving Opportunity Based on Illinois Home Performance Program Field Data: Homeowner Selected Upgrades vs. Cost-Optimized Solutions, Chicago, Illinois

Expanding on previous research by PARR, this study compares measure packages installed during 800 Illinois Home Performance with ENERGY STAR® (IHP) residential retrofits to those recommended as cost-optimal by Building Energy Optimization (BEopt) modeling software. In previous research, cost-optimal measure packages were identified for 15 Chicagoland single family housing archetypes, called housing groups. In the present study, 800 IHP homes are first matched to one of these 15 housing groups, and then the average measures being installed in each housing group are modeled using BEopt to estimate energy savings. For most housing groups, the differences between recommended and installed measure packages is substantial. By comparing actual IHP retrofit measures to BEopt-recommended cost-optimal measures, missed savings opportunities are identified in some housing groups; also, valuable information is obtained regarding housing groups where IHP achieves greater savings than BEopt-modeled, cost-optimal recommendations.

Air Sealing↗

Advanced Nuclear Technology. Using Technology for Small Modular Reactor Staff Optimization, Improved Effectiveness, and Cost Containment, 3002007071

Through this grant, the U.S. Department of Energy (DOE) will review several functional areas within a nuclear power plant, including fire protection, operations and operations support, refueling, training, procurement, maintenance, site engineering, and others. Several functional areas need to be examined since there appears to be no single staffing area or approach that alone has the potential for significant staff optimization at new nuclear power plants. Several of the functional areas will require a review of technology options such as automation, remote monitoring, fleet wide monitoring, new and specialized instrumentation, human factors engineering, risk informed analysis and PRAs, component and system condition monitoring and reporting, just in time training, electronic and automated procedures, electronic tools for configuration management and license and design basis information, etc., that may be applied to support optimization. Additionally, the project will require a review key regulatory issues that affect staffing and could be optimized with additional technology input. Opportunities to further optimize staffing levels and staffing functions by selection of design attributes of physical systems and structures need also be identified. A goal of this project is to develop a prioritized assessment of the functional areas, and R&D actions needed for those functional areas, to provide the best optimization

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data Transfer Advisor with Transport Profiling Optimization

The network infrastructures have been rapidly upgraded in many high-performance networks (HPNs). However, such infrastructure investment has not led to corresponding performance improvement in big data transfer, especially at the application layer, largely due to the complexity of optimizing transport control on end hosts. We design and implement ProbData, a PRofiling Optimization Based DAta Transfer Advisor, to help users determine the most effective data transfer method with the most appropriate control parameter values to achieve the best data transfer performance. ProbData employs a profiling optimization based approach to exploit the optimal operational zone of various data transfer methods in support of big data transfer in extreme scale scientific applications. We present a theoretical framework of the optimized profiling approach employed in ProbData as wellas its detailed design and implementation. The advising procedure and performance benefits of ProbData are illustrated and evaluated by proof-of-concept experiments in real-life networks.

Rao, Nageswara S.↗

Parameter Co-optimization for Hybrid Electric Vehicles Powertrain System Leveraging V2V/V2I Information

A parameter tuning based co-optimization scheme for the hybrid electric vehicles (HEV) powertrain system is designed to maximize the fuel efficiency. The optimization controlled input parameters are chosen based on sensitivity study of powertrain control parameters. The vehicle to vehicle (V2V) and vehicle to infrastructure information is another optimization input, to have the driving conditions taking in to considerations for maximizing fuel efficiency. The catalyst temperature is considered as an additional constraint as the speed to reach lightoff temperature should not decrease during optimized operation. Neural network is used to develop a simplified yet equivalent model for the optimization problem model. We have achieved an average of 9.22% fuel savings for a random driving cycle on a Toyota Prius test model.

Hong, Wanshi↗

Optimization of Workload Distribution of Data Centers Based on a Self-Learning In Situ Adaptive Tabulation Model

Data center cooling typically involves non-uniform airflow and temperature distributions, which are affected by the IT workload distribution. It is helpful to simulate the airflow and temperature to optimize the workload distribution. Traditional computational fluid dynamics (CFD) simulation is usually time-consuming while conventional reduced order models (ROMs), though computationally fast, may generate inaccurate results even after being fully trained. In Situ Adaptive Tabulation (ISAT), contracting to conventional ROM, can make prediction with error lower than a user-specified tolerance. To demonstrate using of ISAT for optimal workload distribution in data center, this paper presents a preliminary study of an ISAT-based genetic algorithm optimization platform. The ISAT is trained offline by using the results from CFD simulations using a hypothetical simple data center. The optimal workload distribution determined by the platform leads to approximately 6.8% of energy savings when compared to the benchmark with a uniform workload distribution. We note that the time cost for the entire optimization process, including the training of ISAT is about 4 hours, which is acceptable in the design phase.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling and Optimization of Trip Level Energy Consumption and Charging Management for Connected Automated Electric Vehicles

This will be a presentation for a tutorial session in 2019 ITEC based on reviewing the publicly existing work in the literature. Trip aware energy consumption and charging management for electric vehicles is a key component to ensure sustainability of electrified transportation. The upcoming vehicle communication and autonomous driving technologies will provide opportunities to achieve more intelligent management strategies. This tutorial will introduce the state-to-art technologies that are being designed for optimizing the trip level energy cost and recharging operations of connected automated electric vehicles (CAEVs). The information needs, modeling, control and optimization techniques for optimal trip level energy management will be introduced. Opportunities and benefits from vehicle communication and automation will be discussed. In general, three main sub-topics will be presented in detail: first, advanced EV energy consumption modeling and prediction technologies; second, energy efficient driving technologies, e.g. eco-driving and eco-routing, etc.; third, optimally automatic charging decision making for CAEVs. Following these details, the research challenges, opportunities for co-optimization between the energy consumption and energy recharging of CAEVs will be illustrated in this tutorial.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Classical Optimizers for Noisy Intermediate-Scale Quantum Devices

We present a collection of optimizers tuned for usage on Noisy Inter-mediate-Scale Quantum (NISQ) devices. Optimizers have a range of applications in quantum computing, including the Variational Quantum Eigensolver (VQE) and Quantum Approximate Optimization (QAOA) algorithms. They have further uses in calibration, hyperparameter tuning, machine learning, etc. We employ the VQE algorithm as a case study. VQE is a hybrid algorithm, with a classical minimizer step driving the next evaluation on the quantum processor. While most results to date concentrated on tuning the quantum VQE circuit, our study indicates that in the presence of quantum noise the classical minimizer step is a weak link and a careful choice combined with tuning is required for correct results. We explore state-of-the-art gradient-free optimizers capable of handling noisy, black-box, cost functions and stress-test them using a quantum circuit simulation environment with noise injection capabilities on individual gates. Our results indicate that specifically tuned optimizers are crucial to obtaining valid science results on NISQ hardware, as well as projecting forward on fault tolerant circuits.

Lavrijsen, Wim↗

Development and Application of a Risk Analysis Toolkit for Plant Resources Optimization

This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.

97 MATHEMATICS AND COMPUTING↗

Optimal Decision Making in High-Throughput Virtual Screening Pipelines

ABSTRACT Effective selection of the potential candidates that meet certain conditions in a tremendously large search space has been one of the major concerns in many real-world applications. In addition to the nearly infinitely large search space, rigorous evaluation of a sample based on the reliable experimental or computational platform is often prohibitively expensive, making the screening problem more challenging. In such a case, constructing a high-throughput screening (HTS) pipeline that pre-sifts the samples expected to be potential candidates through the efficient earlier stages, results in a significant amount of savings in resources. However, to the best of our knowledge, despite many successful applications, no one has studied optimal pipeline design or optimal pipeline operations. In this study, we propose two optimization frameworks, applying to most (if not all) screening campaigns involving experimental or/and computational evaluations, for optimally determining the screening thresholds of an HTS pipeline. We validate the proposed frameworks on both analytic and practical scenarios. In particular, we consider the optimal computational campaign for the long non-coding RNA (lncRNA) classification as a practical example. To accomplish this, we built the high-throughput virtual screening (HTVS) pipeline for classifying the lncRNA. The simulation results demonstrate that the proposed frameworks significantly reduce the effective selection cost per potential candidate and make the HTS pipelines less sensitive to their structural variations. In addition to the validation, we provide insights on constructing a better HTS pipeline based on the simulation results.

97 MATHEMATICS AND COMPUTING↗

THE DESIGN OF LAYER TIME OPTIMIZATION IN LARGE SCALE ADDITIVE MANUFACTURING WITH FIBER REINFORCED POLYMER COMPOSITES

In this study, we have developed a method to optimize a layer deposition time (a.k.a. layer time) for large-scale additive manufacturing (AM) via physics-based simulations. A long layer time leads to an over-cooled surface on which a new layer is deposited, and therefore, it may result in a weak bonding or debonding between layers, cracking, or warping. A short layer time leads to a high temperature of the structure due to insufficient cooling, and therefore, the structure may not be stiff enough and may collapse during manufacturing. Therefore, it is important to estimate the optimal layer time in additive manufacturing for a high-quality product. The temperature of a top layer right before deposition is recommended to be slightly higher than the glass temperature of the material. A temperature cooling was approximated to an exponential function of time, and the optimized layer time was obtained based on a target temperature while maintaining a minimal printing time. The material used is carbon fiber-reinforced polycarbonate (CF/PC), and the large-scale deposition system used is LSAM TM from Thermwood Corporation. Three different layer time cases were used for experiments, and a series of thermal images were obtained via an infra-red (IR) camera during the entire AM processes. AM process simulations were performed using a finite element method and the temperature profiles from the simulation were in good agreement with those from experiments. The layer time optimization was performed based on the temperature profiles from the simulations. A layer temperature with the optimal layer time was confirmed as the target temperature through simulation.

Jo, Eonyeon↗

Evaluation and Optimization of Well Completion Options for the Utah FORGE Site

Orientation and completion for well pairs that have been subjected to multi-zonal stimulation play a critical role in the long-term performance of an Enhanced Geothermal Reservoir. Enhanced geothermal systems often rely on preferential flow along fractures between well injection and production locations. Modeling this preferential flow using discrete fracture networks (DNF) relies on stochastic realizations of the DFN based on geological sampling. Here we present the development of a stochastic optimization methodology to determine well completion options in a discrete fracture network based on using parallel subset simulation. Stochastic optimization will provide insight into regions where placements of the injection and production wells are optimal. An example optimization of well-pair location optimization based on a deterministic-stochastic DFN model representing FORGE follows a discussion of the theory.

15 GEOTHERMAL ENERGY↗

Optimizing Rate of Penetration and Tripping Decision-Making using Real-Time Bit Wear Monitoring While Drilling Geothermal Wells

Understanding bit wear while drilling is critical to minimizing non-productive time (NPT) and optimizing rate of penetration (ROP). Lengthening drilling runs with damaged bits does not only lower the ROP, but also elevates the risk of inducing severe bit damage, which could potentially lead to time-consuming fishing operations. When drillers believe the bit has worn off substantially, the bit is tripped out to be replaced. On geothermal wells, tripping can take up to 20% of the overall well construction time, and this is generally acknowledged as an opportunity for improvement. Ideally, a bit run should be terminated before the bit is damaged beyond repair. At the same time, premature bit pulls are to be avoided as well. This study aims to leverage bit and tooth wear metrics that can be obtained in real time to characterize bit condition in order to optimize ROP and determine the optimal time to pull the bit. Two metrics were explored in this study: a bit wear metric that incorporated depth-of-cut, and a tooth wear metric developed by Bourgoyne & Young characterizing the state of bit teeth dull. Both metrics were computed using recorded data from 12¼ inches roller cone insert bit runs in five geothermal wells targeting a granodiorite formation in the western United States. Together with the actual dull grades, determined after the bits were pulled to surface, the metric trends were interpreted to characterize the downhole bit condition and identify the point at which the bit should have optimally been tripped out. The insights from studying the actual dull grades and how they relate to the two metrics were used to establish a reliable bit pull criterion. The bit wear metric trend correctly showed a noticeable departure from baseline for bits experiencing major dulling behavior. Additionally, the tooth wear model predicted the cutter dull within two dull grades for most runs, with better performance in predicting the inner teeth dull. Moreover, the combination of the bit wear and tooth wear metrics was effective in revealing the cause of the bit performance impairment. Proactive tracking of these two metrics in real-time can facilitate geothermal drilling ROP optimization and better-informed tripping decision-making, thereby avoiding wasted time and cost.

Ashari, Rahmat↗

Optimization of a Residential Air Source Heat Pump using Refrigerants with GWP <150 for Improved Performance and Reduced Emission

Using low-GWP refrigerants can reduce the Green House Gas (GHG) emission of heat pump systems. Heat exchangers and compressors are the key components and have a prominent impact on system performance, significant research is devoted to reducing the cost of the heat exchangers while achieving the same or better system performance with refrigerant charge reduction.To better understand the environmental impacts of optimized systems with low-GWP refrigerants, Life Cycle Climate Performance (LCCP) evaluation method was used to evaluate the direct and indirect emissions of the system over the course of its lifetime from manufacturing to disposal. The DOE/ORNL Heat Pump Design Model (HPDM) is used to evaluate the performance of heat pumps. Multi-objective optimizations using Particle Swarm Optimization (PSO) algorithm are performed on a 3-ton R410A residential air source heat pump on market. Seven R410A alternatives, i.e., R32, R454B, R454C, R455A, R457A, R1234yf and R1234ze(E) are investigated. The last five fluids have GWP lower than 150.As a result, 5.5%-12.8% seasonal energy efficiency ratio 2 (SEER2) improvement is achieved, and the optimized systems reduce life cycle CO2 emission by 8.5%-28.6% with GWP lower than 150 refrigerants. The optimal heat exchangers can fit into the original R410A fan-coil units; therefore, the proposed design method establishes a production and installation path to produce cost-effective low-GWP heat pumps easily accepted by end users.

Li, Zhenning↗

Personalized learning via task load optimization

A method for providing task load-optimized computer-generated training experiences to a user of a training system that includes: a display, a training simulator, a prediction program (ML1), and a training optimization program (ML2). In response to receiving a predicted optimal task load, ML2 provides a first training experience recommendation related to the training content and/or training conditions that, if utilized in providing a training experience to the user, is predicted to result in the predicted actual task load of the user equaling the predicted optimal task load. In response to receiving biometric information or performance metric information, ML1 determines the predicted actual task load. If the predicted actual task load does not match the predicted optimal task load, ML2 provides a second training experience recommendation and a second training experience is provided where at least one of the training content or the training conditions is changed.

Bertolli, Michael G.↗