Search NASA⌕ Search

SEARCH · Search NASA

Results for “tracking problem”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

Remote sensing detection enhancement

Big Data in the area of Remote Sensing has been growing rapidly. Remote sensors are used in surveillance, security, traffic, environmental monitoring, and autonomous sensing. Real-time detection of small moving targets using a remote sensor is an ongoing, challenging problem. Since the object is located far away from the sensor, the object often appears too small. The object’s signal-to-noise-ratio (SNR) is often very low. Occurrences such as camera motion, moving backgrounds (e.g., rustling leaves), low contrast and resolution of foreground objects makes it difficult to segment out the targeted moving objects of interest. Due to the limited appearance of the target, it is tough to obtain the target’s characteristics such as its shape and texture. Without these characteristics, filtering out false detections can be a difficult task. Detecting these targets, would often require the detector to operate under a low detection threshold. However, lowering the detection threshold could lead to an increase of false alarms. In this paper, the author will introduce a new method that improves the probability to detect low SNR objects, while decreasing the number of false alarms as compared to using the traditional baseline detection technique.

47 OTHER INSTRUMENTATION↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgment, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs a 300 million bit-per-second (Mbps) return link for harvesting payload science. In the coming eighteen months, it will step up to 600 Mbps. Already there is talk of a 1.2 billion bit-per-second (Gbps) upgrade for the ISS and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Reward based optimization of resonance-enhanced piezoresponse spectroscopy

Dynamic spectroscopies in scanning probe microscopy (SPM) are critical for probing material properties, such as force interactions, mechanical properties, polarization switching, electrochemical reactions, and ionic dynamics. However, the practical implementation of these measurements is constrained by the need to balance imaging time and data quality. Signal to noise requirements favor long acquisition times and high frequencies to improve signal fidelity. However, these are limited on the low end by contact resonant frequency and photodiode sensitivity and on the high end by the time needed to acquire high-resolution spectra or the propensity for sample degradation under high field excitation over long times. The interdependence of key parameters such as instrument settings, acquisition times, and sampling rates makes manual tuning labor-intensive and highly dependent on user expertise, often yielding operator-dependent results. These limitations are prominent in techniques like dual amplitude resonance tracking in piezoresponse force microscopy that utilize multiple concurrent feedback loops for topography and resonance frequency tracking. Here, a reward-driven workflow is proposed that automates the tuning process, adapting experimental conditions in real time to optimize data quality. Furthermore, this approach significantly reduces the complexity and time required for manual adjustments and can be extended to other SPM spectroscopic methods, enhancing overall efficiency and reproducibility.

47 OTHER INSTRUMENTATION↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgement, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs its high-data-rate return link for harvesting payload science. In the coming months, it will double that data rate and is forecast to fully utilize that capability. Already there is talk of an upgrade that quadruples the current data rate allocated to ISS payload science before the end of its mission and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2018-2020 Period Phase 2

Lockheed Martin Aeronautics Company (LM), working in conjunction with General Electric Global Research (GE GR) and Stanford University, executed a 19 month program responsive to the NASA sponsored "N+2 Supersonic Validation: Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2018-2020 Period" contract. The key technical objective of this effort was to validate integrated airframe and propulsion technologies and design methodologies necessary to realize a supersonic vehicle capable of meeting the N+2 environmental and performance goals. The N+2 program is aligned with NASA's Supersonic Project and is focused on providing system level solutions capable of overcoming the efficiency, environmental, and performance barriers to practical supersonic flight. The N+2 environmental and performance goals are outlined in the technical paper, AIAA-2014-2138 (Ref. 1) along with the validated N+2 Phase 2 results. Our Phase 2 efforts built upon our Phase 1 studies (Ref. 2) and successfully demonstrated the ability to design and test realistic configurations capable of shaped sonic booms over the width of the sonic boom carpet. Developing a shaped boom configuration capable of meeting the N+2 shaped boom targets is a key goal for the N+2 program. During the LM Phase 1 effort, LM successfully designed and tested a shaped boom trijet configuration (1021) capable of achieving 85 PLdB under track (forward and aft shock) and up to 28 deg off-track at Mach 1.6. In Phase 2 we developed a refined configuration (1044-2) that extended the under 85 PLdB sonic boom level over the entire carpet of 52 deg off-track at a cruise Mach number of 1.7. Further, the loudness level of the configuration throughout operational conditions calculates to an average of 79 PLdB. These calculations rely on propagation employing Burger's (sBOOM) rounding methodology, and there are indications that the configuration average loudness would actually be 75 PLdB. We also added significant fidelity to the design of the configuration in this phase by performing a low speed wind tunnel test at our LTWT facility in Palmdale, by more complete modelling of propulsion effects in our sonic boom analysis, and by refining our configuration packaging and performance assessments. Working with General Electric, LM performed an assessment of the impact of inlet and nozzle effects on the sonic boom signature of the LM N+2 configurations. Our results indicate that inlet/exhaust streamtube boundary conditions are adequate for conceptual design studies, but realistic propulsion modeling at similar stream-tube conditions does have a small but measurable impact on the sonic boom signature. Previous supersonic transport studies have identified aeroelastic effects as one of the major challenges associated with the long, slender vehicles particularly common with shaped boom aircraft (Ref. 3). Under the Phase 2 effort, we have developed a detailed structural analysis model to evaluate the impact of flexibility and structural considerations on the feasibility of future quiet supersonic transports. We looked in particular at dynamic structural modes and flutter as a failure that must be avoided. We found that for our N+2 design in particular, adequate flutter margin existed. Our flutter margin is large enough to cover uncertainties like large increases in engine weight and the margin is relatively easy to increase with additional stiffening mass. The lack of major aeroelastic problems probably derives somewhat from an early design bias. While shaped boom aircraft require long length, they are not required to be thin. We intentionally developed our structural depths to avoid major flexibility problems. So at the end of Phase 2, we have validated that aeroelastic problems are not necessarily endemic to shaped boom designs. Experimental validation of sonic boom design and analysis techniques was the primary objective of the N+2 Supersonic Validations contract; and in this Phase, LM participated in four high speed wind tunnel tests. The first so-called Parametric Test in the Ames 9x7 tunnel did an exhaustive look at variation effects of the parameters: humidity, total pressure, sample time, spatial averaging distance and number of measurement locations, and more. From the results we learned to obtain data faster and more accurately, and made test condition tolerances easy to meet (eliminating earlier 60 percent wasted time when condition tolerances could not be held). The next two tests used different tunnels. The Ames 11 ft tunnel was used to test lower Mach numbers of 1.2 and 1.4. There were several difficulties using this tunnel for the first time for sonic boom including having to shift the measurement Mach numbers to 1.15 and 1.3 to avoid flow problems. It is believed that the 11 ft could be used successfully to measure sonic boom but there are likely to be a number of test condition restrictions. The Glenn 8x6 ft tunnel was used next and the tunnel has a number of desirable features for sonic boom measurement. While the Ames 9x7 can only test Mach 1.55 to 2.55 and the 11 ft can only test Mach 1.3 and lower, the Glenn 8x6 can test continuously from Mach 0.3 to 2.0. Unfortunately test measurement accuracy was compromised by a reference pressure drift. Post-test analysis revealed that the drift occurred when Mach number drifted slightly. Test measurements indicated that if Mach number drift is eliminated, results from the 8x6 would be more accurate, especially at longer distances, than results from the 9x7. The fourth test in the 9x7, called LM4, used everything we learned to comprehensively and accurately measure our new 1044-02 configuration with a full-carpet shaped signature design. Productivity was 8 times greater than our Phase 1 LM3 test. Measurement accuracy and repeatability was excellent out to 42 in. However, measurements at greater distances require the rail in the aft position and become substantially less accurate. Further signature processing or measurement improvements are needed for beyond near-field signature validation.

Morgenstern, John↗

Retrievals of Profiles of Fine And Coarse Aerosols Using Lidar And Radiometric Space Measurements

In couple of years we expect the launch of the CALIPSO lidar spaceborne mission designed to observe aerosols and clouds. CALIPSO will collect profiles of the lidar attenuated backscattering coefficients in two spectral wavelengths (0.53 and 1.06 microns). Observations are provided along the track of the satellite around the globe from pole to pole. The attenuated backscattering coefficients are sensitive to the vertical distribution of aerosol particles, their shape and size. However the information is insufficient to be mapped into unique aerosol physical properties and vertical distribution. Infinite number of physical solutions can reconstruct the same two wavelength backscattered profile measured from space. CALIPSO will fly in formation with the Aqua satellite and the MODIS spectro-radiometer on board. Spectral radiances measured by MODIS in six channels between 0.55 and 2.13 microns simultaneously with the CALIPSO observations can constrain the solutions and resolve this ambiguity, albeit under some assumptions. In this paper we describe the inversion method and apply it to aircraft lidar and MODIS data collected over a dust storm off the coast of West Africa during the SHADE experiment. It is shown that the product of the single scattering albedo, omega, and the phase function, P, for backscattering can be retrieved from the synergism between measurements avoiding a priori hypotheses required for inverting lidar measurements alone. The resultant value of (omega)P(180 deg.) = 0.016/sr are significantly different from what is expected using Mie theory, but are in good agreement with recent results obtained from lidar observations of dust episodes. The inversion is robust in the presence of noise of 10% and 20% in the lidar signal in the 0.53 and 1.06 pm channels respectively. Calibration errors of the lidar of 5 to 10% can cause an error in optical thickness of 20 to 40% respectively in the tested cases. The lidar calibration errors cause degradation in the ability to fit the MODIS data. Therefore the MODIS measurements can be used to identify the calibration problem and correct for it. The CALIPSO-MODIS measurements of the profiles of fine and coarse aerosols, together with CALIPSO measurements of clouds vertical distribution, is expected to be critically important in understanding aerosol transport across continents and political boundaries, and to study aerosol-cloud interaction and its effect on precipitation and global forcing of climate.

Kaufman, Yoram↗

Runtime and Pressurization Analyses of Propellant Tanks

Multi-element unstructured CFD has been utilized at NASA SSC to carry out analyses of propellant tank systems in different modes of operation. The three regimes of interest at SSC include (a) tank chill down (b) tank pressurization and (c) runtime propellant draw-down and purge. While tank chill down is an important event that is best addressed with long time-scale heat transfer calculations, CFD can play a critical role in the tank pressurization and runtime modes of operation. In these situations, problems with contamination of the propellant by inclusion of the pressurant gas from the ullage causes a deterioration of the quality of the propellant delivered to the test article. CFD can be used to help quantify the mixing and propellant degradation. During tank pressurization under some circumstances, rapid mixing of relatively warm pressurant gas with cryogenic propellant can lead to rapid densification of the gas and loss of pressure in the tank. This phenomenon can cause serious problems during testing because of the resulting decrease in propellant flow rate. With proper physical models implemented, CFD can model the coupling between the propellant and pressurant including heat transfer and phase change effects and accurately capture the complex physics in the evolving flowfields. This holds the promise of allowing the specification of operational conditions and procedures that could minimize the undesirable mixing and heat transfer inherent in propellant tank operation. It should be noted that traditional CFD modeling is inadequate for such simulations because the fluids in the tank are in a range of different sub-critical and supercritical states and elaborate phase change and mixing rules have to be developed to accurately model the interaction between the ullage gas and the propellant. We show a typical run-time simulation of a spherical propellant tank, containing RP-1 in this case, being pressurized with room-temperature nitrogen at 540 R. Nitrogen, shown in blue on the right-hand side of the figures, enters the tank from the diffuser at the top of the figures and impinges on the RP-1, shown in red, while the propellant is being continuously drained at the rate of 1050 lbs/sec through a pipe at the bottom of the tank. The sequence of frames in Figure 1 shows the resultant velocity fields and mixing between nitrogen and RP-1 in a cross-section of the tank at different times. A vortex is seen to form in the incoming nitrogen stream that tends to entrain propellant, mixing it with the pressurant gas. The RP-1 mass fraction contours in Figure 1 are also indicative of the level of mixing and contamination of the propellant. The simulation is used to track the propagation of the pure propellant front as it is drawn toward the exit with the evolution of the mixing processes in the tank. The CFD simulation modeled a total of 10 seconds of run time. As is seen from Figure 1d, after 5.65 seconds the propellant front is nearing the drain pipe, especially near the center of the tank. Behind this pure propellant front is a mixed fluid of compromised quality that would require the test to end when it reaches the exit pipe. Such unsteady simulations provide an estimate of the time that a high-quality propellant supply to the test article can be guaranteed at the modeled mass flow rate. In the final paper, we will discuss simulations of the LOX and propellant tanks at NASA SSC being pressurized by an inert ullage. Detailed comparisons will be made between the CFD simulations and lower order models as well as with test data. Conditions leading to cryo collapse in the tank will also be identified.

Field, Robert E.↗

Highlights of TOMS Version 9 Total Ozone Algorithm

The fundamental basis of TOMS total ozone algorithm was developed some 45 years ago by Dave and Mateer. It was designed to estimate total ozone from satellite measurements of the backscattered UV radiances at few discrete wavelengths in the Huggins ozone absorption band (310-340 nm). Over the years, as the need for higher accuracy in measuring total ozone from space has increased, several improvements to the basic algorithms have been made. They include: better correction for the effects of aerosols and clouds, an improved method to account for the variation in shape of ozone profiles with season, latitude, and total ozone, and a multi-wavelength correction for remaining profile shape errors. These improvements have made it possible to retrieve total ozone with just 3 spectral channels of moderate spectral resolution (approx. 1 nm) with accuracy comparable to state-of-the-art spectral fitting algorithms like DOAS that require high spectral resolution measurements at large number of wavelengths. One of the deficiencies of the TOMS algorithm has been that it doesn't provide an error estimate. This is a particular problem in high latitudes when the profile shape errors become significant and vary with latitude, season, total ozone, and instrument viewing geometry. The primary objective of the TOMS V9 algorithm is to account for these effects in estimating the error bars. This is done by a straightforward implementation of the Rodgers optimum estimation method using a priori ozone profiles and their error covariances matrices constructed using Aura MLS and ozonesonde data. The algorithm produces a vertical ozone profile that contains 1-2.5 pieces of information (degrees of freedom of signal) depending upon solar zenith angle (SZA). The profile is integrated to obtain the total column. We provide information that shows the altitude range in which the profile is best determined by the measurements. One can use this information in data assimilation and analysis. A side benefit of this algorithm is that it is considerably simpler than the present algorithm that uses a database of 1512 profiles to retrieve total ozone. These profiles are tedious to construct and modify. Though conceptually similar to the SBUV V8 algorithm that was developed about a decade ago, the SBUV and TOMS V9 algorithms differ in detail. The TOMS algorithm uses 3 wavelengths to retrieve the profile while the SBUV algorithm uses 6-9 wavelengths, so TOMS provides less profile information. However both algorithms have comparable total ozone information and TOMS V9 can be easily adapted to use additional wavelengths from instruments like GOME, OMI and OMPS to provide better profile information at smaller SZAs. The other significant difference between the two algorithms is that while the SBUV algorithm has been optimized for deriving monthly zonal means by making an appropriate choice of the a priori error covariance matrix, the TOMS algorithm has been optimized for tracking short-term variability using month and latitude dependent covariance matrices.

Bhartia, Pawan↗

NASA Scout ST-1 Flight-Test Results and Analyses, Launch Operations, and Test Vehicle Description

The first of a series of flight tests for the development of the four-stage, solid-propellant Scout vehicle was conducted at the NASA Wallops Station under the direction of the Langley Research Center. Vehicle designation for the test was NASA Scout ST-1. Performance characteristics of the vehicle and components were recorded during a high-altitude probe mission. Flight-simulation studies are presented and show that the accuracy of the guidance system during the flight was within control-system design specifications. The control system functioned normally during the flight with the exception of an overpowering of the reaction-control roll jets near burnout of the third-stage rocket motor. The resulting roll displacement of the vehicle is shown to have caused the monitor tracking radar which had been erroneously tracking a radar beacon in the vehicle on a side lobe to reorient to the major lobe of the receiving antenna. This tracking switch falsely indicated a violent turning maneuver on the monitor plot board and resulted in a hold-fire decision for the fourth-stage rocket motor. Although data for the final thrusting and coast phase of the flight were not obtained, the majority of the test objectives were achieved. In-flight thrust misalignment angles for the second- and third-stage rocket motors derived from control-system error data and for the first-stage motor determined from flight-simulation studies are presented. All rocket-motor thrust misalignment angles were well within the tolerances used for control-system design. Rocket-motor flight performance is presented, and velocity increments attained from the first three stages substantiated the predicted nominal performance. Operation of the rocket motors was satisfactory with the exception of high-level vibrations which were encountered during third-stage motor burning. Rolling moments which overpowered the reaction-control jets are also attributed to the burning characteristics of the third-stage motor. A discussion of the premature loss of the third-stage heat shield is given and shows that the heat-shield latching mechanism failed from pressure loads as the vehicle entered the transonic speed range. Although venting was provided to relieve the high negative pressures known to exist on the heat shield at these speeds, a field modification of the wiring tunnel had the same effect as opening the inside of the heat shield to ambient pressures. Consequently, the latching mechanism failed from pressure loads which were of about the same magnitude as the latching-mechanism yield loads. Skin temperatures were recorded at several locations on the vehicle and were generally in good agreement with theoretical values. Aerodynamic heating presented no problem during the flight since the maximum temperatures recorded during the flight were only about half the design values because of the high-launch-angle trajectory. Environmental vibrations recorded in the vicinity of the guidance package showed that no significant continuous amplitude levels above the general instrumentation noise level were present during first- and second-stage burning. Large vibration amplitudes were recorded during third-stage burning which coincided with the large roll disturbance experienced by the vehicle near burnout of the third-stage motor.

Scout Launch Vehicle↗

Two-way coupled particle-turbulence interaction: Effect of numerics and resolution on fluid and particle statistics

Euler-Lagrange point-particle simulation has emerged as a premier methodology for studying dispersed particle-laden flows. This method's popularity stems from its ability to resolve fine-scale fluid structures while also tracking individual particles at reduced cost using an appropriate particle acceleration model. However, the point-particle model has known convergence issues in that refinement of the fluid grid can lead to changes in the predicted statistics. The reasons for non-convergence are twofold: the point-particle two-way coupling force in the Navier-Stokes equations requires a numerical regularization and, without careful implementation, yields a singular force on the fluid with grid refinement. The second factor that yields grid-dependent statistics is that the point-particle force model in general depends on the undisturbed fluid velocity. When the undisturbed fluid velocity is not robustly modeled in a grid-insensitive way, the calculated force for both particles and fluid will be grid-dependent, contaminating their respective statistics. While the first issue regarding regularizing the point-particle source term has received attention in the literature, the consequences of robustly modeling the undisturbed velocity in the context of grid refinement of turbulence has received little attention. Here, we consider decaying homogeneous isotropic turbulence laden with particles at different Stokes numbers. For a given Stokes number, we systematically refine the grid and demonstrate that explicitly modeling the undisturbed fluid velocity yields relative grid insensitivity for the energy of the particle and fluid phases, as well as acceleration of the particles. We also demonstrate that an appropriately defined dissipation rate is also grid-insensitive when an undisturbed fluid velocity correction is used. In contrast, when the undisturbed fluid velocity is modeled using the conventional approach of interpolating the local fluid velocity to the particle location, we show this procedure yields divergent statistics with grid refinement. In particular, we show that higher-order interpolation of the fluid velocity in two-way coupled problems is worse than lower-order interpolation, in the absence of a correction procedure to estimate the undisturbed fluid velocity. We also examine velocity derivative statistics of the fluid phase and demonstrate that these statistics are not in general convergent even when the undisturbed fluid velocity is explicitly modeled. Collectively, the observations in this paper are used to present a philosophy on the types of questions which are answerable with point-particle methods.

42 ENGINEERING↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). Utilization of Draper Laboratory's Timeliner software, deployed on-board the ISS within the Command and Control (C&C) computers and the Payload computers, allowed development of the automated procedures specific to ISS without having to certify and employ novel software for procedure development and execution. The procedures contained the ground procedure logic and actions as possible to include fault detection and recovery capabilities. The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures (via Timerliner) provide a step-by-step messaging paradigm and a high-level status upon termination. This messaging and high-level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. WebPD is a web based application that serves as the user interface for electronic procedure execution. It incorporates several aspects of the HTML5 standard. Procedures are written in a dialect of XML called Procedure Representation Language (PRL). WebPD tracks execution status in the procedure or procedures being displayed. WebPD aggregates and simplifies the auto-sequence execution status information, and formatted to be easily followed and understood by an operator who is not dedicated to actively monitoring the task. WebPD also provides an integrated data and control interface to pause or halt the execution in order to provide a check point of operation and to examine progress before starting the next sequence of activities. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high-level execution status was written to PLMDM memory. This memory is read and downlinked via Ku-Band at a 1 Hz rate. The data containing the high-level execution status is de-commutated on the ground, and rebroadcast for WebPD consumption. A future demonstration will be performed onboard, with ISS astronauts initiating the operations instead of ground controllers. The AMO EXPRESS experiment demonstrated activation and de-activation of EXPRESS rack 7, providing the capability of future single button activations and deactivations of facility class racks. The experiment achieved numerous technical and operations 'firsts' for the ISS

Stetson, Howard K.↗

Holodeck Testbed Project

The main objective of the Holodeck Testbed is to create a cost effective, realistic, and highly immersive environment that can be used to train astronauts, carry out engineering analysis, develop procedures, and support various operations tasks. Currently, the Holodeck testbed allows to step into a simulated ISS (International Space Station) and interact with objects; as well as, perform Extra Vehicular Activities (EVA) on the surface of the Moon or Mars. The Holodeck Testbed is using the products being developed in the Hybrid Reality Lab (HRL). The HRL is combining technologies related to merging physical models with photo-realistic visuals to create a realistic and highly immersive environment. The lab also investigates technologies and concepts that are needed to allow it to be integrated with other testbeds; such as, the gravity offload capability provided by the Active Response Gravity Offload System (ARGOS). My main two duties were to develop and animate models for use in the HRL environments and work on a new way to interface with computers using Brain Computer Interface (BCI) technology. On my first task, I was able to create precise computer virtual tool models (accurate down to the thousandths or hundredths of an inch). To make these tools even more realistic, I produced animations for these tools so they would have the same mechanical features as the tools in real life. The computer models were also used to create 3D printed replicas that will be outfitted with tracking sensors. The sensor will allow the 3D printed models to align precisely with the computer models in the physical world and provide people with haptic/tactile feedback while wearing a VR (Virtual Reality) headset and interacting with the tools. Getting close to the end of my internship the lab bought a professional grade 3D Scanner. With this, I was able to replicate more intricate tools at a much more time-effective rate. The second task was to investigate the use of BCI to control objects inside the hybrid reality ISS environment. This task looked at using an Electroencephalogram (EEG) headset to collect brain state data that could be mapped to commands that a computer could execute. On this Task, I had a setback with the hardware, which stopped working and was returned to the vendor for repair. However, I was still able to collect some data, was able to process it, and started to create correlation algorithms between the electrical patterns in the brain and the commands we wanted the computer to carry out. I also carried out a test to investigate the comfort of the headset if it is worn for a long time. The knowledge gained will benefit me in my future career. I learned how to use various modeling and programming tools that included Blender, Maya, Substance Painter, Artec Studio, Github, and Unreal Engine 4. I learned how to use a professional grade 3D scanner and 3D printer. On the BCI Project I learned about data mining and how to create correlation algorithms. I also supported various demos including a live demo of the hybrid reality lab capabilities at ComicPalooza. This internship has given me a good look into engineering at NASA. I developed a more thorough understanding of engineering and my overall confidence has grown. I have also realized that any problem can be fixed, if you try hard enough, and as an engineer it is your job to not only fix problems but to embrace coming up with solutions to those problems.

Arias, Adriel↗

Contracting Quality Early in the Lifecycle Using AS9145 Data Deliverables

Development schedules and a highly dynamic supply chain are a challenge to developers of complex systems produced at low volume. Flaws in designs, parts and materials availability problems, poor manufacturability, and a lack of knowledge about critical items and key process attributes can be realized well before traditional second-party quality assurance activities begin. Supplier audits and product inspections may have little mitigating effect once these foundational problems have been realized. Their impacts can be significant lifecycle disruption, cost overruns, inability to deliver to plan, and even project cancellation. AS9145, Requirements for Advanced Product Quality Planning and Production Part Approval Process, can be used to drive quality engineering practices into early development lifecycles to significantly reduce this late-cycle risk and to reduce the cost of quality overall. Since its initial publication in 2016, it has had very limited adoption by the DoD, no adoption by NASA, and sparse adoption in the aerospace and defense supply chain. A task group within the Aerospace Industries Association's (AIA) Joint Strategic Quality Council (JSQC) identified that both acquirers and suppliers see as AS9145 as a cost-adder and are hesitant to use it as an alternative to late-stage-heavy quality assurance approaches. A lack of prior use creates large capability gaps in request-for-proposal (RFP) teams, proposal teams, suppliers’ quality management systems (QMS), and in experienced personnel executing the early lifecycle approach. To create a more realizable on-ramp for using AS9145 in the space and defense sectors, the AIA JSQC task team created five deliverable requirements descriptions (DRDs) that can be used in a contract to begin to engage both parties in early lifecycle quality engineering and quality assurance activities, that reduce exposure to late-stage cost and schedule collapse due to unidentified risks in design, supply chain, and manufacturability. These DRDs drive the parties to engage in planning and analysis discussions early on to understand what production risks can be known and how they will focus resources based on safety criticality and the key elements of design and construction. The suppliers and acquirers who will produce the data and information required by the DRD will be able to incrementally evolve their QMS and the acquirer will incrementally be able to track and understand the benefits of cost shifting from late to early development phases. A white paper describing this approach and the five recommended DRDs will be published by the AIA in late 2024 or early 2025.

Jeannette Plante↗

Development of New Antifoam for High Level Waste Processing in DWPF

During processing in the Defense Waste Processing Facility (DWPF), the evaporation of sludge leads to large amounts of foaming. This foaming can cause a foam-over, which contaminates other parts of the facility, most importantly the condensate. Currently, the antifoam being used is not sufficient at more extreme pH values and relatively high concentrations are required to minimize foaming. This means that a foam-over is more likely in parts of the process where the pH moves away from the neutral point and antifoam is needed in large quantities to prevent such occurrences. Adding this antifoam can also double processing time. The current antifoam also degrades into flammable byproducts, which creates a hazard in the processing. There are two main ideas proposed in order to solve the problems with the current antifoam: A new antifoam; A mechanical solution (sprays, agitator, etc). The focus of this summer was to develop a new antifoam that works across a broader range of pH values, can be added in lower concentrations, and does not degrade into flammable byproducts. This solution was pursued by obtaining different superspreaders and antifoams from companies across the country in order to perform a series of tests on them; these tests include superspreader testing, Foamscan testing, boiling testing, and Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) process testing. To begin testing, four different superspreaders were tested on their ability to spread. The four superspreaders include: Y-17112, Y-17309, Antifoam 747 (the old antifoam), and Silwet L77 (the main component in Antifoam 747). These superspreaders were tested across a range of pH values and concentrations from 100 ppm to 5000 ppm. After completion of the tests, the results indicated that Y-17112 spread across a wider pH range than the others, even at lower concentrations. This is ideal for developing a new antifoam, as the pH throughout processing in DWPF varies and the lower the necessary concentration, the less antifoam that must be added per cycle. In order to test whether or not the superspreaders work as an antifoam, they have to be tested on real foam. In order to test this, a foamy simulant similar to the foaminess of the sludge in DWPF needed to be developed. This required testing many different sludges and designing our own simulant with different concentrations of insoluble solids. Eventually, a simulant similar enough to what is seen in DWPF was identified. Each superspreader will be tested on the simulant at different pH values and at different concentrations. The simulant will be allowed to foam and small amounts of the superspreader will be added while the Foamscan software tracks the height of the foam column; this allows us to know if the superspreader decreased the foam or not. Next, boiling testing in the Foamscan will be completed. This is testing identical to the Foamscan testing at room temperature, only at boiling conditions similar to DWPF. After boiling testing, the superspreader that is deemed most successful will be tested in a real, scaled-down SRAT/SME cycle. This will ensure it works with all the real chemicals that are added in DWPF and that it will remain successful in all the conditions that it may face. After the SRAT/SME testing, a decision will be made on whether or not the superspreader is successful and it may or may not be chosen as the new antifoam for DWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distributed Fiber Optic Arrays: Integrated Temperature and Seismic Sensing for Detection of CO 2 Flow, Leakage and Subsurface Distribution (Final Report)

This report describes the seismic and heat-pulse monitoring equipment, surveys, results and accomplishments of the fiber optic (FO) project funded by the U.S. Department of Energy (DOE) under Agreement Number DE-FE0012700. The formal title of the project is “Distributed Fiber Optic Arrays: Integrated Temperature and Seismic Sensing for Detection of CO 2 Flow, Leakage and Subsurface Distribution.” The project focuses on the field acquisition of FO data using Distributed Acoustic Sensing (DAS) arrays for subsurface imaging of geologic structure and to track the CO 2 migration in the injection interval using time-lapse techniques. A second component of the project uses a novel heat-pulse monitoring method that relies on Distributed Temperature Sensing (DTS) to evaluate near-field leakage of CO 2 or brine in and around the wellbore. The Southeast Regional Carbon Sequestration (SECARB) partnership hosted the project at the Anthropogenic Test site near Citronelle, Alabama after the original site host, the Kansas Geological Survey (KGS), experienced significant delays in permitting its CO 2 injection well at the Wellington Oil Field site in Kansas. The KGS project was later terminated in 2017 before an injection permit issued. A second field trial was planned for the Livingston Oil Field, located in Louisiana, but the site host ran into financial troubles and the project was terminated in 2015. A replacement field-site host was not found for the Livingston field trial. Both the Wellington, Kansas and Livingston, Louisiana projects were funded by DOE. A novel sensor platform referred to as the Modular Borehole Monitoring (MBM) system deployed at the Citronelle field site was utilized by the FO project. Two different seismic sensor technologies were incorporated in the Citronelle MBM system design including: (1) a semi-permanent, tubing-deployed, 18-level geophone array with custom hydraulic clamps; and (2) two, single mode optical fibers for Distributed Acoustic Sensing (DAS). Incorporation of the 18-level geophone array in the MBM system provided an ideal opportunity to compare the DAS response to conventional geophones. A heat-pulse monitoring system consisting of two, multi-mode optical fibers for Distributed Temperature Sensing (DTS) and copper heater element were also incorporated into the MBM package. This report provides an overview of the design of the MBM, DAS, and DTS equipment and the surveys performed during the study. The heat-pulse monitoring technique was used to diagnose a completion problem with observation well D-9-8 #2 where the MBM system was installed in 2012, thus successfully demonstrating its application for leak detection. In 2015, CO 2 unexpectedly arrived at the observation well approximately one year after CO 2 injection and heat-pulse monitoring ended. It was determined at this time that saltwater intrusion had likely penetrated the stainless-steel capillary tube containing the fibers and copper heater elements, thus preventing the heater from being used. DTS measurements indicated that the fiber had also degraded probably due to hydrogen darkening. It is recommended that the capillary tube be constructed of a more corrosive resistant material (e.g., Inconel) in the future should it be deployed in similar harsh downhole environments. Geophysical imaging of the subsurface and monitoring of the CO 2 were successful using DAS in the vertical seismic profile (VSP) survey configuration. A high resolution VSP image of the subsurface was obtained in 2014 using DAS, which exceeded our expectations in comparison to a lower resolution image obtained by SECARB in 2012 using an 80-level geophone array. A time-lapse image of the redistribution of CO 2 after injection ended in September 2014 was obtained using two DAS VSP surveys from June 2014 and December 2015, thus successfully demonstrating its application. DAS data were also acquired during a crosswell seismic survey conducted in 2014. Unfortunately, the DAS technique was not success in the crosswell survey configuration because the noise level was too high, increasing by a factor of ten, over the high frequency output (100-1,200) of the piezoelectric source.

58 GEOSCIENCES↗

GPS World, Innovation: Autonomous Navigation at High Earth Orbits

Calculating a spacecraft's precise location at high orbital altitudes-22,000 miles (35,800 km) and beyond-is an important and challenging problem. New and exciting opportunities become possible if satellites are able to autonomously determine their own orbits. First, the repetitive task of periodically collecting range measurements from terrestrial antennas to high altitude spacecraft becomes less important-this lessens competition for control facilities and saves money by reducing operational costs. Also, autonomous navigation at high orbital altitudes introduces the possibility of autonomous station keeping. For example, if a geostationary satellite begins to drift outside of its designated slot it can make orbit adjustments without requiring commands from the ground. Finally, precise onboard orbit determination opens the door to satellites flying in formation-an emerging concept for many scientific space applications. The realization of these benefits is not a trivial task. While the navigation signals broadcast by GPS satellites are well suited for orbit and attitude determination at lower altitudes, acquiring and using these signals at geostationary (GEO) and highly elliptical orbits is much more difficult. The light blue trace describes the GPS orbit at approximately 12,550 miles (20,200 km) altitude. GPS satellites were designed to provide navigation signals to terrestrial users-consequently the antenna array points directly toward the earth. GEO and HE0 orbits, however, are well above the operational GPS constellation, making signal reception at these altitudes more challenging. The nominal beamwidth of a Block II/IIA GPS satellite antenna array is approximately 42.6 degrees. At GEO and HE0 altitudes, most of these primary beam transmissions are blocked by the Earth, leaving only a narrow region of nominal signal visibility near opposing limbs of the earth. This region is highlighted in gray. If GPS receivers at GEO and HE0 orbits were designed to use these higher power signals only, precise orbit determination would not be practical. Fortunately, the GPS satellite antenna array also produces side lobe signals at much lower power levels. NASA has designed and tested the Navigator, a new GPS receiver that can acquire and track these weaker signals, thereby dramatically increasing the signal visibility at these altitudes. While using much weaker signals is a fundamental requirement for a high orbital altitude GPS receiver, it is certainly not the only challenge. There are other unique characteristics of this application that must also be considered. For example, Position Dilution of Precision (PDOP) figures are much higher at GEO and HE0 altitudes because visible GPS satellites are concentrated in a much smaller area with respect to the spacecraft antenna. These poor PDOP values contribute considerable error to the point solutions calculated by the spacecraft GPS receiver. Finally, spacecraft GPS receivers must be designed to withstand a variety of extreme environmental conditions. Variations in acceleration between launch and booster separation are extreme. Temperature gradients in the space environment are also severe. Furthermore, radiation effects are a major concern-spacecraft-borne GPS receivers must be designed with radiation-hardened electronics to guard against this phenomenon, otherwise they simply will not work. Perhaps most importantly, there are no opportunities to repair or modify any space-borne GPS receiver after it has been launched. Great care must be taken to ensure all performance characteristics have been analyzed prior to liftoff.

Bamford, William↗

Adaptive Inverse Control for Rotorcraft Vibration Reduction

This thesis extends the Least Mean Square (LMS) algorithm to solve the mult!ple-input, multiple-output problem of alleviating N/Rev (revolutions per minute by number of blades) helicopter fuselage vibration by means of adaptive inverse control. A frequency domain locally linear model is used to represent the transfer matrix relating the higher harmonic pitch control inputs to the harmonic vibration outputs to be controlled. By using the inverse matrix as the controller gain matrix, an adaptive inverse regulator is formed to alleviate the N/Rev vibration. The stability and rate of convergence properties of the extended LMS algorithm are discussed. It is shown that the stability ranges for the elements of the stability gain matrix are directly related to the eigenvalues of the vibration signal information matrix for the learning phase, but not for the control phase. The overall conclusion is that the LMS adaptive inverse control method can form a robust vibration control system, but will require some tuning of the input sensor gains, the stability gain matrix, and the amount of control relaxation to be used. The learning curve of the controller during the learning phase is shown to be quantitatively close to that predicted by averaging the learning curves of the normal modes. For higher order transfer matrices, a rough estimate of the inverse is needed to start the algorithm efficiently. The simulation results indicate that the factor which most influences LMS adaptive inverse control is the product of the control relaxation and the the stability gain matrix. A small stability gain matrix makes the controller less sensitive to relaxation selection, and permits faster and more stable vibration reduction, than by choosing the stability gain matrix large and the control relaxation term small. It is shown that the best selections of the stability gain matrix elements and the amount of control relaxation is basically a compromise between slow, stable convergence and fast convergence with increased possibility of unstable identification. In the simulation studies, the LMS adaptive inverse control algorithm is shown to be capable of adapting the inverse (controller) matrix to track changes in the flight conditions. The algorithm converges quickly for moderate disturbances, while taking longer for larger disturbances. Perfect knowledge of the inverse matrix is not required for good control of the N/Rev vibration. However it is shown that measurement noise will prevent the LMS adaptive inverse control technique from controlling the vibration, unless the signal averaging method presented is incorporated into the algorithm.

Jacklin, Stephen A.↗

Simulation of the modern arctic climate by the NCAR CCM1

The National Center of Atmospheric Research (NCAR) Community Climate Model Version 1 (CCM1's) simulation of the modern arctic climate is evaluated by comparing a five-year seasonal cycle simulation with the European Center for Medium-Range Weather Forecasts (ECMWF) global analyses. The sea level pressure (SLP), storm tracks, vertical cross section of height, 500-hPa height, total energy budget, and moisture budget are analyzed to investigate the biases in the simulated arctic climate. The results show that the model simulates anomalously low SLP, too much storm activity, and anomalously strong baroclinicity to the west of Greenland and vice versa to the east of Greenland. This bias is mainly attributed to the model's topographic representation of Greenland. First, the broadened Greenland topography in the model distorts the path of cyclone waves over the North Atlantic Ocean. Second, the model oversimulates the ridge over Greenland, which intensifies its blocking effect and steers the cyclone waves clockwise around it and hence produces an artificial circum-Greenland trough. These biases are significantly alleviated when the horizontal resolution increases to T42. Over the Arctic basin, the model simulates large amounts of low-level (stratus) clouds in winter and almost no stratus in summer, which is opposite to the observations. This bias is mainly due to the location of the simulated SLP features and the negative anomaly of storm activity, which prevent the transport of moisture into this region during summer but favor this transport in winter. The moisture budget analysis shows that the model's net annual precipitation (P-E) between 70 deg N and the North Pole is 6.6 times larger than the observations and the model transports six times more moisture into this region. The bias in the advection term is attributed to the positive moisture fixer scheme and the distorted flow pattern. However, the excessive moisture transport into the Arctic basin does not solely result from the advection term. The contribution by the moisture fixer is as large as from advection. By contrast, the semi-Lagrangian transport scheme used in the CCM2 significantly improves the moisture simulation for this region; however, globally the error is as serious as for the positive moisture fixer scheme. Finally, because the model has such serious problems in simulating the present arctic climate, its simulations of past and future climate change for this region are questionable.

Bromwich, David H.↗