Search NASA⌕ Search

SEARCH · Search NASA

Results for “work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

Estimation of Preferred Work Envelope from Simulated Functional Tasks in a Spacesuit

Spacesuits allow humans to function in an incredibly harsh environment. However, they introduce some restrictions to human capabilities. In general, crewmembers in a spacesuit have a restricted maximal reach envelope, reduced field of view, and reduced tactility. When tasks and interfaces are being designed, they need to take into account the restrictions associated with working in an Extravehicular Activity (EVA) suit.

Benson, Elizabeth↗

Preparing Students to Work in Diverse Settings and Across Distance: Inter-University, Interdisciplinary Capstone Teams

NASA's Psyche Mission is engaged with a growing number of capstone teams pursuing topics relevant to the mission, including partnering with four universities to trial cross-university teaming. Creating interdisciplinary capstone teams with students from different universities provides an opportunity to prepare students to engage with a diversity of disciplines and collaborate in remote teams in the workplace. Additionally, through such capstones, universities may gain access to non-local, specialized technical mentors and to disciplines not offered at their institutions. An added benefit is providing greater fidelity to NASA space missions, which involve teams working together at a distance. We discuss early lessons learned from the first three inter-university, interdisciplinary capstone teams participating with the Psyche mission and discuss plans for improvement and future expansion.

Bowman, C. D. D.↗

SPHERES/Astrobee Working Group (SAWG) Quarterly Meeting

SPHERES Astrobee Working Group (SAWG) Quarterly meeting. Membership includes MIT, FIT, AFS, DARPA, CASIS, SJSU, and NASA (HQ, KSC, JSC, MSFC, and ARC). Face-to-Face, twice a year Purpose: Information sharing across the SPHERES community. Program office shares National Lab Facility availability. Status of resources (batteries, CO2 tanks, etc.), Overall Calendar (scheduled Test Sessions, upmassreturn), and Updates on new PD, Investigations, and ISS infrastructure. Provide the SPHERES community (PD, investigators, etc.) with up-to-date information to determine opportunities to use the NL Facility. Discuss proposed changes updates to SPHERES Nat Lab which may be required to support a specific activity or research. Discuss specific support requests made to the ISS Office

Benavides, Jose V.↗

EOS Aqua Mission Status at the Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) Meeting in Gilbert, AZ

This presentation provides mission operations status for the Earth Observing System (EOS) Aqua satellite for the past six-months (June 2019 through November 2019). It only contains information that is of interest to the International Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) member missions. It will be presented at the bi-annual MOWG Meeting in Gilbert, Arizona on Tuesday, December 3, 2019. These meetings have been occurring twice a year since the MOWG was formed in 2003.

Guit, Bill↗

SPHERES Synchronized, Position, Hold, Engage, Reorient, Experimental Satellites: SPHERES Working Group (SWG) Quarterly Meeting

SPHERES Working Group (SWG) Quarterly meeting. Membership includes MIT, FIT, AFS, DARPA, CASIS, SJSU, and NASA (HQ, KSC, JSC, MSFC, and ARC). Face-to-Face, twice a year. Next Face-to-Face will be scheduled in Feb. 2017 at NASA Ames. Purpose: Information sharing across the SPHERES community. Program office shares National Lab Facility availability. Status of resources (batteries, CO2 tanks, etc.), Overall Calendar (scheduled Test Sessions, upmassreturn), and Updates on new PD, Investigations, and ISS infrastructure.Provide the SPHERES community (PD, investigators, etc.) with up-to-date information to determine opportunities to use the NL Facility. Discuss proposed changes updates to SPHERES Nat Lab which may be required to support a specific activity or research. Discuss specific support requests made to the ISS Office.

Jose V Benavides↗

Aerothermodynamics Technical Working Group: 2008 Turbomachinery Technology Assessment and Recommendations

This report documents the 2008 Turbomachinery Technology Assessment and Recommendations of the NASA-led Aerothermodynamics Technical Working Group (TWG). It includes technology review, assessment, and recommendation for future research and development. The areas covered are summarized as follows. Inlet Flow Distortion Sensitivity and Stability, Tip Leakage Flows in High-Pressure Cores, Endwall Contouring, Turbine Tip Flows, Combustor and Cooled-Turbine Interaction, Highly Loaded Low-Pressure Turbines.

Heidmann, James D.↗

Work Scheduling and Fatigue Management

There are physiological limits to human performance, influenced by the internal programming of the sleep homeostat and circadian rhythms. There are known fatigue-related risks related to different work scheduling factors. This presentation was for presentation to supervisors and managers at Stennis Space Center to provide information about physiological risks factors associated with shiftwork scheduling practices and facilitate discussion about approaches to manage the related risks.

Gregory, Kevin↗

Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller↗

A Comparison of Aircraft Flyover Auralizations by the Aircraft Noise Simulation Working Group

The Aircraft Noise Simulation Working Group (ANSWr), comprised of NASA, DLR, and ONERA, recently completed an analysis campaign to compare aircraft noise simulation tools, establish guidelines for noise prediction, and launch activities to assess uncertainties associated with the simulation. The campaign included the analyses of two DLR conceptual aircraft, a reference tube-and-wing aircraft, and a low noise aircraft with engines mounted above the fuselage-wing-junction. While the total predicted noise for each of the concepts compared favorably among analyses at the peak level, significant differences were noted at the component level. This paper aims to further that effort by auralizing aircraft flyover noise associated with those predictions. Comparisons are made among the NASA, DLR/Empa, and ONERA generated sounds to determine how differences between the system noise prediction and auralization methods result in changes to the auralized sound.

Stephen A Rizzi↗

Corrosion Atmospheric Exposure Facility PRL #239 SWMU Assessment Report/Confirmation Sampling Work Plan

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). The Corrosion Atmospheric Exposure Facility (CAEF), also known as facility number K8-0600, and the Corrosion Test Area (CTA); also known as facility number K8-0237, herein referred to as the site, is designated Potential Release Location (PRL) 239 under the NASA RCRA permit. A SWMU Assessment (SA) was conducted between November 2019 and February 2020 to identify potential environmental impacts related to current and historic operations being conducted at the site. The SA included a site reconnaissance visit in February 2020, interviews with various personnel possessing knowledge of past work practices and operations at the site, and review of available historical documentation, engineering drawings, and facility inspection reports. Current site conditions were documented in photographs. Soil types and wildlife habitat were also evaluated. The objective of the assessment was to identify potential locations of concern (LOC) at the site and to determine whether further evaluation is required.

Kimberly Clower↗

NASA ESDS Citizen Science Data Working Group

This document provides guidelines for legal, policy, and ethical issues; standards for citizen science data collection and management; information on ensuring usability of citizen science data and communication regarding its use; and best practices for long-term archival of citizen science data.Section1 contains a detailed discussion of policy, ethical, and legal considerations influencing citizen science data collection. Section 2 considers standards for documentation, including documentation of instrumentation, procedures, and the data itself. It concludes with a discussion of how citizen science data should be attributed. Section 3 provides guidance about how to ensure citizen science data are collected and stored in a useable way. It also considers how NASA and data producers should notify the scientific community, including citizen scientists and the public, about citizen science datasets and the scientific conclusions reached using them. Finally, Section 4 provides detailed information regarding what should be archived from projects using a citizen science approach, including data and code. It provides guidance about archive location, process, and timeframe, as well as information about data access and distribution services provided by NASA that may be relevant to data producers working with citizen scientists.

Citizen Science↗

AAM Supply Chain Working Group: Aerospace Supply Chain and Manufacturing

This presentation provides an overview of the aerospace supply chain and how the AAM Supply Chain Working Group will help to make it more sustainable and resilient. The urgent needs are building a tiered system, a modeling and simulation platform, and an electronic exchange platform.

AAM↗

The PDS4 Information Model Design Principles - How Well Did They Work?

The Planetary Data System (PDS) recently released Version 1.5 of the PDS4 Information Model, the primary component of the PDS4 Information Architecture. The Information Model is now stable and is in use by three active missions and several missions in various phases of development. The Information Model drives the PDS4 Information System using a multi-level governance structure that provides for common, discipline, and mission level management of the system’s information standards. For the development of the PDS4 Information Model several design principles were adopted. This paper will describe each design principle and then explain how well they worked, problems encountered during development and their solutions, and how well the results meet the requirements of the multi-discipline planetary science community.

Martin, Michael↗

A Status Update for the FLASHFlux/SOFA Working Group

This presentation provides an update for the SOFA and FLASHFlux working groups for the virtual CERES Science Team meeting. Recent changes to the TSI production are noted and a status of FLASHFlux production, distribution, usage and validation are provided.

CERES↗

How the Internet of "Space" Things will Disrupt and Transform Astronaut Work-life

Future long duration exploration missions will require astronauts to work and behave more autonomously. Over the last several years, we have been investigating how integrating sensors into an astronaut’s environment enables crew autonomy. This paper describes the prototypes we have deployed in Earth analogs investigating the concept of the Internet of “Space” Things.

procedure execution↗