Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerators,OTHER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Automatic Beam Path Analysis of Laser Wakefield Particle Acceleration Data

Numerical simulations of laser wakefield particle accelerators play a key role in the understanding of the complex acceleration process and in the design of expensive experimental facilities. As the size and complexity of simulation output grows, an increasingly acute challenge is the practical need for computational techniques that aid in scientific knowledge discovery. To that end, we present a set of data-understanding algorithms that work in concert in a pipeline fashion to automatically locate and analyze high energy particle bunches undergoing acceleration in very large simulation datasets. These techniques work cooperatively by first identifying features of interest in individual timesteps, then integrating features across timesteps, and based on the information derived perform analysis of temporally dynamic features. This combination of techniques supports accurate detection of particle beams enabling a deeper level of scientific understanding of physical phenomena than hasbeen possible before. By combining efficient data analysis algorithms and state-of-the-art data management we enable high-performance analysis of extremely large particle datasets in 3D. We demonstrate the usefulness of our methods for a variety of 2D and 3D datasets and discuss the performance of our analysis pipeline.

43 PARTICLE ACCELERATORS↗

Generation and Characterization of Electron Bunches with Ramped Current Profiles in a Dual-Frequency Superconducting Linear Accelerator

We report on the successful experimental generation of electron bunches with ramped current profiles. The technique relies on impressing nonlinear correlations in the longitudinal phase space using a superconducing radiofrequency linear accelerator operating at two frequencies and a current-enhancing dispersive section. The produced {approx} 700-MeV bunches have peak currents of the order of a kilo-Ampere. Data taken for various accelerator settings demonstrate the versatility of the method and in particular its ability to produce current profiles that have a quasi-linear dependency on the longitudinal (temporal) coordinate. The measured bunch parameters are shown, via numerical simulations, to produce gigavolt-per-meter peak accelerating electric fields with transformer ratios larger than 2 in dielectric-lined waveguides.

43 PARTICLE ACCELERATORS↗

Laser-driven ion and electron acceleration from near-critical density gas targets: Towards high-repetition rate operation in the 1 PW, sub-100 fs laser interaction regime

Ion acceleration from gaseous targets driven by relativistic-intensity lasers was demonstrated as early as the late 1990s, yet most of the experiments conducted to date have involved picosecond-duration, Nd:glass lasers operating at low repetition rate. Here, we present measurements on the interaction of ultraintense ( ≈ 10 20 W cm − 2 , 1 PW ) , ultrashort ( ≈ 70 fs ) Ti:Sa laser pulses with near-critical ( ≈ 10 20 cm − 3 ) helium gas jets, a debris-free targetry with the potential for future compatibility with high ( ≈ 1 Hz ) repetition rate operation. We provide evidence of α particles being forward accelerated up to ≈ 2.7 − MeV energy with a total flux of ≈ 10 11 sr − 1 as integrated over > 0.1 − MeV energies and detected within a 0.5 − mrad solid angle. We also report on on-axis emission of relativistic electrons with an exponentially decaying spectrum characterized by a ≈ 10 − MeV slope, i.e., five times larger than the standard ponderomotive scaling. The total charge of these electrons with energy above 2 MeV is estimated to be of ≈ 1 nC , corresponding to ≈ 0.1 % of the laser drive energy. In addition, we observe the formation of a plasma channel, extending longitudinally across the gas density maximum and expanding radially with time. These results are well captured by large-scale particle-in-cell simulations, which reveal that the detected fast ions most likely originate from reflection off the rapidly expanding channel walls. The latter process is predicted to yield ion energies in the MeV range, which compare well with the measurements. Finally, direct laser acceleration is shown to be the dominant mechanism behind the observed electron energization. Published by the American Physical Society 2024

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Differentiable Neural Architecture, Mixed Precision and Accelerator Co-Search

Quantization, effective Neural Network architecture, and efficient accelerator hardware are three important design paradigms to maximize accuracy and efficiency. Mixed Precision Quantization is a process of assigning different precision to different Neural Network layers for optimized inference. Neural Architecture Search (NAS) is a process of automatically designing the neural network for a task and can also be extended to search for the precision of each weight and activation matrix. In this paper, we develop the following three methods: (i) Fast Differentiable Hardware-aware Mixed Precision Quantization Search method to find optimal precision, (ii) Joint Differentiable hardware-aware Architecture and Mixed Precision Quantization Co-search, (iii) Joint Accelerator, Architecture, and Precision triple co-search to find best possibilities in all the three worlds. We demonstrate the effectiveness of our proposed methods targeting Bitfusion accelerator by searching mixed precision models on MobilenetV2. We achieve better accuracy-latency trade-off models than the manually designed and previously proposed search methods.

97 MATHEMATICS AND COMPUTING↗

Experimental results from the VENUS-F critical reference state for the GUINEVERE accelerator driven system project

The GUINEVERE (Generation of Uninterrupted Intense Neutron pulses at the lead Venus Reactor) project was launched in 2006 within the framework of FP6 EUROTRANS in order to validate on-line reactivity monitoring and subcriticality level determination in Accelerator Driven Systems. Therefore the VENUS reactor at SCK.CEN in Mol (Belgium) was modified towards a fast core (VENUS-F) and coupled to the GENEPI-3C accelerator built by CNRS The accelerator can operate in both continuous and pulsed mode. The VENUS-F core is loaded with enriched Uranium and reflected with solid lead. A well-chosen critical reference state is indispensable for the validation of the on-line subcriticality monitoring methodology. Moreover a benchmarking tool is required for nuclear data research and code validation. In this paper the design and the importance of the critical reference state for the GUINEVERE project are motivated. The results of the first experimental phase on the critical core are presented. The control rods worth is determined by the rod drop technique and the application of the Modified Source Multiplication (MSM) method allows the determination of the worth of the safety rods. The results are implemented in the VENUS-F core certificate for full exploitation of the critical core. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High power testing of a fused quartz-based dielectric-loaded accelerating structure.

We report on the most recent results from a series of high power tests being carried out on rf-driven dielectric-loaded accelerating (DLA) structures. The purpose of these tests is to determine the viability of the DLA as a traveling-wave accelerator and is a collaborative effort between Argonne National Laboratory (ANL), Naval Research Laboratory (NRL), and Stanford Linear Accelerator Center (SLAC). In this paper, we report on the recent high power tests of a fused quartz-based DLA structure that was carried out at incident powers of up to 12 MW at NRL and 37 MW at SLAC. We also report on test results of a TiN coated quartz structure, that exhibits good multipactor suppression.

43 PARTICLE ACCELERATORS↗

Suppressing Thermal Energy Drift In The LLNL Flash X-Ray Accelerator Using Linear Disk Resistor Stacks

This paper addresses thermal drift in sodium thiosulfate liquid resistors and their replacement with linear disk resistors from HVR Advanced Power Components. Sodium thiosulfate resistors in the FXR induction linear accelerator application have a temperature coefficient of {approx}1.8%/C. The FXR Marx banks send an 8kJ pulse through eight 524 cm{sup 3} liquid resistors at a repetition rate of up to 1 every 45 seconds. Every pulse increases the temperature of the solution by {approx}0.4 C which produces a 0.7% change in resistance. The typical cooling rate is {approx}0.4 C per minute which results in {approx}0.1% energy drop per pulse during continuous pulsed operations. A radiographic accelerator is extraordinarily sensitive to energy variations. Changes in beam energy produce movement in beam transport, changes in spot size, and large dose variations. If self-heating were the only problem, we could predict the increase in input voltage required to compensate for the energy loss. However, there are other variables that influence the temperature of the resistors such as focus magnet heating, changes in room temperature, changes in cooling water, where the cell is located, etc. Additionally not all of the resistors have equivalent cooling rates and as many as 32 resistors are driven from a single power source. The FXR accelerator group elected to replace the sodium thiosulfate resistors with HVR Linear Disk Resistors in a stack type configuration. With data limited for these resistors when used in oil and at low resistance values, a full characterization needed to be performed. High currents (up to 15kA), high voltages (up to 400kV), and Fast Rise times (<10ns) made a resistor choice difficult. Other solid resistors have been tried and had problems at the connection points and with the fact that the resistivity changed as they absorbed oil. The selected HVR resistors have the advantage of being manufactured with the oil impregnated in to them so this characteristic is minimized while still offering the desired low temperature coefficient of resistance compared to sodium thiosulfate. The characterization experiments and comparison with the sodium thiosulfate liquid resistors will be fully discussed and the final design described.

42 ENGINEERING↗

Experimental Safe Extremum Seeking for Accelerators

Here, we demonstrate the recent designs of safe extremum seeking (Safe ES) on the 1-km-long charged particle accelerator at the Los Alamos Neutron Science Center (LANSCE). Safe ES is a modification of extremum seeking (ES) which, in addition to minimizing an analytically unknown cost, also employs a safety filter based on an analytically unknown control barrier function (CBF) safety metric. Tuning is necessitated by accelerators being large complex systems, with many drifting parameters due to thermal effects and degradation. At the same time, safe operation (the maintenance of state constraints) is crucial, as damage brings astronomical costs, both financially and in operation downtime. Our measured (but analytically unknown) safety metric is the beam current. We perform multivariable Safe ES on three accelerator applications, in which we adapt 4, 6, and 3 magnet strength parameters, respectively. Two of the three applications are for validated simulation models of beamlines at LANSCE: the first for the proton radiography (pRad) beamline of 800-MeV protons for spot size tuning; the second on a high-performance code, HPSim, for tuning the low-energy beam transport (LEBT) region that contains a beam of 750-keV protons. The third is an experimental tuning of the steering magnets in the LEBT at LANSCE.

43 PARTICLE ACCELERATORS↗

Acceleration of nonmonoenergetic electron bunches injected into a wake wave

The trapping and acceleration of nonmonoenergetic electron bunches in a wake field wave excited by a laser pulse in a plasma channel is studied. Electrons are injected into the region of the wake wave potential maximum at a velocity lower than the phase velocity of the wave. The paper analyzes the grouping of bunch electrons in the energy space emerging in the course of acceleration under certain conditions of their injection into the wake wave and minimizing the energy spread for such electrons. The factors determining the minimal energy spread between bunch electrons are analyzed. The possibility of monoenergetic acceleration of electron bunches generated by modern injectors in a wake wave is analyzed.

43 PARTICLE ACCELERATORS↗

Flattop operation of the ILC accelerating cryomodule

A 500 GeV center-of-mass International Linear Collider (ILC), currently under R&D development, is foreseen as the next-generation high-energy physics (HEP) instrument. The achievement of a 31.5 MV/m average operational accelerating gradient in a single cryomodule is a proof of principle for the ILC project. However, individual cavity performance may have a large spread in operating gradients, up to 20% of the nominal value. In case of cavities performing below the average, the design parameters could be achieved by tweaking the RF distribution accordingly. We present a simple theoretical analysis of the ILC cryomodule operation with a gradient spread. The difference in the gradients breaks the synchronism of a transient processes in each cavity and causes nonuniform acceleration along the bunch train. A proper solution was found to maintain flattop operation of the accelerating module. Finally, we perform numerical efficiency estimations for the proposed RF distribution scheme based on real data of the gradient spread of actual cavities.

43 PARTICLE ACCELERATORS↗

A Lattice for a Hybrid Fast-Ramping Muon Accelerator to 750 GeV

We describe a lattice for accelerating muons from 375 GeV to 750 GeV. The lattice is a fast-ramping synchrotron with a mixture of fixed-field superconducting dipoles and warm dipoles, so as to have a high average bending field while still being able to rapidly change the average bending field as the beam momentum increases. For a 1.5 TeV center of mass muon collider, muons must be rapidly accelerated to 750 GeV. To accomplish this efficiently, we wish to make as many passes through the RF cavities as possible, while keeping the average RF gradients sufficiently high to avoid excess muon decays. A synchrotron where the magnets are very rapidly ramped has been envisioned as one option to accomplish this. The entire acceleration cycle takes place in less than 1 ms, presenting a technological challenge for the magnets. Clearly superconducting magnets cannot be ramped on this time scale, so instead room-temperature magnets will be ramped. To keep losses low, dipoles can use grain-oriented silicon steel, but quadrupoles will probably need to use more conventional steel, giving a lower maximum field for these high ramping rates. If we want to have a large average RF gradient and simultaneously make a large number of passes through the RF cavities, the average bending field must be high. To achieve such a large bending field while rapidly ramping magnets, it has been proposed to use a hybrid lattice consisting of interleaved superconducting dipoles and bipolar ramped dipoles.

43 PARTICLE ACCELERATORS↗

Tuning the DARHT Axis-II linear induction accelerator focusing

Flash radiography of large hydrodynamic experiments driven by high explosives is a well-known diagnostic technique in use at many laboratories, and the Dual-Axis Radiography for Hydrodynamic Testing (DARHT) facility at Los Alamos produces flash radiographs of large hydrodynamic experiments. Two linear induction accelerators (LIAs) make the bremsstrahlung radiographic source spots for orthogonal views of each test. The 2-kA, 20-MeV Axis-I LIA creates a single 60-ns radiography pulse. The 1.7-kA, 16.5-MeV Axis-II LIA creates up to four radiography pulses by kicking them out of a longer pulse that has a 1.6-μs flattop. The Axis-II injector, LIA, kicker, and downstream transport (DST) to the bremsstrahlung converter are described. Adjusting the magnetic focusing and steering elements to optimize the electron-beam transport through an LIA is often called 'tuning.' As in all high-current LIAs, the focusing field is designed to be as close to that of the ideal continuous solenoid as physically possible. In ideal continuous solenoidal transport a smoothly varying beam size can easily be found for which radial forces balance, and the beam is said to be 'matched' to the focusing field. A 'mismatched' beam exhibits unwanted oscillations in size, which are a source of free energy that contributes to emittance growth. This is undesirable, because in the absence of beam-target effects, the radiographic spot size is proportional to the emittance. Tuning the Axis-II LIA is done in two steps. First, the solenoidal focusing elements are set to values designed to provide a matched beam with little or no envelope oscillations, and little or no beam-breakup (BBU) instability growth. Then, steering elements are adjusted to minimize the motion of the centroid of a well-centered beam at the LIA exit. This article only describes the design of the tune for the focusing solenoids. The DARHT Axis-II LIA was required to be re-tuned after installing an accelerator cell to replace a failed solenoid in March of 2012. We took advantage of this opportunity to improve the design of the focusing tune with better models of the remaining partially failed solenoids, better estimates of beam initial conditions, and better values for pulsed-power voltages. As with all previous tunes for Axis-II, this one incorporates measures to mitigate beam-breakup (BBU) instability, image displacement instability (IDI), corkscrew (sweep), and emittance growth. Section II covers the general approach to of design of focusing solenoid tunes for the DARHT Axis-2 LIA. Section III explains the specific requirements and simulations needed to design the tune for the injector, which includes the thermionic electron source, diode, and six induction cells. Section IV explains the requirements and simulations for tuning the main accelerator, which consists of 68 induction cells. Finally, Section V explores sensitivity of the tune to deviations of parameters from nominal, random variations, and uncertainties in values. Four appendices list solenoid settings for this new tune, discuss comparisons of different simulation codes, show halo formation in mismatched beams, and present a brief discussion of the beam envelope equation, which is the heart of the method used to design LIA solenoid tunes.

43 PARTICLE ACCELERATORS↗

LANL Activities Supporting Electron Accelerator Production of 99 Mo for NorthStar Medical Radioisotopes, LLC

Summary of LANL FY12 Activities are: (1) Preparation, performance, and data analysis for the FY12 accelerator tests at ANL - (a) LANL designed and installed a closed-loop helium target cooling system at ANL for the FY12 accelerator tests, (b) Thermal test was performed on March 27, (c) 24 h production test to follow the accelerator upgrade at ANL; (2) Local target shielding design and OTR/IR recommendations - (a) Target dose rate and activation products were calculated with MCNPX, (b) 206 Pb(γ,2n) 204m Pb vs 204g Pb branching ratio unpublished, will measure using the LANL microtron, (c) OTR system nearing final configuration, (d) IR prototype system demonstrated during the recent thermal test at ANL; (3) Target housing lifetime estimation - Target housing material specifications and design to be finalized following the thermal test, lifetime not believed to be an issue; and (4) Target cooling system reliability - Long duration system characterizations will begin following the thermal test.

42 ENGINEERING↗

Coaxial Two-Channel Dielectric Wake Field Accelerator

Theory, computations, and experimental apparatus are presented that describe and are intended to confirm novel properties of a coaxial two-channel dielectric wake field accelerator. In this configuration, an annular drive beam in the outer coaxial channel excites multimode wakefields which, in the inner channel, can accelerate a test beam to an energy much higher than the energy of the drive beam. This high transformer ratio is the result of judicious choice of the dielectric structure parameters, and of the phase separation between drive bunches and test bunches. A structure with cm-scale wakefields has been build for tests at the Argonne Wakefield Accelerator Laboratory, and a structure with mm-scale wakefields has been built for tests at the SLAC FACET facility. Both tests await scheduling by the respective facilities.

43 PARTICLE ACCELERATORS↗

High-gradient two-beam electron accelerator

The main goal for this project was to design, build, and evaluate a detuned-cavity, collinear, two-beam accelerator structure. Testing was to be at the Yale University Beam Physics Laboratory, under terms of a sub-grant from Omega-P to Yale. Facilities available at Yale for this project include a 6-MeV S-band RF gun and associated beam line for forming and transporting a ~1 A drive beam , a 300 kV beam source for use as a test beam, and a full panoply of laboratory infrastructure and test equipment. During the first year of this project, availability and functionality of the 6-MeV drive beam and 300 kV test beam were confirmed, and the beam line was restored to a layout to be used with the two-beam accelerator project. Major efforts during the first year were also focused on computational design and simulation of the accelerator structure itself, on beam dynamics, and on beam transport. Effort during the second year was focussed on building and preparing to test the structure, including extensive cold testing. Detailed results from work under this project have been published in twelve archival journal articles, listed in Section IV of the technical report.

43 PARTICLE ACCELERATORS↗

Scaling of induction-cell transverse impedance: effect on accelerator design

The strength of the dangerous beam breakup (BBU) instability in linear induction accelerators (LIAs) is characterized by the transverse coupling impedance Z ⊥ . This note addresses the dimensional scaling of Z ⊥ , which is important when comparing new LIA designs to existing accelerators with known i BBU growth. Moreover, it is shown that the scaling of Z ⊥ with the accelerating gap size relates BBU growth directly to high-voltage engineering considerations. It is proposed to firmly establish this scaling though a series of AMOS calculations.

43 PARTICLE ACCELERATORS↗

Corkscrew Motion of an Electron Beam due to Coherent Variations in Accelerating Potentials

Corkscrew motion results from the interaction of fluctuations of beam electron energy with accidental magnetic dipoles caused by misalignment of the beam transport solenoids. Corkscrew is a serious concern for high-current linear induction accelerators (LIA). A simple scaling law for corkscrew amplitude derived from a theory based on a constant-energy beam coasting through a uniform magnetic field has often been used to assess LIA vulnerability to this effect. We use a beam dynamics code to verify that this scaling also holds for an accelerated beam in a non-uniform magnetic field, as in a real accelerator. Results of simulations with this code are strikingly similar to measurements on one of the LIAs at Los Alamos National Laboratory.

43 PARTICLE ACCELERATORS↗

Project X Accelerator R&D Plan

Project X is a high intensity proton facility conceived to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report. Project X is based on an 8 GeV superconducting H-linac, paired with the existing (but modified) Main Injector and Recycler Ring, to provide in excess of 2 MW of beam power throughout the energy range 60-120 GeV, simultaneous with at least 100 kW of beam power at 8 GeV. The linac utilizes technology in common with the ILC over the energy range 0.6-8.0 GeV. Beam current parameters can be made identical to ILC resulting in identical rf generation and distribution systems. This alignment of ILC and Project X technologies allows for a shared development effort. The initial 0.6 GeV of the linac draws heavily on technology developed by Argonne National Laboratory for a facility for rare isotope beams. It is anticipated that the exact configuration and operating parameters of the linac will be defined through the R&D program and will retain alignment with the ILC plan as it evolves over this period. Utilization of the Recycler Ring as an H{sup -} stripper and accumulator ring is the key element that provides the flexibility to operate the linac with the same beam parameters as the ILC. The linac operates at 5 Hz with a total of 5.6 x 10{sup 13} H{sup -} ions delivered per pulse. H{sup -} are stripped at injection into the Recycler in a manner that 'paints' the beam both transversely and longitudinally to reduce space charge forces. Following the 1 ms injection, the orbit moves off the stripping foil and circulates for 200 msec, awaiting the next injection. Following three such injections a total of 1.7 x 10{sup 14} protons are transferred in a single turn to the Main Injector. These protons are then accelerated to 120 GeV and fast extracted to a neutrino target. The Main Injector cycle takes 1.4 seconds, producing approximately 2.3 MW of beam power at 120 GeV. At lower proton energies Main Injector cycle times can be shorter, allowing a beam power above 2 MW in the range of proton energy between 60 GeV and 120 GeV. In parallel, because the loading of the Recycler only requires 0.6 seconds, up to four linac cycles are available for accumulation and distribution of 8 GeV protons from the Recycler. Total available 8 GeV beam power lies in the range of 100-200 kW, depending on the energy in the Main Injector. Primary modifications to the existing accelerator complex to support Project X include integration of an H{sup -} injection system, a new RF system, a new extraction system, and measures to mitigate electron cloud effects, in the Recycler Ring. The Main Injector would need a new RF system, measures to preserve beam stability through transition, and measures to mitigate electron cloud effects. Finally, substantial modifications to the existing NuMI target station will be required to support >2 MW operations. It is anticipated that Project X configured as described above would initially support high intensity neutrino beams to the NOvA experiment, in parallel with at least one new 8 GeV based flavor/rare decay experiment. Depending upon future directions flexibility is retained for delivering neutrinos toward the DUSEL site and/or protons into the Tevatron. The purpose of this document is to describe an R&D plan that would position the U.S. to initiate construction of Project X in the 2012 time frame, assuming a go ahead decision in roughly 2010. The organization of this document is as follows: (1) Goals - Describes goals of the R&D and preliminary design period (2008-2011). Included are design, technical development, project documentation, and organizational goals. These are described in the context of an overall set of performance goals for Project X. (2) R&D Plan Elements - Describes the essential technical elements of the plan, including major subsystem performance requirements, associated accelerator and technology issues, and the plans for addressing these issues. (3) R&D Plan - Describes how the plan elements are assembled into a time-ordered plan, defines the associated resources required to support this plan, and describes the alignment of activities undertaken within the Project X, SRF/ILC, and HINS programs. Also describes how the R&D plan will be organized and executed by the prospective participating institutions.

43 PARTICLE ACCELERATORS↗