Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Results of NASA's First Autonomous Formation Flying Experiment: Earth Observing-1 (EO-1)

NASA's first autonomous formation flying mission completed its primary goal of demonstrating an advanced technology called enhanced formation flying. To enable this technology, the Flight Dynamics Analysis Branch at the Goddard Space Flight Center implemented a universal 3-axis formation flying algorithm in an autonomous executive flight code onboard the New Millennium Program's (NMP) Earth Observing-1 (EO-1) spacecraft. This paper describes the mathematical background of the autonomous formation flying algorithm, the onboard flight design and the validation results of this unique system. Results from fully autonomous maneuver control are presented as comparisons between the onboard EO-1 operational autonomous control system called AutoCon, its ground-based predecessor used in operations, and the original standalone algorithm. Maneuvers discussed encompass reactionary, routine formation maintenance, and inclination control. Orbital data is also examined to verify that all formation flying requirements were met.

Folta, David↗

On-Board Rendezvous Targeting for Orion

The Orion On-board GNC system is among the most complex ever developed for a space mission. It is designed to operate autonomously (independent of the ground). The rendezvous system in particular was designed to operate on the far side of the moon, and in the case of loss-of-communications with the ground. The vehicle GNC system is designed to retarget the rendezvous maneuvers, given a mission plan. As such, all the maneuvers which will be performed by Orion, have been designed and are being incorporated into the flight code.

Weeks, Michael W.↗

X-57 Ground Dynamics Modeling and Analysis

This paper presents simulation work to assess the ground handling behavior of the X-57 airplane, prior to its first flight under electric propulsion. A tire deformation model was fit to manufacturer ground testing data to develop a detailed simulation model of previously unmodeled rolling drag forces on the tires. A special modeling effort corrected for a difference between the runway surface in the manufacturer data (grass) and in intended X-57 surface operations (asphalt/concrete). Analysis based on variation in the test conditions of the manufacturer test data showed that uncertainty in the new estimated rolling drag model should lead to no more than 1.5-percent uncertainty in the takeoff acceleration. Another batch simulation series swept across ground operating conditions and airplane configurations, characterizing turning radii and roll angles experienced for different open-loop steering commands in these various situations. This simulation allowed the identification of ground handling characteristics even beyond the regime of normal operations. As part of this task, a new, modified variant of the Fibonacci search algorithm identified the correct steering inputs for maintaining a straight path as a function of the operating condition. Finally, this paper describes a fixed-base piloted simulator assessment. This assessment supplements the previous simulated ground dynamics data with pilot-in-the-loop data and pilot feedback and confirms the overall acceptability of the ground handling qualities of the X-57 airplane prior to first flight.

Loren J. Newton↗

Platform Management System (PMS) evolution

In fiscal year 1988 a study was begun to define the platform management system (PMS) functions required for the mature platform operations era. The objectives of the task include: (1) defining how to increase the operational productivity of the platform by providing enhanced capability for responding to changing events, (2) influencing the initial PMS design by identifying required 'hooks and scars', and (3) evaluation potential automation techniques that are appropriate given predicted onboard computing resources. Initial platform operations scenarios were defined. The focus was on PMS-related functions where operations enhancements are likely to occur. Operations productivity was defined in terms of scientific productivity of the platform as well as the level of automation of the ground system. The Platform Operations Productivity Enhancement Report was completed earlier this year documenting system enhancements to increase science productivity and ground system automation. Using the baseline PMS defined in the PMS Definition Document as a starting point, the resulting PMS-specific enhancements were molded into a sequence of progressively more sophisticated operations management capabilities. This sequence of upgrades to the PMS has been documented in a PMS Evolution Plan. The plan includes enhancements in the areas of resources scheduling, resource modeling, system and payload anomaly management, and transaction sequence interpretation. A plan for migration of functions from the ground portion of the PMS to the flight portion is also included. The impacts of this plan on the platform are now being documented to ensure that the required 'hooks and scars' are included in the baseline system. Future plans include a prototype of some of the PMS enhancements to address the feasibility of and techniques for implementing these enhancements in the onboard computing environment.

Tilley, Mike↗

Hybrid Electric MC-12 Ground Testing Plan Chapter

In the commercial aviation world, hybrid/electric propulsion is a promising technology for fuel, emissions, and noise reduction in support of the challenging goals established by 2050 EU Flightpath/SRIA, NASA ARMD Strategic Implementation Plan, and the US Air Force ATTAM programs. Ongoing results indicate operational benefits are possible in those three technical areas. Considering military applications, hybrid/electric propulsion may yield further significant improvements by enabling new, unorthodox mission capabilities. Potential benefits are expected in the areas of vehicle signature reduction (lower noise, lower exhaust signature), usage in enhanced flight environments, minimized human-in-the-loop workload by offering a platform compatible with future goals of autonomous operations facilitation, maintenance cost reductions, and performance burst/dash energy. Additional synergies are likely when used in conjunction with energy weapons. Some potential areas of mutual interest could include, dusty operations capability, remote supply capability, extended surveillance, dispatch able power, fuel-flexible vehicles, and autonomous rescue equipment. Many of the key technologies that have been demonstrated in ground operation must now be qualified for altitude conditions. We expect to have many flight qualified powertrain systems over the next decade for military planners to choose from for new future battlefield capability. This requires new flight-weight and flight-efficient powertrain components, fault tolerant power management, and electromagnetic interference mitigation technologies. Moreover, initial studies indicate some combination of ambient and cryogenic thermal management and relatively high bus voltages when compared to state of practice will be required to achieve a net system benefit. Developing all these powertrain technologies within a realistic aircraft architectural geometry and under realistic operational conditions requires a unique electric aircraft test bed. The MC-12 surveillance aircraft is an ideal military aircraft for demonstrating some of the benefits of incorporating hybrid electric propulsion. This report details an approach for full-scale ground-based altitude testing the hybrid electric MC-12 powertrain through a full flight profile.

military electric aircraft propulsion↗

Ground and Onboard Automated Scheduling for the Mars 2020 Rover Mission

The Mars 2020 Rover mission is using automated scheduling in two capacities. As of March 2021 a ground-based scheduler automatically schedules rover wake/sleep and preheats to support Mars 2020 daily operations. Included in the ground system is an explainable scheduling tool that allows users in-sight into the schedule developed by the automated scheduler. An onboard scheduler that will allow the rover autonomously better account for variations in execution is in development for use later in the mission.

Towey, Shannon↗

The Deep Space Network

This report presents DSN progress in flight project support, tracking and data acquisition (TDA) research and technology, network engineering, hardware and software implementation, and operations. Each issue presents material in some, but not all, of the following categories in the order indicated. - Description of the DSN - Mission Support Ongoing Planetary/Interplanetary Flight Projects Advanced Flight Projects - Radio Science - Special Projects - Supporting Research and Technology Tracking and Ground-Based Navigation Communications--Spacecraft/Ground Station Control and Operations Technology Network Control and Data Processing - Network and Facility Engineering and Implementation Network Network Operations Control Center Ground Communications Deep Space Stations - Operations Network Operations Network Operations Control Center Ground Communications Deep Space Stations - Program Planning TDA Planning Quality Assurance In each issue, the part entitled "Description of the DSN" describes the functions and facilities of the DSN and may report the current configuration of one of the five DSN systems (Tracking, Telemetry, Command, Monitor & Control, and Test & Training). The work described in this report series is either performed or managed by the Tracking and Data Acquisition organization of JPL for NASA.

Tracking and Data Acquisition organization↗

Orbital transfer vehicle concept definition and system analysis study, 1985. Volume 2: OTV concept definition and evaluation. Book 4: Operations

The benefits of the reusable Space Shuttle and the advent of the new Space Station hold promise for increasingly effective utilization of space by the scientific and commercial as well as military communities. A high energy reusable oribital transfer vehicle (OTV) represents an additional capability which also exhibits potential for enhancing space access by allowing more ambitious missions and at the same time reducing launch costs when compared to existing upper stages. This section, Vol. 2: Book 4, covers launch operations and flight operations. The launch operations section covers analyses of ground based and space based vehicles, launch site facilities, logistics requirements, propellant loading, space based maintenance and aft cargo carrier access options. The flight operations sections contain summary descriptions of ground based and space based OTV missions, operations and support requirements, and a discussion of fleet implications.

Mitchell, Jack C.↗

NASA Space Launch System Operations Outlook

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is working with the Ground Systems Development and Operations (GSDO) Program, based at the Kennedy Space Center (KSC), to deliver a new safe, affordable, and sustainable capability for human and scientific exploration beyond Earth's orbit (BEO). Larger than the Saturn V Moon rocket, SLS will provide 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The primary mission of the SLS rocket will be to launch astronauts to deep space destinations in the Orion Multi-Purpose Crew Vehicle (MPCV), also in development and managed by the Johnson Space Center. Several high-priority science missions also may benefit from the increased payload volume and reduced trip times offered by this powerful, versatile rocket. Reducing the life-cycle costs for NASA's space transportation flagship will maximize the exploration and scientific discovery returned from the taxpayer's investment. To that end, decisions made during development of SLS and associated systems will impact the nation's space exploration capabilities for decades. This paper will provide an update to the operations strategy presented at SpaceOps 2012. It will focus on: 1) Preparations to streamline the processing flow and infrastructure needed to produce and launch the world's largest rocket (i.e., through incorporation and modification of proven, heritage systems into the vehicle and ground systems); 2) Implementation of a lean approach to reachback support of hardware manufacturing, green-run testing, and launch site processing and activities; and 3) Partnering between the vehicle design and operations communities on state-ofthe- art predictive operations analysis techniques. An example of innovation is testing the integrated vehicle at the processing facility in parallel, rather than sequentially, saving both time and money. These themes are accomplished under the context of a new cross-program integration model that emphasizes peer-to-peer accountability and collaboration towards a common, shared goal. Utilizing the lessons learned through 50 years of human space flight experience, SLS is assigning the right number of people from appropriate backgrounds, providing them the right tools, and exercising the right processes for the job. The result will be a powerful, versatile, and capable heavy-lift, human-rated asset for the future human and scientific exploration of space.

Hefner, William Keith↗

Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

Mars Exploration Rover (MER)↗

NASA Space Launch System Operations Outlook

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is working with the Ground Systems Development and Operations (GSDO) Program, based at the Kennedy Space Center (KSC), to deliver a new safe, affordable, and sustainable capability for human and scientific exploration beyond Earth's orbit (BEO). Larger than the Saturn V Moon rocket, SLS will provide 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The primary mission of the SLS rocket will be to launch astronauts to deep space destinations in the Orion Multi- Purpose Crew Vehicle (MPCV), also in development and managed by the Johnson Space Center. Several high-priority science missions also may benefit from the increased payload volume and reduced trip times offered by this powerful, versatile rocket. Reducing the lifecycle costs for NASA's space transportation flagship will maximize the exploration and scientific discovery returned from the taxpayer's investment. To that end, decisions made during development of SLS and associated systems will impact the nation's space exploration capabilities for decades. This paper will provide an update to the operations strategy presented at SpaceOps 2012. It will focus on: 1) Preparations to streamline the processing flow and infrastructure needed to produce and launch the world's largest rocket (i.e., through incorporation and modification of proven, heritage systems into the vehicle and ground systems); 2) Implementation of a lean approach to reach-back support of hardware manufacturing, green-run testing, and launch site processing and activities; and 3) Partnering between the vehicle design and operations communities on state-of-the-art predictive operations analysis techniques. An example of innovation is testing the integrated vehicle at the processing facility in parallel, rather than sequentially, saving both time and money. These themes are accomplished under the context of a new cross-program integration model that emphasizes peer-to-peer accountability and collaboration towards a common, shared goal. Utilizing the lessons learned through 50 years of human space flight experience, SLS is assigning the right number of people from appropriate backgrounds, providing them the right tools, and exercising the right processes for the job. The result will be a powerful, versatile, and capable heavy-lift, human-rated asset for the future human and scientific exploration of space.

Hefner, William Keith↗

Autonomous Power Controller for the NASA Gateway

Intelligent autonomous control of a spacecraft is an enabling technology that must be developed for deep space human exploration. NASA's current long term human space platform, the International Space Station which is in Low Earth Orbit, is in almost continuous communication with ground based mission control. This allows near real-time operation of all the vehicle core systems, including power, from the ground. As the focus shifts from Low Earth Orbit to deep space, challenges associated with communication time-lag and bandwidth limitations beyond geosynchronous orbit do not permit this type of ground based operation. These communication limitations motivate autonomous vehicle operations, including the vehicle subsystems such as power. This presentation will describe the ongoing development of an Autonomous Power Control (APC) system that can be used for a deep space exploration spacecraft. This work extends previous work on developing an autonomous power control which includes developing a control architecture for deep space vehicles, the use of software agents, and constructing a control simulation lab for demonstrating this capability. This presentation will begin with a discussion of the representative future power architectures that will be required for deep space exploration vehicles. The presentation then will describe how the power controller will integrate with the vehicle followed with a discussion of the autonomous power controller. Next it will describe the test setup used to evaluate the performance of the system and lastly show some of the test results. To develop the type of controller envisioned, it will be necessary to employ a detailed real-time simulation to evaluate its performance and ultimately verify its functionality.

Csank, Jeffrey↗

Evaluation of aero commander propeller acoustic data: Taxi operations

The acoustic data from ground tests performed on an Aero Commander propeller driven aircraft are analyzed. An array of microphones flush mounted on the side of the fuselage were used to record data. The propeller blade passage noise during operations at several different taxi speeds is considered and calculations of the magnitude and phase of the blade passage tones, the amplitude stability of the tones, and the spatial phase and coherence of the tones are included. The measured results are compared to theoretical predictions for propeller noise and various evaluations which reveal important details of propeller noise characteristics are presented.

Piersol, A. G.↗

Space shuttle engineering and operations support: Study of the effects of multiple ground updates on the accuracy of the onboard state vector with IMU only navigation

There are six cases considered: (1) no updates made during the flight, (2) one ground update in the vertical components only at the first practice separation minus 15 minutes, (3) one ground update in all components at the first practice separation minus 5 minutes, (4) updates 2 and 3 applied successively, (5) Case 4 plus an update in all components at the second separation attempt minus 3 minutes, and (6) one ground update at first separation attempt minus 5 minutes and a second update at second separation minus two minutes. The mission control simulation program, GROPER, was run using as radar input a tape containing radar derived state vectors for the trajectory.

Killen, R.↗

Operational Phase Life Cycle Assessment of Select NASA Ground Test Facilities

NASA's Aeronautics Test Program (ATP) is responsible for many large, high-energy ground test facilities that accomplish the nation s most advanced aerospace research. In order to accomplish these national objectives, significant energy and resources are consumed. A select group of facilities was analyzed using life-cycle assessment (LCA) to determine carbon footprint and environmental impacts. Most of these impacts stem from electricity and natural gas consumption, used directly at the facility and to generate support processes such as compressed air and steam. Other activities were analyzed but determined to be smaller in scale and frequency with relatively negligible environmental impacts. More specialized facilities use R-134a, R-14, jet fuels, or nitrogen gas, and these unique inputs can have a considerable effect on a facility s overall environmental impact. The results of this LCA will be useful to ATP and NASA as the nation looks to identify its top energy consumers and NASA looks to maximize research output and minimize environmental impact. Keywords: NASA, Aeronautics, Wind tunnel, Keyword 4, Keyword 5

Sydnor, George H.↗