At least 1,585 records · Page 88

Axiomatic Design of Space Life Support Systems

Systems engineering is an organized way to design and develop systems, but the initial system design concepts are usually seen as the products of unexplained but highly creative intuition. Axiomatic design is a mathematical approach to produce and compare system architectures. The two axioms are:- Maintain the independence of the functional requirements.- Minimize the information content (or complexity) of the design. The first axiom generates good system design structures and the second axiom ranks them. The closed system human life support architecture now implemented in the International Space Station has been essentially unchanged for fifty years. In contrast, brief missions such as Apollo and Shuttle have used open loop life support. As mission length increases, greater system closure and increased recycling become more cost-effective.Closure can be gradually increased, first recycling humidity condensate, then hygiene wastewater, urine, carbon dioxide, and water recovery brine. A long term space station or planetary base could implement nearly full closure, including food production. Dynamic systems theory supports the axioms by showing that fewer requirements, fewer subsystems, and fewer interconnections all increase system stability. If systems are too complex and interconnected, reliability is reduced and operations and maintenance become more difficult. Using axiomatic design shows how the mission duration and other requirements determine the best life support system design including the degree of closure.

Axiomatic design↗

Collaborative Data Curation to Support the Multi-Mission Algorithm and Analysis Platform (MAAP)

Upcoming space-borne missions will offer unprecedented data about Earth but will also feature exponentially high data volumes. These high data volumes will change the way the scientific community works with data and will also create a unique need for improved data sharing and collaboration. NASA and ESA are working together to address these issues by collaboratively developing the Multi-Mission Algorithm and Analysis Platform (MAAP) to improve the understanding of global aboveground terrestrial carbon dynamics. The MAAP will support ESA’s BIOMASS mission, NASA’s GEDI mission and NASA/ISRO’s NISAR mission. The MAAP will be developed in two phases: a pilot phase and a full production phase. The pilot phase will demonstrate collaboration and basic capabilities. The pilot phase will focus on biomass relevant airborne and field campaign data. Two NASA teams are supporting the development of the MAAP. The MAAP engineering team is responsible for the development, maintenance and operations of the MAAP system while the MAAP data team ensures the ongoing quality of the data, metadata and other information provided in the MAAP. The MAAP data team also supports the ingest and archive of identified data to the MAAP platform. This poster describes the use case development process for the pilot MAAP and the data curated in support of those use cases. Additionally, this presentation will outline the pilot MAAP data ingest process and metadata curation effort along with efforts to ensure interoperability between ESA and NASA data and metadata.

Bugbee, Kaylin↗

Ames Collaborative Support Facility/Sustainability Base

This presentation is intended to motivate research initiatives at the Collaborative Support Facility on the Ames Research Center Campus. Awards and accomplishments will be highlighted, along with specific research objectives. Information technology challenges with also be introduced as a key initiative to be addressed to enable the deployment of novel technologies that will offer deeper insights into how better reduced energy consumption, improve occupant satisfaction and streamline building operations and maintenance activities.

algortihms↗

Defining Reliability and Robustness from a Human Factors Perspective

A human factors team was tasked with assessing best practices for developing a crewed space vehicle that is both reliable and robust. The team identified two broad dimensions of human factors are relevant to system design. Namely, the attributes of the product, and the processes used to develop the product. The “product” includes hardware, software, documentation, training systems, and procedures throughout all phases of the system life, including construction, testing, operation and maintenance. Three product attributes relevant to robustness are the extent to which task demands are within human capabilities, the capacity of the system to cope with unanticipated human actions, and the ability of the system to make use of unique human capabilities during non-routine situations. The “process” dimension of human factors relates to the activities that start in the early stages of design, and continue throughout the life of the system. There are, of course, no guarantees that a formal consideration of human factors throughout the design process will identify all the relevant human issues. In the absence of such a consideration, however, problems are virtually assured.

Hobbs, Alan↗

High Reliability Requires More than Providing Spares

It is sometimes optimistically hoped that a space life support system can be kept working throughout a long duration mission by repairing failed components, as long as sufficient spares are flown. It is usually assumed that the components have constant known failure rates. Then the needed numbers of spares can be computed to have any particular probability that all failed components can be replaced by available spares. This approach can provide high reliability if its favorable assumptions, including constant known failure rates, are satisfied. Other favorable assumptions are that the failures are statistically independent, repair will be successful without causing further failures, and all failures are due to internal component failures. These assumptions are not usually justified. The failure rates may be estimates that are inadequately verified because of insufficient testing. Failure rates may change due to materials substitutions, manufacturing changes, redesigns to fix failures, and new failures caused by redesigns. Failures that are not statistically independent may result from one common cause, such as a design or manufacturing error or a cascade of cause and effect, possibly caused by an external event such as a power outage. Repair may be unsuccessful or cause damage. Many failures occur at component interfaces or at the overall systems level, not within isolated components. Other failures causes are completely external to the system, due to assembly, maintenance, and operational errors or to unexpected environmental challenges. Replacement with sufficient spares can compensate for expected internal component failures but may not be able to cope with unpredictable design and manufacturing flaws, human errors, and environmental impacts. Reliability estimates based on providing sufficient spares to compensate for expected failures may be far too high. They are essentially upper bounds on reliability that might be approached if many frequent but often unconsidered failure causes can be eliminated.

spares↗

Base Support Building and Kennedy Athletic, Recreation, and Social Park II, SWMU 014 and SWMU 118, PFAS Site Assessment Progress Report, Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from February 2022 through June 2022 at the Base Support Building (previously known as the Maintenance and Operation Building), Solid Waste Management Unit (SWMU) 014, and at the Kennedy Athletic, Recreation, and Social (KARS) Park II, (SWMU 118) located within Kennedy Space Center (KSC), Florida. SWMUs 014 and 118 were investigated independently, however, the results of the investigations indicated a single PFAS groundwater plume covering both SWMUs, so the two sites are being reported together.

PFAS↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Common Cause Failures Dominate and Defeat Redundancy

Common cause failures occur when several malfunctions are produced by a single event or process. They are especially damaging when they eliminate an entire set of redundant systems and disable their intended function. Redundancy is used when the individual system failure probability is unacceptably high. Redundancy can improve the overall system failure probability if the failures are independent, but the reliability gain is limited if there are dependent failures having a common cause. No amount of redundancy can reduce the total failure probability below the common cause failure probability. Common cause failures defeat redundancy. Systems with high reliability requirements often use extensive redundancy. These highly redundant systems rarely fail unless all the redundant components providing a particular function fail. Complete failures of such highly redundant systems are then usually common cause failures. Common cause failures are prevalent in highly redundant, high reliability systems. Common cause failures dominate redundancy. Redundant systems may fail due to specification, design, manufacturing, operations, or maintenance problems that disable all the identical redundant systems. Common cause failures typically account for one tenth of all failures. If the failure probability is relatively low and common cause failures are significant, adding more than two or three redundant identical units usually gives little added reliability improvement. Common cause failures can be reduced by using diverse components with different technologies and manufacturers, by separating and shielding subsystems, and by avoiding shared control, power, or location. External events and shared vulnerabilities may still cause common cause failures.

common cause failures↗

Common Cause Failures Dominate and Defeat Redundancy

Common cause failures occur when several malfunctions are produced by a single event or process. They are especially damaging when they eliminate an entire set of redundant systems and disable their intended function. Redundancy is used when the individual system failure probability is unacceptably high. Redundancy can improve the overall system failure probability if the failures are independent, but the reliability gain is limited if there are dependent failures having a common cause. No amount of redundancy can reduce the total failure probability below the common cause failure probability. Common cause failures defeat redundancy. Systems with high reliability requirements often use extensive redundancy. These highly redundant systems rarely fail unless all the redundant components providing a particular function fail. Complete failures of such highly redundant systems are then usually common cause failures. Common cause failures are prevalent in highly redundant, high reliability systems. Common cause failures dominate redundancy. Redundant systems may fail due to specification, design, manufacturing, operations, or maintenance problems that disable all the identical redundant systems. Common cause failures typically account for one tenth of all failures. If the failure probability is relatively low and common cause failures are significant, adding more than two or three redundant identical units usually gives little added reliability improvement. Common cause failures can be reduced by using diverse components with different technologies and manufacturers, by separating and shielding subsystems, and by avoiding shared control, power, or location. External events and shared vulnerabilities may still cause common cause failures.

common cause failures↗

Base Support Building and Kennedy Athletic, Recreation, and Social Park II SWMU 014 and SWMU 118 PFAS 2023 Site Assessment Progress Report Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report (SAPR) presents the findings of the 2023 PFAS investigation conducted between October 12, 2022, and January 24, 2024, at the Base Support Building (previously known as the Maintenance and Operation Building), Solid Waste Management Unit (SWMU) 014, and at the Kennedy Athletic, Recreation, and Social (KARS) Park II, (SWMU 118) located within Kennedy Space Center (KSC), Florida. SWMUs 014 and 118 were initially investigated independently; however, the results of the previous investigations indicated a single PFAS groundwater plume covering both SWMUs, so the two sites are being reported together.

PFAS↗

An Efficient Approach to Collect Inlet Characterization Data

This report considers a novel process to acquire performance data for supersonic mixed compression inlets that is faster, and therefore less costly, than the previous one. In the previous process, measurements were recorded in discrete increments. The backpressuring actuator was advanced, there was a pause to allow for airflow fluctuations to diminish, and then the measurements were recorded. While this process was methodical, reliable and accurate, it consumed significant wind-on time. In general, high-speed wind tunnels are expensive to operate considering maintenance, energy and human resource requirements. Furthermore, many facilities, such as blowdown wind tunnels, are limited in the duration that they can maintain the desired test condition. Consequently, a quick method to collect the measurements is desired. A favored approach has the actuator moving in a continuous fashion with measurements recorded as the actuator continuously progresses through the increment points. This approach, identified as the dynamic inlet characteristic data acquisition procedure, uses in situ dynamic high-speed pressure sensors to measure pressure signals. While faster, continuous movement adds dynamic effects to the data. To better understand these dynamic effects and other potential influences, a study was undertaken to compare wind tunnel measurements taken at discrete actuator position points with data gathered during continuous actuator movement. Specially, plots of inlet pressure recovery versus mass capture ratio, or total pressure characteristic curves, were examined. The data were measured during experiments in the NASA Glenn Research Center Abe Silverstein 10- by 10-Foot Supersonic Wind Tunnel (SWT) with an inlet propulsion test article. In this report, the wind tunnel experiment and the study objectives are described. The processes to reduce the data and for analysis are explained. A discussion of the results along with features noted in the data is given. Finally, conclusions from this study that may be used to guide future wind tunnel experiment planning are presented.

Inlet↗

An Efficient Approach to Collect Inlet Characterization Data

This report considers a novel process to acquire performance data for supersonic mixed compression inlets that is faster, and therefore less costly, than the previous one. In the previous process, measurements were recorded in discrete increments. The backpressuring actuator was advanced, there was a pause to allow for airflow fluctuations to diminish, and then the measurements were recorded. While this process was methodical, reliable and accurate, it consumed significant wind-on time. In general, high-speed wind tunnels are expensive to operate considering maintenance, energy and human resource requirements. Furthermore, many facilities, such as blowdown wind tunnels, are limited in the duration that they can maintain the desired test condition. Consequently, a quick method to collect the measurements is desired. A favored approach has the actuator moving in a continuous fashion with measurements recorded as the actuator continuously progresses through the increment points. This approach, identified as the dynamic inlet characteristic data acquisition procedure, uses in situ dynamic high-speed pressure sensors to measure pressure signals. While faster, continuous movement adds dynamic effects to the data. To better understand these dynamic effects and other potential influences, a study was undertaken to compare wind tunnel measurements taken at discrete actuator position points with data gathered during continuous actuator movement. Specially, plots of inlet pressure recovery versus mass capture ratio, or total pressure characteristic curves, were examined. The data were measured during experiments in the NASA Glenn Research Center Abe Silverstein 10- by 10-Foot Supersonic Wind Tunnel (SWT) with an inlet propulsion test article. In this report, the wind tunnel experiment and the study objectives are described. The processes to reduce the data and for analysis are explained. A discussion of the results along with features noted in the data is given. Finally, conclusions from this study that may be used to guide future wind tunnel experiment planning are presented.

Data Acquisition↗

Development of Autonomous Magnetometer Rotorcraft For Wide Area Assessment

Large areas across the United States and internationally are potentially contaminated with unexploded ordinance (UXO), with some ranges encompassing tens to hundreds of thousands of acres. Technologies are needed which will allow for cost effective wide area scanning with (1) near 100% coverage and (2) near 100% detection of subsurface ordnance or features indicative of subsurface ordnance. The current approach to wide area assessment is a multi-level one, in which medium - altitude fixed wing optical imaging is used for an initial site assessment. This assessment is followed with low altitude manned helicopter based magnetometry. Subsequent to this wide area assessment targeted surface investigations are performed using either towed geophysical sensor arrays or man portable sensors. In order to be an effective tool for small UXO detection, the sensing altitude for magnetic site investigations needs to be on the order of 1 to 3 meters. These altitude requirements mean that manned helicopter surveys will generally only be feasible in large, open and relatively flat terrains. While such surveys are effective in mapping large areas relatively fast there are substantial mobilization/demobilization, staffing and equipment costs associated with these surveys, resulting in costs of approximately $100-$150/acre. In addition, due to the low altitude there are substantial risks to pilots and equipment. Surface towed arrays provide highresolution maps but have other limitations, e.g. in their ability to navigate rough terrain effectively. Thus there is a need for other systems, which can be used for effective data collection. An Unmanned Aerial Vehicle (UAV) magnetometer platform is an obvious alternative. The motivation behind such a system is that it reduces risk to operators, is lower in initial and Operational and Maintenance (O&M) costs (and can thus potentially be applied to smaller sites) and has the potential of being more effective in terms of detection and possibly characterization (through the use of dynamic acquisition, i.e. survey mission in-flight reprioritization).

58 GEOSCIENCES↗

An Energy Signature Scheme for Steam Trap Assessment and Flow Rate Estimation Using Pipe-Induced Acoustic Measurements

The US Congress has passed legislation dictating that all government agencies establish a plan and process for improving energy efficiencies at their sites. In response to this legislation, Oak Ridge National Laboratory (ORNL) has recently conducted a pilot study to explore the deployment of a wireless sensor system for a real-time measurement-based energy efficiency optimization framework within the steam distribution system within the ORNL campus. We make assessments on the real-time status of the distribution system by observing the state measurements of acoustic sensors mounted on the steam pipes/traps/valves. In this paper, we describe a spectral-based energy signature scheme that interprets acoustic vibration sensor data to estimate steam flow rates and assess steam traps health status. Experimental results show that the energy signature scheme has the potential to identify different steam trap health status and it has sufficient sensitivity to estimate steam flow rate. Moreover, results indicate a nearly quadratic relationship over the test region between the overall energy signature factor and flow rate in the pipe. The analysis based on estimated steam flow and steam trap status helps generate alerts that enable operators and maintenance personnel to take remedial action. The goal is to achieve significant energy-saving in steam lines by monitoring and acting on leaking steam pipes/traps/valves.

54 ENVIRONMENTAL SCIENCES↗

Remote Structural Health Monitoring and Advanced Prognostics of Wind Turbines

The prospect of substantial investment in wind energy generation represents a significant capital investment strategy. In order to maximize the life-cycle of wind turbines, associated rotors, gears, and structural towers, a capability to detect and predict (prognostics) the onset of mechanical faults at a sufficiently early stage for maintenance actions to be planned would significantly reduce both maintenance and operational costs. Advancement towards this effort has been made through the development of anomaly detection, fault detection and fault diagnosis routines to identify selected fault modes of a wind turbine based on available sensor data preceding an unscheduled emergency shutdown. The anomaly detection approach employs spectral techniques to find an approximation of the data using a combination of attributes that capture the bulk of variability in the data. Fault detection and diagnosis (FDD) is performed using a neural network-based classifier trained from baseline and fault data recorded during known failure conditions. The approach has been evaluated for known baseline conditions and three selected failure modes: pitch rate failure, low oil pressure failure and a gearbox gear-tooth failure. Experimental results demonstrate the approach can distinguish between these failure modes and normal baseline behavior within a specified statistical accuracy.

17 WIND ENERGY↗

100 MW e Baseload Molten Salt Plant Phase 1 & 2 Summary Report: Summary of Conceptual Design, Preliminary Design, Commercialization and Risk Reduction Activities

This document describes steps taken to develop our conceptual and preliminary designs of a modular concept for deploying a 75% capacity factor, 100-MW e solar power plant. The modular approach consists of 14 solar power towers interconnected by hot and cold salt piping leading back to a central power block where the salt storage tanks and power generation systems are located. The plant is described in several sections. First, the overall plant is described, including the general arrangement, process and heat flow diagrams, system interface definitions, and electrical description. Next, each system is described in detail following the flow of energy from incident sunlight, through the plant, to the grid. These systems include the solar collector system (SCS), solar receiver system (SRS), thermal storage system (TSS), steam generator system (SGS), and power generation system (PGS). Then, the plant control system (PCS) and balance of plant (BOP) are discussed as supporting entities. Each system of the plant is described in sufficient detail to allow for the following to be developed: material cost, erection cost, project schedule, EPC bids, detailed performance modeling, and operations and maintenance cost. Cost, schedule, and performance estimates are not described in this document. Two approaches to demonstration of the technology are presented: a single tower integrated into an existing power block and a four tower stand alone 50 MW e power plant. Various demonstration partners have expressed interested in both approaches. The process by which a detailed plant performance model was developed is described to support the development of accurate LCOE data. Information on material and instrument testing is also provided for critical materials and instruments required for molten salt service.

14 SOLAR ENERGY↗

Energy and Cost Savings of Retro-Commissioning and Retrofit Measures for Large Office Buildings

This paper evaluates the energy and cost savings of seven retro-commissioning measures and 29 retrofit measures applicable to most large office buildings. The baseline model is for a hypothetical building with characteristics of large office buildings constructed before 1980. Each retro-commissioning measure is evaluated against the original baseline in terms of its potential of energy and cost savings while each retrofit measure is evaluated against the commissioned building. All measures are evaluated in five locations (Miami, Las Vegas, Seattle, Chicago and Duluth) to understand the impact of weather conditions on energy and cost savings. The results show that implementation of the seven operation and maintenance measures as part of a retro-commissioning process can yield an average of about 22% of energy use reduction and 14% of energy cost reduction. Widening zone temperature deadband, lowering VAV terminal minimum air flow set points and lighting upgrades are effective retrofit measures to be considered.

Wang, Weimin↗

Wind Turbine Drivetrain Condition Monitoring - An Overview (Presentation)

High operation and maintenance costs still hamper the development of the wind industry despite its quick growth worldwide. To reduce unscheduled downtime and avoid catastrophic failures of wind turbines and their components have been and will be crucial to further raise the competitiveness of wind power. Condition monitoring is one of the key tools for achieving such a goal. To enhance the research and development of advanced condition monitoring techniques dedicated to wind turbines, we present an overview of wind turbine condition monitoring, discuss current practices, point out existing challenges, and suggest possible solutions.

17 WIND ENERGY↗