Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Space Station flexible dynamics under plume impingement

Assembly of the Space Station requires numerous construction flights by the Space Shuttle. A particularly challenging problem is that of control of each intermediate station configuration when the shuttle orbiter is approaching it to deliver the next component. The necessary braking maneuvers cause orbiter thruster plumes to impinge on the station, especially its solar arrays. This in turn causes both overall attitude errors and excitation of flexible-body vibration modes. These plume loads are predicted to lead to CMG saturation during the approach of the orbiter to the SC-5 station configuration, necessitating the use of the station RCS jets for desaturation. They are also expected to lead to significant excitation of solar array vibrations. It is therefore of great practical importance to investigate the effects of plume loads on the flexible dynamics of station configuration SC-5 as accurately as possible. However, this system possesses a great many flexible modes (89 below 5 rad/s), making analysis time-consuming and complicated. Model reduction techniques can be used to overcome this problem, reducing the system model to one which retains only the significant dynamics, i.e. those which are strongly excited by the control inputs or plume disturbance forces and which strongly couple with the measured outputs. The particular technique to be used in this study is the subsystem balancing approach which was previously developed by the present investigator. This method is very efficient computationally. Furthermore, it gives accurate results even for the difficult case where the structure has many closed-spaced natural frequencies, when standard modal truncation can give misleading results. Station configuration SC-5 is a good example of such a structure.

Williams, Trevor↗

Assessment and Management of the Risks of Debris Hits During Space Station EVAs

The risk of EVAs is critical to the decision of whether or not to automate a large part of the construction of the International Space Station (ISS). Furthermore, the choice of the technologies of the space suit and the life support system will determine (1) the immediate safety of these operations, and (2) the long-run costs and risks of human presence in space, not only in lower orbit (as is the case of the ISS) but also perhaps, outside these orbits, or on the surface of other planets. The problem is therefore both an immediate one and a long-term one. The fundamental question is how and when to shift from the existing EMU system (suit, helmet, gloves and life support system) to another type (e.g. a hard suit), given the potential trade-offs among life-cycle costs, risks to the astronauts, performance of tasks, and uncertainties about new systems' safety inherent to such a shift in technology. A more immediate issue is how to manage the risks of EVAs during the construction and operation of the ISS in order to make the astronauts (in the words of the NASA Administrator) "as safe outside as inside". For the moment (June 1997), the plan is to construct the Space Station using the low-pressure space suits that have been developed for the space shuttle. In the following, we will refer to this suit assembly as EMU (External Maneuvering Unit). It is the product of a long evolution, starting from the U.S. Air Force pilot suits through the various versions and changes that occurred for the purpose of NASA space exploration, in particular during the Gemini and the Apollo programs. The Shuttle EMU is composed of both soft fabrics and hard plates. As an alternative to the shuttle suit, at least two hard suits were developed by NASA: the AX5 and the MRKIII. The problem of producing hard suits for space exploration is very similar to that of producing deep-sea diving suits. There was thus an opportunity to develop a suit that could be manufactured for both purposes with the economies of scale that could be gained from a two-branch manufacturing line (space and deep sea). Of course, the space suit would need to be space qualified. Some of the problems in adopting one of the hard suits were first that the testing had to be completed, and second that it required additional storage space. The decision was made not to develop a hard suit in time for the construction and operation of the ISS. Instead, to improve the safety of the current suit, it was decided to reinforce the soft parts of the shuttle EMU with KEVLAR linings to strengthen it against debris impacts. Test results, however, show that this advanced suit design has little effect on the penetration characteristics.

Pate-Cornell, Elisabeth↗

Preliminary evaluation of space station transmission line in a ring configuration

The results of a preliminary evaluation of a space station type transmission line and commercial transmission lines in a ring configuration, are reported. In a ring configuration, each node has two paths for the return current of each wire. The additional path can create an unbalanced condition, where the magnetic fields created by the forward and return currents do not cancel. This evaluation was to quantify the effects of the unbalanced case upon the external fields. The transmission lines evaluated were standard commercial coaxial cables, RG59 and RG213, and a space station designed flat Litz transmission line. Each was evaluated in a balanced and unbalanced mode of operation. Currents and their harmonic content were recorded and compared. As expected, the harmonic content of the different current (I delta) was substantial for the unbalanced case as compared to the balanced case. For the balanced case, very little difference was noted among the various transmission lines evaluated. The evaluation is discussed, and the test circuit, the measurements, and the resulting data are described.

Roth, Mary Ellen↗

Summary of the Science performed onboard the International Space Station during Increments 12 and 13

By September of 2007, continuous human presence on the International Space Station will reach a milestone of eighty months. The many astronauts and cosmonauts, who live onboard the station during the last fourteen Increments over that time span, spend their time building the station as well as performing science on a daily basis. Over those eighty months, the U.S astronauts crew members logged over 2954 hours of research time. Far more research time has been accumulated by experiments controlled by investigators on the ground. The U.S astronauts conducted over one hundred and twenty six (126) science investigations. From these hundred and twenty six science investigations, many were operated across multiple Increments. The crew also installed, activated and operated nine (9) science racks that supported six science disciplines ranging from material sciences to life science. By the end of Increment 14, a total of 5083 kg of research rack mass were ferried to the station as well as 5021 kg of research mass. The objectives of this paper are three-fold. (1) To briefly review the science conducted on the International Space Station during the previous eleven Increments; (2) to discuss in detail the science investigations that were conducted on the station during Increments 12 and 13. The discussion will focus mainly on the primary objectives of each investigation and their associated hypotheses that were investigated during these two Increments. Also, some preliminary science results will be discussed for each of the investigation as science results availability permit. (3) The paper will briefly touch on what the science complement planning was and what was actually accomplished due to real time science implementation and challenges during these two Increments in question to illustrate the challenges of daily science activity while the science platform is under construction. Finally, the paper will briefly discuss the science research complements for the other two Increments, Increments 14 and 15, to preview how much science might be accomplished during these two Increments.

Jules, Kenol↗

Design of the Space Station Freedom power system

The design of Space Station Freedom's electric power system (EPS) is reviewed, highlighting the key design goals of performance, low cost, reliability and safety. Tradeoff study results that illustrate the competing factors responsible for many of the more important design decisions are discussed. When Freedom's EPS is compared with previous space power designs, two major differences stand out. The first is the size of the EPS, which is larger than any prior system. The second major difference between the EPS and other space power designs is the indefinite expected life of Freedom; 30 years has been used for life-cycle-cost calculations.

Thomas, Ronald L.↗

A health maintenance facility for space station freedom

We describe a health care facility to be built and used on an orbiting space station in low Earth orbit. This facility, called the health maintenance facility, is based on and modeled after isolated terrestrial medical facilities. It will provide a phased approach to health care for the crews of Space Station Freedom. This paper presents the capabilities of the health maintenance facility. As Freedom is constructed over the next decade there will be an increase in activities, both construction and scientific. The health maintenance facility will evolve with this process until it is a mature, complete, stand-alone health care facility that establishes a foundation to support interplanetary travel. As our experience in space continues to grow so will the commitment to providing health care.

Health Promotion/organization & administration/sta↗

Space Station Freedom Solar Array design development

The Space Station Freedom Solar Array Program is required to provide a 75 kW power module that uses eight solar array (SA) wings over a four-year period in low Earth orbit (LEO). Each wing will be capable of providing 23.4 kW at the 4-year design point. Lockheed Missles and Space Company, Inc. (LMSC) is providing the flexible substrate SAs that must survive exposure to the space environment, including atomic oxygen, for an operating life of fifteen years. Trade studies and development testing, important for evolving any design to maturity, are presently underway at LMSC on the flexible solar array. The trade study and development areas being investigated include solar cell module size, solar cell weld pads, panel stiffener frames, materials inherently resistant to atomic oxygen, and weight reduction design alternatives.

Winslow, Cindy↗

CCSDS Advanced Orbiting Systems - International data communications standards for the Space Station Freedom

Established in 1982, the Consultative Committee for Space Data Systems (CCSDS) is an international organization that is staffed by data-handling experts from nearly all of the world's major space agencies. Its goal is to develop standard data-communications techniques so that several agencies may cross-support each other's data flow and thus allow complex, international missions to be flown. Under the general umbrella of Advanced Orbiting Systems (AOS), an international CCSDS task force was formed in 1985 to develop standard data-communications concepts for manned missions, such as the Space Station Freedom and the Hermes space plane, and large unmanned vehicles, such as polar orbiting platforms. The history of the CCSDS and the development of the AOS recommendation are reviewed, and the user services and protocols embodied in its systems architecture are introduced.

Hooke, Adrian J.↗

Sustaining a Mature Risk Management Process: Ensuring the International Space Station for a Vibrant Future

The International Space Station (ISS) risk management methodology is an example of a mature and sustainable process. Risk management is a systematic approach used to proactively identify, analyze, plan, track, control, communicate, and document risks to help management make risk-informed decisions that increase the likelihood of achieving program objectives. The ISS has been operating in space for over 14 years and permanently crewed for over 12 years. It is the longest surviving habitable vehicle in low Earth orbit history. Without a mature and proven risk management plan, it would be increasingly difficult to achieve mission success throughout the life of the ISS Program. A successful risk management process must be able to adapt to a dynamic program. As ISS program-level decision processes have evolved, so too has the ISS risk management process continued to innovate, improve, and adapt. Constant adaptation of risk management tools and an ever-improving process is essential to the continued success of the ISS Program. Above all, sustained support from program management is vital to risk management continued effectiveness. Risk management is valued and stressed as an important process by the ISS Program.

Raftery, Michael↗

Phase change water processing for Space Station

The use of a vapor compression distillation subsystem (VCDS) for water recovery on the Space Station is analyzed. The self-contained automated system can process waste water at a rate of 32.6 kg/day and requires only 115 W of electric power. The improvements in the mechanical components of VCDS are studied. The operation of VCDS in the normal mode is examined. The VCDS preprototype is evaluated based on water quality, water production rate, and specific energy. The relation between water production rate and fluids pump speed is investigated; it is concluded that a variable speed fluids pump will optimize water production. Components development and testing currently being conducted are described. The properties and operation of the proposed phase change water processing system for the Space Station, based on vapor compression distillation, are examined.

Zdankiewicz, E. M.↗

Exposure of Polymer Film Thermal Control Materials on the Materials International Space Station Experiment (MISSE)

Seventy-nine samples of polymer film thermal control (PFTC) materials have been provided by the National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) for exposure to the low Earth orbit environment on the exterior of the International Space Station (ISS) as part of the Materials International Space Station Experiment (MISSE). MISSE is a materials flight experiment sponsored by the Air Force Research Lab/Materials Lab and NASA. This paper will describe background, objectives, and configurations for the GRC PFTC samples for MISSE. These samples include polyimides, fluorinated polyimides, and Teflon fluorinated ethylene propylene (FEP) with and without second-surface metallizing layers and/or surface coatings. Also included are polyphenylene benzobisoxazole (PBO) and a polyarylene ether benzimidazole (TOR-LM). On August 16, 2001, astronauts installed passive experiment carriers (PECs) on the exterior of the ISS in which were located twenty-eight of the GRC PFTC samples for 1-year space exposure. MISSE PECs for 3-year exposure, which will contain fifty-one GRC PFTC samples, will be installed on the ISS at a later date. Once returned from the ISS, MISSE GRC PFTC samples will be examined for changes in optical and mechanical properties and atomic oxygen (AO) erosion. Additional sapphire witness samples located on the AO exposed trays will be examined for deposition of contaminants.

Dever, Joyce↗

Direct solar heating for Space Station application

Early investigations have shown that a large percentage of the power generated on the Space Station will be needed in the form of high-temperature thermal energy. The most efficient method of satisfying this requirement is through direct utilization of available solar energy. A system concept for the direct use of solar energy on the Space Station, including its benefits to customers, technologists, and designers of the station, is described. After a brief discussion of energy requirements and some possible applications, results of selective tradeoff studies are discussed, showing area reduction benefits and some possible configurations for the practical use of direct solar heating. Following this is a description of system elements and required technologies. Finally, an assessment of available contributive technologies is presented, and a Space Shuttle Orbiter flight experiment is proposed.

Simon, W. E.↗

Impacting Space Station Freedom design with operations and safety requirements - An availability process

The unusually long mission duration of Space Station Freedom leads to operations costs that have significant impacts on life-cycle cost relative to previous manned space programs. Maintaining an affordable program requires that operations costs be considered throughout the design process. An appropriate means of impacting the design with operations concerns is to specify requirements that ensure operational effectiveness when implemented. The Space Station Freedom Program has developed a process defining such requirements. It focuses on specifying functional profiles and allocating resources such that designers gain a better understanding of the operational envelope in which their systems must perform. This paper examines the details of the process, where it came from, and why it is effective.

Garegnani, Jerry J.↗

Evolutionary space station fluids management strategies

Results are summarized for an 11-month study to define fluid storage and handling strategies and requirements for various specific mission case studies and their associated design impacts on the Space Station. There are a variety of fluid users which require a variety of fluids and use rates. Also, the cryogenic propellants required for NASA's STV, Planetary, and Code Z missions are enormous. The storage methods must accommodate fluids ranging from a high pressure gas or supercritical state fluid to a sub-cooled liquid (and superfluid helium). These requirements begin in the year 1994, reach a maximum of nearly 1800 metric tons in the year 2004, and trail off to the year 2018, as currently planned. It is conceivable that the cryogenic propellant needs for the STV and/or Lunar mission models will be met by LTCSF LH2/LO2 tanksets attached to the SS truss structure. Concepts and corresponding transfer and delivery operations have been presented for STV propellant provisioning from the SS. A growth orbit maneuvering vehicle (OMV) and associated servicing capability will be required to move tanksets from delivery launch vehicles to the SS or co-orbiting platforms. Also, appropriate changes to the software used for OMV operation are necessary to allow for the combined operation of the growth OMV. To support fluid management activities at the Space Station for the experimental payloads and propellant provisioning, there must be truss structure space allocated for fluid carriers and propellant tanksets, and substantial beam strengthening may be required. The Station must have two Mobile Remote Manipulator Systems (MRMS) and the growth OMV propellant handling operations for the STV at the SS. Propellant needs for the Planetary Initiatives and Code Z mission models will most likely be provided by co-orbiting propellant platform(s). Space Station impacts for Code Z mission fluid management activities will be minimal.

Source record↗

Space Station Freedom solar array design development

The Space Station Freedom solar array program is required to provide a 75-kW power module that uses eight solar array (SA) wings over a four-year period in low earth orbit (LEO). Each wing will be capable of providing 23.4 kW at the 4-yr design point. The design of flexible-substrate SAs that must survive exposure to the space environment, including atomic oxygen, for an operating life of fifteen years is discussed. The tradeoff study and development areas being investigated include solar cell module size, solar cell weld pads, panel stiffener frames, materials inherently resistant to atomic oxygen, and weight reduction design alternatives.

Winslow, Cindy↗

Space Station water degradation study covering the first 24 months of exposure

This report describes the MSFC space station water degradation study (WDS) and presents interim results from the first 24 months of testing. The WDS simulates the stagnant storage of water in distribution lines before the activation of the space station's water processor by storing processed water at ambient temperature in valved sections of 1-in stainless steel and titanium tube. The WDS seeks to determine whether the water quality will degrade unacceptably and whether microbial growth will proceed to an unmanageable extent during extended stagnation. During the first 24 months, significant changes have occurred. Although iodine, which is used as a biocide, was nearly depleted within the first 6 months of testing, microbial growth has been minimal. This report describes the decrease in iodine concentration and the results of microbial and biofilm analyses. Increases in total organic carbon, iodide, chloride, nickel, iron, and chromium concentrations are presented and discussed. The observed increase in conductivity and the decreases in pH and turbidity are also presented. The authors conclude that, with proper preparation, potable water can be stored under stagnant conditions without unmanageable degradation in water quality; a flushing operation and subsequent processing of the degraded water should render the water system ready for use.

Mcright, P. S.↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗