Search NASA⌕ Search

SEARCH · Search NASA

Results for “certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Achieving Challenge Home in Affordable Housing in the Hot-Humid Climate

The Building America Partnership for Improved Residential Construction (BA-PIRC), one of the Building America research team leads, has partnered with two builders as they work through the Challenge Home certification process (now Zero Energy Ready Home) in one test home each. The builder partners participating in this cost-shared research are Southeast Volusia County Habitat for Humanity near Daytona, Florida and Manatee County Habitat for Humanity near Tampa, Florida. Both are affiliates of Habitat for Humanity International, a non-profit affordable housing organization. This research serves to identify viable technical pathways to meeting the CH criteria for other builders in the region. A further objective of this research is to identify gaps and barriers in the marketplace related to product availability, labor force capability, code issues, cost effectiveness, and business case issues that hinder or prevent broader adoption on a production scale.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hood River Passive House

The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50% (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

322-R2U2 Engineering Assessment - August 2015

This Engineering Assessment and Certification of Integrity of retention tank system 322-R2 has been prepared for tank systems that store and neutralizes hazardous waste and have secondary containment. The regulations require that this assessment be completed periodically and certified by an independent, qualified, California-registered professional engineer. Abri Environmental Engineering performed an inspection of the 322-R2 Tank system at the Lawrence Livermore National Laboratory (LLNL) in Livermore, CA. Mr. William W. Moore, P.E., conducted this inspection on March 16, 2015. Mr. Moore is a California Registered Civil Engineer, with extensive experience in civil engineering, and hazardous waste management.

42 ENGINEERING↗

CILogon-HA. Higher Assurance Federated Identities for DOE Science

The CILogon-HA project extended the existing open source CILogon service (initially developed with funding from the National Science Foundation) to provide credentials at multiple levels of assurance to users of DOE facilities for collaborative science. CILogon translates mechanism and policy across higher education and grid trust federations, bridging from the InCommon identity federation (which federates university and DOE lab identities) to the Interoperable Global Trust Federation (which defines standards across the Worldwide LHC Computing Grid, the Open Science Grid, and other cyberinfrastructure). The CILogon-HA project expanded the CILogon service to support over 160 identity providers (including 6 DOE facilities) and 3 internationally accredited certification authorities. To provide continuity of operations upon the end of the CILogon-HA project period, project staff transitioned the CILogon service to operation by XSEDE.

97 MATHEMATICS AND COMPUTING↗

Buildings Interoperability Landscape

Through its Building Technologies Office (BTO), the United States Department of Energy’s Office of Energy Efficiency and Renewable Energy (DOE-EERE) is sponsoring an effort to advance interoperability for the integration of intelligent buildings equipment and automation systems, understanding the importance of integration frameworks and product ecosystems to this cause. This is important to BTO’s mission to enhance energy efficiency and save energy for economic and environmental purposes. For connected buildings ecosystems of products and services from various manufacturers to flourish, the ICT aspects of the equipment need to integrate and operate simply and reliably. Within the concepts of interoperability lie the specification, development, and certification of equipment with standards-based interfaces that connect and work. Beyond this, a healthy community of stakeholders that contribute to and use interoperability work products must be developed. On May 1, 2014, the DOE convened a technical meeting to take stock of the current state of interoperability of connected equipment and systems in buildings. Several insights from that meeting helped facilitate a draft description of the landscape of interoperability for connected buildings, which focuses mainly on small and medium commercial buildings. This document revises the February 2015 landscape document to address reviewer comments, incorporate important insights from the Buildings Interoperability Vision technical meeting, and capture thoughts from that meeting about the topics to be addressed in a buildings interoperability vision. In particular, greater attention is paid to the state of information modeling in buildings and the great potential for near-term benefits in this area from progress and community alignment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ER Consolidated Qtrly Rpt_July-September 2015_January 2016

This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented by Sandia National Laboratories, New Mexico (SNL/NM) for the July, August, and September 2015 quarterly reporting period. The Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM are listed in Table I-1. The work completed during this quarter is reported below in Sections I.2.1 and I.2.2. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities (SWMUs 8 and 58, 68, 149, 154, and 502, and three groundwater AOCs). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) has issued a certificate of completion and the site is in the corrective action complete (CAC) regulatory process. Currently, the Mixed Waste Landfill (MWL, SWMU 76) is the only site in the CAC regulatory process. Corrective action activities have been deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these are active mission facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Documentation of operational protocol for the use of MAMA software

Image analysis of Scanning Electron Microscope (SEM) micrographs is a complex process that can vary significantly between analysts. The factors causing the variation are numerous, and the purpose of Task 2b is to develop and test a set of protocols designed to minimize variation in image analysis between different analysts and laboratories, specifically using the MAMA software package, Version 2.1. The protocols were designed to be “minimally invasive”, so that expert SEM operators will not be overly constrained in the way they analyze particle samples. The protocols will be tested using a round-robin approach where results from expert SEM users at Los Alamos National Laboratory, Lawrence Livermore National Laboratory, Pacific Northwest National Laboratory, Savannah River National Laboratory, and the National Institute of Standards and Testing will be compared. The variation of the results will be used to quantify uncertainty in the particle image analysis process. The round-robin exercise will proceed with 3 levels of rigor, each with their own set of protocols, as described below in Tasks 2b.1, 2b.2, and 2b.3. The uncertainty will be developed using NIST standard reference material SRM 1984 “Thermal Spray Powder – Particle Size Distribution, Tungsten Carbide/Cobalt (Acicular)” [Reference 1]. Full details are available in the Certificate of Analysis, posted on the NIST website (http://www.nist.gov/srm/).

97 MATHEMATICS AND COMPUTING↗

Development and Implementation of Degree Programs in Electric Drive Vehicle Technology

The Electric-drive Vehicle Engineering (EVE) MS degree and graduate certificate programs have been continuing to make good progress, thanks to the funding and the guidance from DOE grant management group, the support from our University and College administrations, and to valuable inputs and feedback from our Industrial Advisory Board as well as our project partners Macomb Community College and NextEnergy. Table 1 below lists originally proposed Statement of Project Objectives (SOPO), which have all been completed successfully. Our program and course enrollments continue to be good and increasing, as shown in later sections. Our graduating students continue to get good job offers from local EV-related companies. Following the top recommendation from our Industrial Advisory Board, we were fortunate enough to be accepted into the prestigious EcoCAR2 (http://www.ecocar2.org/) North America university design competition, and have been having some modest success with the competition. But most importantly, EcoCAR2 offers the most holistic educational environment for integrating real-world engineering and design with our EVE graduate curriculum. Such integrations include true real-world hands-on course projects based on EcoCAR2 related tasks for the students, and faculty curricular and course improvements based on lessons and best practices learned from EcoCAR2. We are in the third and last year of EcoCAR2, and we have already formed a core group of students in pursuit of EcoCAR”3”, for which the proposal is due in early December.

33 ADVANCED PROPULSION SYSTEMS↗

Cloud County Community College Wind Energy Technology Project and Renewable Energy Center of Excellence

Cloud County Community College's (CCCC) Wind Energy Technology (WET) program is a leader in the renewable energy movement across Kansas and the USA. The field of renewable energy is a growing industry which continues to experience high demand for career opportunities. This CCCC/DOE project entailed two phases: 1) the installation of two Northwind 100 wind turbines, and 2) the continued development of the WET program curriculum, including enhancement of the CCCC Blade Repair Certificate program. This report provides a technical account of the total work performed, and is a comprehensive description of the results achieved.

17 WIND ENERGY↗

Virtual Design Studio (VDS) - Development of an Integrated Computer Simulation Environment for Performance Based Design of Very-Low Energy and High IEQ Buildings

Executive Summary The objective of this study was to develop a “Virtual Design Studio (VDS)”: a software platform for integrated, coordinated and optimized design of green building systems with low energy consumption, high indoor environmental quality (IEQ), and high level of sustainability. This VDS is intended to assist collaborating architects, engineers and project management team members throughout from the early phases to the detailed building design stages. It can be used to plan design tasks and workflow, and evaluate the potential impacts of various green building strategies on the building performance by using the state of the art simulation tools as well as industrial/professional standards and guidelines for green building system design. Engaged in the development of VDS was a multi-disciplinary research team that included architects, engineers, and software developers. Based on the review and analysis of how existing professional practices in building systems design operate, particularly those used in the U.S., Germany and UK, a generic process for performance-based building design, construction and operation was proposed. It distinguishes the whole process into five distinct stages: Assess, Define, Design, Apply, and Monitoring (ADDAM). The current VDS is focused on the first three stages. The VDS considers building design as a multi-dimensional process, involving multiple design teams, design factors, and design stages. The intersection among these three dimensions defines a specific design task in terms of “who”, “what” and “when”. It also considers building design as a multi-objective process that aims to enhance the five aspects of performance for green building systems: site sustainability, materials and resource efficiency, water utilization efficiency, energy efficiency and impacts to the atmospheric environment, and IEQ. The current VDS development has been limited to energy efficiency and IEQ performance, with particular focus on evaluating thermal performance, air quality and lighting environmental quality because of their strong interaction with the energy performance of buildings. The VDS software framework contains four major functions: 1) Design coordination: It enables users to define tasks using the Input-Process-Output flow approach, which specifies the anticipated activities (i.e., the process), required input and output information, and anticipated interactions with other tasks. It also allows task scheduling to define the work flow, and sharing of the design data and information via the internet. 2) Modeling and simulation: It enables users to perform building simulations to predict the energy consumption and IEQ conditions at any of the design stages by using EnergyPlus and a combined heat, air, moisture and pollutant simulation (CHAMPS) model. A method for co-simulation was developed to allow the use of both models at the same time step for the combined energy and indoor air quality analysis. 3) Results visualization: It enables users to display a 3-D geometric design of the building by reading BIM (building information model) file generated by design software such as SketchUp, and the predicted results of heat, air, moisture, pollutant and light distributions in the building. 4) Performance evaluation: It enables the users to compare the performance of a proposed building design against a reference building that is defined for the same type of buildings under the same climate condition, and predicts the percent of improvements over the minimum requirements specified in ASHRAE Standard 55-2010, 62.1-2010 and 90.1-2010. An approach was developed to estimate the potential impact of a design factor on the whole building performance, and hence can assist the user to identify areas that have most pay back for investment. The VDS software was developed by using C++ with the conventional Model, View and Control (MVC) software architecture. The software has been verified by using a simple 3-zone case building. The application of the VDS concepts and framework for building design and performance analysis has been illustrated by using a medium-sized, five story office building that received LEED Platinum Certification from USGBC.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Report. Forest County Potawatomi Community, Community-Scale Solar Project

The Forest County Potawatomi Community (“FCPC” or “Tribe”) is a federally recognized Indian tribe with a membership of over 1400. The Tribe has a reservation in Forest County, Wisconsin, and also holds tribal trust and fee lands in Milwaukee, Oconto, and Fond du Lac Counties, Wisconsin. The Tribe has developed the long-term goal of becoming energy independent using renewable resources. In order to meet this goal, the Tribe has taken a number of important steps including energy audits leading to efficiency measures, installation of solar PV, the construction of a biodigester and the purchase of Renewable Energy Certificates to offset its current energy use. To further its energy independence goals, FCPC submitted an application to the Department of Energy (“DOE”) and was awarded a Community-Scale Clean Energy Projects in Indian Country grant, under funding opportunity DE-FOA-0000852. The Tribe, in collaboration with Pewaukee, Wisconsin based SunVest Solar Inc. (SunVest), installed approximately 922.95 kW of solar PV systems at fifteen tribal facilities in Milwaukee and Forest Counties. The individual installations ranged from 9.0 kW to 447.64 kW and will displace between 16.9% to in some cases in excess of 90% of each building’s energy needs.

14 SOLAR ENERGY↗

Multifamily Housing Rehabilitation Process Improvements

Rea Ventures Group, LLC, (Rea Ventures) partnered with Southface Energy Institute (Southface) on the rehabilitation of 418 low-income rental multifamily apartments located at 14 different properties in Georgia (Climate Zones 2-4). These 22-year old, individually-metered units were arranged in rowhouse or townhouse style units. Rehabilitation plans were developed using a process prescribed by the US Department of Agriculture (USDA) Rural Development program, who partially funded the building upgrades. The USDA is responsible for building, upgrading, and subsidizing housing in rural areas nationwide. In 2012, over $100 million was allocated in grants and loans. Due to the unique financing mechanism as well as long-term ownership requirements, property owners are especially motivated to invest in upgrades that will increase durability and tenant retention. These buildings represent a large stock of rural affordable housing that have the potential for significant energy and cost savings for property owners and tenants. Southface analyzed the energy upgrade potential of one stereotypical property in the Rea Ventures portfolio. This study will provide insight into the most cost-effective, implementable energy efficiency and durability upgrades for this age multifamily housing, having an enormous impact not only on the portfolio of Rea Ventures but on the vast USDA and larger Federal portfolio. Additionally, Southface will identify gaps in the current capital needs assessment process, examine available audit and simulation tools and protocols, and evaluate additional auditor training or certification needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LANL Q2 2016 Quarterly Progress Report. Science Campaign and ICF

This progress report includes highlights for the Science Campaign and ICF about Advanced Certification and Assessment Methodologies, Implosion Hydrodynamics (C-1, SCE), Materials and Nuclear Science (C-1, C-2), Capabilities for Nuclear Intelligence, and High Energy Density Science (C-1, C-4, C-10). Upcoming meetings, briefings, and experiments are then listed for April and May.

99 GENERAL AND MISCELLANEOUS↗

Multi-Function Gas Fired Heat Pump

The aim of this project was to design a residential fuel fired heat pump and further improve efficiency in collaboration with an industry partner – Southwest Gas, the developer of the Nextaire commercial rooftop fuel-fired heat pump. Work started in late 2010. After extensive search for suitable engines, one manufactured by Marathon was selected. Several prototypes were designed and built over the following four years. Design changes were focused on lowering the cost of components and the cost of manufacturing. The design evolved to a final one that yielded the lowest cost. The final design also incorporates noise and vibration reduction measures that were verified to be effective through a customer survey. ETL certification is currently (as of November 2015) underway. Southwest Gas is currently in talks with GTI to reach an agreement through which GTI will assess the commercial viability and potential of the heat pump. Southwest Gas is searching for investors to manufacture the heat pump and introduce it to the market.

42 ENGINEERING↗

Advanced Offshore Wind Energy: Atlantic Consortium

This project developed relationships among the lead institution, U of Delaware, wind industry participants from 11 companies, and two other universities in the region. The participating regional universities were University of Maryland and Old Dominion University. Research was carried out in six major areas: Analysis and documentation of extreme oceanic wind events & their impact on design parameters, calibration of corrosivity estimates measured on a coastal turbine, measurment and modeling of tower structures, measurement and modeling of the tribology of major drive components, and gearbox conditioning monitoring using acoustic sensors. The project also had several educational goals, including establishing a course in wind energy and training graduate students. Going beyond these goals, three new courses were developed, a graduate certificate program in wind power was developed and approved, and an exchange program in wind energy was established with Danish Technical University. Related to the installation of a Gamesa G90 turbine on campus and a Gamesa-UD research program established in part due to this award, several additional research projects have been carried out based on mutual industry-university interests, and funded by turbine revenues. This award and the Gamesa partnership have jointly led to seven graduate students receiving full safety and climb training, to become “research climbers” as part of their wind power training, and contributing to on-turbine research. As a result of the educational program, already six graduate students have taken jobs in the US wind industry.

17 WIND ENERGY↗

Optimization of Helium Vessel Design for ILC Cavities

The ILC (International Linear Collider) is a proposed new major particle accelerator. It consists of two 20 km long linear accelerators colliding electrons and positrons at an energy exceeding 500 GeV, Achieving this collision energy while keeping reasonable accelerator dimensions requires the use of high electric field superconducting cavities as the main acceleration element. These cavities are operated at l.3 GHz inside an appropriate container (He vessel) at temperatures as low as 1.4 K using superfluid Helium as the refrigerating medium. The purpose of this thesis, in the context of the ILC R&D activities currently in progress at Fermilab (Fermi National Accelerator Laboratory), is the mechanical study of an ILC superconducting cavity and Helium vessel prototype. The main goals of these studies are the determination of the limiting working conditions of the whole He vessel assembly, the simulation of the manufacturing process of the cavity end-caps and the assessment of the Helium vessel's efficiency. In addition this thesis studies the requirements to certify the compliance with the ASME Code of the whole cavity/vessel assembly. Several Finite Elements Analyses were performed by the candidate himself in order to perform the studies listed above and described in detail in Chapters 4 through 8. ln particular the candidate has developed an improved procedure to obtain more accurate results with lower computational times. These procedures will be accurately described in the following chapters. After an introduction that briefly describes the Fennilab and in particular the Technical Division (where all the activities concerning with this thesis were developed), the first part of this thesis (Chapters 2 and 3) explains some of the main aspects of modem particle accelerators. Moreover it describes the most important particle accelerators working at the moment and the basic features of the ILC project. Chapter 4 describes all the activities that were done to certify the compliance of the Helium vessel and the cavity to the ASME code standard. After briefly recalling to the main contents of the the ASME Code (Sections II and Vlll - Division ll), the procedure used for finding all relevant stresses and comparing the obtained results with the maximum values allowed are explained. This part also includes the buckling verification of the cavity. In Chapter 5 the manufacturing process of the cavity end-caps, whose function is to link the Helium vessel with the cavity, is studied. The present configuration of the dies is described and the manufacturing process is simulated in order to explain the origin of some defects fol.llld on real parts. Finally a new design of the dies is proposed and the resulting deformed piece is compared with the design requirements. Chapter 6 describes a finite elements analysis to assess the efficiency and the stiffness of the Helium vessel. Furthermore the results of the optimization of the Helium vessel (in order to increase the value of the efficiency) are reported. The same stiffness analysis is used in Chapter 7 for the Blade-Tuner study. After a description of this tuner and of its function, the preliminary analyses done to confirm the results provided by the vendor are described and then its limiting load conditions are found. Chapter 8 shows a study of the resistance of all the welds present in between the cavity and the end-cap and between the end-caps and the He vessel for a smaller superconducting cavity operating at 3.9 GHz. Finally Chapter 9 briefly describes some R&D activities in progress at INFN (Section of Pisa) and Fermilab that could produce significant cost reductions of the Helium vessel design. All the finite elements analyses contained and described in this thesis made possible the certification of the whole superconducting cavity-Helium vessel assembly at Fermilab. Furthermore they gave several useful indications to the Fermilab staff to improve the performance of the Helium vessel by modifying some design parameters or refining the manufacturing processes.

43 PARTICLE ACCELERATORS↗

Advanced Simulation and Computing FY17 Implementation Plan, Version 0

The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computational resources that support annual stockpile assessment and certification, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This requires a balance of resource, including technical staff, hardware, simulation software, and computer science solutions. ASC is now focused on increasing predictive capabilities in a three-dimensional (3D) simulation environment while maintaining support to the SSP. The program continues to improve its unique tools for solving progressively more difficult stockpile problems (sufficient resolution, dimensionality, and scientific details), and quantifying critical margins and uncertainties. Resolving each issue requires increasingly difficult analyses because the aging process has progressively moved the stockpile further away from the original test base. Where possible, the program also enables the use of high performance computing (HPC) and simulation tools to address broader national security needs, such as foreign nuclear weapon assessments and counter nuclear terrorism.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Energy Savings Modeling and Inspection Guidelines for Commercial Building Federal Tax Deductions for Buildings in 2016 and Later

This document provides guidance for modeling and inspecting energy-efficient property in commercial buildings for certification of the energy and power cost savings related to Section 179D of the Internal Revenue Code (IRC) enacted in Section 1331 of the 2005 Energy Policy Act (EPAct) of 2005, noted in Internal Revenue Service (IRS) Notices 2006-52 (IRS 2006), 2008-40 (IRS 2008) and 2012-26 (IRS 2012), and updated by the Protecting Americans from Tax Hikes (PATH) Act of 2015. Specifically, Section 179D provides federal tax deductions for energy-efficient property related to a commercial building's envelope; interior lighting; heating, ventilating, and air conditioning (HVAC); and service hot water (SHW) systems. This document applies to buildings placed in service on or after January 1, 2016.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗