Search NASA⌕ Search

SEARCH · Search NASA

Results for “likelihood estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,585 records · Page 88

Forest inventory using multistage sampling with probability proportional to size

A multistage sampling technique, with probability proportional to size, for forest volume inventory using remote sensing data is developed and evaluated. The study area is located in the Southeastern Brazil. The LANDSAT 4 digital data of the study area are used in the first stage for automatic classification of reforested areas. Four classes of pine and eucalypt with different tree volumes are classified utilizing a maximum likelihood classification algorithm. Color infrared aerial photographs are utilized in the second stage of sampling. In the third state (ground level) the time volume of each class is determined. The total time volume of each class is expanded through a statistical procedure taking into account all the three stages of sampling. This procedure results in an accurate time volume estimate with a smaller number of aerial photographs and reduced time in field work.

Parada, N. D. J.↗

Vacuum selection on axionic landscapes

We compute the distribution of minima that are reached dynamically on multi-field axionic landscapes, both numerically and analytically. Such landscapes are well suited for inflationary model building due to the presence of shift symmetries and possible alignment effects (the KNP mechanism). The resulting distribution of dynamically reached minima differs considerably from the naive expectation based on counting all vacua. These differences are more pronounced in the presence of many fields due to dynamical selection effects: while low lying minima are preferred as fields roll down the potential, trajectories are also more likely to get trapped by one of the many nearby minima. We show that common analytic arguments based on random matrix theory in the large D-limit to estimate the distribution of minima are insufficient for quantitative arguments pertaining to the dynamically reached ones. This discrepancy is not restricted to axionic potentials. We provide an empirical expression for the expectation value of such dynamically reached minimas' height and argue that the cosmological constant problem is not alleviated in the absence of anthropic arguments. We further comment on the likelihood of inflation on axionic landscapes in the large D-limit.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Poisson vs. Gaussian statistics for sparse X-ray data: Application to the soft X-ray spectrometer

Abstract Reliable results when fitting X-ray data require proper consideration of the statistics involved. We probe the impact of Gaussian versus Poisson statistics at low count levels using both the standard χ2 method and maximum likelihood based on Poisson (C) statistics. The difference is studied and quantified through simulated spectra with known properties. We then test the results through analysis of Mn Kα calibration data taken with the flight spare microcalorimeter for the Hitomi soft X-ray spectrometer. Through comparison with simulations, our results show that the χ2 method tends to give overly optimistic estimates of the detector energy resolution, in particular when there are few counts. Given an energy resolution of ∼5 eV and a line with about 100 photons, the line width becomes ∼10% lower in the χ2 method than in Poisson statistics. This is a consequence of the uncertainties being dominated by counting statistics, and therefore highlights the need to choose the appropriate fit statistic.

79 ASTRONOMY AND ASTROPHYSICS↗

Lignite-plus-Biomass to Synthetic Jet Fuel with CO2 Capture and Storage: Design, Cost, and Greenhouse Gas Emissions Analysis for a Near-Term First-of-a-Kind Demonstration Project and Prospective Future Commercial Plants

We report on a 30-month design study for a first-of-a-kind (FOAK) demonstration plant that would be built at a site near Meridian, Mississippi, to coprocess lignite coal and woody biomass into jet fuel. The design uses an oxygen-blown TRIG™ gasifier developed by KBR and Southern Company. Fischer-Tropsch conversion of the syngas produces synthetic paraffinic kerosene (SPK) as the primary product, plus naphtha. Other co-products include electricity sold to the grid and CO 2 sold for use in enhanced oil recovery (EOR). Previous studies have identified coprocessing of various coals and biomass with CO 2 capture as promising options for cost-competitive production of low net lifecycle greenhouse gas (GHG) emissions synthetic fuels. The effort reported here goes beyond earlier studies in the level of detail in process design and cost estimation with the aim of improving the understanding of the economic prospects for lignite and woody biomass coprocessing systems. Key objectives in the design of the FOAK lignite/biomass-to-jet (LBJ) plant were to achieve net lifecycle GHG emissions for the SPK that are less than for conventional petroleum-derived jet fuel and to make process design and equipment selections such that the plant could be built and operated in the near term, e.g., before 2025. The process design was developed by researchers at Princeton University and the University of Queensland and validated by engineers at the WorleyParsons Group (WP). Commercial vendors provided design and cost estimates for several major plant components. Bare-erected capital costs and operating and maintenance costs were estimated by WP. The primary objective in building and operating the FOAK plant would be to demonstrate the technical viability of the LBJ concept as an essential first step toward launching commercial-scale plants in the longer term. With this in mind, the project team developed a set of principles to help guide the process design: the total plant cost should be less than 2 billion USD (to limit investment risk); the level of input biomass should be both proportionally significant to reflect biomass/lignite co-gasification and sufficient to achieve GHG emissions goals; process design decisions and vendor/equipment selections should prioritize the likelihood of technical success over minimizing the cost of jet fuel production. The resulting FOAK plant design capacity is 1,551 metric t/d (45.5% moisture) lignite and 556 t/d (43.3% moisture) biomass, for a total input of 295 MW HHV , of which 25% is biomass. The design output is 1,252 actual barrels per day of liquids, of which 80% is SPK (62.3 MW LHV ) and 20% is naphtha (13.9 MW LHV ). It exports 15 MW e of electricity after satisfying a 38 MW e onsite auxiliary load. Additional products are 1,326 t/d of pressurized pipeline-quality CO 2 and 49 t/day of sulfuric acid (93 wt% H 2 SO 4 ). With thinnings from sustainably-managed southern pine plantations as the biomass, and with captured CO 2 stored underground via EOR, the net lifecycle emissions for the SPK product are estimated to be about one-quarter of those for petroleum-derived jet fuel. The bare-erected cost (BEC) estimated by WP for this plant is 588 million USD (2015). The authors’ best estimate of total plant cost (TPC) is 1,230 million USD, arrived at by assuming engineering, procurement and construction management services (20% of BEC), process 5 contingencies (35% of BEC), and project contingencies (35% of the sum of all other costs, i.e., 35% of 1.55xBEC). Not surprisingly, an annual discounted cash flow (DCF) analysis determined that it would be impossible to generate a positive net present value (NPV) over a wide range in key input assumptions. An SPK production cost subsidy of nearly 400/bbl USD over a 20-year plant life would be required to achieve zero NPV under a baseline set of assumptions (including 3% real weighted average cost of capital and a levelized crude oil price of 80/bbl USD). Alternatively, a capital grant in excess of the TPC value would also achieve zero NPV. The poor financial results reflect the small scale of the plant, the design principle to prioritize technical success, the levels of contingencies appropriate for the relatively early stage of project development, and the first-of-a-kind nature of the plant. Technology innovations, learning via construction and operating experience, alternative plant configurations, and larger scale should improve economics of future plants. To help understand these prospects, a preliminary analysis of N th -of-a-kind (NOAK) plants was developed, but with the limitation that plants would use only equipment components that for the most part are already commercial today: consideration of advanced, not-yet-commercial technologies and of R&D-driven improvements in existing technologies were beyond the scope of this analysis. The analysis found that a variety of NOAK plant designs that coprocess lignite and woody biomass to make jet fuel are unlikely to be economically competitive without subsidy even in the presence of a high future carbon tax or equivalent greenhouse gas mitigation policy. This conclusion applies to process configurations and input biomass/lignite ratios that result in net GHG emissions as high as those for petroleum-derived jet fuel and as low as zero. In contrast, encouraging results were found for plants processing only biomass. The economics of these “BECCS” plants (biomass energy with CCS) improve dramatically with the strength of carbon mitigation policies because of their strongly negative net GHG emissions. These findings do not imply that coal/biomass coprocessing strategies for making synfuels with CCS are not economically promising – only that, in the case of lignite, much more than a 25% biomass coprocessing rate would be needed. However, our analysis shows that all such systems are unlikely to be economic in the absence of a strong carbon mitigation policy. Future R&D driven technological innovations could modify this conclusion. Among other R&D priorities, an emphasis on better understanding and reducing plant auxiliary loads is warranted.

09 BIOMASS FUELS↗

Determination of interstellar O parameters using the first two years of data from the Interstellar Boundary Explorer

The direct measurements of interstellar matter by the Interstellar Boundary Explorer (IBEX) mission have opened a new and important chapter in our study of the interactions that control the boundaries of our heliosphere. Here we derive for the quantitative information about interstellar O flow parameters from IBEX low-energy neutral atom data for the first time. Specifically, we derive a relatively narrow four-dimensional parameter tube along which interstellar O flow parameters must lie. Along the parameter tube, we find a large uncertainty in interstellar O flow longitude, 76.°0 ± 3.°4 from χ {sup 2} analysis and 76.°5 ± 6.°2 from a maximum likelihood fit, which is statistically consistent with the flow longitude derived for interstellar He, 75.°6 ± 1.°4. The best-fit O and He temperatures are almost identical at a reference flow longitude of 76°, which provides a strong indication that the local interstellar plasma near the Sun is relatively unaffected by turbulent heating. However, key differences include an oxygen parameter tube for the interstellar speed (relation between speed and longitude) that has higher speeds than those in the corresponding parameter tube for He, and an upstream flow latitude for oxygen that is southward of the upstream flow latitude for helium. Both of these differences are likely the result of enhanced filtration of interstellar oxygen due to its charge-exchange ionization rate, which is higher than that for helium. Furthermore, we derive an interstellar O density near the termination shock of 5.8{sub −0.8}{sup +0.9}×10{sup −5} cm{sup −3} that, within uncertainties, is consistent with previous estimates. Thus, we use IBEX data to probe the interstellar properties of oxygen.

79 ASTRONOMY AND ASTROPHYSICS↗

Effects of climate change on streamflow extremes and implications for reservoir inflow in the United States

The magnitude and frequency of hydrometeorological extremes are expected to increase in the conterminous United States (CONUS) over the rest of this century, and their increase will significantly impact water resource management. While previous efforts focused on the effects of reservoirs on downstream discharge, the effects of climate change on reservoir inflows in upstream areas are not well understood. We evaluated the large-scale climate change effects on extreme hydrological events and their implications for reservoir inflows in 178 headwater basins across CONUS using the Variable Infiltration Capacity (VIC) hydrologic model. The VIC model was forced with a 10-member ensemble of global circulation models under the Representative Concentration Pathway 8.5 that were dynamically downscaled using a regional climate model (RegCM4) and bias-corrected to 1/24° grid cell resolution. The results projected an increase in the likelihood of flood risk by 44% for a majority of subbasins upstream of flood control reservoirs in the central United States and increased drought risk by 11% for subbasins upstream of hydropower reservoirs across the western United States. Increased risk of both floods and droughts can potentially make reservoirs across CONUS more vulnerable to future climate conditions. In conclusion, this study estimates reservoir inflow changes over the next several decades, which can be used to optimize water supply management downstream.

54 ENVIRONMENTAL SCIENCES↗

Probabilistic Prediction of Geomagnetic Storms and the K p index

Geomagnetic activity is often described using summary indices to summarize the likelihood of space weather impacts, as well as when parameterizing space weather models. The geomagnetic index K p in particular, is widely used for these purposes. Current state-of-the-art forecast models provide deterministic K p predictions using a variety of methods – including empirically-derived functions, physics-based models, and neural networks – but do not provide uncertainty estimates associated with the forecast. This paper provides a sample methodology to generate a 3-hour-ahead K p prediction with uncertainty bounds and from this provide a probabilistic geomagnetic storm forecast. Specifically, we have used a two-layered architecture to separately predict storm (K p ≥ 5 – ) and non-storm cases. As solar wind-driven models are limited in their ability to predict the onset of transient-driven activity we also introduce a model variant using solar X-ray flux to assess whether simple models including proxies for solar activity can improve the predictions of geomagnetic storm activity with lead times longer than the L1-to-Earth propagation time. By comparing the performance of these models we show that including operationally-available information about solar irradiance enhances the ability of predictive models to capture the onset of geomagnetic storms and that this can be achieved while also enabling probabilistic forecasts.

79 ASTRONOMY AND ASTROPHYSICS↗

Monte Carlo simulations of time-of-flight PET with double-ended readout: calibration, coincidence resolving times and statistical lower bounds

Here, this paper demonstrates through Monte Carlo simulations that a practical positron emission tomograph with (1) deep scintillators for efficient detection, (2) double-ended readout for depth-of-interaction information, (3) fixed-level analog triggering, and (4) accurate calibration and timing data corrections can achieve a coincidence resolving time (CRT) that is not far above the statistical lower bound. One Monte Carlo algorithm simulates a calibration procedure that uses data from a positron point source. Annihilation events with an interaction near the entrance surface of one scintillator are selected, and data from the two photodetectors on the other scintillator provide depth-dependent timing corrections. Another Monte Carlo algorithm simulates normal operation using these corrections and determines the CRT. A third Monte Carlo algorithm determines the CRT statistical lower bound by generating a series of random interaction depths, and for each interaction a set of random photoelectron times for each of the two photodetectors. The most likely interaction times are determined by shifting the depth-dependent probability density function to maximize the joint likelihood for all the photoelectron times in each set. Example calculations are tabulated for different numbers of photoelectrons and photodetector time jitters for three 3 × 3 × 30 mm 3 scintillators: Lu 2 SiO 5 :Ce,Ca (LSO), LaBr 3 :Ce, and a hypothetical ultra-fast scintillator. To isolate the factors that depend on the scintillator length and the ability to estimate the DOI, CRT values are tabulated for perfect scintillator-photodetectors. For LSO with 4000 photoelectrons and single photoelectron time jitter of the photodetector J = 0.2 ns (FWHM), the CRT value using the statistically weighted average of corrected trigger times is 0.098 ns FWHM and the statistical lower bound is 0.091 ns FWHM. For LaBr 3 :Ce with 8000 photoelectrons and J = 0.2 ns FWHM, the CRT values are 0.070 and 0.063 ns FWHM, respectively. For the ultra-fast scintillator with 1 ns decay time, 4000 photoelectrons, and J = 0.2 ns FWHM, the CRT values are 0.021 and 0.017 ns FWHM, respectively. Lastly, the examples also show that calibration and correction for depth-dependent variations in pulse height and in annihilation and optical photon transit times are necessary to achieve these CRT values.

60 APPLIED LIFE SCIENCES↗

Medical Surveillance for Former Workers

The Former Hanford Worker Medical Monitoring Program, directed by the Occupational and Environmental Medicine Program at the University of Washington, served former production and other non-construction workers who were potentially exposed to workplace hazards while working for the USDOE or its contractors at Hanford. The USDOE Former Workers Program arose from Congressional action in the Defense Authorization of 1993 (Public Law 102). Section 3162 stated that, “The Secretary shall establish and carry out a program for the identification and ongoing medical evaluation of current and former Department of Energy employees who are subject to significant health risks as a result of exposure of such employees to hazardous or radioactive substances during such employment.” (This also covers former employees of USDOE contractors and subcontractors.) The key objective has been to provide these former workers with medical evaluations in order to determine whether workers have experienced significant risk due to workplace exposure to hazards. Exposures to asbestos, beryllium, and noise can produce specific medical conditions: asbestosis, berylliosis, and noise-induced hearing loss (NIHL). Each of these conditions can be identified by specific, non-invasive screening tests, which are widely available. Treatments are also available for individuals affected by these conditions. This project involved two phases. Phase I involved a needs and risk assessment, characterizing the nature and extent of workplace health hazards which may have increased the risk for long-term health effects. We categorized jobs and tasks by likelihood of exposures to specific workplace health hazards; and located and established contact with former Hanford workers. Phase II involved implementation of medical monitoring programs for former workers whose individual work history indicated significant risk for adverse health effects. We identified 118,000 former workers, employed from 1943 to 1997. After excluding current workers, construction workers, and deceased workers, the total estimated number of former workers eligible for screening was 72,611. By September, 2006, 53,010 workers had been contacted, 20,298 responded, 2,835 were eligible and authorized, and 2,773 workers were ultimately screened. The cohort was 80% male, 85% white, and had a mean age of 63 years (range 24-96 years) at the time of first exam. Participants completed an occupational health history survey prior to the medical exam. Former Hanford workers were considered eligible for an exam if they reported exposure to asbestos, beryllium, or noise, or if a review of their Hanford work history indicated possible or probable exposure to one of these three hazards. We also invited any former Hanford worker who requested an exam to participate, regardless of documentation of exposure. The screening exam included a problem-focused physical exam, along with screening tests for one or more of three specific medical conditions: asbestosis (chest X-ray and spirometry), berylliosis (chest X-ray, spirometry, and beryllium-induced lymphocyte proliferation test), and NIHL (audiometry). We assisted ill workers in filing appropriate workers’ compensation claims, and facilitated appropriate follow-up medical care. This program has made an important contribution to the health of former DOE contractor workers at the Hanford defense nuclear site.

99 GENERAL AND MISCELLANEOUS↗

Improving Project Management with Simulation and Completion Distribution Functions

Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

Cates, Grant R.↗

A Population Pharmacokinetic Model for Disposition in Plasma, Saliva and Urine of Scopolamine after Intranasal Administration to Healthy Human Subjects

An intranasal gel formulation of scopolamine (INSCOP) was developed for the treatment of Space Motion Sickness. The bioavailability and pharmacokinetics (PK) were evaluated under the Food and Drug Administration guidelines for clinical trials with an Investigative New Drug (IND) protocol. The aim of this project was to develop a PK model that can predict the relationship between plasma, saliva and urinary scopolamine concentrations using data collected from the IND clinical trials with INSCOP. Methods: Twelve healthy human subjects were administered three dose levels (0.1, 0.2 and 0.4 mg) of INSCOP. Serial blood, saliva and urine samples were collected between 5 min and 24 h after dosing and scopolamine concentrations were measured by using a validated LC‐MS‐MS assay. Pharmacokinetic Compartmental models, using actual dosing and sampling times, were built using Phoenix (version 1.2). Model selection was based on the likelihood ratio test on the difference of criteria (‐2LL) and comparison of the quality of fit plots. Results: The best structural model for INSCOP (minimal ‐2LL= 502.8) was established. It consisted of one compartment each for plasma, saliva and urine, respectively, which were connected with linear transport processes except the nonlinear PK process from plasma to saliva compartment. The best‐fit estimates of PK parameters from individual PK compartmental analysis and Population PK model analysis were shown in Tables 1 and 2, respectively. Conclusion: A population PK model that could predict population and individual PK of scopolamine in plasma, saliva and urine after dosing was developed and validated. Incorporating a non‐linear transfer from plasma to saliva compartments resulted in a significantly improved model fitting. The model could be used to predict scopolamine plasma concentrations from salivary and urinary drug levels, allowing non‐invasive therapeutic monitoring of scopolamine in space and other remote environments.

Wu, L.↗

Poisson vs. Gaussian statistics for sparse X-ray data: Application to the soft X-ray spectrometer

Reliable results when fitting X-ray data require proper consideration of the statistics involved. We probe the impact of Gaussian versus Poisson statistics at low count levels using both the standard χ^(2) method and maximum likelihood based on Poisson (C) statistics. The difference is studied and quantified through simulated spectra with known properties. We then test the results through analysis of Mn Kα calibration data taken with the flight spare microcalorimeter for the Hitomi soft X-ray spectrometer. Through comparison with simulations, our results show that the χ^(2) method tends to give overly optimistic estimates of the detector energy resolution, in particular when there are few counts. Given an energy resolution of ∼5 eV and a line with about 100 photons, the line width becomes ∼10% lower in the χ^(2) method than in Poisson statistics. This is a consequence of the uncertainties being dominated by counting statistics, and therefore highlights the need to choose the appropriate fit statistic.

Shinya Yamada↗

Risk assessment framework for geologic carbon sequestration sites

We have developed a simple and transparent approach for assessing CO{sub 2} and brine leakage risk associated with CO{sub 2} injection at geologic carbon sequestration (GCS) sites. The approach, called the Certification Framework (CF), is based on the concept of effective trapping, which takes into account both the probability of leakage from the storage formation and impacts of leakage. The effective trapping concept acknowledges that GCS can be safe and effective even if some CO{sub 2} and brine were to escape from the storage formation provided the impact of such leakage is below agreed-upon limits. The CF uses deterministic process models to calculate expected well- and fault-related leakage fluxes and concentrations. These in turn quantify the impacts under a given leakage scenario to so-called 'compartments,' which comprise collections of vulnerable entities. The probabilistic part of the calculated risk comes from the likelihood of (1) the intersections of injected CO{sub 2} and related pressure perturbations with well or fault leakage pathways, and (2) intersections of leakage pathways with compartments. Two innovative approaches for predicting leakage likelihood, namely (1) fault statistics, and (2) fuzzy rules for fault and fracture intersection probability, are highlighted here.

54 ENVIRONMENTAL SCIENCES↗

Toward tsunami early warning system in Indonesia by using rapid rupture durations estimation

Indonesia has Indonesian Tsunami Early Warning System (Ina-TEWS) since 2008. The Ina-TEWS has used automatic processing on hypocenter; Mwp, Mw (mB) and Mj. If earthquake occurred in Ocean, depth < 70 km and magnitude > 7, then Ina-TEWS announce early warning that the earthquake can generate tsunami. However, the announcement of the Ina-TEWS is still not accuracy. Purposes of this research are to estimate earthquake rupture duration of large Indonesia earthquakes that occurred in Indian Ocean, Java, Timor sea, Banda sea, Arafura sea and Pasific ocean. We analyzed at least 330 vertical seismogram recorded by IRIS-DMC network using a direct procedure for rapid assessment of earthquake tsunami potential using simple measures on P-wave vertical seismograms on the velocity records, and the likelihood that the high-frequency, apparent rupture duration, T{sub dur}. T{sub dur} can be related to the critical parameters rupture length (L), depth (z), and shear modulus ({mu}) while T{sub dur} may be related to wide (W), slip (D), z or {mu}. Our analysis shows that the rupture duration has a stronger influence to generate tsunami than Mw and depth. The rupture duration gives more information on tsunami impact, Mo/{mu}, depth and size than Mw and other currently used discriminants. We show more information which known from the rupture durations. The longer rupture duration, the shallower source of the earthquake. For rupture duration greater than 50 s, the depth less than 50 km, Mw greater than 7, the longer rupture length, because T{sub dur} is proportional L and greater Mo/{mu}. Because Mo/{mu} is proportional L. So, with rupture duration information can be known information of the four parameters. We also suggest that tsunami potential is not directly related to the faulting type of source and for events that have rupture duration greater than 50 s, the earthquakes generated tsunami. With available real-time seismogram data, rapid calculation, rupture duration discriminant can be completed within 4-5 min after an earthquake occurs and thus can aid in effective, accuracy and reliable tsunami early warning for Indonesia region.

58 GEOSCIENCES↗

A SURVEY OF METAL LINES AT HIGH-REDSHIFT. I. SDSS ABSORPTION LINE STUDIES- THE METHODOLOGY AND FIRST SEARCH RESULTS FOR O VI

We report the results of a systematic search for signatures of metal lines in quasar spectra of the Sloan Digital Sky Survey (SDSS) data release 3 (DR3), focusing on finding intervening absorbers via detection of their O VI doublet. Here, we present the search algorithm and criteria for distinguishing candidates from spurious Ly{alpha} forest lines. In addition, we compare our findings with simulations of the Ly{alpha} forest in order to estimate the detectability of O VI doublets over various redshift intervals. We have obtained a sample of 1756 O VI doublet candidates with rest-frame equivalent width (EW) {>=}0.05 A in 855 active galactic nuclei spectra (out of 3702 objects with redshifts in the accessible range for O VI detection). This sample is further subdivided into three groups according to the likelihood of being real and the potential for follow-up observation of the candidate. The group with the cleanest and most secure candidates is comprised of 145 candidates. Sixty-nine of these reside at a velocity separation {>=}5000 km s{sup -1} from the QSO and can therefore be classified tentatively as intervening absorbers. Most of these absorbers have not been picked up by earlier, automated QSO absorption line detection algorithms. This sample increases the number of known O VI absorbers at redshifts beyond z{sub abs{>=}} 2.7 substantially.

79 ASTRONOMY AND ASTROPHYSICS↗

Advanced electrochemical concepts for NASA applications

A Jet Propulsion Laboratory (JPL) survey of 23 electrochemical systems for space applications in which experts from universities, industry, and government participated is discussed. They recommended achievable specific energy for these systems and forecast the likelihood of their development of these systems by the year 1995, 2000, and 2005. The highest ranked systems for operation in planetary inner-orbit spacecraft included Na/beta-double prime-alumina/Z, where Z = S, FeCl2 or NiCl2, the upper plateau Li(Al)/FeS2 system, and the H2/O2 alkaline regenerative fuel cell. The achievable specific energy for these as operational batteries was estimated to be 130, 180 and 100 Wh/kg, respectively. For planetary outer-orbit and small geosynchronous (GEO) spacecraft Li/TiS2 (estimated 90 Wh/kg) was the choice.

Halpert, Gerald↗

Mapathons versus automated feature extraction: a comparative analysis for strengthening immunization microplanning

Background: Social instability and logistical factors like the displacement of vulnerable populations, the difficulty of accessing these populations, and the lack of geographic information for hard-to-reach areas continue to serve as barriers to global essential immunizations (EI). Microplanning, a population-based, healthcare intervention planning method has begun to leverage geographic information system (GIS) technology and geospatial methods to improve the remote identification and mapping of vulnerable populations to ensure inclusion in outreach and immunization services, when feasible. We compare two methods of accomplishing a remote inventory of building locations to assess their accuracy and similarity to currently employed microplan line-lists in the study area. Methods: The outputs of a crowd-sourced digitization effort, or mapathon, were compared to those of a machine-learning algorithm for digitization, referred to as automatic feature extraction (AFE). The following accuracy assessments were employed to determine the performance of each feature generation method: (1) an agreement analysis of the two methods assessed the occurrence of matches across the two outputs, where agreements were labeled as “befriended” and disagreements as “lonely”; (2) true and false positive percentages of each method were calculated in comparison to satellite imagery; (3) counts of features generated from both the mapathon and AFE were statistically compared to the number of features listed in the microplan line-list for the study area; and (4) population estimates for both feature generation method were determined for every structure identified assuming a total of three households per compound, with each household averaging two adults and 5 children. Results: The mapathon and AFE outputs detected 92,713 and 53,150 features, respectively. A higher proportion (30%) of AFE features were befriended compared with befriended mapathon points (28%). The AFE had a higher true positive rate (90.5%) of identifying structures than the mapathon (84.5%). The difference in the average number of features identified per area between the microplan and mapathon points was larger (t = 3.56) than the microplan and AFE (t = -2.09) (alpha = 0.05). Conclusions: Our findings indicate AFE outputs had higher agreement (i.e., befriended), slightly higher likelihood of correctly identifying a structure, and were more similar to the local microplan line-lists than the mapathon outputs. These findings suggest AFE may be more accurate for identifying structures in high-resolution satellite imagery than mapathons. However, they both had their advantages and the ideal method would utilize both methods in tandem.

59 BASIC BIOLOGICAL SCIENCES↗

Assessing the Thermal Environmental Impacts of an Groundwater Heat Pump in Southeastern Washington State

A thermal analysis of a large-scale (e.g., 1900 gpm), open-loop ground source heat pump (GSHP) installed on the Pacific Northwest National Laboratory (PNNL) campus in southeastern Washington State has been performed using a numerical modeling approach. Water temperature increases at the upgradient extraction wells in the system and at the downgradient Columbia River are potential concerns, especially since heat rejection to the subsurface will occur year-round. Hence, thermal impacts of the open-loop GSHP were investigated to identify operational scenarios that minimized downgradient environmental impacts at the river, and upgradient temperature drift at the production wells. Simulations examined the sensitivity of the system to variations in pumping rates and injected water temperatures, as well as to hydraulic conductivity estimates of the aquifer. Results demonstrated that both downgradient and upgradient thermal impacts were more sensitive to injection flow rates than estimates of hydraulic conductivity. Higher injection rates at lower temperatures resulted in higher temperature increases at the extraction wells but lower increases at the river. Conversely, lower pumping rates and higher injected water temperatures resulted in a smaller temperature increase at the extraction wells, but higher increases at the river. The scenario with lower pumping rates is operationally more efficient, but does increase the likelihood of a thermal plume discharging into the Columbia River. However, this impact would be mitigated by mixing within the hyporheic zone and the Columbia River. The impact under current operational conditions is negligible, but future increases in heat rejection could require a compromise between maximizing operational efficiency and minimizing temperature increases at the shoreline.

15 GEOTHERMAL ENERGY↗