Report to NCSP on FY21 DANCE and NEUANCE measurements of 233 U(n, γ)
In order to complete the statistics needed above 10 keV after the experiment performed in December 2020, a production measurement of the 233 U capture cross section, using the thick target (~20 mg) was proposed for the CY21 runcycle. Through collaboration with the DANCE experimental team, we arranged for the NEUANCE array to stay in place in the CY21 run cycle until the 233 U measurement was complete in June-July 2021, further reducing systematic uncertainties in the measurement. The measurement was performed over 10 days with the 20 mg sample, and the 10 mg sample was placed in the beam for 1 day. The rest of the beam time was used to measure radioactive γ sources for energy calibration, and background measurements and tests to define the 233 U windows required during the data taking. The NEUANCE detector placed inside the DANCE cavity is shown.