Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

The 'CommTech' Methodology: A Demand-Driven Approach to Efficient, Productive and Measurable Technology Transfer

Market research sources were used to initially gather primary technological problems and needs data from non-aerospace companies in targeted industry sectors. The company-supplied information served as input data to activate or start-up an internal, phased match-making process. This process was based on technical-level relationship exploration followed by business-level agreement negotiations, and culminated with project management and execution. Space Act Agreements represented near-term outputs. Company product or process commercialization derived from Lewis support and measurable economic effects represented far-term outputs.

Horsham, Gray A. P.↗

A Compendium of Wind Statistics and Models for the NASA Space Shuttle and Other Aerospace Vehicle Programs

The wind profile with all of its variations with respect to altitude has been, is now, and will continue to be important for aerospace vehicle design and operations. Wind profile databases and models are used for the vehicle ascent flight design for structural wind loading, flight control systems, performance analysis, and launch operations. This report presents the evolution of wind statistics and wind models from the empirical scalar wind profile model established for the Saturn Program through the development of the vector wind profile model used for the Space Shuttle design to the variations of this wind modeling concept for the X-33 program. Because wind is a vector quantity, the vector wind models use the rigorous mathematical probability properties of the multivariate normal probability distribution. When the vehicle ascent steering commands (ascent guidance) are wind biased to the wind profile measured on the day-of-launch, ascent structural wind loads are reduced and launch probability is increased. This wind load alleviation technique is recommended in the initial phase of vehicle development. The vehicle must fly through the largest load allowable versus altitude to achieve its mission. The Gumbel extreme value probability distribution is used to obtain the probability of exceeding (or not exceeding) the load allowable. The time conditional probability function is derived from the Gumbel bivariate extreme value distribution. This time conditional function is used for calculation of wind loads persistence increments using 3.5-hour Jimsphere wind pairs. These increments are used to protect the commit-to-launch decision. Other topics presented include the Shuttle Shuttle load-response to smoothed wind profiles, a new gust model, and advancements in wind profile measuring systems. From the lessons learned and knowledge gained from past vehicle programs, the development of future launch vehicles can be accelerated. However, new vehicle programs by their very nature will require specialized support for new databases and analyses for wind, atmospheric parameters (pressure, temperature, and density versus altitude), and weather. It is for this reason that project managers are encouraged to collaborate with natural environment specialists early in the conceptual design phase. Such action will give the lead time necessary to meet the natural environment design and operational requirements, and thus, reduce development costs.

Smith, O. E.↗

Requirement Metrics for Risk Identification

The Software Assurance Technology Center (SATC) is part of the Office of Mission Assurance of the Goddard Space Flight Center (GSFC). The SATC's mission is to assist National Aeronautics and Space Administration (NASA) projects to improve the quality of software which they acquire or develop. The SATC's efforts are currently focused on the development and use of metric methodologies and tools that identify and assess risks associated with software performance and scheduled delivery. This starts at the requirements phase, where the SATC, in conjunction with software projects at GSFC and other NASA centers is working to identify tools and metric methodologies to assist project managers in identifying and mitigating risks. This paper discusses requirement metrics currently being used at NASA in a collaborative effort between the SATC and the Quality Assurance Office at GSFC to utilize the information available through the application of requirements management tools.

Hammer, Theodore↗

Discover Earth

Discover Earth is a NASA-sponsored project for teachers of grades 5-12, designed to: (1) enhance understanding of the Earth as an integrated system; (2) enhance the interdisciplinary approach to science instruction; and (3) provide classroom materials that focus on those goals. Discover Earth is conducted by the Institute for Global Environmental Strategies in collaboration with Dr. Eric Barron, Director, Earth System Science Center, The Pennsylvania State University; and Dr. Robert Hudson, Chair, the Department of Meteorology, University of Maryland at College Park. The enclosed materials: (1) represent only part of the Discover Earth materials; (2) were developed by classroom teachers who are participating in the Discover Earth project; (3) utilize an investigative approach and on-line data; and (4) can be effectively adjusted to classrooms with greater/without technology access. The Discover Earth classroom materials focus on the Earth system and key issues of global climate change including topics such as the greenhouse effect, clouds and Earth's radiation balance, surface hydrology and land cover, and volcanoes and climate change. All the materials developed to date are available on line at (http://www.strategies.org) You are encouraged to submit comments and recommendations about these materials to the Discover Earth project manager, contact information is listed below. You are welcome to duplicate all these materials.

Steele, Colleen↗

Vortex Wake Turbulence: Flight Tests Conducted During 1970

A flight test program designed to obtain data on the characteristics of wing-tip vortices generated by large jet aircraft was initiated on 12 February 1970. The objective was to update the interim air traffic separation standards issued on 21 January 1970 restricting the airspace behind the B-747 and C-5A aircraft 60 deg either side and 2,000 feet below to a distance of 10 miles. The program involved flight tests at three different locations, which were conducted simultaneously. (1) At the Edwards Air Force Base test range, a NASA CV-990 and F-104 probed the vortices of a C-5A. This supplemented previous flight tests in U-3A and F-104 behind a B-52 and C-5A. (2) At Seattle, the Boeing Company probed the vortices of a B-747 and a B-707-300 with a B-737 and F-86. In addition, approach, landing, takeoff, and crossing runway tests were conducted with a B-737 trailing a B-747. Immediately following the Edwards tests, the NASA CV-990 proceeded to Seattle and engaged in probing flights behind the same B-747 and B-707-300. (3) At Idaho Falls, Idaho, FAA personnel, utilizing the Atomic Energy Commission and Environmental Science Services Administration facilities and a 200 ft, instrumented tower, conducted 114 flights past the tower. The aircraft were positioned to permit their vortices to descend into the air flow sensors and smoke generated from various levels on the tower. This permitted obtaining measurements and photography of the vortex core diameters, tangential velocities and related characteristics. Immediately following this test phase, analysis of the interrelated data was completed by the project managers representing NASA, Boeing and FAA and a Compilation of Work Papers was issued on 30 April 1970. These data were the basis of a revised General Notice issued on 26 February 1970 which, in essence, modified the restricted airspace to five miles behind heavy jets in the 300,000 lb. gross takeoff weight category.

Source record↗

The Commtech Methodology: A Demand-Driven Approach to Efficient, Productive, and Measurable Technology Transfer and Commercialization

This paper presents a comprehensive review and assessment of a demonstration technology transfer and commercialization prouram called "CommTech". The pro-ram was conceived and initiated in early to mid-fiscal year 1995, and extended roughly three years into the future. Market research sources were used to initially gather primary technological problems and needs data from non-aerospace companies in three targeted industry sectors: environmental, surface transportation, and bioengineering. Company-supplied information served as input data to activate or start-up an internal, phased matchmaking process. This process was based on technical-level relationship exploration followed by business-level agreement negotiations. and culminated with project management and execution. Space Act Agreements represented near-term outputs. Company product or process commercialization derived from NASA Glenn support and measurable economic effects represented far-term outputs.

Horsham, Gary A. P.↗

White Light Stray Light Test of the SOHO UVCS

During the late stages of the integration phase of the Ultraviolet Coronagraph Spectrometer (UVCS) instrument for the Solar and Heliospheric Observatory (SOHO) at MATRA-Marconi in Toulouse, France, SOHO Project management at Goddard Space Flight Center (GSFC) became concerned that the elaborate stray light rejection system for the instrument had not been tested and might possibly be misaligned such that the instrument could not deliver promised scientific returns. A white light stray light test, which would place an upper bound on the value of UVCS's stray light rejection capability, was commissioned, conceived, and carried out. This upper bound value would be indicative of the weakest coronal features the spectrometer would be capable of discerning. The test was rapidly developed at GSFC in coordination with science team members from Harvard-Smithsonian Center for Astrophysics (CFA) and was carried out at MATRA in late February 1995. The outcome of this test helped to justify similar, much desired tests with visible and far ultraviolet light at CFA in a facility specifically designed to perform such testing.

Gardner, L. N.↗

Spacecraft Software Maintenance: An Effective Approach to Reducing Costs and Increasing Science Return

Flight software is a mission critical element of spacecraft functionality and performance. When ground operations personnel interface to a spacecraft, they are typically dealing almost entirely with the capabilities of onboard software. This software, even more than critical ground/flight communications systems, is expected to perform perfectly during all phases of spacecraft life. Due to the fact that it can be reprogrammed on-orbit to accommodate degradations or failures in flight hardware, new insights into spacecraft characteristics, new control options which permit enhanced science options, etc., the on- orbit flight software maintenance team is usually significantly responsible for the long term success of a science mission. Failure of flight software to perform as needed can result in very expensive operations work-around costs and lost science opportunities. There are three basic approaches to maintaining spacecraft software--namely using the original developers, using the mission operations personnel, or assembling a center of excellence for multi-spacecraft software maintenance. Not planning properly for flight software maintenance can lead to unnecessarily high on-orbit costs and/or unacceptably long delays, or errors, in patch installations. A common approach for flight software maintenance is to access the original development staff. The argument for utilizing the development staff is that the people who developed the software will be the best people to modify the software on-orbit. However, it can quickly becomes a challenge to obtain the services of these key people. They may no longer be available to the organization. They may have a more urgent job to perform, quite likely on another project under different project management. If they havn't worked on the software for a long time, they may need precious time for refamiliarization to the software, testbeds and tools. Further, a lack of insight into issues related to flight software in its on-orbit environment, may find the developer unprepared for the challenges. The second approach is to train a member of the flight operations team to maintain the spacecraft software. This can prove to be a costly and inflexible solution. The person assigned to this duty may not have enough work to do during a problem free period and may have too much to do when a problem arises. If the person is a talented software engineer, he/she may not enjoy the limited software opportunities available in this position; and may eventually leave for newer technology computer science opportunities. Training replacement flight software personnel can be a difficult and lengthy process. The third approach is to assemble a center of excellence for on-orbit spacecraft software maintenance. Personnel in this specialty center can be managed to support flight software of multiple missions at once. The variety of challenges among a set of on-orbit missions, can result in a dedicated, talented staff which is fully trained and available to support each mission's needs. Such staff are not software developers but are rather spacecraft software systems engineers. The cost to any one mission is extremely low because the software staff works and charges, minimally on missions with no current operations issues; and their professional insight into on-orbit software troubleshooting and maintenance methods ensures low risk, effective and minimal-cost solutions to on-orbit issues.

Shell, Elaine M.↗

Studies for the Loss of Atomic and Molecular Species from IO

The general objective of this project has been to advance our theoretical understanding of lo's atmosphere and how various atomic and molecular species are lost from this atmosphere and are distributed in the circumplanetary environment of Jupiter. This grant has provided support for the activities of Dr. Michael Combi at the University of Michigan to serve as a small part in collaboration with a larger project awarded to Atmospheric & Environmental Research, Inc., with primary principal investigator Dr. William H. Smyth. Dr. Combi is the Principal Investigator and Project Manager for the Michigan grant NAG5-6187. This Michigan grant has provided for a continuation of a collaboration between Drs. Smyth and Combi in related efforts beginning in 1981, and with the object to develop and apply sophisticated theoretical models to interpret and to relate a number of new and exciting observations for the atmospheric gases of the satellite. The ability to interpret and then to relate through the theoretical fabric a number of these otherwise independent observations are a central strength of this program. This comprehensive approach provides a collective power, extracting more from the sum of the parts and seeing beyond various limitations that are inherent in any one observation. Although the approach is designed to unify, the program is divided into well-defined studies for the likely dominant atmospheric gases involving species of the SO2 family (SO2, SO, O2, S and O) and for the trace atmospheric gas atomic sodium and a likely escaping molecular ion NaX(+) (where Na(X) is the atmospheric molecule and X represents one or more atoms).Attachments: IO's sodium corona and spatially cloud: a consistent flux speed distribution. and Io's plasma environment during the Galileo flyby: global three-dimensional MHD modeling with adaptive mesh refinement.

Combi, Michael R.↗

Lightning Protection Guidelines for Aerospace Vehicles

This technical memorandum provides lightning protection engineering guidelines and technical procedures used by the George C. Marshall Space Flight Center (MSFC) Electromagnetics and Aerospace Environments Branch for aerospace vehicles. The overviews illustrate the technical support available to project managers, chief engineers, and design engineers to ensure that aerospace vehicles managed by MSFC are adequately protected from direct and indirect effects of lightning. Generic descriptions of the lightning environment and vehicle protection technical processes are presented. More specific aerospace vehicle requirements for lightning protection design, performance, and interface characteristics are available upon request to the MSFC Electromagnetics and Aerospace Environments Branch, mail code EL23.

Goodloe, C. C.↗

Galileo Science Writers' Briefing

This NASA Kennedy video production presents Part 1 of a press conference held at JPL on August 8, 1989. The briefing in its entirety covers the Galileo Project's mission design from launch to completion in 1997 and is moderated by JPL Public Information Mgr. Robert Macmillan. Part 1 of the 3 part video series includes presentations by Richard J. Spehalski (Galileo Project Manager) and Clayne M. Yeates (Acting Science Mission Design Manager). Mr. Spehalski's presentation includes actual footage of spacecraft preparations at Kennedy Space Center and slides of mission timelines. Dr. Yeates discusses the Galileo mission in chronological order and includes slides of the interplanetary trajectory, encounter geometry, propellant margins vs. launch date, and planned earth images.

Source record↗

STS-26 Preflight Press Briefing: Flight Crew and TDRS

This NASA KSC video release presents part of a press conference held prior to Discovery flight STS-26, the first shuttle mission flown following the 51-L Challenger accident. The first portion of the video presents the 5 member flight crew, (Frederick H. Hauck, Commander, Richard O. Covey, Pilot, John M. Lounge, Mission Specialist, George D. Nelson, Mission Specialist, and David C. Hilmers, Mission Specialist) answering questions posed by scientific journalists. Inquiries are made regarding the approximately 250 changes implemented on the orbiter and boosters, failures that occurred during 51-L, astronaut attitudes about flying the first mission since the Challenger accident, and the issue of range safety. The second part of the video includes viewgraph presentations given by Dr. Dale W. Harris (TDRS Project Manager, Goddard Space Flight Center(GSFC)) and Gary A. Morse (Network Director, GSFC) that discuss the primary payload, the NASA Tracking and Data Relay Satellite-3 (TDRS-3) that is attached to an Inertial Upper Stage (IUS), and is the second TDRS deployed.

Source record↗

HELIOS Critical Design Review: Quality Assurance

The following is an account of the activities of the Quality Assurance (QA) department of the project management office highlighting some of the ways in which it controls QA of the subcontractors on one hand and reports on Quality to GfW (Gesellschaft fur Weltraumforschung) on the other hand. The basic document prepared by MBB (Messerschmitt-Bolkow-Blohm) for QA activities is 1. The QA plan based on GfW 002. The QA department is responsible moreover for monitoring and making decisions about the quality of parts and materials and the governing document for this activity is 2. The Parts and Materials Control Plan based on GfW 001 - the reliability program provisions, as well as GfW 002. A brief survey of the contents of the QA Plan is shown. It should be noted that QA activity dealing with parts procurement is partially covered in a separate presentation entitled "Hi-Rel Parts". Supplementary quality documents are shown.

Benoehr, H. C.↗

X-34 Captive Carry & Seunghee Lee Interview

Live footage shows the rollout of the aircraft carrying the X-34. Also shown are the taxing of the aircraft and takeoff. The NASA Dryden X-34 Project Manager is also shown during an interview.

Source record↗

Enhancement of the Probabilistic CEramic Matrix Composite ANalyzer (PCEMCAN) Computer Code

This report represents a final technical report for Order No. C-78019-J entitled "Enhancement of the Probabilistic Ceramic Matrix Composite Analyzer (PCEMCAN) Computer Code." The scope of the enhancement relates to including the probabilistic evaluation of the D-Matrix terms in MAT2 and MAT9 material properties card (available in CEMCAN code) for the MSC/NASTRAN. Technical activities performed during the time period of June 1, 1999 through September 3, 1999 have been summarized, and the final version of the enhanced PCEMCAN code and revisions to the User's Manual is delivered along with. Discussions related to the performed activities were made to the NASA Project Manager during the performance period. The enhanced capabilities have been demonstrated using sample problems.

Shah, Ashwin↗

X-33, X-34, X-37 Press Conference (Tape 2)

Live footage shows Project Managers Susan Turner, MSFC and David Manley, Boeing Co. participating in the X-37 Briefing. NASA's Public Affairs June Malone introduced these panelists who went on to discuss the vehicle and its secondary payload. Manley mentions the X-37 capabilities, main propulsion system, its lithium iron batteries, hot control surfaces, and its fly by wire system. Turner mentions the on-board operations, the deployment of the solar arrays, and the autonomous navigation and landing system. Also included is an animation of the X-37 vehicle during flight and the secondary payload release into orbit.

Source record↗

ATLAS SOHO Presentation, SAEF 2

Live footage of the Solar and Heliospheric Observatory (SOHO) Spacecraft located at the Spacecraft Assembly and Encapsulation Facility (SAEF 2) is presented. A representative from the European Space Agency (ESA) SOHO project, and Kenneth Sizemore, Project Manager Goddard Space Flight Center, discuss the objectives of the SOHO mission, which are to provide an understanding of how the sun works and also its interaction with the Earth's environment. SOHO will be positioned between the sun and the Earth and will give the scientist an unobstructed view of the Sun for two years. SOHO will be positioned along with Atlas IIAS which is an Atlas Centaur launch vehicle featuring two solid rocket boosters. Launch is set for November 1995.

Source record↗

Mars Observer Press Conference

Footage shows Bob MacMillin, NASA's Public Information Office, as he introduces the Mars Observer Project Manager, Glen Cunningham. Glen is shown addressing the current status of the Mars Observer communication system, the inability of NASA to establish contact, and the action that is currently being taken to establish contact with the spacecraft. Glen is also seen answering questions from both the audience as well as other NASA Centers.

Source record↗