Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

The NASA Human Space Flight Supply Chain, Current and Future

The current NASA Human Space Flight transportation system, the Space Shuttle, is scheduled for final flight in 2010. The Exploration initiative will create a new capability with a combination of existing systems and new flight and ground elements. To fully understand and act on the implications of such change it is necessary to understand what, how, when and where such changes occur and more importantly, how all these interact. This paper presents Human Space Flight, with an emphasis on KSC Launch and Landing, as a Supply Chain of both information and materials. A supply chain methodology for understanding the flow of information and materials is presented. Further, modeling and simulation projects funded by the Exploration initiative to understand the NASA Exploration Supply Chain are explained. Key concepts and their purpose, including the Enterprise, Locations, Physical and Organizational Functional Units, Products, and Resources, are explained. It is shown that the art, science and perspective of Supply Chain Management is not only applicable to such a government & contractor operation, it is also an invaluable approach for understanding, focusing improvement and growth. It is shown that such commercial practice applies to Human Space Flight and is invaluable towards one day creating routine, affordable access to and from space.

supply chain managemen↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-T-152: Building An Ultrafast, Earthquake Proof Treatment Planning System

Purpose: Situated 20 miles from 5 major fault lines in California’s Bay Area, Stanford Universityhas a critical need for IT infrastructure planning to handle the high probability devastating earthquakes. Recently, a multi-million dollar project has been underway to overhaul Stanford’s radiation oncology information systems, maximizing planning system performance and providing true disaster recovery abilities. An overview of the project will be given with particular focus on lessons learned throughout the build. Methods: In this implementation, two isolated external datacenters provide geographical redundancy to Stanford’s main campus datacenter. Real-time mirroring is made of all data stored to our serial attached network (SAN) storage. In each datacenter, hardware/software virtualization was heavily implemented to maximize server efficiency and provide a robust mechanism to seamlessly migrate users in the event of an earthquake. System performance is routinely assessed through the use of virtualized data robots, able to log in to the system at scheduled times, perform routine planning tasks and report timing results to a performance dashboard. A substantial dose calculation framework (608 CPU cores) has been constructed as part of the implementation. Results: Migration to a virtualized server environment with a high performance SAN has resulted in up to a 45% speed up of common treatment planning tasks. Switching to a 608 core DCF has resulted in a 280% speed increase in dose calculations. Server tuning was found to further improved read/write performance by 20%. Disaster recovery tests are carried out quarterly and, although successful, remain time consuming to perform and verify functionality. Conclusion: Achieving true disaster recovery capabilities is possible through server virtualization, support from skilled IT staff and leadership. Substantial performance improvements are also achievable through careful tuning of server resources and disk read/write operations. Developing a streamlined method to comprehensively test failover is a key requirement to the system’s success.

60 APPLIED LIFE SCIENCES↗

Comparison of Ground-Penetrating Radar and Low-Frequency Electromagnetic Sounding for Detection and Characterization of Groundwater on Mars

Two orbital, ground-penetrating radars, MARSIS and SHARAD, are scheduled for Mars flight, with detection of groundwater a high priority. While these radars will doubtlessly provide significant new information on the subsurface of Mars, thin films of adsorbed water in the cryosphere will strongly attenuate radar signals and prevent characterization of any true aquifers, if present. Scattering from 10-m scale layering or wavelength-size regolith heterogeneities will also degrade radar performance. Dielectric contrasts are sufficiently small for low-porosity, deep aquifers that groundwater cannot be reliably identified. In contrast, low-frequency (mHz-kHz) soundings are ideally suited to groundwater detection due to their great depths of penetration and the high electrical conductivity (compared to cold, dry rock) of groundwater. A variety of low-frequency methods span likely ranges of mass, volume, and power resources, but all require acquisition at or near the planetary surface. Therefore the current generation of orbital radars will provide useful global reconnaissance for subsequent targeted exploration at low frequency. Introduction: Electromagnetic (EM) methods

R E Grimm↗

Immediate Dismantling of a Large Fleet of LWR NPPs: Consequences for Spent Fuel and Waste Management - 16027

The experience feedback shows that the complete dismantling of one Light Water Reactor (LWR) unit is an activity now globally well under control (reactor pressure vessel and its internals removal and cutting included). However some specific industrial difficulties may arise in view of the dismantling of numerous LWR units simultaneously. Indeed more than 300 LWR units are currently operated worldwide, which have been commissioned these last 50 years. So in some countries, many units may be permanently shut down over a period of few years in the next decades. Such a situation addresses the issue of the overall management of large quantities of spent nuclear fuel (SNF) and decommissioning waste for the concerned units. For example, in France, the legislative and regulatory framework for the nuclear facilities favors their dismantling 'as soon as possible' after their permanent shutdown which implies as well to limit the duration of the transition period from operation to decommissioning. Furthermore 58 LWR units have been commissioned between 1977 and 1999 in France - on average more than 2 units per year. In this context, the operator (Electricite de France - EDF) plans to remove quickly the SNF then to perform dismantling actions immediately after the permanent shutdown of the LWR units. One issue is to remove the SNF from all the relevant units, even if this removal is simultaneous in many units (permanently shut down or still under operation). Similar issue has to be taken into account regarding the management of the radioactive waste (RW) produced by the dismantling and clean-up actions, notably the RW that cannot be disposed of in a near surface repository. One method followed by the French technical support organization (Institut de Radioprotection et de Surete Nucleaire - IRSN) to analyze these issues is the use of estimates of flows of SNF and RW. These estimates are based notably on a phasing-scenario and a planning template defined for the decommissioning of the units of one nuclear power plant (NPP) and coupled to an overall schedule for phase out all the units of the fleet. The estimates relative to the next decades can be compared to the current experience feedback of flows of SNF and RW for units under operation, in order to identify risks when facing decommissioning. The risks highlighted are driven by key parameters (as duration of the main dismantling actions) of the estimates which can be adapted to minimize their impact. On this basis, it is possible to identify the key-factors to dismantle each unit of NPPs and phase out the fleet regarding SNF and RW management. It is noteworthy that this work needs to be done in any case upstream the studies and the implementation of dismantling actions. Finally it can be underlined that another issue is the human resources (staff, skills and knowledge) necessary to perform all the decommissioning actions, but this aspect is not addressed in the present paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lunar Regenerative Fuel Cell (RFC) Reliability Testing for Assured Mission Success

NASA's Constellation program has selected the closed cycle hydrogen oxygen Polymer Electrolyte Membrane (PEM) Regenerative Fuel Cell (RFC) as its baseline solar energy storage system for the lunar outpost and manned rover vehicles. Since the outpost and manned rovers are "human-rated," these energy storage systems will have to be of proven reliability exceeding 99 percent over the length of the mission. Because of the low (TRL=5) development state of the closed cycle hydrogen oxygen PEM RFC at present, and because there is no equivalent technology base in the commercial sector from which to draw or infer reliability information from, NASA will have to spend significant resources developing this technology from TRL 5 to TRL 9, and will have to embark upon an ambitious reliability development program to make this technology ready for a manned mission. Because NASA would be the first user of this new technology, NASA will likely have to bear all the costs associated with its development.When well-known reliability estimation techniques are applied to the hydrogen oxygen RFC to determine the amount of testing that will be required to assure RFC unit reliability over life of the mission, the analysis indicates the reliability testing phase by itself will take at least 2 yr, and could take up to 6 yr depending on the number of QA units that are built and tested and the individual unit reliability that is desired. The cost and schedule impacts of reliability development need to be considered in NASA's Exploration Technology Development Program (ETDP) plans, since life cycle testing to build meaningful reliability data is the only way to assure "return to the moon, this time to stay, then on to Mars" mission success.

Bents, David J.↗

Impact of Glen Canyon Generation Loss

Colorado River Basin hydropower generation has faced challenges due to droughts and ecological and social water requirements. Specifically, Glen Canyon hydropower generation fluctuates substantially with recent extreme weather trends. Further, the western grid evolves with higher wind and solar share, and Glen Canyon hydropower's contribution to grid flexibility services is essential. The Western Area Power Administration (WAPA) markets and schedules electricity production at GCD, and the loss of this power could have significant financial consequences for the WAPA Colorado River Storage Project's (CRSP) Office because it may need to purchase relatively large amounts of energy to serve its firm electrical obligations. In addition, GCD provides grid reliability services for the WAPA Colorado-Missouri (WACM) balancing authority (BA). Both WAPA and DOE's Water & Power Technology Office (WPTO) are interested in researching how these drier hydrological conditions will impact federal electrical energy production, the Western Electricity Coordinating Council (WECC) power grid, and the value of hydropower in the face of lower production. We study multiple hydrologic and power grid scenarios to understand the grid impacts of the loss of Glen Canyon generation. The study uses a production cost model, water resources planning models, water-centric grid models, and various data analytic techniques. The study progress presentation discusses the selection of probable CRSP' hydropower scenarios and power grid scenarios to understand the impacts of Glen Canyon generation, which includes technologies that compensate the Glen Canyon energy and ancillary services contributions, transmission availability, and energy local marginal prices at interested grid locations of WAPA operation.

droughts↗

Lunar RFC Reliability Testing for Assured Mission Success

NASA's Constellation program has selected the closed cycle hydrogen oxygen Polymer Electrolyte Membrane (PEM) regenerative Fuel Cell (RFC) as its baseline solar energy storage system for the lunar outpost and manned rover vehicles. Since the outpost and manned rovers are "human-rated", these energy storage systems will have to be of proven reliability exceeding 99 percent over the length of the mission. Because of the low (TRL=5) development state of the closed cycle hydrogen oxygen PEM RFC at present, and because there is no equivalent technology base in the commercial sector from which to draw or infer reliability information from, NASA will have to spend significant resources developing this technology from TRL 5 to TRL 9, and will have to embark upon an ambitious reliability development program to make this technology ready for a manned mission. Because NASA would be the first user of this new technology, NASA will likely have to bear all the costs associated with its development. When well-known reliability estimation techniques are applied to the hydrogen oxygen RFC to determine the amount of testing that will be required to assure RFC unit reliability over life of the mission, the analysis indicates the reliability testing phase by itself will take at least 2 yr, and could take up to 6 yr depending on the number of QA units that are built and tested and the individual unit reliability that is desired. The cost and schedule impacts of reliability development need to be considered in NASA's Exploration Technology Development Program (ETDP) plans, since life cycle testing to build meaningful reliability data is the only way to assure "return to the moon, this time to stay, then on to Mars" mission success.

Bents, David J.↗

Y-12 National Security Complex's Sustainable Recovery and Transformation - 12420

American Recovery and Reinvestment Act (ARRA) funds were used at the Y-12 National Security Complex (Y-12) to remove legacy materials from large contaminated excess facilities in order to prepare the facilities for demolition, demolish five excess buildings, and clean up sources of environmental contamination. The legacy materials and buildings presented many challenges and the potential hazards included depleted uranium and other radiological contaminants, lead, polychlorinated biphenyls, Freon, mold, mildew, asbestos, beryllium and mercury. Y-12 project teams have integrated sustainable waste management practices into each of the seven ARRA projects. The ARRA clean up efforts have resulted in the reduction of potential environmental, health, and safety risks posed by the excess facilities and sources of environmental contamination. Y-12's ARRA project teams focused on completing the activities in a sustainable, timely and safe manner. The site utilized a systematic material disposition evaluation process to ensure that materials were not automatically dis-positioned as waste. ARRA projects have recycled or reused over 1.3 million pounds of materials while preventing over 3 million vehicle miles traveled for waste disposal. Y-12 ARRA projects have worked over 2 million safe work hours without a lost time injury. The site has already begun to beneficially reuse land cleared by ARRA project activities to support sustainable transformation efforts. The Y-12 ARRA project activities have demonstrated that large complex projects can be completed sustainably and safely while maintaining an aggressive schedule. Through careful planning and execution, ARRA projects at the site have sustainably reduced the potential environmental, health, and safety risks posed to site employees and the community by the excess facilities and sources of environmental contamination. Y-12's systematic material disposition process ensured that materials were not automatically assumed to be wastes and facilitated the evaluation of all unneeded materials for reuse or recycling. The site's pervasive pollution prevention culture is reflected in the recycling or reuse of over 1.3 million pounds of materials by the ARRA project teams. While the disposal of a large volume of ARRA wastes could not be avoided, the projects were able to reduce the local and national impacts of waste transportation and disposal through careful planning and efficient execution. The site has conserved natural resources through the preservation and beneficial reuse of materials and land cleared by ARRA activities. Y-12 has taken steps to preserve its history as the site undergoes a sustainable and safe transformation for the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Patterns of Practice of Palliative Radiotherapy in Africa, Part 1: Bone and Brain Metastases

Purpose: To provide data on the pattern of practice of palliative radiotherapy (RT) on the African continent. Methods and Materials: A questionnaire was distributed to participants in a regional training course of the International Atomic Energy Agency in palliative cancer care and sent by e-mail to other institutions in Africa. Requested information included both infrastructure and human resources available and the pattern of RT practice for metastatic and locally advanced cancers. Results: Of 35 centers contacted, 24 (68%) completed the questionnaire. Although RT is used by most centers for most metastatic cancers, liver and lung metastases are treated with chemotherapy. Of 23 centers, 14 (61%) had a single RT regimen as an institutional policy for treating painful bone metastases, but only 5 centers (23%) of 23 used 8 Gy in 1 fraction. Brain metastases were being treated by RT to the whole brain to 30 Gy in 10 fractions, either exclusively (n = 13, 56%) or in addition to the use of 20 Gy in 5 fractions (n = 3, 14%). Conclusion: Radiotherapy is a major component of treatment of cancer patients in African countries. There is consensus among few centers for treatment schedules for almost all sites regarding time and dose-fractionation characteristics of RT regimens used and/or indications for the use of RT in this setting.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Probabilistic Zonal Reserve Requirements for Improved Energy Deliverability with Wind Power

In power systems with high penetration of renewable energy resources, uncertainty and variability of these stochastic resources introduce additional challenges for the operation of power systems. To improve the power system's reliability in the face of uncertainty, reserves are required as additional generation capacity to rebalance the power system following random disturbances. However, reserve deliverability is not guaranteed, because it may encounter potential transmission line congestion. Zonal reserve requirements can address this issue, but operators lack efficient ways to allocate reserves to zones while accounting for wind power forecast uncertainty. Herein we propose a methodology for probabilistic zonal reserve requirements to address wind power forecast uncertainties. This method estimates the probability distribution of line flows based on the system generation margin and injection shift factor. This estimate is then used to construct pre-defined and post-zonal reserve requirements. Case studies demonstrate that the proposed method efficiently schedules energy and reserves to balance energy and manage deliverability with wind power forecast uncertainty.We also discuss operational implications of the proposed method.

17 WIND ENERGY↗

Fourth Annual Report: 2007 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation

King County proposes to build a new sewer outfall discharging to Puget Sound near Point Wells, Washington. Construction is scheduled for 2008. The Point Wells site was selected to minimize effects on the nearshore marine environment, but unavoidable impacts to eelgrass (Zostera marina) beds are anticipated during construction. To mitigate these impacts and prepare for post-construction restoration, King County began implementing a multiyear eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions. Major program elements related to eelgrass are (a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over 5 years prior to construction, (b) eelgrass transplanting, including harvesting, offsite propagating, and stockpiling of local plants for post-construction planting, and (c) post-construction planting and subsequent monitoring. The program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2006). This report describes calendar year 2007 pre-construction activities conducted by Pacific Northwest National Laboratory (PNNL) for King County. Activities included continued propagation of eelgrass shoots at the PNNL Marine Sciences Laboratory (MSL) in Sequim, Washington, and monitoring of the experimental harvest plots in the marine outfall corridor area to evaluate recovery rates relative to harvest rates. In addition, 490 eelgrass shoots were also harvested from the Marine Outfall Corridor in July 2007 to supplement the plants in the propagation tank at the MSL, bringing the total number of shoots to 1464. Eelgrass densities were monitored in four of five experimental harvest plots established in the Marine Outfall Corridor. Changes in eelgrass density were evaluated in year-to-year comparisons with initial harvest rates. A net increase in eelgrass density from 2004 post-harvest to 2007 was observed in all plots, despite density decreases observed in 2006 in all plots and at most harvest rates. Eelgrass densities within individual subplots were highly variable from year to year, and the change in density in any interannual period was not related to initial 2004 harvest rate. Harvest rates of neighboring subplots did not appear to affect subplot eelgrass density (Woodruff et al. 2007). Three years post-harvest, eelgrass shoot densities were not significantly different from pre-harvest shoot densities at any harvest level. Additional plans are being discussed with King County to harvest all eelgrass from the construction corridor and hold in the propagation tanks at the MSL for post-construction planting. Under this plan, plants that would have been lost to construction will be held offsite until construction is completed. This strategy reduces and possibly eliminates the need to harvest eelgrass from donor beds located south of the construction area, allowing them to remain undisturbed. However, if eelgrass is harvested from donor beds, the monitoring of eelgrass growth at different harvest rates should help determine an optimum harvest rate that supports rapid recovery of donor eelgrass beds.

54 ENVIRONMENTAL SCIENCES↗

The Lunar Regolith Terrain (LRT) Field: A New Lunar Surface Planetary Analog Facility at NASA Marshall Space Flight Center (MSFC)

Introduction: NASA is moving toward a new age of exploration and resource utilization of the lunar surface. Challenges related to exploration, resource utilization, and construction at the Lunar South Pole will require advanced technology and well-designed mission concepts and operations. NASA Marshall Space Flight Center (MSFC) has added new capabilities to support surface mobility and construction activities to meet industry, academia, and NASA research and development goals for lunar applications. The Lunar Regolith Terrain (LRT) field is a new, large-area, lunar regolith simulant planetary analog testing ground for users interested in surface mobility and lunar construction activities. The LRT complements NASA MSFC’s other lunar environment testing facilities such as the Lunar Surface Simulator (V20 dirty vacuum chamber), the Lunar Environment Testing System (LETS), among many others. Lunar Regolith Terrain (LTR) Description: The Lunar Regolith Terrain field is an outdoor planetary analog environment facility located on base at MSFC. The lunar regolith simulant is JSC-1A feedstock material (volcanic cinder sand sourced from Meriam Crater, Flagstaff, AZ). The field contains more than 500 tons of lunar regolith simulant confined within a 125 ft x 125 ft (38 m x 38 m) area. The field is placed ~ 50% over paved parking lot and ~ 50% over a natural ground. Currently, the depth of regolith ranges between ~ 5 in - ~ 4 ft (~ 13cm – 1.2m) but can be modified to suit user needs. The lunar regolith simulant that makes up the field has representative geotechnical, geochemical, and optical properties of lunar mare basalt. An area within the LRT of lunar highlands terrain simulant is planned. Additional Features of the LRT: The LRT was designed to allow rapid modification of the terrain’s topography obstacles in the field. The terrain can be reshaped to suit specific testing requirements that may require flat expanses, steep hills, or heavily cratered and rocky landscapes. Large rocky obstacles in Fig. 1 are artificial landscape boulders (faux-rocks) that can be easily placed by users or removed entirely. Areas of the field also contain buried fiducials, large sheets, bar stock, and pipes of various composition and dimensions to allow for possible ground penetrating radar and shallow seismic studies. Rapid modification capabilities will also allow for burial of additional user-specific materials to enable in-situ resource utilization detection (e.g., burial of hydrogen sources for neutron detection or other materials). The field is also equipped with on-site office space with an air-conditioned and heated trailer with 120/240V power and lighting. The site has Wi-Fi and Cellular signal coverage. Direct radio frequency communication with the Huntsville Operations Support Center (HOSC) is in development. Additional on-site workspace and secure equipment storage is available in adjacent buildings. Accessibility to the field is straightforward with on-site parking and access for delivery of instruments, payloads, and additional equipment. Community Availability: The LRTF provides an accessible planetary analog surface environment for surface mobility testing, autonomous roving operations, developing advanced navigation techniques and operations development. Interested parties can contact the abstract authors for additional details, tours, and scheduling.

Lunar Regolith↗

Marshall Space Flight Center: Lunar Regolith Terrain (LRT)

Introduction: NASA is moving toward a new age of exploration and resource utilization of the lunar surface. Challenges related to exploration, resource utilization, and construction at the Lunar South Pole will require advanced technology and well-designed mission concepts and operations. NASA Marshall Space Flight Center (MSFC) has added new capabilities to support surface mobility and construction activities to meet industry, academia, and NASA research and development goals for lunar applications. The Lunar Regolith Terrain (LRT) field is a new, large-area, lunar regolith simulant planetary analog testing ground for users interested in surface mobility and lunar construction activities. The LRT complements NASA MSFC’s other lunar environment testing facilities such as the Lunar Surface Simulator (V20 dirty vacuum chamber), the Lunar Environment Testing System (LETS), among many others. Lunar Regolith Terrain (LTR) Description: The Lunar Regolith Terrain field is an outdoor planetary analog environment facility located on base at MSFC. The lunar regolith simulant is JSC-1A feedstock material (volcanic cinder sand sourced from Meriam Crater, Flagstaff, AZ). The field contains more than 500 tons of lunar regolith simulant confined within a 125 ft x 125 ft (38 m x 38 m) area. The field is placed ~ 50% over paved parking lot and ~ 50% over a natural ground. Currently, the depth of regolith ranges between ~ 5 in - ~ 4 ft (~ 13cm – 1.2m) but can be modified to suit user needs. The lunar regolith simulant that makes up the field has representative geotechnical, geochemical, and optical properties of lunar mare basalt. An area within the LRT of lunar highlands terrain simulant is planned. Additional Features of the LRT: The LRT was designed to allow rapid modification of the terrain’s topography obstacles in the field. The terrain can be reshaped to suit specific testing requirements that may require flat expanses, steep hills, or heavily cratered and rocky landscapes. Large rocky obstacles in Fig. 1 are artificial landscape boulders (faux-rocks) that can be easily placed by users or removed entirely. Areas of the field also contain buried fiducials, large sheets, bar stock, and pipes of various composition and dimensions to allow for possible ground penetrating radar and shallow seismic studies. Rapid modification capabilities will also allow for burial of additional user-specific materials to enable in-situ resource utilization detection (e.g., burial of hydrogen sources for neutron detection or other materials). The field is also equipped with on-site office space with an air-conditioned and heated trailer with 120/240V power and lighting. The site has Wi-Fi and Cellular signal coverage. Direct radio frequency communication with the Huntsville Operations Support Center (HOSC) is in development. Additional on-site workspace and secure equipment storage is available in adjacent buildings. Accessibility to the field is straightforward with on-site parking and access for delivery of instruments, payloads, and additional equipment. Community Availability: The LRTF provides an accessible planetary analog surface environment for surface mobility testing, autonomous roving operations, developing advanced navigation techniques and operations development. Interested parties can contact the abstract authors for additional details, tours, and scheduling.

Lunar Regolith↗

Marshall Space Flight Center: Lunar Regolith Terrain (LRT)

Introduction: NASA is moving toward a new age of exploration and resource utilization of the lunar surface. Challenges related to exploration, resource utilization, and construction at the Lunar South Pole will require advanced technology and well-designed mission concepts and operations. NASA Marshall Space Flight Center (MSFC) has added new capabilities to support surface mobility and construction activities to meet industry, academia, and NASA research and development goals for lunar applications. The Lunar Regolith Terrain (LRT) field is a new, large-area, lunar regolith simulant planetary analog testing ground for users interested in surface mobility and lunar construction activities. The LRT complements NASA MSFC’s other lunar environment testing facilities such as the Lunar Surface Simulator (V20 dirty vacuum chamber), the Lunar Environment Testing System (LETS), among many others. Lunar Regolith Terrain (LTR) Description: The Lunar Regolith Terrain field is an outdoor planetary analog environment facility located on base at MSFC. The lunar regolith simulant is JSC-1A feedstock material (volcanic cinder sand sourced from Meriam Crater, Flagstaff, AZ). The field contains more than 500 tons of lunar regolith simulant confined within a 125 ft x 125 ft (38 m x 38 m) area. The field is placed ~ 50% over paved parking lot and ~ 50% over a natural ground. Currently, the depth of regolith ranges between ~ 5 in - ~ 4 ft (~ 13cm – 1.2m) but can be modified to suit user needs. The lunar regolith simulant that makes up the field has representative geotechnical, geochemical, and optical properties of lunar mare basalt. An area within the LRT of lunar highlands terrain simulant is planned. Additional Features of the LRT: The LRT was designed to allow rapid modification of the terrain’s topography obstacles in the field. The terrain can be reshaped to suit specific testing requirements that may require flat expanses, steep hills, or heavily cratered and rocky landscapes. Large rocky obstacles in Fig. 1 are artificial landscape boulders (faux-rocks) that can be easily placed by users or removed entirely. Areas of the field also contain buried fiducials, large sheets, bar stock, and pipes of various composition and dimensions to allow for possible ground penetrating radar and shallow seismic studies. Rapid modification capabilities will also allow for burial of additional user-specific materials to enable in-situ resource utilization detection (e.g., burial of hydrogen sources for neutron detection or other materials). The field is also equipped with on-site office space with an air-conditioned and heated trailer with 120/240V power and lighting. The site has Wi-Fi and Cellular signal coverage. Direct radio frequency communication with the Huntsville Operations Support Center (HOSC) is in development. Additional on-site workspace and secure equipment storage is available in adjacent buildings. Accessibility to the field is straightforward with on-site parking and access for delivery of instruments, payloads, and additional equipment. Community Availability: The LRTF provides an accessible planetary analog surface environment for surface mobility testing, autonomous roving operations, developing advanced navigation techniques and operations development. Interested parties can contact the abstract authors for additional details, tours, and scheduling.

Lunar Regolith↗

The Lunar Explorer Instrument for Space Biology Applications (LEIA) Pre-Flight Tests: Mechanical Considerations​

The BioSensor payload on the upcoming LEIA platform aboard the CLPS (CP-22) lander will carry yeast to the Moon's south pole to study the effects of lunar radiation and gravity. From Earth, BioSensor will transport desiccated yeast within 16 fluidic cards, each containing 16 fluidic wells of 100 microliters volume. At the start of the experiment, these microbes will be autonomously rehydrated on the Moon, and optical absorbance measurements at three wavelengths will be performed across all 256 wells. Absorbance measurements in fluidic wells are susceptible to noise and artifacts due to bubble formation during well rehydration and microbial growth. BioSensor, as a biofluidics system, faces significant data anomalies caused by payload vibrations, particularly from the operation of the co-located PROSPECT’s ProSEED drill, to assess lunar resources by penetrating the subsurface. To evaluate the impact of drill vibrations, fully assembled and filled fluidic cards were subjected to sine sweep signals in the x, y, z planes, ranging from 5 - 2560 Hz at g-loads of 0.25 and 0.5, with on-board accelerometer for localized vibration measurement. Wells with various fill conditions, including partial fills with different bubble sizes and completely filled wells, were tested. Results indicated that small bubbles adhered to well walls at high frequencies but were dislodged at low frequencies, causing data anomalies. Medium and large bubbles exhibited higher interference with optical data due to lower surface tension and variable bubble surface flexion. Overall, it was found that irrespective of the fill type, low-frequency vibrations were most detrimental to optical readings. Understanding the drill schedule and correlating it with BioSensor timestamps will help identify periods when BioSensor data is unreliable, a crucial step for accurately interpreting the microbial response data and ensuring the validity of the BioSensor's scientific measurements on the lunar surface.

Chinmayee Govinda Raj↗

Instrumentation for Lunar Volatile Analysis

Understanding the available lunar resources is key to incorporating their availability into exploration architectures. Previous lunar missions have provided insight into the potential resources on the moon as an initial step enabling in-situ resource utilization (ISRU). Orbiting missions, such as Clementine and Lunar Prospector, have mapped the lunar polar region and found enhanced hydrogen signals on kilometer-scale resolution. The Lunar Crater Observation and Sensing Satellite (LCROSS) mission provided the first direct measurement of water ice in a permanently shadowed region. Future missions will provide ground truth data to measure and quantify lunar volatiles.One approach to exploration capitalizes on commercial partnerships for Class D risk aware missions. Partnerships with commercial partners enable rapid design cycles, leveraging the investment of the commercial industry in instrument development. Modified Commercial off the Shelf (COTS) hardware can be utilized to enhance capabilities in exploration missions. The hardware under development at the Kennedy Space Center for availability within the Commercial Lunar Payload Services opportunities capitalizes on modified COTS, enabling an aggressive delivery schedule and low-cost development. The modified hardware has been integrated and tested in a thermal vacuum environment, with final flight modifications currently in work. The use of a modified COTS instruments will be discussed for space applications.

Captain, J.↗

Lila: Optimal Dispatching in Probabilistic Temporal Networks using Monte Carlo Tree Search

Executing a Probabilistic Simple Temporal Network (PSTN) amounts at scheduling, i.e. \textit{dispatch}, a set of events under time uncertainty. This constitutes a NP-hard online optimization problem. The right execution time must be dynamically assigned to each event of the PSTN such that the temporal constraints are met, whereas activity durations are progressively observed as the execution unfolds. We propose a dispatching algorithm based on Monte Carlo Tree Search, called Lila, with the following characteristics: (i) it is an anytime algorithm, both offline and online, proven asymptotically optimal; (ii) it returns the current probability of success, either before or at any moment during operations; (iii) it handles any possible continuous or discrete, even non-parametric, probability distributions, as well as inter-dependencies between random variables, exogenous and endogenous uncertainty; and (iv) can be easily extended to handle probabilistic external events, PSTNs with resources, PSTNs with cutoff times and precondition chains, etc. Lila is universal in the sense that it can handle any dispatching protocol, simply by specifying it to the algorithm. It has the unlimited flexibility offered by the simulation paradigm, whilst it asymptotically converges to optimal decisions and/or robustness approximations.

Chien, Steve A.↗