Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Real-time flight test analysis and display techniques for the X-29A aircraft

The X-29A advanced technology demonstrator flight envelope expansion program and the subsequent flight research phase gave impetus to the development of several innovative real-time analysis and display techniques. These new techniques produced significant improvements in flight test productivity, flight research capabilities, and flight safety. These techniques include real-time measurement and display of in-flight structural loads, dynamic structural mode frequency and damping, flight control system dynamic stability and control response, aeroperformance drag polars, and aircraft specific excess power. Several of these analysis techniques also provided for direct comparisons of flight-measured results with analytical predictions. The aeroperformance technique was made possible by the concurrent development of a new simplified in-flight net thrust computation method. To achieve these levels of on-line flight test analysis, integration of ground and airborne systems was required. The capability of NASA Ames Research Center, Dryden Flight Research Facility's Western Aeronautical Test Range was a key factor to enable implementation of these methods.

Hicks, John W.↗

Evaluation of Contamination Inspection and Analysis Methods through Modeling System Performance

Contamination is usually identified as a risk on the risk register for sensitive space systems hardware. Despite detailed, time-consuming, and costly contamination control efforts during assembly, integration, and test of space systems, contaminants are still found during visual inspections of hardware. Improved methods are needed to gather information during systems integration to catch potential contamination issues earlier and manage contamination risks better. This research explores evaluation of contamination inspection and analysis methods to determine optical system sensitivity to minimum detectable molecular contamination levels based on IEST-STD-CC1246E non-volatile residue (NVR) cleanliness levels. Potential future degradation of the system is modeled given chosen modules representative of optical elements in an optical system, minimum detectable molecular contamination levels for a chosen inspection and analysis method, and determining the effect of contamination on the system. By modeling system performance based on when molecular contamination is detected during systems integration and at what cleanliness level, the decision maker can perform trades amongst different inspection and analysis methods and determine if a planned method is adequate to meet system requirements and manage contamination risk.

Seasly, Elaine↗

Applications of electron lenses: scraping of high-power beams, beam-beam compensation, and nonlinear optics

Electron lenses are pulsed, magnetically confined electron beams whose current-density profile is shaped to obtain the desired effect on the circulating beam. Electron lenses were used in the Fermilab Tevatron collider for bunch-by-bunch compensation of long-range beam-beam tune shifts, for removal of uncaptured particles in the abort gap, for preliminary experiments on head-on beam-beam compensation, and for the demonstration of halo scraping with hollow electron beams. Electron lenses for beam-beam compensation are being commissioned in the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory (BNL). Hollow electron beam collimation and halo control were studied as an option to complement the collimation system for the upgrades of the Large Hadron Collider (LHC) at CERN; a conceptual design was recently completed. Because of their electric charge and the absence of materials close to the proton beam, electron lenses may also provide an alternative to wires for long-range beam-beam compensation in LHC luminosity upgrade scenarios with small crossing angles. At Fermilab, we are planning to install an electron lens in the Integrable Optics Test Accelerator (IOTA, a 40-m ring for 150-MeV electrons) as one of the proof-of-principle implementations of nonlinear integrable optics to achieve large tune spreads and more stable beams without loss of dynamic aperture.

43 PARTICLE ACCELERATORS↗

Roadmap for IES Modeling and Simulation Activities

Since inception of the DOE-NE Integrated Energy Systems (IES) program, several program and modeling visions and roadmaps have been published. In 2017, the last modeling and simulation capability development plan was published. In 2020, a comprehensive roadmap for the DOE-NE Integrated Energy Systems program has been published. The current report is meant to update the 2017 modeling and simulation capability roadmap and complement the IES overall program roadmap published in 2020. The role of modeling and simulation within IES is to support the demonstration of new coupled integrated technologies along every step of the technology maturation from the strategic analysis of preferred system architecture to preliminary design, to laboratory testing, up to full commercial testing and integration. To achieve this role, modeling and simulation must be able to assess the technical performance and the economic viability of potential IES. Also, modeling and simulation must provide support for experimental evaluations, i.e., support component design and real time operations of experimental demonstration systems. Finally, modeling and simulation can help scale-up experimental systems to the final commercial systems. This report details the current state of the modeling and simulation efforts within IES for the above-mentioned areas, provides a gap analysis and proposes next steps for a time horizon over the next 4 to 5 years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of SSME test data reduction methods

Accurate prediction of hardware and flow characteristics within the Space Shuttle Main Engine (SSME) during transient and main-stage operation requires a significant integration of ground test data, flight experience, and computational models. The process of integrating SSME test measurements with physical model predictions is commonly referred to as data reduction. Uncertainties within both test measurements and simplified models of the SSME flow environment compound the data integration problem. The first objective of this effort was to establish an acceptability criterion for data reduction solutions. The second objective of this effort was to investigate the data reduction potential of the ROCETS (Rocket Engine Transient Simulation) simulation platform. A simplified ROCETS model of the SSME was obtained from the MSFC Performance Analysis Branch . This model was examined and tested for physical consistency. Two modules were constructed and added to the ROCETS library to independently check the mass and energy balances of selected engine subsystems including the low pressure fuel turbopump, the high pressure fuel turbopump, the low pressure oxidizer turbopump, the high pressure oxidizer turbopump, the fuel preburner, the oxidizer preburner, the main combustion chamber coolant circuit, and the nozzle coolant circuit. A sensitivity study was then conducted to determine the individual influences of forty-two hardware characteristics on fourteen high pressure region prediction variables as returned by the SSME ROCETS model.

Santi, L. Michael↗

James Webb Space Telescope Integrated Science Instrument Module Thermal Balance/Thermal Vacuum Test Configuration and Test Planning at NASA's Goddard Space Flight Center

The James Webb Space Telescope (JWST) is the next of the great observatories , scheduled to be launched in 2014. Three of the four science instruments are passively cooled to their operational temperature range of 36K to 40K, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. Thermal-vacuum testing of the flight science instruments at the Integrated Science Instrument Module (ISIM) element level will take place within a newly constructed shroud cooled by gaseous helium inside Goddard Space Flight Center s (GSFC) Space Environment Simulator (SES). The test enclosure surrounding the instruments during the integrated ISIM-level thermal balance testing is complex, and is designed to simulate as closely as possible the in-flight conductive and radiative thermal environment around the ISIM. Thermal control and measurement of parasitic sources of heat leak into the test volume is critical, as the dissipation plus known parasitics in the flight ISIM is approximately 454 mW, and additional parasitics attributed to the flight enclosure itself are nearly equal to this, resulting in the energy balance of the inflight ISIM being less than 1.0 W. Sources of test-induced parasitics must be carefully controlled and measured, and the ability to thermally control the test environment is critical to enable accurate thermal balance testing and thermal model correlation. This paper describes the test configuration and plans for the ISIM-level thermal vacuum/thermal balance testing at GSFC.

Glazer, Stuart↗

Advanced simulation capability for environmental management - current status and future applications

The U.S. Department of Energy (US DOE) Office of Environmental Management (EM), Office of Soil and Groundwater (EM-12), is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach that is currently aimed at understanding and predicting contaminant fate and transport in natural and engineered systems. ASCEM is a modular and open source high-performance computing tool. It will be used to facilitate integrated approaches to modeling and site characterization, and provide robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of capabilities, with current emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Tool-sets and High-Performance Computing (HPC) multi-process simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, tool-sets for interaction with Platform, and verification and model confidence testing. The integration of the Platform and HPC capabilities were tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities in 2012. The current maturity of the ASCEM computational and analysis capabilities has afforded the opportunity for collaborative efforts to develop decision analysis tools to support and optimize radioactive waste disposal. Recent advances in computerized decision analysis frameworks provide the perfect opportunity to bring this capability into ASCEM. This will allow radioactive waste disposal to be evaluated based on decision needs, such as disposal, closure, and maintenance. Decision models will be used in ASCEM to identify information/data needs, and model refinements that might be necessary to effectively reduce uncertainty in waste disposal decisions. Decision analysis models start with tools for framing the problem, and continue with modeling both the science side of the problem (for example, inventories, source terms, fate and transport, receptors, risk, etc.), and the cost side of the problem, which could include costs of implementation of any action that is chosen (e.g., for disposal or closure), and the values associated with those actions. The cost side of the decision problem covers economic, environmental and societal costs, which correspond to the three pillars of sustainability (economic, social, and environmental). These tools will facilitate stakeholder driven decision analysis to support optimal sustainable solutions in ASCEM. In this paper the current state of ASCEM is first described, followed by a description of the approach that will be taken to augment ASCEM for simulating fate and transport with tools that facilitate a top-down or systems level view of finding optimal, sustainable solutions to difficult environmental (including radioactive waste) problems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced regenerator testing in the Raytheon dual-use cryocoolerr

Significant progress has been made on the Raytheon low cost space cryocooler called the Dual-Use Cryocooler (DUC). Most notably, the DUC has been integrated and tested with an advanced regenerator. The advanced regenerator is a drop-in replacement for stainless steel screens and has shown significant thermodynamic performance improvements. This paper will compare the performance of two different regenerators and explain the benefits of the advanced regenerator.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

James Webb Space Telescope (JWST) Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryogenic Test Program and Results

In 2017, the James Webb Space Telescope Optical Telescope Element and Integrated Science Instrument Module (OTIS) underwent cryogenic optical testing at the Johnson Space Center. In this paper, we summarize the successful execution and results of this 100-day test, which was a major program milestone. We summarize the as-run test configuration and provide a top-level as-run timeline. We also provide the top-level functional, optical, thermal, and operational results from the test. We summarize the key technical issues encountered and the resolution of those issues. The results of the OTIS test indicate that the payload should be fully capable of delivering on JWST's exciting scientific potential.

Kimble, Randy A.↗

Space Flight LiDARs, Navigation & Science Instrument Implementations: Lasers, Optoelectronics, Integrated Photonics, Fiber Optic Subsystems and Components

For the past 25 years, the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center's Photonics Group in the Engineering Directorate has been substantially contributing to the flight design, development, production, testing and integration of many science and navigational instruments. The Moon to Mars initiative will rely heavily upon utilizing commercial technologies for instrumentation with aggressive schedule deadlines. The group has an extensive background in screening, qualifying, development and integration of commercial components for spaceflight applications. By remaining adaptable and employing a rigorous approach to component and instrument development, they have forged and fostered relationships with industry partners. They have been willing to communicate lessons learned in packaging, part construction, materials selection, testing, and other facets of the design and production process critical to implementation for high-reliability systems. As a result, this successful collaboration with industry vendors and component suppliers has enabled a history of mission success from the Moon to Mars (and beyond) while balancing cost, schedule, and risk postures. In cases where no commercial components exist, the group works closely with other teams at Goddard Space Flight Center and other NASA field centers to fabricate and produce flight hardware for science, remote sensing, and navigation applications. Summarized here is the last ten years of instrumentation development lessons learned and data collected from the subsystems down to the optoelectronic component level.

Detectors↗

Operational Experience of the NML Cryogenic Plant at the FAST Test Facility

The NML cryogenic plant cools two individually cryostated superconducting radio frequency (SRF) capture cavities and one prototype ILC cryomodule with eight SRF cavities. This complex accelerates electrons at 150 MeV for the Integrable Optics Test Accelerator (IOTA) ring, located at the Fermilab Accelerator Science and Technology (FAST) facility. The cryogenic plant is composed of two nitrogen precooled Tevatron satellite refrigerators, two Mycom 2016C compressors, a cryogenic distribution system, a Frick purifier compressor, two charcoal bed adsorber purifiers, and a liquid ring vacuum pump with a roots booster. The SRF cavities are immersed in a 2.0 K liquid helium bath, shielded with a 5 K gaseous helium shield and a liquid nitrogen cooled thermal shield. Since 2019, this R&D accelerator complex has gone through four science runs with an average duration of 12 months. Operational experience for each run, availability metrics, performance data and common outages are presented in this paper.

Wallace, Timothy [Fermilab] (ORCID:000900051589302↗

A Boresight Adjustment Mechanism for use on Laser Altimeters

This paper describes the development of the Boresight Adjustment Mechanism (BAM) for the Geoscience Laser Altimeter System (GLAS) Instrument. The BAM was developed late in the integration and test phase of the GLAS instrument flight program. Thermal vacuum tests of the GLAS instrument indicated that the instrument boresight alignment stability over temperature may be marginal. To reduce the risk that GLAS may not be able to meet the boresight alignment requirements, an intensive effort was started to develop a BAM. Observatory-level testing and further evaluation of the boresight alignment data indicated that sufficient margin could be obtained utilizing existing instrument resources and therefore the BAM was never integrated onto the GLAS Instrument. However, the BAM was designed fabricated and fully qualified over a 4 month timeframe to be capable of precisely steering (< 1 arcsec over 300 arcsec) the output of three independent lasers to ensure the alignment between the transmit and receive paths of the GLAS instrument. The short timeline for the development of the mechanism resulted in several interesting design solutions. This paper discusses the requirement definition, design, and testing processes of the BAM development effort, how the design was affected by the extremely tight development schedule, and the lessons learned throughout the process.

Hakun, Claef↗

Analysis and Integration of the Hydraulic Fracturing Test Site-2 (HFTS-2) Comprehensive Dataset

Hydraulic Fracturing Test Site-2 (HFTS-2) is a field-based research experiment performed in the Permian (Delaware) Basin. The unique aspect of this program was the acquisition of a unique, comprehensive, diagnostic dataset. Additionally, shorter parent wells drilled three years before the child wells offered clear distinction between the stages influenced by parent-child effects and the stages without any effects. The goal of this study was to analyze and integrate this comprehensive diagnostic dataset to understand the areal and vertical extent of hydraulic fractures (HF). The paper also provides insights on the effects of parent wells’ depletion on child well HF geometry based on various monitoring methods and subsurface models. Areal and vertical coverage for all HFTS-2 wells during stimulation and depletion was estimated based on analysis and interpretation of diagnostics and advanced modeling results. HFTS-2 diagnostics included microseismic (MS), pre- and post-stimulation logs and cores, bottomhole gauges, and fiber optic (FO) data. The diagnostics results (MS, FO, image logs) were integrated and used to calibrate subsurface models. Additional field tests were designed and implemented for depletion monitoring. The tailored program for monitoring depletion included vertical and slant well pressures, interference testing, and a vertical strain depletion trial. Areal Coverage: Conventional MS (and FO MS) were used to compute HF dimensions, which were compared with diagnostics (FO strain, gauge, image logs) observations and calibrated subsurface models. A post-production interference test did not show offset well communication. Vertical Coverage: Vertical coverage during stimulation was monitored using a vertical monitoring well. The stronger mechanical strain signals showed good correlation with MS event intensities, geomechanical properties, and gauge inferences. Vertical depletion was estimated based on vertical/slant well gauges and strain depletion tests. Parent-Child Effects: Diagnostics and calibrated subsurface models show asymmetry in child well fracture geometries for stages that overlap parent wells. Child well image logs serve as a good indicator for parent Downloaded from http://onepetro.org/URTECONF/proceedings-pdf/21URTC/2-21URTC/D021S031R004/2477423/urtec-2021-5241-ms.pdf/1 by Carol Worster on 28 February 2022 URTeC 5241 well HF tracking. Child well MS events had an eastward bias, in line with pre-stimulation image logs, and was confirmed by parent well frac hits. Novel/Additive Information: The dataset presents a unique, over-constrained problem space to compare independent techniques to arrive at HF metrics (i.e., stimulation height and/or half-length), unlike a single source dataset, in which calibration is done using available data to guide predictions. Here, the asymmetry in HF geometry seen in the stages influenced by parent-child effects offers unique insights into well spacing and landing, which are key capital decisions the unconventional resources industry is seeking to optimize.

58 GEOSCIENCES↗

Fabrication and testing of a three-channel integrated optical data preprocessor

As a precursor to the construction of a 16-channel device, a 3-channel integrated optical data preprocessor has been fabricated and tested. The device, which is fabricated in an outdiffused LiNbO3 waveguide, provides a signal related to the channel-by-channel difference between a prerecorded reference set and an incoming data set which is presented in the form of parallel analog voltages. The data are impressed upon the guided wave as a set of electrooptically induced phase shifts, and the comparison to the reference set is performed by holographic subtraction. The reference set can either be introduced as a separate operation or it can be 'learned' by the preprocessor during operation.

Verber, C. M.↗

Ground test challenges in the development of the Space Shuttle orbiter auxiliary power unit

A conventional aircraft hydraulic system design approach was selected to provide fluid power for the Space Shuttle Orbiter. Developing the power unit, known as the Auxiliary Power Unit (APU), to drive the hydraulic pumps presented a major technological challenge. A small, high speed turbine drive unit powered by catalytically decomposed hydrazine and operating in the pulse mode was selected to meet the requirement. Because of limitations of vendor test facilities, significant portions of the development, flight qualification, and postflight anomaly testing of the Orbiter APU were accomplished at the Johnson Space Center (JSC) test facilities. This paper discusses the unique requirements of attitude, gravity forces, pressure profiles, and thermal environments which had to be satisfied by the APU, and presents the unique test facility and simulation techniques employed to meet the ground test requirements. In particular, the development of the zero-g lubrication system, the development of necessary APU thermal control techniques, the accomplishment of integrated systems tests, and the postflight investigation of the APU lube oil cooler behavior are discussed.

Chaffee, N. H.↗

A Boresight Adjusment Mechanism For Use in Laser Altimeters

This paper describes the development of the Boresight Adjustment Mechanism (BAM) for the Geoscience Laser Altimeter System (GLAS) Instrument. The BAM was developed late in the integration and test phase of the GLAS instrument flight program. Thermal vacuum tests of the GLAS instrument indicated that the instrument-boresight alignment stability over temperature may be marginal. To reduce the risk that GLAS may not be able to meet the boresight alignment requirements an intensive effort was started to develop a BAM. Observatory-level testing and further evaluation of the boresight alignment data indicated that sufficient margin could be obtained utilizing existing instrument resources and therefore the BAM was never integrated onto the GLAS Instrument. However, the BAM was designed fabricated and fully qualified over a 4 month timeframe to be capable of precisely steering (less than 2 arcsec over plus or minus 300 arcsec) the output of three independent lasers to ensure the alignment between the transmit and receive paths of the GLAS instrument. The short timeline for the development of the mechanism resulted in several interesting design solutions. This paper discusses the requirement definition design, and testing processes of the BAM development effort how the design was affected by the extremely tight development schedule and the lessons learned throughout the process.

Hakun, Claef↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗