Search NASA⌕ Search

SEARCH · Search NASA

Results for “program areas”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

High-Burnup BWR LOCA Burst Analysis Framework Development and Demonstration

Nuclear power currently contributes approximately 20% of total electricity generation in the United States and more than 10% globally. Given the increasing reliance on nuclear energy to achieve our nation’s goal of reaching net-zero carbon emissions by 2050, there is significant pressure on the existing nuclear industry to extend plant operational licenses and improve efficiency. This is crucial as the existing nuclear fleet serves as a vital bridge until new light water and advanced reactors can be developed and deployed, bolstering the supply of carbon-free energy to meet domestic demands. Operational costs primarily consist of plant operation and maintenance and fuel costs, influenced by materials and reactor core designs. These factors, coupled with heavily subsidized renewable energy markets, create a challenging economic environment for the existing light water reactor fleet, as well as for new build projects. To address these economic challenges, the nuclear industry has developed a strategic blueprint aimed at enhancing nuclear power’s economic sustainability. Past initiatives, such as efforts to eliminate fuel failures by 2010 and reduce operating costs by 30% before 2020, have laid the groundwork. Optimizing core design parameters, including burnup limits and enrichment levels, can lengthen cycles, reduce outages, reduce batch reload batch fractions and spent fuel storage requirements, and lower maintenance and operating expenses, thereby enhancing economic viability. In the United States, boiling water reactors (BWRs) comprise approximately one-third of the fleet, although much of the research and development focus has traditionally been on pressurized water reactors (PWRs). Advances in modeling and simulation, particularly through the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, are crucial to the long-term viability of BWRs, just as they are for PWRs. A key research area of the high burnup/increased enriched fuel initiative is focused on addressing loss-of-coolant-accident (LOCA)-related issues. NEAMS has dedicated significant effort to enhancing tools to better support BWRs, with a current focus on showcasing the BWR framework for high-burnup LOCA analysis. This high-fidelity work will demonstrate a best estimate pin-by-pin high-burnup BWR LOCA analysis to assess full-core cladding rupture behavior. This modeling capability will help with better understanding and realistic evaluation of fuel fragmentation, relocation, and dispersal (FFRD) phenomena at BWRs, which then could be used to prevent FFRD at BWRs without penalizing operational parameters. In addition, the results of this work will help identify strategies to identify additional margins or to potentially limit cladding rupture through core design optimizations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FORCE Update 2024

The Framework for Optimization of Resources and Economics (FORCE) tool suite is the U.S. Department of Energy’s Nuclear Integrated Energy Systems (IES) Program flagship tool suite for technoeconomic IES analysis of IES. This tool suite is useful for analysis designed to evaluate and improve the technoeconomics of energy production systems, particularly for systems including nuclear technology. In this report, we document the development activity for the FORCE tool suite to extend its capabilities as performed during fiscal year 2024. In addition to reliability and accessibility, capability is one of the three standards guiding the development of the FORCE tool suite and the software codes that are its constituent parts. Extending the capabilities of the FORCE tool suite allows analysis both within the IES program as well as industry, university, and laboratory partners to perform analysis with more accuracy, insight, and impactful narrative. Four areas of capability development were the focus of activity this year: economic parameter uncertainty quantification, multiresolution analysis, components-to-optimization workflow automation, and statespace construction workflows for real-time optimal control. In economic parameter uncertainty quantification, the ability of HERON to capture risk due to scenarios (weather and energy demand uncertainty) was expanded to also include uncertainties in financial parameters such as capital cost or operation and maintenance costs. By including these sources of uncertainty, which are sometimes very large compared with scenario uncertainty, HERON is better able to capture the risk posed by investment in various IES technology. Because of this, analysts can also consider the reduction in risks that can be realized by choice of some technologies. In multiresolution analysis, development activity extended on work completed previously. In fiscal year 2023, methods for decomposing time series signals, such as demand, solar and wind availability, and price profiles, were analyzed and down-selected to those most effective at splitting signals into different resolutions. These resolutions allow considering the influence of different energy demand and supply behaviors across different time scales. For example, energy demand might be divided into seasonal, weekly, and hourly profiles. In fiscal year 2024, this preliminary work was extended and implemented within the Risk Analysis Virtual Environment (RAVEN) risk and uncertainty analysis platform, which is used throughout the FORCE framework. This development of the “multi-resolution time series analysis” (MR-TSA) module in RAVEN allows training synthetic history generators on complex time series. These synthetic history generators can then be used in HERON for generating scenarios that represent possible market and weather scenarios that can be analyzed on different time scales. We envision completing this work in the future, implementing multiresolution dispatch optimization strategies that can make the most beneficial use of these stratified time histories. In components-to-optimization workflow development, workflows for translating user inputs of components into algorithms for algebraic optimization were selected and implemented. Similar algorithms within the Holistic Energy Resource Optimization Network (HERON) were separated from the main code base of HERON and gathered with the components-to-optimization workflows in the new Dispatch Optimization Variable Engine (DOVE) software library. This modularization allows FORCE users to analyze dispatch optimization and energy system duty cycles independently of HERON, which previously was a burdensome task. Additionally, these dispatch optimization algorithms, set up in an independent library, can now be used across all software applications within FORCE, especially including the real-time optimal control software Optimization of Real-time Capacity Allocation (ORCA). Allowing FORCE software to share dispatch optimization algorithms within a single library allows for improved software maintenance and reliability. In statespace characterization workflow development, alternative workflows for optimizing dispatch with additional technical accuracy was the focus, particularly to improve the real-time optimization decision making in ORCA. Using algorithms and workflows initially developed for the Feasible Actuator Range Modifier (FARM), workflows for determining the statespace representation of IES were identified and demonstrated. The resulting dispatch optimization required a more robust optimization algorithm than that originally used in HERON (and moved to DOVE), which required adding an alternate workflow to DOVE that can more accurately match the behavior of physical systems using a partial differential equation representation. In conclusion, capability developments in the FORCE tool suite in fiscal year 2024 have improved the ability of the FORCE tool suite to perform

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Technical Report for Industrial Assessment Center at West Virginia University

The Industrial Assessment Center (IAC) program at West Virginia University (WVU), which is funded by the Industrial Technologies Program (ITP) in the U.S. Department of Energy’s (DOE) Office of Energy Efficiency and Renewable Energy (EERE), has provided a unique opportunity to enhance efficient energy utilization in small to medium-sized manufacturers. It has also provided training to engineering students in the identification and analysis of efficient energy use in each aspect of the manufacturing process and associated supporting elements. The outcomes of the IAC Program at WVU have assisted the manufacturers and the students in having a heightened sensitivity to industrial energy conservation, waste reduction, and productivity improvement, as well as a better understanding of the technical aspects of manufacturing processes and the supporting elements through which efficient energy utilization can be enhanced. The IAC at WVU has conducted 101 energy assessments from 2002 until 2006. The focus of the industrial assessments has been on energy savings. It has been the IAC’s interest to strongly focus on energy savings and on waste minimization and productivity improvements that strictly have an impact on energy. The IAC at WVU was selected as the Center of the year in 2005 from amongst 26 centers and has obtained a ranking within the top 5 in the previous few years. From 2002 to 2006, the total recommended energy savings produced by the IAC at WVU is 1,214,414 MMBtu, of which the electricity accounts for 93,826,067 kWh (equivalent to 320,226 MMBtu) and natural gas for 871,743 MMBtu. The balance is accounted for in savings in other fuels, mainly coal and wood. This results in an average recommended energy savings of 928,971 kWh from electricity and 8,631 MMBtu from natural gas per facility. The total CO2 emissions saved from 2002 to 2006 is 154,462 tons, with an average of 1,529.3 tons per facility. The average recommended energy cost savings per facility is $135,036. The overall implementation rate of the assessment recommendations is 60.6% for the 101 industrial assessments conducted since 2002. The implemented recommendations resulted in total energy savings of 62,328,006 kWh from electricity, 295,241 MMBtu from natural gas, and 43,593 MMBtu from other fuels, totaling 551,557 MMBtu. The average implemented energy savings per industrial facility is 5,461 MMBtu and the average implemented energy cost savings is $ 59,879. The average implemented energy and productivity cost savings exceeds the program average of $ 60,000 per assessment. The IAC at WVU has produced a variety of energy efficiency recommendations in areas of industrial energy consumption such as Boilers and Steam systems (19), Air Compressors (15), HVAC (4), Chillers (12), Furnaces and Ovens (17), Motors (8), Lighting (20), Insulation (3), CHP and Cogeneration (4), and Process Equipment (7). The project has benefited the public by enabling the reduction of CO2 emissions by 89,726 tons due to the implemented energy saving recommendations at 101 small and medium sized manufacturing facilities. Since CO2 is a green house gas, its reduction will improve the quality of the environment significantly. The reduction in operating costs for the manufacturing facilities in terms of energy cost savings will increase the manufacturing facilities’ profits and improve their competitive edge, thus causing possible expansion in the manufacturing activities, leading to increase in good paying jobs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

BER Science Network Requirements Workshop -- July 26-27,2007

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States of America. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In July 2007, ESnet and the Biological and Environmental Research (BER) Program Office of the DOE Office of Science organized a workshop to characterize the networking requirements of the science programs funded by the BER Program Office. These included several large programs and facilities, including Atmospheric Radiation Measurement (ARM) Program and the ARM Climate Research Facility (ACRF), Bioinformatics and Life Sciences Programs, Climate Sciences Programs, the Environmental Molecular Sciences Laboratory at PNNL, the Joint Genome Institute (JGI). National Center for Atmospheric Research (NCAR) also participated in the workshop and contributed a section to this report due to the fact that a large distributed data repository for climate data will be established at NERSC, ORNL and NCAR, and this will have an effect on ESnet. Workshop participants were asked to codify their requirements in a 'case study' format, which summarizes the instruments and facilities necessary for the science and the process by which the science is done, with emphasis on the network services needed and the way in which the network is used. Participants were asked to consider three time scales in their case studies--the near term (immediately and up to 12 months in the future), the medium term (3-5 years in the future), and the long term (greater than 5 years in the future). In addition to achieving its goal of collecting and characterizing the network requirements of the science endeavors funded by the BER Program Office, the workshop emphasized some additional points. These included the need for a future ESnet presence in the Denver area, a desire for ESnet to continue support of collaboration services, and the need for ESnet to support dedicated bandwidth or 'virtual circuit' services. In addition, it is clear that the BER facilities are going to experience significant growth in data production over the next 5 years. The reasons for this vary (model resolution and supercomputer allocations for climate, detector upgrades for EMSL and ARM, sequencing hardware upgrades for JGI), but all indicators point to significant growth in data volumes over the near to medium term. This growth in data volume, combined with the ever-expanding scope of scientific collaboration, will continue to demand ever-increasing bandwidth, reliability and service richness from the networks that support DOE science.

42 ENGINEERING↗

HYDROGEN CONCENTRATIONS DURING STORAGE OF 3013 OXIDE SAMPLES

As part of a surveillance program intended to ensure the safe storage of plutonium bearing nuclear materials in the Savannah River Site (SRS) K-Area Materials Storage (KAMS), samples of these materials are shipped to Savannah River National Laboratory (SRNL) for analysis. These samples are in the form of solids or powders which will have absorbed moisture. Potentially flammable hydrogen gas is generated due to radiolysis of the moisture. The samples are shipped for processing after chemical analysis. To preclude the possibility of a hydrogen deflagration or detonation inside the shipping containers, the shipping times are limited to ensure that hydrogen concentration in the vapor space of every layer of confinement is below the lower flammability limit of 4 volume percent (vol%). This study presents an analysis of the rate of hydrogen accumulation due to radiolysis and calculation of allowable shipping times for typical KAMS materials.

08 HYDROGEN↗

Summary of experimental discussion session at ILWOG42

During the ILWOG-42 held at LANL in May of 2010, a set of discussions between scientists from AWE, LANL, and LLNL was held to develop collaborative experiments that would improve radiochemical diagnostic evaluations. DOE headquarters has asked that a 5-year roadmap be developed to resolve outstanding issues. The goal of this discussion was to explore common areas of interest where collaborative experiments could be undertaken to resolve identified problems and to gain support across the weapons program and DOE for this work. Collaboration was encouraged not only between these laboratories, but with University collaborators who are funded through the NNSA Stewardship Science Academic Alliance. In the development of experiments there were some criteria that were established. The uncertainty budgets will need to be assessed for proposed experiments so that potential gains to the programs can be determined. Measurements using different methods should be encouraged to provide greater confidence (and hopefully improved accuracy) in the result. Six distinct subjects were discussed: (1) Experiments at critical assemblies/14-MeV neutron (D+T) facilities; (2) Fission-chain-yield (FCY) energy dependence; (3) Absolute FCY measurements; (4) Measurements of {sup 147}Nd 531-keV absolute gamma-ray intensity; (5) Atom scale cross calibrations; and (6) Other experimental issues. A short summary of the discussions is given.

36 MATERIALS SCIENCE↗

Fuel cell collaboration in the United States. A report to the Danish Partnership for Hydrogen and Fuel Cells

The purpose of this report is to provide members of the Danish Partnership for Hydrogen and Fuel Cells with information regarding collaborative opportunities in the United States. The report is designed to provide an overview of key issues and activities and to provide guidance on strategies for finding U.S. research and commercial partners and gaining access to the U.S. market. Section 1 of this report provides an overview of the key drivers of policy at the federal and state government levels regarding hydrogen and fuel cell technologies and provides a perspective of the U.S. industry and key players. It also suggests three general pathways for accessing U.S. opportunities: enhancing visibility; developing vendor relationships; and establishing a formal presence in the U.S. The next sections summarize focus areas for commercial and research activity that currently are of the greatest interest in the U.S. Section 2 describes major programs within the federal government and national laboratories, and discusses various methods for identifying R and D funding opportunities, with an overview of federal acquisition regulations. Section 3 reviews the efforts of several state governments engaging the fuel cell industry as an economic driver and presents an overview of acquisition at the state level. Section 4 discusses university research and development (R and D) and university-industry partnerships. There are 12 appendices attached to the report. These appendices provide more detailed information regarding the key federal government agencies involved in fuel cells and hydrogen, state-specific policies and activities, national laboratories and universities, and other information regarding the fuel cell and hydrogen industry in the U.S. (Author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CRADA Final Report, 2011S003, Faraday Technologies

This Phase I SBIR program addressed the need for an improved manufacturing process for electropolishing niobium RF superconducting cavities for the International Linear Collider (ILC). The ILC is a proposed particle accelerator that will be used to gain a deeper understanding of the forces of energy and matter by colliding beams of electrons and positrons at nearly the speed of light. The energy required for this to happen will be achieved through the use of advanced superconducting technology, specifically ~16,000 RF superconducting cavities operating at near absolute zero. The RF superconductor cavities will be fabricated from highly pure Nb, which has an extremely low surface resistance at 2 Kelvin when compared to other materials. To take full advantage of the superconducting properties of the Nb cavities, the inner surface must be a) polished to a microscale roughness < 0.1 µm with removal of at least 100 µm of material, and b) cleaned to be free of impurities that would degrade performance of the ILC. State-of-the-art polishing uses either chemical polishing or electropolishing, both of which require hydrofluoric acid to achieve breakdown of the strong passive film on the surface. In this Phase I program, Faraday worked with its collaborators at the Thomas Jefferson National Accelerator Facility (JLab) to demonstrate the feasibility of an electropolishing process for pure niobium, utilizing an environmentally benign alternative to chemical or electrochemical polishing electrolytes containing hydrofluoric acid. Faraday utilized a 31 wt% aqueous sulfuric acid solution (devoid of hydrofluoric acid) in conjunction with the FARADAYICSM Process, which uses pulse/pulse reverse fields for electropolishing, to demonstrate the ability to electropolish niobium to the desired surface finish. The anticipated benefits of the FARADAYICSM Electropolishing process will be a simpler, safer, and less expensive method capable of surface finishing high purity niobium cavities. Another potential benefit would be for the medical industry that uses hydrofluoric acid to electropolish niobium-alloy materials. The FARADAYICSM Electropolishing process will eliminate the environmental hazards posed by the use of hydrofluoric acid employed by chemical polishing and conventional electropolishing. Further, improved performance benefits may be possible. The overall objective of the Phase I program was to demonstrate that FARADAYIC Electropolishing of niobium cavities in electrolytes free of hydrofluoric acid can meet the RF superconducting performance criteria of those cavities. The FARADAYIC Electropolishing Process developed in the Phase I program was used to polish 50 mm Nb disks to a surface roughness (RA) of < 1 nm over a small area through process and post-processing optimization. An excellent level of surface cleanliness was achieved. While the desired 2K RF performance has not yet been achieved, Faraday believes that surface oxide state can be controlled through manipulation of the process parameters, to meet the 2K RF standard. Faraday is establishing apparatus and facilities infrastructure for single-cell SRF cavity electropolishing, through a synergistic effort with the Fermi National Accelerator Facility (Fermilab) to scale-up electropolishing of superconducting RF cavities. Faraday proposes to commercialize the subject technology via an IP based strategic relationship with a partner with established market channels within two primary commercialization avenues: 1) the superconducting particle accelerator community, 2) the medical device and implant market. Faraday will initially maintain Low Rate Initial Production capabilities for an application, but latterly seek a strategic partner who is solely dedicated to high rate production.

36 MATERIALS SCIENCE↗

Progress Addressing Safeguards Capability Development Needs through Educational Outreach and Knowledge Management

This paper describes the NGSI Human Capital Development Program's domestic and international activities, and offers specific case studies to exemplify the outcomes and progress achieved in this area over the past several years. The paper highlights the importance of a sustained effort to address the human dimension of safeguards and nonproliferation and to address critical work force issues in the U.S. and abroad.

international safeguards, human capital developmen↗

Determining gas hydrate distribution in sands using integrated analysis of well log and seismic data in the Terrebonne Basin, Gulf of Mexico

The Terrebonne Basin is a salt bounded mini-basin in the northeast section of the Walker Ridge protraction area in the Gulf of Mexico, and the main site for an upcoming gas-hydrate focused International Ocean Discovery Program (IODP) cruise. The basin is infilled by an increasingly mud rich sedimentary sequence with several 5-15 meter gas-hydrate filled sand units of Miocene to Pliocene age overlying the up-domed salt. These gas-hydrate filled sand units can be identified in logging while drilling data from two existing wells in the Terrebonne Basin, drilled in 2009 by the Gas Hydrate Joint Industry Project (JIP) Leg 2. The sand units are cross cut by a distinct bottom-simulating reflector (BSR), and are clearly characterized by a polarity reversal in the sand units. The polarity reversal is caused by a positive gas-hydrate filled sand within the stability zone changing to negative gas-bearing sand. Using well data and calculated synthetic seismogram well ties we are able to identify several additional 1-4 meter gas-hydrate and water-saturated sand units associated with thick (100-200 m-thick), fine grained, hydrate bearing fractured units in the upper sedimentary sequence on the seismic data. Following on previous work, we propose that microbial generation of methane occurring within the fine-grained, fractured units acts as a source for gas hydrate formation in the thin sands. In contrast, it has been proposed that the gas hydrate in the 5-15 m-thick sands first discovered by the JIP was originates from a deeper thermogenic source. Through correlating hydrate occurrence in sands from well data, to amplitudes derived from the seismic data, we can estimate possible distribution of hydrate across the basin. Overall, we find the Terrebonne basin to be a complex gas hydrate system with multiple mechanisms of methane generation and migration.

Hillman, Jess↗

Collab Fracture Characterization: Preliminary Results from the Modeling and Flow Testing of Experiment 1

The EGS Collab project is developing ~10-20 m-scale field sites where fracture stimulation and flow models can be validated against controlled, small-scale, in-situ experiments. At the first experimental site, a hydraulic fracture will be created in metamorphic rock at the 4850 level in the former Homestake Mine. The experimental concept is for fracturing to be initiated at an injection well and continue until it intersects a production well approximately 10 meters away. Initial step-pressure flow testing of the fracture are to be performed to describe pressure-aperture-flow relationships. The flow field between the injector and producer boreholes will be characterized using a series of forced gradient dipole tracer tests. A number of fracture characterization models have been used to assist in the design of the tracer tests. The tracer test program will use conservative, sorbing, and particulate tracers, as well as sampling for radon gas to describe the fracture surface area (i.e., potential heat transfer area), flow pathway distribution, and volume. Tracer concentration at the production well (i.e. break through curves) will be measured using a series of inline sensors, liquid sampling devices, filtering of the effluent, and the measuring of gas concentrations in the effluent. Tracer monitoring data will be compared against results from a collection of numerical simulators developed at U.S. national laboratories and universities for the purpose of validating these flow and transport models. Ultimately these same models will be used to predict the heat transfer characteristics of the fracture and will be compared to a thermal characterization field test where cold water will be injected at the injection well and the temperature will be measured at the production well. This paper discusses the early tracer transport model predictions and parameters sensitivity that affect the tracer breakthrough curves at the production well.

15 GEOTHERMAL ENERGY↗

Collab Fracture Characterization: Preliminary Results from the Modeling and Flow Testing of Experiment 1

The EGS Collab project is developing ~10-20 m-scale field sites where fracture stimulation and flow models can be validated against controlled, small-scale, in-situ experiments. At the first experimental site, a hydraulic fracture will be created in metamorphic rock at the 4850 level in the former Homestake Mine. The experimental concept is for fracturing to be initiated at an injection well and continue until it intersects a production well approximately 10 meters away. Initial step-pressure flow testing of the fracture are to be performed to describe pressure-aperture-flow relationships. The flow field between the injector and producer boreholes will be characterized using a series of forced gradient dipole tracer tests. A number of fracture characterization models have been used to assist in the design of the tracer tests. The tracer test program will use conservative, sorbing, and particulate tracers, as well as sampling for radon gas to describe the fracture surface area (i.e., potential heat transfer area), flow pathway distribution, and volume. Tracer concentration at the production well (i.e. break through curves) will be measured using a series of inline sensors, liquid sampling devices, filtering of the effluent, and the measuring of gas concentrations in the effluent. Tracer monitoring data will be compared against results from a collection of numerical simulators developed at U.S. national laboratories and universities for the purpose of validating these flow and transport models. Ultimately these same models will be used to predict the heat transfer characteristics of the fracture and will be compared to a thermal characterization field test where cold water will be injected at the injection well and the temperature will be measured at the production well. This paper discusses the early tracer transport model predictions and parameters sensitivity that affect the tracer breakthrough curves at the production well.

15 GEOTHERMAL ENERGY↗

Collab Fracture Characterization: Preliminary Results from the Modeling and Flow Testing of Experiment 1

The EGS Collab project is developing ~10-20 m-scale field sites where fracture stimulation and flow models can be validated against controlled, small-scale, in-situ experiments. At the first experimental site, a hydraulic fracture will be created in metamorphic rock at the 4850 level in the former Homestake Mine. The experimental concept is for fracturing to be initiated at an injection well and continue until it intersects a production well approximately 10 meters away. Initial step-pressure flow testing of the fracture are to be performed to describe pressure-aperture-flow relationships. The flow field between the injector and producer boreholes will be characterized using a series of forced gradient dipole tracer tests. A number of fracture characterization models have been used to assist in the design of the tracer tests. The tracer test program will use conservative, sorbing, and particulate tracers, as well as sampling for radon gas to describe the fracture surface area (i.e., potential heat transfer area), flow pathway distribution, and volume. Tracer concentration at the production well (i.e. break through curves) will be measured using a series of inline sensors, liquid sampling devices, filtering of the effluent, and the measuring of gas concentrations in the effluent. Tracer monitoring data will be compared against results from a collection of numerical simulators developed at U.S. national laboratories and universities for the purpose of validating these flow and transport models. Ultimately these same models will be used to predict the heat transfer characteristics of the fracture and will be compared to a thermal characterization field test where cold water will be injected at the injection well and the temperature will be measured at the production well. This paper discusses the early tracer transport model predictions and parameters sensitivity that affect the tracer breakthrough curves at the production well.

Enhanced Geothermal Systems, EGS Collab, Sanford U↗

Radiochemistry Lab Decommissioning and Dismantlement. AECL, Chalk River Labs, Ontario, Canada

Atomic Energy of Canada (AECL) was originally founded in the mid 1940's to perform research in radiation and nuclear areas under the Canadian Defense Department. In the mid 50's The Canadian government embarked on several research and development programs for the development of the Candu Reactor. AECL was initially built as a temporary site and is now faced with many redundant buildings. Prior to 2004 small amounts of Decommissioning work was in progress. Many reasons for deferring decommissioning activities were used with the predominant ones being: 1. Reduction in radiation doses to workers during the final dismantlement, 2. Development of a long-term solution for the management of radioactive wastes in Canada, 3. Financial constraints presented by the number of facilities shutdown that would require decommissioning funds and the absence of an approved funding strategy. This has led to the development of a comprehensive decommissioning plan that is all inclusive of AECL's current and legacy liabilities. Canada does not have a long-term disposal site; therefore waste minimization becomes the driving factor behind decontamination for decommissioning before and during dismantlement. This decommissioning job was a great learning experience for decommissioning and the associated contractors who worked on this project. Throughout the life of the project there was a constant focus on waste minimization. This focus was constantly in conflict with regulatory compliance primarily with respect to fire regulations and protecting the facility along with adjacent facilities during the decommissioning activities. Discrepancies in historical documents forced the project to treat every space as a contaminated space until proven differently. Decommissioning and dismantlement within an operating site adds to the complexity of the tasks especially when it is being conducted in the heart of the plant. This project was very successful with no lost time accidents in over one hundred thousand hours worked, on schedule and under budget despite some significant changes throughout the decommissioning phases. The actual cost to decommission this building will come in under 9 million dollars vs. an estimated 14.5 million dollars. This paper will cover some of the unique aspects of dismantling a radioactive building that has seen pretty much every element of the periodic table pass through it with the client requirement focused on minimization of radioactive waste volumes.

42 ENGINEERING↗

Multipurpose Transportation, Aging, and Disposal Canisters for Used Nuclear Fuel - Getting From Here to There and Beyond

The idea of a universal canister system, in which used fuel can be placed at reactor sites, transported and - without ever needing to be re-opened -, disposed of in a geologic repository, is certainly not new. Originally proposed by DOE in the early 1990's as the Multi-Purpose Canister (MPC) system, this common sense idea has always had considerable appeal as a means to reduce used fuel handling and simplify repository surface facility operations. However, difficulties in launching the development of such a system, in the face of large uncertainties in repository design and limited program funding, caused the original MPC project to be abandoned in 1997. Then, after eight years of inactivity in this area, DOE, while experiencing difficulty completing the repository surface facility design and having missed a December 2004 deadline for submittal of a repository license application to the Nuclear Regulatory Commission (NRC), re-proposed the concept. Under this renewed initiative, the MPC systems were renamed as Transportation, Aging, and Disposal or TAD canister systems. DOE's repository design had advanced significantly at this point and industry, having gained considerable experience through the design, licensing, manufacture, and loading of over 800 used fuel dry storage systems, was well positioned to provide DOE with the meaningful technical input that would be necessary to bring the TAD concept to reality. With a firm foundation on which to build, industry actively engaged DOE in an extensive series of interactions to facilitate TAD development. This paper describes the evolution of the TAD concept through the industry/DOE dialogue that occurred over an 18 month period beginning in January 2006. It discusses the technical issues that were addressed and resolved through this collaboration. Successful completion of this dialogue led to the issuance, by DOE, of a final TAD design specification in July, 2007. This specification is being used by DOE as a fundamental input to the Yucca Mountain license application that DOE expects to submit to the NRC no later than June 2008. DOE is now in the process completing a procurement of TAD demonstrations. As part of these demonstrations, DOE expects industry vendors to seek and obtain storage and transportation licenses for the TADs by 2010 and for utilities to deploy them at reactor sites by 2012. (authors)

42 ENGINEERING↗

The Use of Subsurface Barriers to Support Treatment of Metals and Reduce the Flux of Tritium to Fourmile Branch at the Savannah River Site in South Carolina - 13358

The Savannah River Site (SRS) produced tritium, plutonium, and special nuclear materials for national defense, medicine, and the space programs. Acidic groundwater plumes containing metals, metallic radionuclides, non-metallic radionuclides and tritium sourced from the F and H Area Seepage Basins have impacted the surface water of Fourmile Branch on SRS. Tritium releases from Fourmile Branch have impacted the water quality within areas of the Savannah River adjacent to the SRS, and this circumstance has been an ongoing regulatory concern. The F and H Area Seepage Basins operated until 1988 for the disposition of deionized acidic waste water from the F and H Separations Facilities. The waste water contained dilute nitric acid and low concentrations of non-radioactive metals, and radionuclides, with the major isotopes being Cs-137, Sr-90, U-235, U-238, Pu-239, Tc-99, I-129, and tritium. The tritium concentration in the waste water was relatively elevated because there is not a practicable removal method in water. The acid content of the waste water during the operational period of the basins was equal to 12 billion liters of nitric acid. The seepage basins were closed in 1988 and backfilled and capped by 1991. The plumes associated with the F and H basins cover an area of nearly 2.4 square kilometers (600 acres) and discharge along ∼2,600 meters of Fourmile Branch. The acidic nature of the plumes and their overall discharge extent along the branch represent a large challenge with respect to reducing contaminant flux to Fourmile Branch. The introduction of nitric acid into the groundwater over a long time effectively reduced the retardation of metal migration from the basins to the groundwater and in the groundwater to Fourmile Branch, because most negatively charged surfaces on the aquifer materials were filled with hydrogen ion. Two large pump and treat systems were constructed in 1997 and operated until 2003 in an attempt to capture and control the releases to Fourmile Branch. The operating cost, including waste disposal, for the two systems was ∼$1.3 M/month. Both systems employed reinjection of tritiated water up gradient of the extraction, and produced large quantities of waste from non-tritium isotopes and metals removal prior to reinjection. Both systems were determined to be ineffective and potentially detrimental with respect to limiting the flux of contaminants to Fourmile Branch. After it became apparent that there was very little benefit to continued operation of the systems, and the staggering cost of operations was recognized by the SRS and regulators, a new remedy was developed. The new system uses vertical subsurface barriers to redirect groundwater flow to limit the transport of contaminants to the stream. The barriers were constructed of acid resistant grout using deep soil mixing techniques. The grout mixture used low swelling clay, fly ash, and sodium hydroxide to form a pozzolana material with low permeability and low strength. The SRS and regulators agreed to a series of remedial goals, with the first goal to reduce tritium flux to the stream by 70% and bring constituents other than tritium to groundwater protection standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Analysis of a Pipe Over-pack Container with a Combustible Waste Matrix for Los Alamos National Laboratory - 17307

Los Alamos National Laboratory (LANL) Technical Area 55 (TA 55) utilizes several different container types to store and transfer special nuclear material and waste for numerous programs. The Nuclear Process Infrastructure - Infrastructure Operations Group (NPI-2) analyzes and certifies containers to meet the specifications for distinct processes and storage. Engineering analysis performed on these containers include but are not limited to: leak testing, filter efficiency testing, pressure drop test, drop testing, water penetration testing, polymer (o-ring) hardness testing, and thermal steady state testing. Of all of these tests, thermal steady-state testing is most crucial to ensure critical components for specific containers do not fail under an internal heat payload. This testing provides data for setting heat payload limits for different containers. The Pipe Over-pack Container (POC) is a vented carbon steel container with a removable lid designed for storing or transferring nuclear waste. Additionally, TA 55 has been tasked to manage and store all of its Transuranic (TRU) waste for the foreseeable future. Being able to place more material into a single container conserves the physical storage space available at TA 55. The Pipe Over pack Handling and Operations Manual requires each user to ensure that the maximum temperature of each component in the POC is not exceeded. Conducting a thermal steady-state test with a combustible waste matrix on the POC can benefit stakeholders on increasing the material limits of the container. The results of these measurements will establish new wattage limits to meet LANL's transportation requirements. The current LANL Transportation Safety Document (TSD) limits the amount of heat source plutonium to 10 grams per POC, corresponding to approximately 5 Watts of heat. The result of this test was provided to the Packaging and Transportation (OS-PT) group to evaluate new wattage limits that can satisfy the needs of TA 55, while maintaining a safe packaging configuration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗