Search NASA⌕ Search

SEARCH · Search NASA

Results for “programming systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Tracking the Sun IX: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

Now in its ninth edition, Lawrence Berkeley National Laboratory (LBNL)’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected solar photovoltaic (PV) systems in the United States. The present report focuses on residential and non-residential systems installed through year-end 2015, with preliminary trends for the first half of 2016. An accompanying LBNL report, Utility-Scale Solar, addresses trends in the utility-scale sector. This year’s report incorporates a number of important changes and enhancements from prior editions. Among those changes, LBNL has made available a public data file containing all non-confidential project-level data underlying the analysis in this report. Installed pricing trends presented within this report derive primarily from project-level data reported to state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. Refer to the text box to the right for several key notes about these data. In total, data were collected and cleaned for more than 820,000 individual PV systems, representing 85% of U.S. residential and non-residential PV systems installed cumulatively through 2015 and 82% of systems installed in 2015. The analysis in this report is based on a subset of this sample, consisting of roughly 450,000 systems with available installed price data.

14 SOLAR ENERGY↗

SU-E-T-372: Evaluation and Comparison of Second-Check Monitor Unit Calculation Software with Pinnacle Treatment Planning System

Purpose: The purpose of this study was to evaluate and compare the accuracy of dose calculation algorithms in the second check software programs Radcalc, Diamond, IMSure, and MUcheck, against the Pinnacle3 treatment planning system (TPS). Methods: Baseline accuracy of the second check software was established by comparison against Pinnacle TPS data using open square fields of 5, 10, 20, 30 and 40cm in a SAD setup. 18 previously treated patients’ files were exported from the Pinnacle3 TPS to each of the four second check softwares, consisting of 146 step and shoot intensity modulated radiotherapy (IMRT) beams and 60 Smart Arcs. Monitor unit (MU) calculated in each of the software were compared with the TPS and the values were represented as a percent difference. Open fields were calculated as a baseline for each software’s accuracy using 5×5, 10×10, 20×20, 30×30, and 40×40 fields. Box plots, Pearson correlation, and Bland-Altman analysis were used for comparison of the results. Results: The baseline accuracy was established to within 0.6%, −1.4%, −0.2%, and −1.0% for Diamond, IMSure,MUcheck, and Radcalc, respectively. In the clinical data, the dose difference represented as mean ± 1 standard deviation were 0.7%±0.1%, −0.3%±0.1%, −1.5%±0.1%, and 0.4%±0.0% for Diamond, IMSure, MUcheck, and Radcalc, respectively Conclusion: The implementation of Clarkson algorithm for the dose calculation between each of the software in question can vary considerably. The currently used second check software, Radcalc has shown the best agreement on average, variance, and smallest percent range from Pinnacle3 TPS values. The closest in average percent difference from the TPS data was the IMSure software, but has significantly larger variance and percent range. The mean percent differences in Diamond and MUcheck were significantly larger than Radcalc and IMSure.

60 APPLIED LIFE SCIENCES↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Singularity v1.x

Singularity is a container solution designed to facilitate mobility of compute across systems and HPC infrastructures. It does this by creating minimal containers that are defined by a specfile and files from the host system are used to build the container. The resulting container can then be launched by any Linux computer with Singularity installed regardless if the programs inside the container are present on the target system, or if they are a different version, or even incompatible versions. Singularity achieves extreme portability without sacrificing usability thus solving the need of mobility of compute. Singularity containers can be executed within a normal/standard command line process flow.

Kurtzer, Gregory↗

Benchmark Simulations of the Thermal-Hydraulic Responses during EBR-II Inherent Safety Tests using SAM

An advanced system analysis tool SAM is being developed for fast-running, improved-fidelity, and whole-plant transient analyses at Argonne National Laboratory under DOE-NE’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. As an important part of code development, companion validation activities are being conducted to ensure the performance and validity of the SAM code. This paper presents the benchmark simulations of two EBR-II tests, SHRT-45R and BOP-302R, whose data are available through the support of DOE-NE’s Advanced Reactor Technology (ART) program. The code predictions of major primary coolant system parameter are compared with the test results. Additionally, the SAS4A/SASSYS-1 code simulation results are also included for a code-to-code comparison.

Hu, Rui↗

Digital Radiography and Computed Tomography (DRCT) of Recovered Chemical Warfare Materiel

The Digital Radiography and Computed Tomography (DRCT) of recovered chemical warfare material (RCWM) project is an ongoing effort to provide the following to the U.S. Army Chemical Materiel Activity (CMA): 1. Development of field-portable and transportable digital x-ray inspection capabilities including radiography and computed tomography. 2. Continuous maintenance and product development to maintain state of the art in x-ray inspection. 3. Evaluation and incorporation of advanced technologies. 4. Deployment of capabilities to selected U.S. Army designated sites. 5. Training of personnel in the use of x-ray inspection equipment. 6. Development of user guides and related documentation for inspection systems. 7. Operations support to field personnel to assess and resolve problems in the field. Support includes both remote (from Idaho) and on-site depending on the problem. These systems have been used to inspect thousands of containers ranging from bare and overpacked munitions to drums and ton containers. This in-progress program review showcases prospective efforts and updates to project systems that are in the developmental stage.

36 MATERIALS SCIENCE↗

Scalable Energy System Expansion Under Uncertainty Using Multi-Stage Stochastic Optimization

The intermittent nature of power from renewable energy sources poses new challenges for electrical grids. This is due to the variable and uncertain nature of the power output from these resources. These features of renewable generation are becoming more relevant to energy system planning as grids reach higher penetration levels of renewable energy. In this presentation we present approaches for energy system planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using multi-stage stochastic programming and the progressive hedging algorithm, we compute energy system expansion decisions on modified versions of the RTS-GMLC test system augmented with large amounts of renewable generation.

MATHEMATICS AND COMPUTING↗

CyTRICS Impact-Based Prioritization Process

Cyber Testing for Resilient Industrial Control Systems™ (CyTRICS™) is the Department of Energy’s (DOE’s) program for cybersecurity vulnerability testing, digital subcomponent enumeration, and forensic assessment. CyTRICS leverages best-in-class test facilities and analytic capabilities at six DOE National Laboratories and strategic partnerships with key stakeholders including technology developers, manufacturers, asset owners and operators, and interagency partners. During the program’s development, CyTRICS established a unique methodology for prioritizing digital components within operational technology (OT) and industrial control systems (ICS) in the Energy Sector Industrial Base (ESIB) for cyber vulnerability testing. The CyTRICS prioritization process leverages multiple characteristics of systems, components, and their contextual deployment to calculate a quantification of individual digital components for CyTRICS testing. The initial version of the CyTRICS prioritization process was premised largely upon the impact which could result to an energy sector industrial control system if the digital component under testing was compromised, either through malicious means, faulty engineering, or other modes. CyTRICS has termed this process the “CyTRICS Impact-based Prioritization Process.” This paper describes the factors identified for use in the Impact-based Prioritization process and identifies the rationale for inclusion. During development, three National Laboratories piloted this prioritization process and generated prioritization scores for seven systems. Following the piloting of the process, laboratory subject matter experts (SME) validated that the numerical scores generated by the prioritization process were consistent with their knowledge of the impact that may occur should any of these systems be disrupted. The following document explains how to perform the prioritization process to generate prioritization scores for energy sector systems. After outlining assumptions required to conduct the process, it describes how to identify and elicit data which can be leveraged to evaluate a system and assign numerical values for each factor. The prioritization process uses different weights on different factors; rationale for each weight is included within the paper. Additionally, the paper includes some recommendations for future enhancements to prioritization, including lessons learned from developing and piloting the process. Finally, a comprehensive appendix includes example documents to be leveraged by those looking to execute the prioritization process.

99 GENERAL AND MISCELLANEOUS↗

Energy Assessments under the Top 10,000 Program - A Case Study for a Steel Mill in China

One of the largest energy-savings programs for the Chinese industrial sector was the Top-1,000 Program, which targeted the 1,000 largest industrial enterprises in China. This program was launched in 2006, implemented through 2010, and covered 33% of national energy usage. Because of the success of the Top-1000 initiative, the program has now been expanded to the Top-10,000 program in the 12th Five-Year Plan period (2011-2015). The Top-10,000 program covers roughly 15,000 industrial enterprises, or about two-thirds of China s total energy consumption. Implementing energy audit systems and conducting industrial energy efficiency assessments are key requirements of the Top-10,000 program. Previous research done by Lawrence Berkeley National Laboratory (LBNL) has shown that there is a significant potential for improvement in energy assessment practices and applications in China. Issues such as lack of long term policy mechanisms, insufficient motivation for industrial enterprises, limited technical scope of energy assessments, and lack of systematic standardization have been identified. Through the support of the U.S. Department of Energy (DOE) and the U.S. State Department (with additional co-funding from the Energy Foundation China), LBNL, Oak Ridge National Laboratory, the Institute for Sustainable Communities (ISC), and DOE Energy Experts worked collaboratively with Chinese local organizations and conducted a series of industrial energy efficiency assessment demonstrations in selected Chinese industrial plants. The project aimed to not only introduce standardized methodologies and tools for energy assessments, but also to bring the systems approach for energy system analysis to the Top 10,000 enterprises. Through the project, five energy system assessments were conducted, and more than 300 Chinese experts from local energy conservation centers, universities, research organizations, energy service companies, and plant engineers were trained. This paper begins by introducing China s national energy intensity and carbon intensity reduction targets. Then, this paper explains the development of Top 10,000 program, including program requirements, the method for target allocation, key supporting policies, as well as challenges in implementing the program. By focusing on a process heating energy system assessment conducted in a Chinese steel mill, this paper presents an example of an energy system assessment conducted on steel reheating furnaces, including overall energy efficiency levels, areas of heat loss, and the potential for energy savings. In addition, the paper provides energy-savings recommendations that were identified during the assessment, as well as potential energy and energy costs savings. To conclude, this paper presents key findings that could further improve the Top 10,000 program by implementing a systems approach for energy assessments.

China Energy Efficiency↗

Optimal PMU Restoration for Power System Observability Recovery After Massive Attacks

Cyber-physically resilient power system operation requires rapid recovery of situational awareness after disastrous scenarios such as massive cyber attacks. In this article, the concept of optimal sequential restoration of Phasor Measurement Units is introduced, aiming at rapid recovery of power system observability in post-attack scenarios. Additionally, the observability recovery problem is formulated as a Mixed Integer Linear Programming problem to maximize the cumulative observability level gained over time during the restoration process. Three alternative objective functions-maximizing the number of observable buses, the number of observable branches, and the total amount of observable power flow-are considered. The effectiveness of the proposed optimal strategy is verified by comparing it with heuristic approaches on the IEEE 57-bus system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of a Novel Technology to Manage Electricity Demand in Grid-Independent Military Microgrids

This research was conducted by the National Renewable Energy Laboratory (NREL) in collaboration with the S&C Electric Inc. through funding provided by the ESTCP. The project demonstrates use of cybersecure Automated Demand Response (ADR) technology to effectively manage microgrid loads during grid-independent, also known as "islanded," operation. When military microgrids become isolated from the main electrical grid, they are required to balance electricity supply and demand locally. Given that local generation may be constrained, the prevailing strategy involves shedding all but the most critical loads by tripping smart circuit breakers, which then necessitate manual resetting. This approach is generally implemented at the building level, which means that the buildings with mission-critical activities are exempt from load management and remain fully powered, whereas those deemed non-critical can experience a complete loss of service. In this research we developed a method that allows building automation systems to selectively control their assets in response to load shedding request from a microgrid controller, avoiding total loss of service in contrast to the conventional control approach. A commercial OpenADR client server by GridFabric is used for communication between the microgrid controller and the building management system (BMS). The microgrid controller monitors both generation capacity and various assets within the microgrid and issues a demand reduction request when necessary. This request is communicated to the OpenADR server via Modbus. Upon receiving the request, the OpenADR server forwards it to the BMS utilizing the OpenADR protocol. The BMS is pre-configured with various levels of load reduction strategies based on the controllable assets available, allowing for a nuanced approach to demand reduction. Both lab and field tests were performed that considered load shedding needed to achieve closed transition into island mode and to accommodate changing loads and power source availability while islanded. A commercial microgrid controller was used for these tests with normal programming within the expected constraints of the system capabilities. That is, the solution did not require any specialized modification to the code base of the controller. Given the latency of the round-trip communication path between the microgrid controller and the various devices involved with the load shed processes, there are certain scenarios for which the demonstrated solution are appropriate and some which are not. The methods described in this report can be used for load shedding/restoration during transitions between islanded and grid-tied modes of operation, as well as accommodating normal variations in load and the need to remove a power source from operation for maintenance. These methods should not be used for scenarios that require load shedding within a second or two such as sudden and unanticipated significant load increases or loss of power sources through equipment faults.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A low-cost centralized HVAC control system solution for energy savings, load shedding, and improved maintenance

University campuses rely on centralized controls for managing and optimizing complex HVAC systems in larger buildings. However, most campuses also have many smaller buildings with packaged HVAC systems controlled by a stand-alone thermostat. Even when these distributed and often overlooked systems have modern programmable thermostats, they cannot be centrally monitored or controlled, and they are typically not programmed adequately. This paper describes the implementation of a low-cost centralized control solution for these systems serving smaller campus buildings, mostly under 5,000 sf and representative of light commercial spaces. Thanks to advances in technology spurred by residential and commercial IoT developments, simple networked thermostat solutions exist that can easily replace original thermostats, and, connect these systems to a web-based portal for monitoring and control. We show that, with small customizations, these platforms can be integrated into facility management workflows. Beyond the energy savings potential from improved scheduling and closer management of these systems, there are significant advantages for maintenance crews since these systems can now be monitored on smart phones or tablets. A grid-responsive load-shedding program has also been implemented for additional cost savings. The networked thermostats can also be connected to additional systems such as economizer controls for improved ventilation management and energy savings. With data from these systems integrated centrally, it can also be used for improved analytics and fault detection. A toolkit has been developed to share the program with other campuses, whether for energy savings, improved management of ventilation, or a more proactive maintenance approach.

Fauchier-Magnan, Nicolas↗

Alternatives to NIST Cf-252 Iirradiations for Transfer Calibration of S-32 Neutron Monitors

Gas-flow proportional counting systems are used by the Radiation Metrology Laboratory (RML) at Sandia National Laboratories for reactor fluence monitoring with the 32 S(n,p) 32 P reaction. Calibration of these systems has traditionally been accomplished by fluence-transfer irradiations at the NIST 252 Cf facility. Such calibrations have become increasingly difficult as the NIST 252 Cf source decayed to unusable levels. To minimize the risk to the testing programs from an inability to properly calibrate these systems, the RML has developed two alternative calibration techniques: 1) development and implementation of certified 32 P sources for activity calibrations and subsequent calculation of neutron fluence, and 2) direct counting of non-certified reactor-irradiated sulfur pellets by liquid scintillation counting to determine 32 P activity for the subsequent calibration of gas-flow proportional counters. Preliminary comparisons show that the several calibration methods are capable of overall uncertainties within about 5 percent.

Vehar, David W.↗

Development of an Assessment Methodology That Enables the Nuclear Industry to Evaluate Adoption of Advanced Automation

Nuclear power has a crucial role in providing safe, reliable, and economical carbon-free electricity for today and the future. For continued operation, many of the existing United States nuclear power plants will begin the subsequent license renewal process for extending their operating license periods. As plants extend their expected operating lifetimes, there is a significant opportunity to modernize. These plants have a much stronger business case with these extended mission periods to modernize and significantly enhance their economic viability in current and future energy markets by implementing digital technologies that support innovation, efficiency gains, and business-model transformation. Ensuring continued safety and reliability is crucial. Transformative digital technologies—including automation—that fundamentally change the concept of operation for the nuclear power plant operating model requires a critical focus on the human and technology integration element. Further, the nuclear industry has historically been reluctant to modernize due to having a risk adverse culture and lack of clarity for a transformative new state vision (Joe & Remer, 2019; Thomas et al., 2020). Common barriers include (1) the perceived value and return on investment (ROI) of digital technology, (2) the perceived risk associated with licensing, regulatory, and cybersecurity, and (3) insufficient guidance for performing digital modifications to power generation systems. This work presents a methodology to address these barriers and support the industry in adopting advanced automation and digital technology through developing a transformative vision and implementation strategy that will address the human and technology integration element. This research leverages previous LWRS Program and industry results. It draws specifically on previous LWRS Program research in the areas of advanced alarm systems, computer-based procedures, model informed decision support, and advanced human-system interface displays (e.g., overviews and task-based). The modernization methodology can be used to guide transformative thinking when integrating a set of vendor-specific capabilities to support a new concept of operations and a utility’s end-state vision. The results of this research are organized into six major sections: - Section 1 introduces the need for supporting large-scale digital modifications that will renew the technology base for extended operating life beyond 60 years - Section 2 describes the challenges that the nuclear industry is enduring with modernizing. - Section 3 summarizes the primary standards and guidance. - Section 4 presents earlier work from the LWRS Program regarding the development of a transformative conceptual design for an advanced control room of a hybrid plants. - Section 5 presents a methodology that is designed at addressing the challenges in the industry today in achieving a transformative new state vision and concept of operations. - Conclusions and next steps of this research are provided in Section 6.

99 GENERAL AND MISCELLANEOUS↗

Are coupled renewable-battery power plants more valuable than independently sited installations?

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$$10/MWh across ISOs on average. The highest boost occurs in California ($\$$15/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$$12.5/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$$12.5/MWh coupling penalty is reduced to $\$$1.6/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$$2–$\$$13/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

Trinity Benchmarks on the Intel Xeon Phi (Knights Corner)

This report documents the early experiences with porting and performance analysis of the Tri-Lab Trinity benchmark applications on Intel Xeon Phi (Knights Corner) (KNC) processor. KNC, the second generation of the Intel Many Integrated Core (MIC) architectures, uses a large number of small P54C-x86 cores with wide vector units and is deployed as PCI bus attached process accelerators. Sandia has experimental test beds of small InifiniBand clusters and workstations to investigate the performance of the MIC architecture. On these experimental test beds the programming models that may be investigated are "offload", "symmetric" and "native". Among these program usage models our primary interest is in the so called "native" mode, because the planned Trinity system to be deployed in 2016 using the next generation MIC processor architecture called Knights Landing would be self-hosted. Trinity / NERSC-8 benchmark programs cover a variety of scientific disciplines and they were used to guide the procurement of these systems. Architectures such as the Intel MIC are well suited to study evolving processor architectures and a usage model commonly referred to as MPI + X that facilitates migration of our applications to use both coarse grain and fine grain parallelism. Our focus with the applications selected is on the efficacy of algorithms in these applications to take advantage of features like: large number of cores, wide vector units, higher-bandwidth and deeper memory sub-system. This is a first step towards understanding applications, algorithms and programming environments for Trinity and future exascale computing systems.

97 MATHEMATICS AND COMPUTING↗

On the Convergence of Inexact Predictor-Corrector Methods for Linear Programming

Interior point methods (IPMs) are a common approach for solving linear programs (LPs) with strong theoretical guarantees and solid empirical performance. The time complexity of these methods is dominated by the cost of solving a linear system of equations at each iteration. In common applications of linear programming, particularly in machine learning and scientific computing, the size of this linear system can become prohibitively large, requiring the use of iterative solvers, which provide an approximate solution to the linear system. However, approximately solving the linear system at each iteration of an IPM invalidates the theoretical guarantees of common IPM analyses. To remedy this, we theoretically and empirically analyze (slightly modified) predictor-corrector IPMs when using approximate linear solvers: our approach guarantees that, when certain conditions are satisfied, the number of IPM iterations does not increase and that the final solution remains feasible. We also provide practical instantiations of approximate linear solvers that satisfy these conditions for special classes of constraint matrices using randomized linear algebra.

Dexter, Gregory↗

Keep it short: Exploring the impacts of configuration choices on the recent economics of solar-plus-battery and wind-plus-battery hybrid energy plants

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$10$/MWh across ISOs on average. The highest boost occurs in California ($\$15$/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$12.5$/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$12.5$/MWh coupling penalty is reduced to $\$1.6$/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$2$–$\$13$/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗