Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,603 records · Page 89

Fiber-Optic Sensing for Earthquake Hazards Research, Monitoring, and Early Warning

The use of fiber‐optic sensing systems in seismology has exploded in the past decade. Despite an ever‐growing library of ground‐breaking studies, questions remain about the potential of fiber‐optic sensing technologies as tools for advancing if not revolutionizing earthquake‐hazards‐related research, monitoring, and early warning systems. A working group convened to explore these topics; we comprehensively examined the application of fiber optics in various aspects of earthquake hazards, encompassing earthquake source processes, crustal imaging, data archiving, and technological challenges. There is great potential for fiber‐optic systems to advance earthquake monitoring and understanding, but to fully unlock their capabilities requires continued progress in key areas of research and development, including instrument testing and validation, increased dynamic range for applications focused on larger earthquakes, and continued improvement in subsurface and source imaging methods. A key current stumbling block results from the lack of clear data archiving requirements, and we propose an initial strategy that balances data volume requirements with preserving key data for a broad range of future studies. In addition, we demonstrate the potential for fiber‐optic sensing to impact monitoring efforts by documenting the data completeness in a number of long‐term experiments. Finally, we outline the features of a instrument testing facility that would enable progress toward reliable and standardized distributed acoustic sensing data. Overcoming these current obstacles would facilitate progress in fiber‐optic sensing and unlock its potential application to a broad range of earthquake hazard problems.

58 GEOSCIENCES↗

Beam test of a harmonic kicker cavity

A harmonically resonant kicker cavity designed for beam exchange in a circulator cooler was built and successfully tested at the Upgraded Injector Test Facility (UITF) at Jefferson Lab. This type of cavity is being considered for the injection scheme of the Rapid Cycling Synchrotron at the Electron-Ion Collider, where the spacing of neighboring bunches demands very short kicks. Operating with five transversely deflecting modes simultaneously that resonate at 86.6 MHz and consecutive odd harmonics thereof, the prototype cavity selectively deflects 1 of 11 electron bunches while leaving the others unperturbed. An RF driver was developed to synthesize phase- and amplitude-controlled harmonic signals and combine them to drive the cavity while also separating the modes from a field-probe antenna for RF feedback and dynamic tuning. Beam deflection was measured by sweeping the cavity phase; the deflection waveform agrees with expectations, having sub-nanosecond rise and fall times. No emittance increase is observed. Harmonically resonant cavities like the one described provide a new capability for injection and extraction at circulators and rings.

Bruker, M.W.↗

HIGH ORDER MODES SURVEY AND MITIGATION OF THE CEBAF C100 CRYOMODULES

Ten new C100 cryomodules have been fabricated and installed for the CEBAF 12 GeV upgrade in the past few years. The high order modes (HOM) of these modules need to be controlled to avoid beam breakup (BBU) instability. Over the last few years, we surveyed the HOM for all the 80 cavities of the C100 modules in the Vertical Test Area (VTA), as well as in the JLAB Cryomodule Test Facility (CMTF) and the CEBAF tunnel. Additional measures such as waveguide filters were applied to reduce the quality factor of the out of spec modes. In addition, we also measured the same passband modes of all the cavities. In this paper, we will present the HOM survey methodology and results from CMTF and CEBAF survey (not including the VTA survey), as well as the same passband modes. The mitigation measures and their effects will also be discussed.

Wang, Shaoheng↗

Investigation of Thermal Acoustic Effects on SRF Cavities within CM1 at Fermilab

Two TESLA-style 8-cavity cryomodules have been operated at Fermilab Accelerator Science and Technology (FAST), formerly the Superconducting Radio Frequency (SRF) Accelerator Test Facility. Operational instabilities were revealed during Radio Frequency (RF) power studies. These observations were complemented by the characterization of thermal acoustic effects on cavity microphonics manifested by apparent noisy boiling of helium involving vapor bubble and liquid vibration. The thermal acoustic measurements also consider pressure and temperature spikes which drive the phenomenon at low and high frequencies.

43 PARTICLE ACCELERATORS↗

Measurements of Decay and Snapback in Nb₃Sn Accelerator Magnets at Fermilab

In recent years, Fermilab has been executing an inten-sive R&D program on Nb₃Sn accelerator magnets. This program has included dipole and quadrupole models and demonstrators for various programs and projects, including the HL-LHC accelerator upgrade project. A systematic study of the field decay and snapback during the injection portion of a simulated accelerator cycle was executed at the Fermilab Magnet Test Facility. This paper summarizes the recent measurements of the MQXFS1 short quadrupole model and discusses the results of some previously measured Nb₃Sn magnets at CERN

43 PARTICLE ACCELERATORS↗

Optimization of a High Bunch Charge ERL Injection Merger for PERLE

Delivery of high charge electron bunches into the main loop of an ERL (energy recovery linac) while preserving the emittance is challenging. This is because at the typical injection momentum, space charge forces still have a significant effect on the beam dynamics. In this work we consider the design of the merger for PERLE, an ERL test facility to be based at IJCLab in France. Previous simulations have shown that the baseline DC gun based injector can achieve the required emittance at the booster linac exit. The quality of the 500 pC bunches must then be preserved with space charge through the merger at total beam energy of 7 MeV keeping the emittance below 6 mm mrad. The beam dynamics in the merger were simulated using the code OPAL and optimised using a genetic algorithm. Three possible merger schemes were investigated. The goal of the optimisation was to minimise the emittance growth while also achieving the required Twiss parameters to match onto the spreader at the main linac exit. A three dipole solution is then examined in more detail.

Hounsell, B.↗

JLAB LLRF 3.0 Development and Tests

The Jefferson Lab LLRF 3.0 system is being developed to replace legacy LLRF systems in the CEBAF accelerator. The new design builds upon 25 years of design and operational RF control experience, and our recent collaboration in the design of the LCLSII LLRF system. The new cavity control algorithm is a fully functional phase and amplitude locked Self Exciting Loop (SEL). This paper discusses the progress of the LLRF 3.0 hardware design, FPGA firmware development, User Datagram Protocol (UDP) operation, and recent LLRF 3.0 system tests on the CEBAF Booster cryomodule in the Upgrade Injector Test Facility (UITF).

Plawski, T. E.↗

Simulation Studies on the Interactions of Electron Beam with Wastewater

The manufactured chemical pollutants, like 1,4 dioxane and PFAS (per- and polyfluroralkyl substances), found in the underground water and/or drinking water are challenging to be removed or biodegraded. Energetic electrons are capable of mediating and removing them. This paper utilizes FLUKA code to evaluate the beam-wastewater interaction effects with different energy, space and divergence distributions of the electron beam. With 8 MeV average energy, the electron beam exits from a 0.0127 cm thick titanium window, travels through a 4.3 cm distance air and a second 0.0127 cm thick stainless water container window with 2.43 cm radius, and finally is injected into the water area, where the volume of water is around 75 cubic cm. The distribution parameters of the electron beam are from the GPT (General Particle Tracer) simulations for UITF (Upgraded Injector Test Facility) in Jefferson lab. By varying the distributions, several measurements including the dose (or energy deposition) distribution, electron fluence, photon fluence are scored and compared. Taking the comparisons into consideration, this paper is aiming to find better electron beams for the wastewater irradiation.

Li, X.↗

Modeling a Nb3Sn Cryounit in GPT at UITF

Nb₃Sn is a prospective material for future superconducting RF (SRF) accelerator cavities. The material can achieve higher quality factors, higher temperature operation and potentially higher accelerating gradients (E_{acc} 96 MV/m) compared to conventional niobium. In this work, we performed modeling of the Upgraded Injector Test Facility (UITF) at Jefferson Lab utilizing newly constructed Nb₃Sn cavities. We studied the effects of the buncher cavity and varied the gun voltages from 200-500 keV. We have calibrated and optimized the SRF cavity gradients and phases for the Nb₃Sn five-cell cavities energy gains with the framework of General Particle Tracer (GPT). Our calculations show the beam goes cleanly through the unit. There is full energy gain out of the second SRF cavity but not from the first SRF cavity due to non-relativistic phase shifts.

Pokharel, S.↗

Python-EPICS RF Conditioning Automatic Control System at the Spallation Neutron Source

The RF Test Facility (RFTF) at the Spallation Neutron Source (SNS) is used for the conditioning of RF compo-nents such as ceramic vacuum windows and power cou-plers prior to their installation in the H- ion linear accel-erator. This process exposes components to high-power RF fields and thermal cycling to improve performance and remove surface impurities. To automate and optimize this process, a Python-based EPICS control system was developed alongside targeted hardware upgrades. The system enables real-time monitoring and control of RF power levels, temperature, and vacuum pressure. A user-friendly graphical interface was implemented using CS-Studio (Phoebus), allowing operators to adjust parameters and collect data efficiently. The system integrates a High-Power Protection Module (HPM) for interlocks based on vacuum and arc detection, ensuring safe operation. These upgrades have significantly improved the efficiency, accuracy, and safety of RF conditioning at the SNS RFTF. This paper describes the updated RF conditioning sys-tem, highlighting the software and hardware develop-ments and their application in support of the Proton Pow-er Upgrade (PPU) project.

Lee, Sung-Woo [ORNL] (ORCID:000000030915835X)↗

Results From the 6D Diagnostics Test Bench at SNS

This paper presents the method and results for measuring the full six-dimensional phase space of a low energy, high intensity hadron beam. This was done by combining four-dimensional emittance measurement techniques along with dispersion measurement and a beam shape monitor to provide the energy and arrival time components. The measurements were performed on the new Beam Test Facility (BTF) at the Spallation Neutron Source (SNS), a 2.5 MeV functional duplicate of the SNS accelerator front end. The results include a correlation the had not previously been observed.

Cathey, Brandon↗

LCLS-II CRYOMODULE TRANSPORT SYSTEM TESTING

The Cryomodules (CM) for the Linear Coherent Light Source II (LCLS-II) will be shipped to SLAC (Menlo Park, California) from JLab (Newport News, Virginia) and FNAL (Batavia, Illinois). A transportation system has been designed and built to safely transport the CMs over the road. It uses an array of helical isolator springs to attenuate shocks on the CM to below 1.5g in all directions. The system rides on trailers equipped with Air-Ride suspension, which attenuates vibration loads. The prototype LCLS-II CM (pCM) was driven 750 miles to test the transport system; shock loggers recorded the shock attenuation on the pCM and vacuum gauges were used to detect any compromises in beamline vacuum. Alignment measurements were taken before and after the trip to check whether cavity positions had shifted beyond the ± 0.2mm spec. Passband frequencies and cavity gradients were measured at 2K at the Cryomodule Test Facility (CMTF) at JLab to identify any degradation of CM performance after transportation. The transport system was found to have safely carried the CM and is cleared to begin shipments from JLab and FNAL to SLAC.

Huque, Naeem↗

Operation of an SRF Cavity Tuner Submerged into Liquid He

To precisely control the resonance of 1.3 GHz SRF cavities during testing at the FNAL’s Vertical Test Facility, we install for the first time a double lever tuner and operate it when submerged into the liquid He bath. Both active components of the tuner: electromechanical actuator (stepper motor) and piezo-actuators are operated inside superfluid helium. Accuracy in controlling the SRF cavity resonance frequency will be presented. Specifics of the tuner operation when submerged into liquid He will be discussed.

43 PARTICLE ACCELERATORS↗

Proton Improvement Plan – II: Overview of Progress in the Construction

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV linac, which comprises a room temperature front end followed by an SRF accelerator. The front end has been constructed and operated with (pulsed & CW) beam in the PIP-II Injector Test facility (PIP2IT). The SRF accelerator consists of five different types of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at state-of-the-art parameters. The first two PIP-II cryomodules, HWR and Single Spoke Resonator 1 (SSR1) are installed in PIP2IT and have accelerated beam to 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was recently baselined, and site construction is underway

43 PARTICLE ACCELERATORS↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

Correlations to predict frictional pressure loss of hydraulic-fracturing slurry in coiled tubing

Compared with conventional-tubing fracturing, coiled-tubing (CT) fracturing has several advantages. CT fracturing has become an effective stimulation technique for multizone oil and gas wells. It is also an attractive production-enhancement method for multiseam coalbed-methane wells, and wells with bypassed zones. The excessive frictional pressure loss through CT has been a concern in fracturing. The small diameter of the string limits the cross-sectional area open to flow. Furthermore, the tubing curvature causes secondary flow and results in extra flow resistance. This increased frictional pressure loss results in high surface pumping pressure. The maximum possible pump rate and sand concentration, therefore, have to be reduced. To design a CT fracturing job properly, it is essential to predict the frictional pressure loss through the tubing accurately. This paper presents correlations for the prediction of frictional pressure loss of fracturing slurries in straight tubing and CT. They are developed on the basis of full-scale slurry-flow tests with 11/2-in. CT and slurries prepared with 35 lbm/1,000 gal of guar gel. The extensive experiments were conducted at the full-scale CT-flow test facility. The proposed correlations have been verified with the experimental data and actual field CT-fracturing data. Case studies of wells recently fractured are provided to demonstrate the application of the correlations. The correlations will be useful to the CT engineers in their hydraulics design calculations.

01 COAL, LIGNITE, AND PEAT↗

LCLS Gun Solenoid Design Considerations

The LCLS photocathode rf gun requires a solenoid immediately downstream for proper emittance compensation. Such a gun and solenoid have been operational at the SSRL Gun Test Facility (GTF) for over eight years. Based on magnetic measurements and operational experience with the GTF gun solenoid multiple modifications are suggested for the LCLS gun solenoid. The modifications include adding dipole and quadrupole correctors inside the solenoid, increasing the bore to accommodate the correctors, decreasing the mirror plate thickness to allow the solenoid to move closer to the cathode, cutouts in the mirror plate to allow greater optical clearance with grazing incidence cathode illumination, utilizing pancake coil mirror images to compensate the first and second integrals of the transverse fields and incorporating a bipolar power supply to allow for proper magnet standardization and quick polarity changes. This paper describes all these modifications plus the magnetic measurements and operational experience leading to the suggested modifications.

43 PARTICLE ACCELERATORS↗

Earth's Magnetic Field Measurements for the LCLS Undulators

Measurements of the earth's magnetic field at several locations at SLAC were conducted to determine the possible field error contribution from tuning the undulators in a location with a different magnetic field than that which will be found in the undulator hall. An average difference of 0.08 {+-} 0.04 Gauss has been measured between the downward earth's field components in the test facility and SLAC tunnel locations.

43 PARTICLE ACCELERATORS↗