SISO Space Reference FOM 101
This is a tutorial that covers the basic concepts associated with the SISO Space Reference Federation Object Model. It will be given at the SISO 2020 SIW in Orlando, Florida.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This is a tutorial that covers the basic concepts associated with the SISO Space Reference Federation Object Model. It will be given at the SISO 2020 SIW in Orlando, Florida.
This presentation provides an overview of the Advanced Modular Power Systems (AMPS) Project, along with sections to describe the three technical focus areas - Modular Power Electronics & Standards, Autonomous Power Control, and the Modular Power Testbed.
Explore the source record for details and available documents.
The purpose of this tutorial is to provide an introduction to various space mission types, link together the various mission systems engineering concepts which go into the design and development of a space mission with the ground system architecture. Attendees will learn about: Types of satellite missions and characteristics of them, Types of satellite orbits and why a particular mission is in a particular orbit, Characteristics of different satellite operators (commercial, DoD, civil), Mission drivers, Mission operations concepts and how various challenges have been addressed, Space mission data standards, How to deliver data, General ground system and Mission Operations Center design.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The ISS Plug-in Plan (IPiP) Team coordinates and develops an integrated plug-in plan each Increment for Payload and Systems hardware that connects downstream of a UOP or SUP. This presentation is to familiarize Payload Developers with the processes and forms used by IPiP.
Before the Artemis I mission launches on its way around the Moon, the launch team at Kennedy Space Center and supporting teams across the country will begin the launch countdown about two days before liftoff. The launch countdown contains "L Minus” and "T Minus" times. "L minus" indicates how far away we are from liftoff in hours and minutes and does not include built-in holds. “T minus” time is a sequence of events that are built into the launch countdown where counting and holds are inserted. The 730,000 gallons of propellants that will be loaded into the rocket are liquid oxygen (LO2) and liquid hydrogen (LH2). Pauses in the countdown, or "holds," are built into the countdown to allow the launch team to target a precise launch window, and to provide a cushion of time for certain tasks and procedures without impacting the overall schedule. For the Artemis I countdown, planned built-in holds vary in length and occur at the following times: L-8 hours, 40 minutes, and L-40 minutes.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Objective of the presentation: Enhance awareness of space weather and why you should care
No abstract provided