Search NASA⌕ Search

SEARCH · Search NASA

Results for “ASBESTOS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deactivation and Demolition (D and D) of the Toxic Substance Control Act (TSCA) Incinerator Oak Ridge, Tennessee - 19184

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. In 1989, the U.S. Environmental Protection Agency (EPA) added the Oak Ridge Reservation to the National Priorities List of sites and facilities that pose a sufficient threat to human health or the environment to warrant cleanup. The U.S. Department of Energy is cleaning up the Oak Ridge Reservation under a Federal Facility Agreement with the EPA and the Tennessee Department of Environment and Conservation. Many types of waste have been managed and disposed as part of the multi-decade cleanup effort. One unique facility, the Toxic Substance Control Act (TSCA) Incinerator, was constructed at the Department of Energy's Est Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Incinerator was constructed in the mid-1980's and underwent a series of test burns and readiness reviews to obtain the necessary environmental permits and operating approvals from state and federal regulatory agencies. With these in place, the incinerator began routine operations in 1991. It was designed and permitted for receiving, sorting, storing, preparing, and thermally destroying low-level radioactive and RCRA mixed waste contaminated with PCBs. The incinerator was named after a law passed in 1976 that provides the U.S. Environmental Protection Agency with authority to require reporting, record-keeping, testing, and restrictions relating to chemical substances and/or mixtures. During its operating lifetime, the one-of-a-kind thermal treatment facility burned materials regulated under TSCA and the Resource Conservation and Recovery Act (RCRA), most notably radiologically-contaminated polychlorinated biphenyls (PCBs). The TSCA Incinerator met or exceeded environmental regulations and DOE requirements for the treatment of these types of wastes. After more than 18 years of operation and more than 35 million pounds of waste safely incinerated, the TSCA Incinerator shut down operations on December 2, 2009. The TSCA Incinerator has been called a national resource for DOE sites from coast to coast. As the only U.S. facility permitted to incinerate specialized types of wastes, it not only accepted material from the Oak Ridge Reservation but also other facilities across the nationwide DOE complex. Over the years, a dynamic team of hard working and talented people operated and maintained the facility under the most stringent environmental permits and site requirements. The facility has played a key role in the treatment of radioactive PCB and hazardous wastes (mixed wastes) from the Oak Ridge Reservation, as well as from other facilities across the DOE complex. Through its support to over 20 sites in the DOE complex, environmental waste from past and ongoing operations has been safely and permanently treated. In the years since it was shut down, deactivation workers have been preparing TSCA for demolition. This work scope included triple cleaning, rinsing of all production equipment and tanks to RCRA clean criteria, filling sumps, encapsulating PCB and radioactive contamination, removal of universal waste (asbestos. lead and mercury), draining and disposal of residual water in tanks and transfer piping, and removing and disposing of carbon vessels, which were part of the water management system. In 2018, the facility was successfully deactivated and demolished, permanently removing one of the most unique facilities in the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Robot for Nondestructive Assay of Holdup Deposits in Gaseous Diffusion Piping - 19504

Miles of contaminated pipe must be characterized as part of the decommissioning effort at deactivated gaseous diffusion enrichment facilities. The current method requires cutting away asbestos- lined thermal enclosures and performing repeated, elevated operations to manually perform nondestructive assay (NDA) on pipe from the outside. The RadPiper robot, part of the Pipe Crawling Activity Measurement System (PCAMS) developed by Carnegie Mellon University and commissioned for use at the DOE Portsmouth Gaseous Diffusion Enrichment Facility, automatically measures U-235 in pipes from the inside. This improves certainty, increases safety, and greatly reduces measurement time. The heart of the RadPiper robot is a sodium iodide scintillation detector in an innovative disc-collimated assembly. By measuring from inside pipes, the robot significantly increases its count rate relative to external through-pipe measurements. The robot also provides imagery, models interior pipe geometry, and precisely measures distance in order to localize radiation measurements. Data collected by this system provides insight into pipe interiors that is simply not possible from exterior measurements, all while keeping operators safer. This paper describes the technical details of the PCAMS RadPiper robot. Key features for this robot include precision distance measurement, in-pipe obstacle detection, ability to transform for two pipe sizes, and robustness in autonomous operation. Test results demonstrating the robot's functionality are presented, including deployment tolerance tests, safeguarding tests, and localization tests. Integrated robot tests are also shown. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site - Area 5 Waste Received Under Permit SW532

Calendar Year 23 Asbestos Report for Permit SW532 Being resubmitted to address a comment received by NDEP, the weight and volume of two packages on one of the shipments was rounded differently than the quarterly report and we are revising the annual report to match.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How much have adverse occupational health outcomes among construction workers improved over time? Evidence from 25 years of medical screening

Background Construction workers have always had a high risk of occupational illnesses. We used 25 years of data from a medical screening program serving older construction workers to determine how much health outcomes have improved over the past 60 years. Methods We investigated changes in relative risk for chest radiographs consistent with pneumoconiosis, COPD by spirometry, lung cancer mortality, and audiometry-assessed hearing impairment among workers participating in a medical screening program. Results were stratified by decade of first construction employment: before 1960, 1960–1969, 1970–1979, 1980–1989, and after 1990. Poisson and Cox regression analyses assessed relative risk by decade adjusted for age, sex, smoking, and years of construction trade work. Results Subjects were 94% male and, on average, 60 years old with 25 years of construction work. When compared to workers employed before 1960, those first employed after 1990 experienced the following reductions in model-adjusted relative risks: chronic obstructive pulmonary disease, 32%; all pneumoconiosis, 68%; parenchymal abnormalities, 35%; pleural abnormalities, 71%; hearing impairment, 20%; and lung cancer mortality, 48%. Risks started to decline in the 1960s with greatest reductions among workers first employed after 1970. Conclusions This study demonstrates the positive impact that adoption of occupational health protections have had over the past 60 years. The greatest risk reductions were observed for outcomes with strong regulatory and legal incentives to reduce exposures and associated risks, such as those associated with inhalation hazards (asbestos and silica), while lowest improvement was for hearing impairment, for which little regulatory enforcement and few prevention incentives have been adopted.

60 APPLIED LIFE SCIENCES↗

Expression profile and function of Wnt signaling mechanisms in malignant mesothelioma cells

Highlights: •Expression profile of Wnt pathway related genes in mesothelioma cells. •Differential expression of key Wnt pathway molecules and regulators. •Wnt3a stimulated mesothelioma growth whereas sFRP4 was inhibitory. •Targeting β-Catenin can sensitise mesothelioma cells to cytotoxic drugs. -- Abstract: Malignant mesothelioma (MM) is an uncommon and particularly aggressive cancer associated with asbestos exposure, which currently presents an intractable clinical challenge. Wnt signaling has been reported to play a role in the neoplastic properties of mesothelioma cells but has not been investigated in detail in this cancer. We surveyed expression of Wnts, their receptors, and other key molecules in this pathway in well established in vitro mesothelioma models in comparison with primary mesothelial cultures. We also tested the biological response of MM cell lines to exogenous Wnt and secreted regulators, as well as targeting β-catenin. We detected frequent expression of Wnt3 and Wnt5a, as well as Fzd 2, 4 and 6. The mRNA of Wnt4, Fzd3, sFRP4, APC and axin2 were downregulated in MM relative to mesothelial cells while LEF1 was overexpressed in MM. Functionally, we observed that Wnt3a stimulated MM proliferation while sFRP4 was inhibitory. Furthermore, directly targeting β-catenin expression could sensitise MM cells to cytotoxic drugs. These results provide evidence for altered expression of a number of Wnt/Fzd signaling molecules in MM. Modulation of Wnt signaling in MM may prove a means of targeting proliferation and drug resistance in this cancer.

60 APPLIED LIFE SCIENCES↗

Macrophage receptor with collagenous structure (MARCO) is a dynamic adhesive molecule that enhances uptake of carbon nanotubes by CHO-K1 Cells

The toxicity of carbon nanotubes (CNTs), a highly promising nanomaterial, is similar to that of asbestos because both types of particles have a fibrous shape and are biopersistent. Here, we investigated the characteristics of macrophage receptor with collagenous structure (MARCO), a membrane receptor expressed on macrophages that recognizes environmental or unopsonized particles, and we assessed whether and how MARCO was involved in cellular uptake of multi-walled CNTs (MWCNTs). MARCO-transfected Chinese hamster ovary (CHO-K1) cells took up polystyrene beads irrespective of the particle size (20 nm–1 μm). In the culture of MARCO-transfected CHO-K1 cells dendritic structures were observed on the bottom of culture dishes, and the edges of these dendritic structures were continually renewed as the cell body migrated along the dendritic structures. MWCNTs were first tethered to the dendritic structures and then taken up by the cell body. MWCNTs appeared to be taken up via membrane ruffling like macropinocytosis, rather than phagocytosis. The cytotoxic EC{sub 50} value of MWCNTs in MARCO-transfected CHO-K1 cells was calculated to be 6.1 μg/mL and transmission electron microscopic observation indicated that the toxicity of MWCNTs may be due to the incomplete inclusion of MWCNTs by the membrane structure. -- Highlights: ►Carbon nanotubes (CNTs) were tethered to MARCO in vitro. ►CNTs were taken up rapidly into the cell body via MARCO by membrane ruffling. ►The incomplete inclusion of CNTs by membranes caused cytotoxicity.

60 APPLIED LIFE SCIENCES↗

Overexpression of activin-A and -B in malignant mesothelioma – Attenuated Smad3 signaling responses and ERK activation promote cell migration and invasive growth

Activin-A and activin-B, members of the TGF-β superfamily, are regulators of reproductive functions, inflammation and wound healing. These dimeric molecules regulate various cellular activities such as proliferation, migration and suvival. Malignant mesothelioma is an asbestos exposure related tumor affecting mainly pleura and it usually has a dismal prognosis. Here, we demonstrate that both activin-A and -B are abundantly expressed in mesothelioma tumor tissue as well as in cultured primary and established mesothelioma cells. Migratory and invasive mesothelioma cells were also found to have attenuated activation of the Smad2/3 pathway in response to activins. Migration and invasive growth of the cells in three-dimentional matrix was prevented by inhibition of activin activity using a soluble activin receptor 2B (sActR2B-Fc). This was associated with decreased ERK activity. Furthermore, migration and invasive growth was significantly inhibited by blocking ERK phosphorylation. Mesothelioma tumors are locally invasive and our results clearly suggest that acivins have a tumor-promoting function in mesothelioma through increasing expression and switching from canonical Smad3 pathway to non-canonical ERK pathway signaling. Blocking activin activity offers a new therapeutic approach for inhibition of mesothelioma invasive growth. - Highlights: • Activin-A and activin-B are highly expressed in mesothelioma. • Mesothelioma cell migration and invasive growth can be blocked with sActR2B. • Activin induced Smad3 activity is attenuated in invasive mesothelioma cells. • Activins induce ERK activity in mesothelioma cells.

60 APPLIED LIFE SCIENCES↗

Olivine Dissolution in Simulated Lung and Gastric Fluid as an Analog to the Behavior of Lunar Particulate Matter Inside the Human Respiratory and Gastrointestinal Systems

With the Artemis III mission scheduled to land humans on the Moon in 2025, work must be done to understand the hazards lunar dust inhalation would pose to humans. In this study, San Carlos olivine was used as an analog of lunar olivine, a common component of lunar dust. Olivine was dissolved in a flow-through apparatus in both simulated lung fluid and 0.1 M HCl (simulated gastric fluid) over a period of approximately 2 weeks at physiological temperature, 37°C. Effluent samples were collected periodically and analyzed for pH, iron, silicon, and magnesium ion concentrations. The dissolution rate data derived from our measurements allow us to estimate that an inhaled 1.0 μm diameter olivine particle would take approximately 24 years to dissolve in the human lungs and approximately 3 weeks to dissolve in gastric fluid. Results revealed that inhaled olivine particles may generate the toxic chemical, hydroxyl radical, for up to 5–6 days in lung fluid. Olivine dissolved in 0.1 M HCl for 2 weeks transformed to an amorphous silica-rich solid plus the ferric iron oxy-hydroxide ferrihydrite. Olivine dissolved in simulated lung fluid shows no detectable change in composition or crystallinity. Equilibrium thermodynamic models indicate that olivine in the human lungs can precipitate secondary minerals with fibrous crystal structures that have the potential to induce detrimental health effects similar to asbestos exposure. Our work indicates that inhaled lunar dust containing olivine can settle in the human lungs for years and could induce long-term potential health effects like that of silicosis.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Gunnar uranium mine environmental remediation - Northern Saskatchewan

The Gunnar Mine and mill site was the largest of some 38 now-abandoned uranium mines that were developed and operated in Northern Saskatchewan, Canada, during the Cold War years. During their operating lifetimes these mines produced large quantities of ore and tailings. The Gunnar mine (open pit and underground) produced over 5 million tonnes of uranium ore and nearly 4.4 million tonnes of mine tailings during its operations from 1955 through 1963. An estimated 2.2 to 2.7 million m{sup 3} of waste rock that was generated during the processing of the ore abuts the shores of Lake Athabasca, the 22. largest lake in the world. After closure in the 1960's, the Gunnar site was abandoned with little to no decommissioning being done. The Saskatchewan Research Council has been contracted to manage the clean-up of these abandoned northern uranium mine and mill sites. The Gunnar Mine, because of the magnitude of tailings and waste rock, is subject to an environmental site assessment process regulated by both provincial and federal governments. This process requires a detailed study of the environmental impacts that have resulted from the mining activities and an analysis of projected impacts from remediation efforts. The environmental assessment process, specific site studies, and public involvement initiatives are all now well underway. Due to the many uncertainties associated with an abandoned site, an adaptive remediation approach, utilizing a decision tree, presented within the environmental assessment documents will be used as part of the site regulatory licensing. A critical early task was dealing with major public safety hazards on the site. The site originally included many buildings that were remnants of a community of approximately 800 people who once occupied the site. These buildings, many of which contained high levels of asbestos, had to be appropriately abated and demolished. Similarly, the original mine head frame and mill site buildings, many of which still contained the original machinery and equipment, also had to be dismantled. Remediation options for the accumulated demolition debris have been assessed, as have remediation options for the waste rock and tailings, all of which form part of the environmental assessment. The regulatory requirements include the environmental assessment processes, a complex public involvement strategy, and licensing from the Canadian Nuclear Safety Commission (CNSC) with the long-term goal of releasing the property in a remediated and stable state to the Province of Saskatchewan. Prescribed environmental and land use endpoints will be determined based on the environmental assessment studies and remediation options analyzed and implemented. Ultimately, the site will be released into an institutional controls program that will allow long-term government management and monitoring. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Management of the decommissioning of the Thetis reactor

The Thetis research reactor on the site of the Nuclear Sciences Institute of the Ghent University has been in operation from 1967 until December 2003. This light-water moderated graphite-reflected low-enriched uranium pool-type reactor has been used for various purposes e.g. the production of radioisotopes and activation analyses. During the first years its core power was 15 kW. In the early '70, a core enlargement allowed for operation at typically 150 kW, while the maximum was allowed to be 250 kW In September 2007, Ghent University entrusted to SCK-CEN the management of the back-end of the spent fuel and the decommissioning of the reactor. In 2010, the spent fuel was removed from the reactor and transported to Belgoprocess for cementation in 400 l drums and interim storage awaiting final disposal. This activity allows tackling the decommissioning of the reactor. The objective is to complete its decommissioning by the end of 2014. In the framework of the decommissioning of the Thetis reactor, SCK-CEN set-up the final decommissioning plan and the decommissioning licensing file. These documents include among others a radiological inventory of the reactor. The graphite moderator blocks, the control and the safety pates, the liner of the pool were modeled to assess the activation products (isotopic vector and intensity). At the end of the unloading of the reactor in 2010 a brief mapping of the equipment's and internals of the reactor pool was performed. In 2012, we realized a more detailed mapping. These results confirmed those performed earlier and allowed to confirm the assumptions made in the final decommissioning plan. We set-up the terms of reference for the first decommissioning phase of the reactor namely the dismantling of the reactor i.e. reactor pool, circuits and rabbit system, equipment's and ventilation ducts. The removal of asbestos is also included into this phase. We conducted the selection process and the awarding of this decommissioning job. We gained the decommissioning license in May 2012. We also prepared the software tool allowing managing the decommissioning project by updating the inventory and recording the progress, the characterization measurements and the material and waste production. This software allows also to trace all the material streams and to report to the Authorities. This software is a simplified release of the ones developed by SCK-CEN in the framework of other decommissioning projects like BR3 and Belgonucleaire. The dismantling of the reactor i.e. reactor pool, circuits and rabbit system, will be performed in 2013. In 2014, it is planned to map all the surfaces of the infrastructure to highlight residual contamination of floor, walls and ceiling. The contaminated surfaces will be decontaminated and controlled. The objective is to reach the free release of the reactor building and laboratories by the end of 2014. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electron Transport in Tellurium Nanowires

The temperature and magnetic field dependences of the voltage-current characteristics of tellurium nanowires manufactured via the insertion of tellurium into chrysotile asbestos pores from a melt have been measured. The measurements have been performed within a broad range of temperatures and magnetic fields. The results of such measurements are analyzed by means of their comparison with the predictions of theoretical models developed for the case of one-dimensional structures. The obtained dependences are concluded to most closely correspond to Luttinger liquid theory predictions. This result agrees with the concepts that the major mechanism of current in such one-dimensional wires does not depend on the material inserted into pores, but depends only on the dimension of conducting wires.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

The legacy of weapons grade plutonium production: Health status of Hanford complex workers who manage the waste

The extent and etiology of health effects in workers who maintain underground storage tanks at the Hanford Nuclear Reservation (Hanford) have been subjects of controversy and concern for several decades. Hanford is a decommissioned nuclear production complex managed by the US Department of Energy in southeast Washington State. This integration-of-evidence review evaluates the relationship between exposure to vapors from mixed chemical and radioactive waste stored in underground storage tanks at Hanford and worker health. Hanford workers’ health information was gathered from technical reports, media reports, and published literature, including the systematic search of seven databases. This review describes the health status and health concerns of Hanford tank farm workers based on the integration of the available health effects data from disparate sources. In interviews with external groups, Hanford workers reported both irritant-type symptoms and diseases that they believe are attributable to tank farm vapors. However, the results of this integration-of-evidence review indicated that no pervasive pattern of occupational disease was identified that can be associated with exposure to tank farm vapors. Inhalation exposure to asbestos and beryllium is associated with lung disease from various types of nuclear industry work but not from work on tank farms. This review concluded that while irritant-type symptoms and isolated cases of occupational disease are plausible under certain conditions, the currently available data do not support a pervasive pattern of occupational disease associated with vapor exposure.

Cherry, Debra↗

Closure Report for Corrective Action Unit 548: Areas 9, 10, 18, 19, and 20 Housekeeping Sites, Nevada National Security Site, Nevada

This Closure Report (CR) documents closure activities for Corrective Action Unit (CAU) 548, Areas 9, 10, 18, 19, and 20 Housekeeping Sites, and complies with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 548 consists of the following Corrective Action Sites (CASs), located in Areas 9, 10, 12, 18, 19, and 20 of the Nevada National Security Site: · CAS 09-99-02, Material Piles (2) · CAS 09-99-04, Wax, Paraffin · CAS 09-99-05, Asbestos, Vermiculite · CAS 09-99-07, Tar Spill · CAS 10-22-02, Drums · CAS 10-22-05, Gas Block · CAS 10-22-07, Gas Block · CAS 10-22-34, Drum · CAS 10-22-38, Drum; Cable · CAS 12-99-04, Epoxy Tar Spill · CAS 12-99-08, Cement Spill · CAS 18-14-01, Transformers (3) · CAS 19-22-01, Drums · CAS 19-22-11, Gas Block (2) · CAS 19-44-01, Fuel Spill · CAS 20-22-07, Drums (2) · CAS 20-22-09, Drums (3) · CAS 20-22-14, Drums (2) · CAS 20-22-16, Drums (2) · CAS 20-24-09, Battery Closure activities began in July 2011 and were completed in December 2011 and included removal and disposal of material piles, spills, sanitary debris, a lead acid battery, lead and steel shot, and stained soil. Activities were conducted according to the Sectored Clean-up Work Plan for Housekeeping Category Waste Sites (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003). Closure activities generated sanitary waste, hydrocarbon waste, low-level waste, hazardous waste, and mixed waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 548 · The transfer of CAU 548 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Renovations - Volume 17: Insulation - A Guide for Contractors to Share with Homeowners

This report was prepared by PNNL for DOE's Building America program and is intended as a guide that energy performance contractors can share with homeowners to describe various insulation options for improving the energy performance and comfort of existing homes. The report provides descriptions of many common insulation types, including their advantages and disadvantages, R-values, characteristics, and typical uses. The report also describes potentially hazardous products such as asbestos and formaldehyde and safety issues when conducting energy-efficient upgrades including radon. The guide is available for download at the DOE Building America website, www.buildingamerica.gov.

building↗

Data Sharing Report Characterization of Isotope Row Facilities Oak Ridge National Laboratory Oak Ridge TN

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using funds provided by the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a survey approach, focused on characterizing the Isotope Row Facilities located at the Oak Ridge National Laboratory (ORNL) for future determination of an appropriate disposition pathway for building debris and systems, should the buildings be demolished. The characterization effort was designed to identify and quantify radiological and chemical contamination associated with building structures and process systems. The Isotope Row Facilities discussed in this report include Bldgs. 3030, 3031, 3032, 3033, 3033A, 3034, 3036, 3093, and 3118, and are located in the northeast quadrant of the main ORNL campus area, between Hillside and Central Avenues. Construction of the isotope production facilities was initiated in the late 1940s, with the exception of Bldgs. 3033A and 3118, which were enclosed in the early 1960s. The Isotope Row facilities were intended for the purpose of light industrial use for the processing, assemblage, and storage of radionuclides used for a variety of applications (ORNL 1952 and ORAU 2013). The Isotope Row Facilities provided laboratory and support services as part of the Isotopes Production and Distribution Program until 1989 when DOE mandated their shutdown (ORNL 1990). These facilities performed diverse research and developmental experiments in support of isotopes production. As a result of the many years of operations, various projects, and final cessation of operations, production was followed by inclusion into the surveillance and maintenance (S&M) project for eventual decontamination and decommissioning (D&D). The process for D&D and final dismantlement of facilities requires that the known contaminants of concern (COCs) be evaluated and quantified and to identify and quantify any additional contaminants in order to satisfy the waste acceptance criteria requirements for the desired disposal pathway. Known facility contaminants include, but are not limited to, asbestos-containing material (ACM), radiological contaminants, and chemical contaminants including polychlorinated biphenyls (PCBs) and metals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Baseline Survey for Proposed Land Use Permit Modification for Expansion of the Dynamic Explosive Test Site (DETS) 9940 Main Complex Parking Lot.

The approach was to perform a document search, supplemented by a visual site inspection, to identify potential environmental contamination associated with the property. Factors evaluated included hazardous substances; petroleum products and derivatives; environmental restoration sites; areas of concern; storage tanks; oil/water separators; grease traps; wash racks; waste tanks; pesticides; military munitions/ordnance; medical or bio-hazardous waste; radioactive waste; solid/municipal waste; indoor air quality; groundwater; wastewater treatment, collection, and disposal/discharge; drinking water quality; utilities; asbestos; polychlorinated biphenyls (PCBs); radon; lead-based paint; cultural resources; floodplains; and natural/biological resources.

54 ENVIRONMENTAL SCIENCES↗

Supplemental Environmental Baseline Survey for Proposed Land Use Permit Modification for Expansion of the Dynamic Explosive Test Site (DETS) 9940 Main Complex Parking Lot

The “subject property” is comprised of a parcel of land within the Kirtland Military Reservation, Bernalillo County, New Mexico, as shown on the map in Appendix B of this document. The land requirement for the parking lot addition to the 9940 Main Complex is approximately 2.7 acres. The scope of this Supplemental Environmental Baseline Survey (SEBS) is for the parking lot addition land transfer only. For details on the original 9940 Main Complex see Environmental Baseline Survey, Land Use Permit Request for the 9940 Complex PERM/0-KI-00-0001, August 21, 2003, and for details on the 9940 Complex Expansion see Environmental Baseline Survey, Proposed Land Use Permit Expansion for 9940 DETS Complex, June 24, 2009. The 2.7-acre parcel of land for the new parking lot, which is the subject of this EBS (also referred to as the “subject property”), is adjacent to the southwest boundary of the original 12.3- acre 9940 Main Complex. No testing is known to have taken place on the subject property site. The only activity known to have taken place was the burial of overhead utility lines in 2014. Adjacent to the subject property, the 9940 Main Complex was originally a 12.3-acre site used by the Department of Energy (DOE) under a land use permit from the United States Air Force (USAF). Historical use of the site, dating from 1964, included arming, fusing, and firing of explosives and testing of explosives systems components. In the late 1970s and early 1980s experiments at the 9940 Main Complex shifted toward reactor safety issues. From 1983 to 1988, fuel coolant interaction (FCI) experiments were conducted, as were experiments with conventional high explosives (HE). Today, the land is used for training of the Nuclear Emergency Response community and for research on energetic materials. In 2009, the original complex was expanded to include four additional 20-acre areas: 9940 Training South, 9940 Training East, T-Range 6, and Training West Landing Zone. The proposed use of the subject property is for the purpose of adding a parking lot to serve the increase in customer vehicles that is occurring as the 9940 Main Complex is more heavily utilized, and as the 2009 Expansion areas come online as operational training facilities. The subject property would be used only for parking, not for testing or training activities. The parking lot would have a gravel surface. Current and future work at the 9940 Main Complex involves arming, fuzing, and firing of explosives and the testing of explosive systems components in both terrestrial and aquatic settings. It also involves specialized training activities for a variety of first responder customers, both DOE and non-DOE agencies. The approach was to perform a document search, supplemented by a visual site inspection, to identify potential environmental contamination associated with the property. Factors evaluated included hazardous substances; petroleum products and derivatives; environmental restoration sites; areas of concern; storage tanks; oil/water separators; grease traps; wash racks; waste tanks; pesticides; military munitions/ordnance; medical or bio-hazardous waste; radioactive waste; solid/municipal waste; indoor air quality; groundwater; wastewater treatment, collection, and disposal/discharge; drinking water quality; utilities; asbestos; polychlorinated biphenyls (PCBs); radon; lead-based paint; cultural resources; floodplains; and natural/biological resources. Each of these factors is evaluated separately in Section 5, Findings for Subject Property. The property categorization for this subject property would be considered Category 1- “An area or real property where no storage, release, or disposal of hazardous substances or petroleum products or their derivatives has occurred into the environment or structures or disposed on the subject property (including no migration of these substances from adjacent properties).” There appears to be sufficient information to categorize the subject property and it appears that no further effort needs to be made to obtain additional information. There are no findings of an adverse nature on the subject property itself or from adjacent properties. It is recommended that the proposed transfer of the subject property from the USAF to DOE proceed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗