Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Control System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Installation of a second superconducting wiggler at SAGA-LS

The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of the vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.

43 PARTICLE ACCELERATORS↗

Designing a Magnetic Measurement Data Acquisition and Control System With Reuse in Mind: A Rotating Coil System Example

Accelerator magnet test facilities frequently need to measure different magnets on differently equipped test stands and with different instrumentation. Designing a modular and highly reusable system that combines flexibility built-in at the architectural level as well as on the component level addresses this need. Specification of the backbone of the system, with the interfaces and dataflow for software components and core hardware modules, serves as a basis for building such a system. The design process and implementation of an extensible magnetic measurement data acquisition and control system are described, including techniques for maximizing the reuse of software. The discussion is supported by showing the application of this methodology to constructing two dissimilar systems for rotating coil measurements, both based on the same architecture and sharing core hardware modules and many software components. The first system is for production testing 10 m long cryo-assemblies containing two MQXFA quadrupole magnets for the high-luminosity upgrade of the Large Hadron Collider and the second for testing IQC conventional quadrupole magnets in support of the accelerator system at Fermilab.

43 PARTICLE ACCELERATORS↗

The SLAC P2 Marx

A proposed high energy physics accelerator, the International Linear Collider, will require greater than five hundred rf stations. Each station is composed of a klystron driven by a modulator. Recently, the SLAC P2 Marx was designated the baseline modulator for the ILC. This paper describes some key features of this modulator and presents recent experimental results. The P2 Marx is presently being transported to another facility for lifetime testing. Here, we will gain understanding of how the Marx performs into a klystron load and gain experience operating the Marx for longer periods. Long term plans include the possibility of using this rf station for L-band technology demonstration at SLAC. While the Marx was designed with the ILC in mind, the topology can be readily applied to several different applications. We are currently evaluating the use of the topology for ESS, CLIC, and upgrades for systems at Fermi National Accelerator Laboratory. Because of the modular nature of the cell and the robustness of the control system, many different combinations of series and parallel operation are possible along with different load currents and pulse shapes.

43 PARTICLE ACCELERATORS↗

Status Update on the Second-Generation ILC Marx Modulator Prototype

This paper is a status update of the SLAC P2 Marx. This Marx-topology klystron modulator is a second-generation modulator which builds upon experience gained from the SLAC P1 Marx. There are several fundamental differences between these modulators including the correction scheme, bus voltages, and the control system architecture. These differences, along with preliminary experimental results and the schedule for further development, are detailed in this paper.

43 PARTICLE ACCELERATORS↗

Combining structured and unstructured data in a configurable web-based logbook

A typical electronic logbook is designed as a general-purpose system for recording time-ordered events and actions and, therefore, allows for a great flexibility in recording information, but the data is unstructured. To better position it in a specific context (e.g., a, test facility, a group activity log) it needs to support both structured data (keyword, authors, etc) and unstructured data (text, title, attachments) in that context. To do this, a logbook system can define a set of attributes, possibly built as a hierarchy. These application-specific attributes will be associated with each entry. To be flexible, such a system has to be configurable to allow for tailoring it to each specific environment. The paper describes a design, functionality, and experiences with WebLog, a database-configurable electronic logbook developed with the J2EE Web technology. Various functional and technical properties of the system are discussed, including views, searches, threads of entries, an automated alerting system as well as integration with other applications.

99 GENERAL AND MISCELLANEOUS↗

Commissioning and first operation of the low-beta triplets and their electrical feed boxes at the Large Hadron Collider

The insertion regions located around the four interaction points of the Large Hadron Collider (LHC) are mainly composed of the low-{beta} triplets, the separation dipoles and their respective electrical feed-boxes (DFBX). The low-{beta} triplets are Nb-Ti superconductor quadrupole magnets, which operate at 215 T/m in superfluid helium at a temperature of 1.9 K. The commissioning and the first operation of these components have been performed. The thermo-mechanical behavior of the low-{beta} triplets and DFBX were studied. Cooling and control systems were tuned to optimize the cryogenic operation of the insertion regions. Hardware commissioning also permitted to test the system response. This paper summarizes the performance results and the lessons learned.

43 PARTICLE ACCELERATORS↗

ML-based Real-Time Control at the Edge: An Approach Using hls4ml

This study focuses on implementing a real-time control system for a particle accelerator facility that performs high energy physics experiments. A critical operating parameter in this facility is beam loss, which is the fraction of particles deviating from the accelerated proton beam into a cascade of secondary particles. Accelerators employ a large number of sensors to monitor beam loss. The data from these sensors is monitored by human operators who predict the relative contribution of different sub-systems to the beam loss. Using this information, they engage control interventions. In this paper, we present a controller to track this phenomenon in real-time using edge-Machine Learning (ML) and support control with low latency and high accuracy. We implemented this system on an Intel Arria 10 SoC. Optimizations at the algorithm, high-level synthesis, and interface levels to improve latency and resource usage are presented. Our design implements a neural network, which can predict the main source of beam loss (between two possible causes) at speeds up to 575 frames per second (fps) (average latency of 1.74 ms). The practical deployed system is required to operate at 320 fps, with a 3ms latency requirement, which has been met by our design successfully.

Shi, R.↗

TEACHING AN OLD ACCELERATOR NEW TRICKS

The Argonne Tandem Linac Accelerator System (ATLAS) has been a National User Facility since 1985. In that time, many of the systems that help operators retrieve, modify, and store beamline parameters have not kept pace with the advancement of technology. Development of a new method of storing and retrieving beamline parameters resulted in the testing and installation of a time-series database as a potential replacement for the traditional relational database. InfluxDB was selected due to its self-hosted Open-Source version availability as well as the simplicity of installation and setup. A program was written to periodically gather all accelerator parameters in the control system and store them in the time-series database. This resulted in over 13,000 distinct data points, captured at 5-minute intervals. A second test captured 35 channels on a 1-minute cadence. Graphing of the captured data is being done on Grafana, an Open-Source version is available that co-exists well with InfluxDB as the back-end. Grafana made visualizing the data simple and flexible. The testing has allowed for the use of modern graphing tools to generate new insights into operating the accelerator, as well as opened the door to building large data sets suitable for Artificial Intelligence and Machine Learning applications.

Novak, D.↗

The E-lens test bench for RHIC beam-beam compensation

To compensate for the beam-beam effects from the proton-proton interactions at IP6 and IP8 in the Relativistic Heavy Ion Collider (RHIC), we are fabricating two electron lenses that we plan to install at RHIC IR10. Before installing the e-lenses, we are setting-up the e-lens test bench to test the electron gun, collector, GS1 coil, modulator, partial control system, some instrumentation, and the application software. Some e-lens power supplies, the electronics for current measurement will also be qualified on test bench. The test bench also was designed for measuring the properties of the cathode and the profile of the beam. In this paper, we introduce the layout and elements of the e-lens test bench; and we discuss its present status towards the end of this paper.

43 PARTICLE ACCELERATORS↗

Installation and Initial Operation of an On-line Target Imaging System for SNS

After several years of operation, the SNS now enters an era of megawatt class operation. At this intensity level, the target will be operating closer to its engineering limits and the beam profile on target must be carefully controlled. During commissioning and early operations, a temporary imaging system was used to measure the proton density on target. This system was not designed to survive the increasing power levels and it had to be removed in the second half of 2006. Since then, no direct measurement of beam properties at the target has been available. A collaboration was forged to remedy this situation, and has resulted in a new imaging system consisting of three major components: a thermal-sprayed luminescent coating deposited on the target nose, a radiation-tolerant optical system installed upstream of the target, and an image acquisition system integrated with the accelerator controls network. The design, installation, and integration of these components will be described. Initial beam measurements and image analysis results will be presented. Lessons learned during this initial operating experience have been documented and will guide the collaboration s future plans.

43 PARTICLE ACCELERATORS↗

Creating an EPICS Based Test Stand Development System for a BPM Digitizer of the Linac Coherent Light Source

The Linac Coherent Light Source (LCLS) is required to deliver a high quality electron beam for producing coherent X-rays. As a result, high resolution beam position monitoring is required. The Beam Position Monitor (BPM) digitizer acquires analog signals from the beam line and digitizes them to obtain beam position data. Although Matlab is currently being used to test the BPM digitizer?s functions and capability, the Controls Department at SLAC prefers to use Experimental Physics and Industrial Control Systems (EPICS). This paper discusses the transition of providing similar as well as enhanced functionalities, than those offered by Matlab, to test the digitizer. Altogether, the improved test stand development system can perform mathematical and statistical calculations with the waveform signals acquired from the digitizer and compute the fast Fourier transform (FFT) of the signals. Finally, logging of meaningful data into files has been added.

43 PARTICLE ACCELERATORS↗

SSRF Beamline Control System

There are seven beamlines in the Phase-I of SSRF. Five of them are equipped with Insertion Devices, while two with Bending Magnets. The beamline control system is based on the standard hardware and software architecture. The VME(PowerPC) with VxWorks is used for motion control, while the personal computers with Scientific Linux are the front end controllers of equipment protection and personnel safety systems. The control software is developed under EPICS which makes various experimental programs of Blu-Ice, LabView, VC and SPEC conveniently access Monochromators, mirror chambers and other optical components.

43 PARTICLE ACCELERATORS↗

National Ignition Facility Project Completion and Control System Status

The National Ignition Facility (NIF) is the world's largest and most energetic laser experimental system providing a scientific center to study inertial confinement fusion (ICF) and matter at extreme energy densities and pressures. Completed in 2009, NIF is a stadium-sized facility containing a 1.8-MJ, 500-TW 192-beam ultraviolet laser and target chamber. A cryogenic tritium target system and suite of optical, X-ray and nuclear diagnostics will support experiments in a strategy to achieve fusion ignition starting in 2010. Automatic control of NIF is performed by the large-scale Integrated Computer Control System (ICCS), which is implemented by 2 MSLOC of Java and Ada running on 1300 front-end processors and servers. The ICCS framework uses CORBA distribution for interoperation between heterogeneous languages and computers. Laser setup is guided by a physics model and shots are coordinated by data-driven distributed workflow engines. The NIF information system includes operational tools and a peta-scale repository for provisioning experimental results. This paper discusses results achieved and the effort now underway to conduct full-scale operations and prepare for ignition.

42 ENGINEERING↗

Status and Plans for an SRF Accelerator Test Facility at Fermilab

A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and multiple downstream beam lines for testing diagnostics and performing beam experiments. With 3 cryomodules installed this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. The facility can accommodate up to 6 cryomodules for a total beam energy of 1.5 GeV. This facility will be used to test SRF cryomodules under high intensity beam conditions, RF power equipment, instrumentation, and LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

43 PARTICLE ACCELERATORS↗

Booster main magnet power supply, present operation and potential future upgrades

The Brookhaven Booster Main Magnet Power Supply (MMPS) is a 24 pulse thyristor control supply, rated at 5500 Amps, +/-2000 Volts, or 3000 Amps, +/-6000 Volts. The power supply is fed directly from the power utility and the peak magnet power is 18 MWatts. This peak power is seen directly at the incoming ac line. This power supply has been in operation for the last 18 years. This paper will describe the present topology and operation of the power supply, the feedback control system and the different modes of operation of the power supply. Since the power supply has been in operation for the last 18 years, upgrading this power supply is essential. A new power supply topology has been studied where energy is stored in capacitor banks. DC to DC converters are used to convert the dc voltage stored in the capacitor banks to pulsed DC voltage into the magnet load. This enables the average incoming power from the ac line to be constant while the peak magnet power is pulsed to +/- 18 MWatts. Simulations and waveforms of this power supply will be presented.

43 PARTICLE ACCELERATORS↗

Accelerated quantum control using superadiabatic dynamics in a solid-state lambda system

Adiabatic evolutions find widespread utility in applications to quantum state engineering1 , geometric quantum computation2 , and quantum simulation3 . Although offering desirable robustness to experimental imperfections, adiabatic techniques are susceptible to decoherence during their long operation time. A recent strategy termed ‘shortcuts to adiabaticity’ 4–10 (STA) aims to circumvent this trade-off by designing fast dynamics to reproduce the results of infinitely slow, adiabatic processes. Here, as a realization of this strategy, we implement ‘superadiabatic’ transitionless driving11 (SATD) to speed up stimulated Raman adiabatic passage1,12–15 (STIRAP) in a solid-state lambda (Λ) system. Utilizing optical transitions to a dissipative excited state in the nitrogen vacancy (NV) center in diamond, we demonstrate the accelerated performance of different shortcut trajectories for population transfer and for the transfer and initialization of coherent superpositions. We reveal that SATD protocols exhibit robustness to dissipation and experimental uncertainty, and can be optimized when these effects are present. These results motivate STA as a promising tool for controlling open quantum systems comprising individual or hybrid nanomechanical, superconducting, and photonic elements in the solid state12–17.

36 MATERIALS SCIENCE↗