Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design, Technology, Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Initial Conditioning of the Rod-style RFQ

The RFQ test stand will allow new sources to be tested and will provide information on the performance of our RFQ designs. The RFQ must sustain the high peak power that will be necessary for bunching and accelerating beam, and that peak power must be sustained at a duty factor that is higher than other facilities that use similar rod-style RFQs. The conditioning of the RFQ allows both requirements to be tested, and in addition the intricacies of its operation are discovered and can be corrected for future work. In addition, the conditioning procedure was able to be done concurrently with the source development.

43 PARTICLE ACCELERATORS↗

Production Facility Prototype Blower Installation Report with 1000 Hr Test Results

The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GM 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing. This report describes this blower/motor/pressure vessel package and the status of the facility preparations. The blower has been operated for 1000 hours as a preliminary investigation of long-term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced.

43 PARTICLE ACCELERATORS↗

Production Facility Prototype Blower Installation Report with 1000 Hour Test Results

The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GM 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing. This report describes this blower/motor/pressure vessel package and the status of the facility preparations. The blower has been operated for 1000 hours as a preliminary investigation of long term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced. Test results and conclusions are reported.

43 PARTICLE ACCELERATORS↗

Preliminary Look at the LBEG & MPEG Beam Transmissions between HPSim and Operation Data

This report summarizes recent work on estimating the transmission of LANSCE H- beams from the end of the present DTL to both the PSR stripper foil (LBEG) and WNR target 4 (MPEG). The LBEG beam might be considered a more typical LINAC beam and lends itself to continuous monitoring of transmission through the various stages of the accelerator. For the MPEG, however, the widely-spaced micropulses and lack of the requisite sensitivity current monitors throughout the accelerator make these measurements extremely difficult and more uncertain. Therefore, to assist in estimating the MPEG beam transmission, beam-dynamics simulations using HPSim were employed. These beam transmission estimates from the end of the Drift Tube Linac (DTL) to Target 4 (MPEG) and the PSR stripper foil (LBEG) are vital to determine the charge requirements for LAMP’s front end. In this technote, we demonstrate three major efforts in determining the transmission: (1) Convert the WNR beamline lattice from TRANSPORT to HPSim for use in the simulation; (2) Simulate the optimization process in the Central Control Room (CCR) that brings down the losses by up to a factor of 4000 between the end of the initial physics-based tuneup phase and production beam operation; (3) Analyze operational data to deduce measured transmissions. Table 1 shows the estimated losses with HPSim and operational analysis. Finally, a better measurement and other improvements to refine the results are also proposed.

43 PARTICLE ACCELERATORS↗

Helium Loop Cooling Channel Hydraulic Characterization

New methods for generating 99 Mo are being explored in an effort to eliminate proliferation issues and provide a domestic supply of 99m Tc for medical imaging. Electron accelerating technology is used by sending an electron beam through a series of 100 Mo targets. During this process a large amount of heat is created, which directly affects the operating temperature set for the system. In order to maintain the required temperature range, helium gas is used to serve as a cooling agent that flows through narrow channels between the target disks. Currently we are tailoring the cooling channel entrance and exits to decrease the pressure drop through the targets. Currently all hardware has be procured and manufactured to conduct flow measurements and visualization via solid particle seeder. Pressure drop will be studied as a function of mass flow and diffuser angle. The results from these experiments will help in determining target cooling geometry and validate CFD code results.

42 ENGINEERING↗

NorthStar Facility Target Fab and Flow Testing - FY 21

The facility target fabrication and flow testing activity will consist of flow tests using the blower system at LANL to test the disk holder and target, both redesigned by the NorthStar prime contractor. The housing and transition system delivering helium cooling to the disc holder and target will be fabricated and tested at LANL facilities. The tests will include pressure drop versus flow measurements through the target and housing, optical flow diagnostics and fiber optic imaging of the disc stack. The pressure drop measurements will be compared to CFD simulations to verify the latter, the optical flow diagnostics will be used to determine whether modifications made to the housing and target holder allow sufficient flow through the bottom of the housing to adequately cool it and the fiber optics will be used to image the discs during operation as a proof of concept of the diagnostic, to be used at NorthStar facilities during preproduction testing. The work is a Partial Fulfillment of the Deliverable Requirement for NorthStar Facility Target Fab and Flow Testing and Production Target Testing Support by LANL

42 ENGINEERING↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

LEBT Buncher / Feed Forward / Frequency Generation: System Design Document (SDD)

The LAMP Low Energy Beam Transport (LEBT) transfers a continuous beam at 100 keV from the ion source to RFQ in LEBT. A LEBT buncher imposes an energy tilt to initiate velocy bunching in the chopped beam pulse about 25 ns long to form a short MPEG bunch. One possible option for the LEBT buncher based on a two-gap LC-circuit driven structure was considered, which is similar to the existing LANSCE low-frequncy buncher (LFB). Another possible option is a non-resonant element driven by a pulse-forming-network that provides a single pulse at the repetition frequency of MPEG beam, with a period of 1.8 µs. The LEBT operation is synchronized with the accelerator timing system.

43 PARTICLE ACCELERATORS↗

Extremum seeking-based optimization of high voltage converter modulator rise-time

We digitally implement an extremum seeking (ES) algorithm, which optimizes the rise time of the output voltage of a high voltage converter modulator (HVCM) at the Los Alamos Neutron Science Center (LANSCE) HVCM test stand by iteratively, simultaneously tuning the first 8 switching edges of each of the three phase drive waveforms (24 variables total). We achieve a 50 μs rise time, which is reduction in half compared to the 100 μs achieved at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory. Considering that HVCMs typically operate with an output voltage of 100 kV, with a 60Hz repetition rate, the 50 μs rise time reduction will result in very significant energy savings. The ES algorithm will prove successful, despite the noisy measurements and cost calculations, confirming the theoretical results that the algorithm is not affected by noise whose frequency components are independent of the perturbing frequencies.

43 PARTICLE ACCELERATORS↗

MEBT Bunchers: System Design Document (SDD)

The LAMP Medium Energy Beam Transport (MEBT) transfers bunched beam at the energy 3 MeV from RFQ to the Drift-Tube Linac (DTL) entrance. The beam particles (protons or H- ) in the LAMP MEBT have velocity β = v/c = 0.08, where v is the beam velocity, c is the speed of light. The MEBT bunchers keep beam bunches from spreading longitudinally as they propagate through the MEBT, where some unwanted bunches are removed by a chopper to create a required beam pattern. The MEBT bunchers are RF cavities operating at the frequency 201.25 MHz; possible design options were considered in.

43 PARTICLE ACCELERATORS↗

High-Intensity Linear Accelerator with Ribbon Beam

We propose a solution of the fundamental problem in accelerator physics: significant increase of peak beam power in linear accelerator with conservation of beam brightness. It is of primary importance for operation of existing high-power accelerators (LANSCE, Spallation Neutron Source), for development of the next generation of high-power accelerators for basic scientific research and Accelerator-Driven Systems applications (Transmutation of Waste, Nuclear Reactor-Driver), and national security applications, which are all $1B-class facilities. The concept utilizes acceleration of beam with ribbon geometry instead of traditional circular beam. High value of beam current is reached using large width of the beam. Acceleration and focusing is achieved using alternative-focusing principle, which does not require traditional focusing elements (quadrupoles, solenoids). The concept utilizes advantage of 2D plane geometry which excludes beam distortion along beam width and results in conservation of high-value of beam brightness.

43 PARTICLE ACCELERATORS↗

Modeling of a Compact Terahertz Source based on the Two-Stream Instability

THz radiation straddles the microwave and infrared bands of the electromagnetic spectrum, thus combining the penetrating power of lower-frequency waves and imaging capabilities of higher-energy infrared radiation. THz radiation is employed in various elds such as cancer research, biology, agriculture, homeland security, and environmental monitoring. Conventional vacuum electronic sources of THz radiation (e.g., fast- and slow-wave devices) either require very small structures or are bulky and expensive to operate. Optical sources necessitate cryogenic cooling and are presently capable of producing milliwatt levels of power at THz frequencies. We propose a millimeter and sub-millimeter wave source based on a well-known phenomenon called the two-stream instability. The two-beam source relies on lowenergy and low-current electron beams for operation. Also, it is compact, simple in design, and does not contain expensive parts that require complex machining and precise alignment. In this dissertation, we perform 2-D particle-in-cell (PIC) simulations of the interaction region of the two-beam source. The interaction region consists of a beam pipe of radius ra and two electron beams of radius rb co-propagating and interacting inside the pipe. The simulations involve the interaction of unmodulated (no initial energy modulation) and modulated (energy-modulated, seeded at a given frequency) electron beams. In addition, both cold (monoenergetic) and warm (Gaussian) beams are treated.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Development of an accelerator-based neutron source to prototype Mo-99 production, Part II: A liquid LBE loop under a high vacuum

To provide US domestic supply of Mo-99 without using high-enriched uranium (HEU), a subcritical uranium target assembly (UTA) is irradiated by an accelerator-based neutron source to create Mo-99 through fission. Part I of this work discusses the design of a liquid lead–bismuth eutectic (LBE) windowless target for an accelerator-based neutron source development. Part II discusses how to couple this windowless target to an accelerator operating at an ultra-high vacuum and the subcritical UTA cooled by water at room temperature. Due to the windowless design of the target, the liquid LBE flow shares an ultra-high vacuum (<1.3 × 10 -7 Pa or 10 -9 Torr) space with the accelerator. As a result of this shared vacuum space, the LBE system must operate at a high vacuum (10 -3 ~10 -6 Pa or 10 -5 ~10 -8 Torr). A magnetic rotary motion feedthrough unit utilizes magnetic fluid to allow rotation of the pump while maintaining a high vacuum environment. Prior to testing the LBE system under vacuum, a pump curve measurement is performed to estimate flowrate in the system. This measurement also generates data on orifice loss coefficients, which are compared to correlations in literature. The second experiment investigates vacuum level in the LBE system during operation. High vacuum is maintained (10 -3 ~10 -5 Pa or 10 -5 ~10 -7 Torr) during system operation, and a residual gas analyzer (RGA) scan shows that partial pressures of residual gases in the LBE system lower over the duration of LBE system operations. The third experiment investigates the gravity driven liquid LBE flowing out of the target chamber in the return line, which is partially full. If the liquid LBE is not drained quickly enough, flooding in the target chamber could occur. The coefficient n in the Manning equation is found to be around 0.008 s/m 1/3 . The last experiment performed is a demonstration that a vacuum jacket could provide sufficient thermal insulation to allow coupling between 300 °C LBE loop and a water tank at room temperature. In conclusion, the results from these experiments have influenced the development of the neutron source for the future commercial scale Mo-99 production system.

43 PARTICLE ACCELERATORS↗

Target Housing Material Options

With gas cooling, heat transfer coefficients are low compared to water. The benefit of gas from a heat transfer point of view is that there is really no upper temperature limit for the coolant, as compared to water, which is limited ultimately by the critical point, and in practice the critical heat flux. In our case with parallel flow channels, water is limited to even lower operating limits by nucleate boiling. So gas can get as hot as the containment material will allow, but to get the density and heat transfer up to something reasonable, we must also increase pressure, thus increasing stress on the containment, namely the front and back faces. We are designing to ASME BPVC, which, for most materials allows a maximum stress of UTS/3. So we want the highest possible UTS. For reference, the front face stress in the 12 mm target at 300 psi was about 90 MPa. The inconel 718 allowable stress at 900°C is 1/3 of 517 or 172 MPa. So we are in a very safe place, but the uTS is dropping rapidly with temperature above 900°C. As we increase target diameter, the challenge will be to keep the stress down. We are probably looking at keeping the allowable at or above the present value, and at as high a temperature as possible.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design and Analysis of a Double Wall, Water Cooled Window for Accelerator Based Mo-99 Production

The electron accelerator based Mo-99 production technique requires the use of Rhodotrons to generate 38 MeV, 6.32 mA pulsed electron beams. The introduction of the pulsed beam structure has introduced fatigue concerns in the vacuum-helium windows that did not exist previously for electron beam production via linear accelerators. Previous analysis has shown that temperature fluctuations of approximately 100°C above and below the steady state operating temperature of ~500°C will occur within the windows. A water cooled window will eliminate this concern by reducing the primary mechanical stress due to the 300-psig helium pressure load as well as the secondary thermally induced stress. Although a water cooled window was considered years ago, the complexities of adding an additional water line was unattractive until now. A double wall, water cooled window has been designed and analyzed for this reason. The water cooled window design is shown to decrease the helium-side window temperature to as low as 125°C, while the vacuum-side window is maintained at 161°C at a water flow rate of 3.2 GPM. These low steady state temperatures reduce the thermal stress of the helium-side window significantly. Also, the primary mechanical stress has been reduced by roughly 50% due to the reduced pressure gradient across the helium-side window (150-psig water and 300-psig helium). Considering a Mo-99 production loss of roughly 1%, the water cooled window is a drastic improvement over the previous helium cooled designs and should be greatly considered for future upgrades and redesign.

43 PARTICLE ACCELERATORS↗

Northstar Mo100 Target Beam Spot Size Sensitivity Study

Northstar Mo100 target for production of the medical isotope Mo99 is particularly sensitive to beam over focusing because of the intended high power density. At 38 MeV and 6.32 mA (240 kW beam power, nominally 160 kW th in the target), small deviation from the nominal 12 mm FWHM beam can significantly increase the target disk temperatures and more importantly the load bearing target window temperature. A rhodotron will be the source of the electron beam to be used in the isotope production. This machine operates in a pulsed beam mode, currently expected to be at 50 Hz, which results in a 100 C temperature oscillation above and below the steady state temperature that is the focus of this study. This must be considered in the determination of minimum beam spot size that can be accepted by the target without risk of failure. In addition to the nominal beam spot size of 12 mm, the analysis of 10, 11 and 14.5 mm beam spot sizes are analyzed. The primary conclusion is that an over focused beam to just 11 mm FWHM is the minimum beam spot allowable, based on window temperature and the Ultimate Tensile Stress (UTS) of the window material Inconel 718 as a function of temperature. In contrast an under focused beam of 14.5 mm FWHM has much reduced target and window temperatures, but there is a resulting 6% drop in isotope production, all other factor staying the same. These results are presented herein.

07 ISOTOPE AND RADIATION SOURCES↗

Photoelectron spectroscopy of CsK2Sb photocathode at Synchrotron Radiation Facility using vacuum transport system

As accelerators and electron microscopes become more advanced, high-performance photocathodes are required. In particular, Cesium potassium antimonide (CsK 2 Sb) photocathode is of interest because of its low emittance, excitability in visible light, and high quantum efficiency (QE). The challenge is its high susceptibility to environment that lead to low operating vacuum pressure and short lifetime/low extraction charge. To resolve these issues, it is necessary to understand the molecular structure of the cathode and its degradation mechanism. In this study, we transported CsK 2 Sb photocathode to a beamline of synchrotron radiation facility using a vacuum transport system for molecular structure analysis. Specifically, the cathode was deposited in an evaporation system at Nagoya University. We transported it to Aichi Synchrotron Radiation Center (Aichi SR) located 15 km away, and analyzed it in the depth direction by X-ray photoelectron spectroscopy (XPS) at BL7U. Based on the results, we quantitatively evaluated the composition ratios and stoichiometry of the cathode elements (Sb, K, Cs). A Cs ex-cess state of surface was observed at the surface, and it is consistent with previous studies. The intended atomic structure of CsK 2 Sb was formed only at a few nanometres of the surface on the Mo substrate. On the other hand, the CsK 2 Sb cathode structure on the graphene substrate was preserved further in the depth direction.

47 OTHER INSTRUMENTATION↗