Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPITAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Convex Capital Cost Optimization: A Rwandan Case

Most power grids were designed and constructed for a centralized generation system, under the principle of large plants transmitting power over long distances. For grids with increasingly high renewable generators, the intermittent nature of renewable energy production can cause large seasonal swings in the supply [1]. To account for these changes, developing countries often use centralized diesel generation to satisfy energy peak demand each day, as diesel generation is relatively easy to ramp, is not dependent on weather, and has a fairly low fixed cost to add capacity. However, in this study we want to provide a tool to question whether diesel is the most economic way to shave peak demand in some developing countries.

13 HYDRO ENERGY↗

Techno-Economic Assessment of the Factory Production of Small Modular Reactor

The demand for electricity continues to grow around the world while pressures remain high to reduce carbon emissions. Nuclear energy provides a strong and reliable baseload power component without a high output of greenhouse gases. Global nuclear energy capacity is increasing with 62 reactors under construction in 14 countries. Nuclear energy will be crucial as energy demands are met with a sustainable and diverse energy portfolio. Small modular reactors (SMRs) are small scale (less than 300 MWe) reactors that incorporate the same advanced technologies included in recent LR nuclear reactor designs. SMRs are designed to include the latest reactor technology including passive safety features. SMRs offer economic advantages over LRs such as lower up-front capital and easier integration into the existing power grid. The modular characteristic of SMRs would allow incremental additions to power plants years after its completion. The cost of constructing SMR power plants will determine their future in the energy industry. Three SMR reactors are in advanced stages of design in the United States; the Westinghouse 225 MWe, mPower 180 MWe and nuScale 45 MWe. SMRs are expected to have lower capital expenses of reactor components due to factory production. Current estimates predict these savings to reduce SMR capital 30-40%. Existing studies have estimated SMR capital using economies of scale and holistic discounts applied to an overall capital expense figure, but do not include the expense of an SMR factory facility. To better understand the actual costs associated with construction of an SMR power plant, capital components will be broken down according to its place in the construction phase. The expense of a factory facility will also be included with SMR capital expenses to determine its significance and benefits to overall capital expenses. Results from this study show that SMRs can compete with LRs in terms of startup costs. The capital cost of building a factory for SMRs was previously overlooked for SMR capital estimates. The annualized capital expenses expected for an SMR factory are very small, but offer significant discounts to the overall capital costs for SMRs. Case 3 shows that factory production can reduce SMR capital expenses to the range of 30%-40% when compared to Case 1 in this study. Factory savings of this magnitude would require factory production of several SMR reactor and generator components including the reactor pressure vessel, control rods, steam generation, and chemical and volume control system, containment, condenser and turbo-generator. SMRs will also benefit from lower indirect expenses due to a much smaller construction duration. It is expected that SMRs will have capital costs competitive with LRs. The differences between Case 2 and Case 3 in this study show that SMRs are heavily dependent on the cost reductions coming from factory production. The factory facility represents a small increase in capital expense, but accounts for a large reduction of cost for factory components. SMRs have the potential to meet growing energy demands in the United States and around the world, but their economic viability is dependent on a factory facility that will lower the capital expenses of reactor and generator components. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Economic Benefits of Advanced Materials in Nuclear Power Systems

One of the key obstacles for the commercial deployment of advanced fast reactors (for either transuranic element burning or power generation) is the capital cost. There is a perception of higher capital cost for fast reactor systems than advanced light water reactors (ALWR). However, the cost estimates for a fast reactor come with a large uncertainty due to the fact that far fewer fast reactors have been built than LWR facilities. Furthermore, the large variability of industrial cost estimates complicates accurate comparisons. For example, under the Gen IV program, the Japanese Sodium Fast Reactor (JSFR) has a capital cost estimate that is lower than current LWR s, and considerably lower than that for the PRISM design (which is arguably among the most mature of today s fast reactor designs). Further reductions in capital cost must be made in US fast reactor systems to be considered economically viable. Three key approaches for cost reduction can be pursued. These include design simplifications, new technologies that allow reduced capital costs, and simulation techniques that help optimize system design. While it is plausible that improved materials will provide opportunities for both simplified design and reduced capital cost, the economic benefit of advanced materials has not been quantitatively analyzed. The objective of this work is to examine the potential impact of advanced materials on the capital investment costs of fast nuclear reactors.

Busby, Jeremy T↗

Benefits of Integration of Aerojet Rocketdyne and RTI Advanced Gasification Technologies for Hydrogen-Rich Syngas Production

The key objective for this project was to evaluate the potential to achieve substantial reductions in the production cost of H 2 -rich syngas via coal gasification with near-zero emissions due to the cumulative and synergistic benefits realized when multiple advanced technologies are integrated into the overall conversion process. In this project, Aerojet Rocketdyne’s (AR’s) advanced gasification technology (currently being offered as R-GAS™) and RTI International’s (RTI’s) advanced warm syngas cleanup technologies were evaluated via a number of comparative techno-economic case studies. AR’s advanced gasification technology consists of a dry solids pump and a compact gasifier system. Based on the unique design of this gasifier, it has been shown to reduce the capital cost of the gasification block by between 40 and 50%. At the start of this project, actual experimental work had been demonstrated through pilot plant systems for both the gasifier and dry solids pump. RTI’s advanced warm syngas cleanup technologies consist primarily of RTI’s Warm Gas Desulfurization Process (WDP) technology, which effectively allows decoupling of the sulfur and CO 2 removal allowing for more flexibility in the selection of the CO 2 removal technology, plus associated advanced technologies for direct sulfur recovery and water gas shift (WGS). WDP has been demonstrated at pre-commercial scale using an activated amine carbon dioxide recovery process which would not have been possible if a majority of the sulfur had not been removed from the syngas by WDP. This pre-commercial demonstration of RTI’s advanced warm syngas cleanup system was conducted in parallel to the activities on this project. The technical data and cost information from this pre-commercial demonstration were extensively used in this project during the techno-economic analysis. With this project, both of RTI’s advanced WGS technologies were investigated. Because RT’s advanced fixed-bed WGS (AFWGS) process was successfully implemented in the WDP pre-commercial demonstration test mentioned above, this technology was used as part of RTI’s advanced warm syngas technology package for the techno-economic analyses for this project. RTI’s advanced transport-reactor-based WGS (ATWGS) process was still conceptual at the start of this project, but one of the tasks for this project was to evaluate the technical feasibility of this technology. In each of the three application-based comparison studies conducted as part of this project, the reference case was based on an existing Department of Energy National Energy Technology Laboratory (DOE/NETL) system study. Each of these references cases used existing commercial technology and the system resulted in > 90% carbon capture. In the comparison studies for the use of the hydrogen-rich syngas generated in either an Integrated Gasification Combined Cycle (IGCC) or a Coal-to-Methanol (CTM) plant, the comparison cases consisted of the reference case, a case with the integration of each individual advanced technology (either AR or RTI), and finally a case with the integration of all the advanced technologies (AR and RTI combined). In the Coal-to-Liquids (CTL) comparison study, the comparison study consisted of only three cases, which included a reference case, a case with just RTI’s advanced syngas cleaning technology, and a case with AR’s and RTI’s advanced technologies. The results from these comparison studies showed that the integration of the advanced technologies did result in substantial benefits, and by far the greatest benefits were achieved for cases integrating all the advanced technologies. For the IGCC study, the fully integrated case resulted in a 1.4% net efficiency improvement, an 18% reduction in capital cost per kW of capacity, a 12% reduction in the operating cost per kWh, and a 75–79% reduction in sulfur emissions. For the CTM case, the fully integrated plant resulted in a 22% reduction in capital cost, a 13% reduction in operating costs, a > 99% net reduction in sulfur emissions, and a reduction of 13–15% in CO 2 emissions. Because the capital cost represents over 60% of the methanol Required Selling Price (RSP), the significant reduction in the capital cost for the advanced technology case resulted in an 18% reduction in methanol RSP. For the CTL case, the fully integrated plant resulted in a 16% reduction in capital cost, which represented a 13% reduction in diesel RSP. Finally, the technical feasibility analysis of RTI’s ATWGS process demonstrated that a fluid-bed catalyst with sufficient attrition resistance and WGS activity could be made and that the process achieved about a 24% reduction in capital cost compared to a conventional fixed-bed commercial process.

08 HYDROGEN↗

Estimation of economic impacts of cellulosic biofuel production: a comparative analysis of three biofuel pathways: Economic impacts of biofuel production

The development of a cellulosic biofuel industry utilizing domestic biomass resources is expected to create opportunities for economic growth resulting from the construction and operation of new biorefineries. We applied an economic input-output model to estimate potential economic impacts, particularly gross job growth, resulting from the construction and operation of biorefineries using three different technology pathways: 1) cellulosic ethanol via biochemical conversion in Iowa, 2) renewable diesel blendstock via biological conversion in Georgia, and 3) renewable diesel and gasoline blendstock via fast pyrolysis in Mississippi. Combining direct, indirect, and induced effects, capital investment associated with the construction of a biorefinery processing 2,000 dry metric tons of biomass per day (DMT/day) could yield between 5,960 and 8,470 full-time equivalent (FTE) jobs during the construction period. Fast pyrolysis biorefineries produce the most jobs on a project level thanks to the highest capital requirement among the three pathways. Normalized for one million dollars of capital investment, the fast pyrolysis biorefineries are estimated to yield slighter more jobs (12.1 jobs) than the renewable diesel (11.8 jobs) and the cellulosic ethanol (11.6 jobs) biorefineries. While operating biorefineries is not labor-intensive, the annual operation of a 2,000 DMT/day biorefinery could support between 720 and 970 jobs when the direct, indirect, and induced effects are considered. The major factor, which results in the variations among the three pathways, is the type of biomass feedstock used for biofuels. The agriculture/forest, services, and trade industries are the primary sectors that will benefit from the ongoing operation of biorefineries.

Biofuels↗

Bulk Storage of Hydrogen

The technical aspects and economics of bulk hydrogen storage in underground pipes, lined rock caverns (LRC) and salt caverns are analyzed. Hydrogen storage in underground pipes is more economical than in geological caverns for useable amounts <20-t-H2. However, because the pipe material is a major cost factor, the capital and operating costs for this storage method do not decrease appreciably with an increase in the amount of stored H2. Unlike underground pipes, the installed capital cost of salt caverns decreases appreciably from ~$95/kg-H2 at 100 t-H2 stored to <$19/kg-H2 at 3000 t-H2 stored. Over the same scale, the annual storage cost decreases from ~$17/kg-H2 to ~$3/kg-H2. Like salt caverns, the installed capital cost of lined rock caverns decreases from ~$160/kg-H2 at 100 t-H2 stored to <$44/kg-H2 at 3000 t-H2 stored. Storing >750-t useable H2 requires multiple caverns. The cost of salt caverns scales more favorably with size because the salt caverns are larger than lined rock caverns and need to be added at a slower rate as the storage capacity is increased.

Bulk storage of hydrogen↗

Optimization and Techno-Economic Comparison of Regenerators and Recuperators in sCO2 Recompression Brayton Cycles for Concentrating Solar Power Applications

Supercritical CO2 power cycles might be capable of providing the cost reductions and efficiency improvements necessary to reach concentrating solar power (CSP) cost targets, but require large, highly effective recuperators. Fixed-bed regenerators are a periodic heat exchanger that could be an effective yet low-cost alternative to these recuperators. This study presents a techno-economic comparison of regenerators and recuperators for a 100 MWe supercritical CO2 power cycle for CSP applications. We quantify the levelized cost of energy (LCOE) for the power plant with both types of heat exchangers, and explore sensitivity of LCOE to parameters such as CSP-specific capital costs, power cycle component capital costs, and regenerator valve replacements costs. Results indicate that the incumbent printed circuit heat exchangers achieve the lowest LCOE, unless the upper extreme of PCHE capital cost and lower extremes of regenerator and valve capital and O&M costs are realized. Sensitivity analysis also illustrates that the primary heat exchanger cost is the most influential of power cycle components, and that CSP component capital cost is more influential than power cycle capital costs. This illustrates the importance of reducing the cost of heliostats, receivers, and thermal energy storage for achieving CSP LCOE targets.

OTHER INSTRUMENTATION,SOLAR ENERGY↗

Bookending the Opportunity to Lower Wind’s LCOE by Reducing the Uncertainty Surrounding Annual Energy Production

Reducing the performance risk surrounding a wind project can potentially lead to a lower weighted-average cost of capital (WACC), and hence a lower levelized cost of energy (LCOE), through an advantageous shift in capital structure, and possibly also a reduction in the cost of capital. Specifically, a reduction in performance risk will move the 1-year P99 annual energy production (AEP) estimate closer to the P50 AEP estimate, which in turn reduces the minimum debt service coverage ratio (DSCR) required by lenders, thereby allowing the project to be financed with a greater proportion of low-cost debt. In addition, a reduction in performance risk might also reduce the cost of one or more of the three sources of capital that are commonly used to finance wind projects: sponsor or cash equity, tax equity, and/or debt. Preliminary internal LBNL analysis of the maximum possible LCOE reduction attainable from reducing the performance risk of a wind project found a potentially significant opportunity for LCOE reduction of ~$10/MWh, by reducing the P50 DSCR to its theoretical minimum value of 1.0 (Bolinger 2015b, 2014) and by reducing the cost of sponsor equity and debt by one-third to one-half each (Bolinger 2015a, 2015b). However, with FY17 funding from the U.S. Department of Energy’s Atmosphere to Electrons (A2e) Performance Risk, Uncertainty, and Finance (PRUF) initiative, LBNL has been revisiting this “bookending” exercise in more depth, and now believes that its earlier preliminary assessment of the LCOE reduction opportunity was overstated. This reassessment is based on two new-found understandings: (1) Due to ever-present and largely irreducible inter-annual variability (IAV) in the wind resource, the minimum required DSCR cannot possibly fall to 1.0 (on a P50 basis), and (2) A reduction in AEP uncertainty will not necessarily lead to a reduction in the cost of capital, meaning that a shift in capital structure is perhaps the best that can be expected (perhaps along with a modest decline in the cost of cash equity as new investors enter the market).

17 WIND ENERGY↗

An Asset-Based Approach to Tribal Community Energy Planning

Community energy planning is a vital component of successful energy resource development and project implementation. Planning can help tribes develop a shared vision and strategies to accomplish their energy goals. This paper explores the benefits of an asset-based approach to tribal community energy planning. While a framework for community energy planning and federal funding already exists, some areas of difficulty in the planning cycle have been identified. This paper focuses on developing a planning framework that offsets those challenges. The asset-based framework described here takes inventory of a tribe’s capital assets, such as: land capital, human capital, financial capital, and political capital. Such an analysis evaluates how being rich in a specific type of capital can offer a tribe unique advantages in implementing their energy vision. Finally, a tribal case study demonstrates the practical application of an asset-based framework.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗