Search NASA⌕ Search

SEARCH · Search NASA

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

Hoover, Jay C.↗

Dynamic Control System Performance during Commissioning of the Space Technology 7-Disturbance Reduction System Experiment of LISA Pathfinder

The Space Technology-7 Disturbance Reduction System (DRS) launched aboard the European Space Agencys LISA Pathfinder spacecraft on December 3, 2015, after more than a decade in development. DRS consists of three prima-ry components: an Integrated Avionics Unit (IAU), Colloidal MicroNewton Thrusters, and Dynamic Control System (DCS) algorithms implemented on the IAU. During the portions of the mission in which the DRS was under control, the DCS was responsible for controlling the spacecraft and the free-floating test masses that were part of the LISA Test Package. The commissioning period was originally divided into two periods: before propulsion separation and after pro-pulsion separation. A recommissioning period was added after an anomaly oc-curred in the thruster system. The paper will describe the activities used to com-mission DRS, present results from the commissioning of the DCS and the re-commissioning activities performed after the thruster anomaly.

Hsu, Oscar↗

Dynamic Control System Performance during Commissioning of the Space Technology 7-Disturbance Reduction System Experiment of LISA Pathfinder

The Space Technology-7 Disturbance Reduction System (DRS) launched aboard the European Space Agency's LISA Pathfinder spacecraft on December 3, 2015, after more than a decade in development. DRS consists of three primary components: an Integrated Avionics Unit (IAU), Colloidal MicroNewton Thrusters, and Dynamic Control System (DCS) algorithms implemented on the IAU. During the portions of the mission in which the DRS was under control, the DCS was responsible for controlling the spacecraft and the free-floating test masses that were part of the LISA Test Package. The commissioning period was originally divided into two periods: before propulsion separation and after propulsion separation. A recommissioning period was added after an anomaly occurred in the thruster system. The paper will describe the activities used to commission DRS, present results from the commissioning of the DCS and the recommissioning activities per-formed after the thruster anomaly.

Hsu, Oscar↗

Astrobee On-Orbit Commissioning

The Astrobee free flying robots operate in the interior of the International Space Station (ISS) under supervisory control of a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee also provides a tool for improving the efficiency of ISS operations as a mobile camera/sensor platform available to flight and payload controllers. The Astrobee system consists of three robots with perching arms, a docking station, and a ground data system. Development began in late-2014, and flight hardware has been deployed to ISS on several launches starting in November 2018 and concluding in October 2019. Shortly after the first two robots arrived on ISS in April, we began a series of "commissioning" activities to validate both space and ground segments. We plan to complete commissioning and become an operational facility available to guest scientists by the end of 2019. This paper provides an overview of the Astrobee system, a description of the on-orbit activities, and commissioning results.

ISS↗

Site Selection Restart in Germany Results of the Site Selection Commission - 17017

Since 2011 Germany is pursuing a phase-out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high-level heat-generating waste from scratch. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law [1] and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission included representatives from the parliament, civil society organizations, industry, environmental organizations, trade unions and scientists. The commission forwarded its recommendations in summer 2016. The evaluated law should come into force in 2017. The stepwise approach for finding a suitable site for a repository for Germany's heat-generating waste might then start in 2017. As shown in publication [2], the site selection process will take several decades. The preferred solution based on the present state of the art is the final disposal in deep geological formations in a mine with the option 'Reversibility and Retrievability (R and R)'. The scientific challenges and the upcoming R and D program are complex. Therefore a 'step-back option' (learning process) is foreseen in the program. The R and D program has to react flexibly to new findings, demands or modifications of criteria or requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Nuclear Regulatory Commission Historical Perspectives of Very Low-Level Radioactive Waste - 18367

The United States Nuclear Regulatory Commission (NRC), in Title 10 of the Code of Federal Regulations Part 61 (10 CFR Part 61), 'Licensing Requirements for Land Disposal of Radioactive Waste', provides licensing procedures, performance objectives, and technical requirements for the issuance of licenses for the land disposal of low-level radioactive waste. Low-level radioactive waste is divided into four categories based on its potential risk and need for isolation. Class A is the lowest category of low-level radioactive waste and poses the least risk. A large percentage of Class A low-level waste contains very low radionuclide concentrations and does not pose a significant health and safety risk. In the current regulatory framework, this waste, referred to as low-activity or very low-level waste, is managed in the same manner as much more hazardous waste. In 1986 and 1990, as a result of the Low-Level Radioactive Waste Policy Amendments Act of 1985, the NRC issued the Below Regulatory Concern (BRC) policy statement. This policy statement established an implementation plan regarding the expeditious handling of rulemaking petitions 'to exempt specific radioactive waste streams from regulation due to the presence of radionuclides in sufficiently low concentrations or quantities as to be below regulatory concern.' The BRC policy statement provided a consistent risk framework when considering regulatory exemption decisions, such as: (1) the release for unrestricted public use of lands and structures containing residual radioactivity; (2) the distribution of consumer products containing small amounts of radioactive material; (3) the disposal of very low-level radioactive waste at other than licensed disposal sites; and (4) the recycling of slightly contaminated equipment and materials. Due to concerns with the BRC policy that were raised by Congress, the States, the public, and others, Congress enacted the Energy Policy Act of 1992, which revoked the NRC's 1986 and 1990 BRC policy statements and led to the NRC's formal withdrawal of the BRC policy in 1993. Stakeholders raised concerns on NRC's potential deregulation of radioactive material. Additionally, in March 2005, the NRC staff proposed a rule to amend 10 CFR Part 20, 'Standards for Protection Against Radiation,' to include radiological criteria for controlling the disposition of solid materials with very small amounts of residual radioactivity. The NRC staff also proposed a limited disposition approach for the disposition of solid material, limiting the release of solid material meeting a 0.01 milli-Sievert per year (mSv/yr) [1 milli-rem (mrem/yr)] dose criterion, from licensed control. In June 2005, the Commission disapproved publication of the proposed rule and deferred the rulemaking until a later time, stating that the NRC's existing approach of reviewing specific cases on an individual basis was fully protective of public health and safety. This rulemaking effort was discontinued by the Commission in 2016. Recently, several nuclear power plant licensees have announced early decommissioning of their facilities. Some stakeholders have expressed concerns about the capacity and disposal costs associated with using the four existing low-level waste disposal sites for very low levels of radioactive waste (i.e., waste at the low end of the Class A category). A more risk-informed, performance based approach to waste disposal would allow more flexibility in managing this waste commensurate with its risk and hazard. A new approach would also allow the NRC to align with international standards for this type of waste. The NRC is presently conducting a scoping study to identify the actions the agency should take to strengthen its regulatory framework for very low-level waste disposal. The Very Low-Level Waste (VLLW) scoping study will consider divergent stakeholder comments; lessons learned from the BRC policy statements and the proposed rule on radiological criteria for controlling the disposition of solid materials; and best practices of other countries with respect to VLLW disposal. The NRC will also engage other government agencies to discuss regulatory options for VLLW. This paper offers a historical overview of past NRC initiatives to manage the lower end of Class A waste in a manner that is risk informed and performance based. It examines previous endeavors and discusses the regulatory challenges that arose. It also addresses lessons learned and introduces NRC's current effort regarding very low-level radioactive waste disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance and Commissioning of the BigBite Timing Hodoscope for Nucleon Form Factor Measurements at Jefferson Lab

The BigBite Timing Hodoscope detector is the primary subject of this thesis. The Super BigBite Spectrometer is a Jefferson Lab Hall A Collaboration project that has and will continue to measure nucleon electromagnetic form factors. This spectrometer includes the Timing Hodoscope which provides high resolution particle timing data for scattered electrons in the electron arm of BigBite. The Timing Hodoscope utilizes 90, 25 × 25 × 600 mm3 scintillator bars stacked on top of each other to form a single detector plane, and these bars are connected to 180 photo-multiplier tubes via light guides. Particles collide with the scintillating material creating a shower of optical photons and these particle events in the bars are collected to generate signals that are readout by the data acquisition (DAQ) electronics. NINO ASIC amplifier-discriminator cards output signals from the photo-multiplier tubes into analogue and logic signals, which are sent to analogue-to-digital (ADC) and time-to-digital (TDC) converter data acquisition readout modules. This data is then used for analysis of the detector. The focus of this thesis is the construction, commissioning, calibration, and performance of the BigBite Timing Hodoscope before and during the first of five nucleon electromagnetic form factor experiments at Jefferson Lab Hall A. Before the neutron magnetic form factor, G n M, experiment, cosmic ray data was collected during commissioning to confirm proper operation of the Timing Hodoscope electronics by observing the ADC and TDC data. Commissioning studies for charge normalization, gain matching, and other ADC and TDC detector data variables were performed before moving the detector into Hall A. Following installation in Hall A, several calibration studies were implemented to fine-tune the detector in preparation for use in the experiment. The calibration studies included analysis of timing cuts, TDC alignment, the time-walk effect, time difference offsets, and scintillator velocity corrections. Once the Timing Hodoscope was well-calibrated, data-taking during the experiment commenced and the beam-on-target data was used to characterize the Timing Hodoscope performance during the G n M experiment run-time. The performance analysis included studies observing energy deposit, cluster size, rates, accidentals, pile-up, tracking efficiency, position resolution, and time resolution. After application of physics cuts to ensure a data set comprised of particle tracks corresponding to elastic electrons, which is the main data of interest for measurement of G n M, the Timing Hodoscope is shown on average across all kinematic settings to have a >98% tracking efficiency, a position resolution of 4-6 cm in the non-dispersive plane and 1.5-2 cm in the dispersive plane, and a time resolution of 500-750 ps. These performance results are compared to a GEANT4 based performance simulation of the BigBite Timing Hodoscope for reference, showing to what degree the measured performance values match those taken from the simulation.

Marinaro, Ralph↗

Design and Commission of Solid State Switch Driver in SLAC Subbooster Modulator

The LINAC sub-booster modulator is a pulsed power supply to provide a 30kV pulse to drive a klystron in SLAC LINAC. It has utilized vacuum tetrode as pulse switch for more than 60 years. With the vacuum tetrode availability becoming less and its cost surging, a natural choice is to use solid state switch in this pulsed power modulator. To commission solid state switch in LINAC sub-booster modulator, a driver board is designed to drive a BEHLKE HTS-LC2 series MOSFET based switches. The design concept and some concerns in design will be presented. The driver board is universal for all HTS-LC2 series switches because they share the same driver signals and connections. After the driver is commissioned, two AI systems are introduced to design one core part of the driver, the results are presented here. During the commission of the driver board in the LINAC sub-booster modulators, some problems happened and were addressed.

AI Circuit Design↗

Detector Characterization for SuperCDMS Commissioning

Super Cryogenic Dark Matter Search (SuperCDMS) SNOLAB is a next generation direct detection experiment search ing for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As the experiment begins its first commissioning data taking, establishing that the detectors respond to energy deposits in a stable, predictable way is a prerequisite for any future physics analysis. This work presents a study of detector stability for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium), and det 11 and det 14 (silicon), using two data sets taken during early commissioning: dedicated Barium-133 calibration runs, which provide a known gamma ray energy reference at 356 keV, and low background runs, which record whatever background radiation the detectors see with no external source present. The Ba-133 data do not show a distinct, well localized line at the expected energy, and the low background data show a baseline that drifts and oscillates over time rather than remaining flat. This baseline instability appears consistently across multiple channels rather than being confined to one, suggesting a shared, detector wide cause rather than a single faulty channel. Together, these observations point to the detectors’ cryogenic support system as the likely source of the instability, since small temperature fluctuations introduced during normal operation of the cooling system could plausibly couple into the exquisitely temperature sensitive detectors. These results inform the ongoing commissioning effort by narrowing down where instability in the current data is originating from.

O'Hanlon, Viktoria M. [Skidmore Coll.; Fermilab]↗

Detector Characterization for SuperCDMS Commissioning

Super Cryogenic Dark Matter Search (SuperCDMS) SNOLAB is a next generation direct detection experiment search ing for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As the experiment begins its first commissioning data taking, establishing that the detectors respond to energy deposits in a stable, predictable way is a prerequisite for any future physics analysis. This work presents a study of detector stability for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium), and det 11 and det 14 (silicon), using two data sets taken during early commissioning: dedicated Barium-133 calibration runs, which provide a known gamma ray energy reference at 356 keV, and low background runs, which record whatever background radiation the detectors see with no external source present. The Ba-133 data do not show a distinct, well localized line at the expected energy, and the low background data show a baseline that drifts and oscillates over time rather than remaining flat. This baseline instability appears consistently across multiple channels rather than being confined to one, suggesting a shared, detector wide cause rather than a single faulty channel. Together, these observations point to the detectors’ cryogenic support system as the likely source of the instability, since small temperature fluctuations introduced during normal operation of the cooling system could plausibly couple into the exquisitely temperature sensitive detectors. These results inform the ongoing commissioning effort by narrowing down where instability in the current data is originating from.

O'Hanlon, Viktoria M. [Skidmore Coll.; Fermilab]↗

Cognitive barriers during monitoring-based commissioning of buildings

Monitoring-based commissioning (MBCx) is a continuous building energy management process used to optimize energy performance in buildings. Although monitoring-based commissioning (MBCx) can reduce energy waste by up to 20%, many buildings still underperform due to issues such as unnoticed system faults and inefficient operational procedures. While there are technical barriers that impede the MBCx process, such as data quality, the focuses of this paper are the non-technical, behavioral and organizational, barriers that contribute to issues initiating and implementing MBCx. In particular, this paper discusses cognitive biases, which can lead to suboptimal outcomes in energy efficiency decisions, resulting in missed opportunities for energy savings. This paper provides evidence of cognitive biases in decisions during the MBCx process using qualitative data from over 40 public and private sector organizations. The results describe barriers resulting from cognitive biases, listed in descending order of occurrence, including: risk aversion, social norms, choice overload, status quo bias, information overload, professional bias, and temporal discounting. Building practitioners can use these results to better understand potential cognitive biases, in turn allowing them to establish best practices and make more informed decisions. Finally, researchers can use these results to empirically test specific decision interventions and facilitate more energy efficient decisions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Construction and Beam Commissioning of J-PARC Hadron Experimental Facility

J-PARC Hadron Experimental Facility is designed as a multi-purpose experimental facility for particle and nuclear physics experiments using high-intensity secondary particles (Kaons, pions, and so on) produced by 50 GeV-15 muA (750 kW) primary proton beams. Currently, three secondary beam lines (K 1.8 BR, K 1.8, and KL) have been constructed. The first beam extraction from 50 GeV proton synchrotron was on January 27{sup th}, 2009, and the beam commissioning of the primary and secondary beam lines are on going. The present article reports construction status and beam commissioning of Hadron Experimental Facility in detail.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Commissioning of a Soft X-ray Beamline PF-BL-16A with a Variable-Included-Angle Varied-Line-Spacing Grating Monochromator

The design and commissioning of a new soft X-ray beamline, BL-16A, at the Photon Factory is presented. The beamline consists of a pre-focusing mirror, an entrance slit, a variable-included-angle varied-line-spacing plane grating monochromator, and a post-focusing system as usual, and provides circularly and linearly polarized soft X rays in the energy range 200-1500 eV with an APPLE-II type undulator. The commissioning procedure for the beamline optics is described in detail, especially the check of the focal position for the zero-th order and diffracted X rays.

43 PARTICLE ACCELERATORS↗

Preliminary Commissioning and Performance of the Soft X-ray Micro-characterization Beamline at the Canadian Light Source

The Soft X-ray Micro-characterization Beamline (SXRMB) is a medium energy, bending magnet based beamline, designed to cover an energy range of 1.7-10 keV using two sets of crystals--InSb(111) and Si(111). The design goal is to deliver a flux of 2x10{sup 11} photons sec{sup -1}/100 mA with a resolution up to 10,000 for X-ray Absorption Spectroscopy. A KB mirror stage is designed to provide microprobe capability, with a spot size of 10x10 {mu}m{sup 2} and a flux of >10{sup 9} at the microprobe station. The beamline has been in the commissioning phase since 2008, and access to the X-ray absorption endstation is now open to general users. The optical commissioning and performance of the beamline is presented with some early experimental results.

43 PARTICLE ACCELERATORS↗

Commissioning and Validation of the First Monte Carlo Based Dose Calculation Algorithm Commercial Treatment Planning System in Mexico

This work presents the beam data commissioning and dose calculation validation of the first Monte Carlo (MC) based treatment planning system (TPS) installed in Mexico. According to the manufacturer specifications, the beam data commissioning needed for this model includes: several in-air and water profiles, depth dose curves, head-scatter factors and output factors (6x6, 12x12, 18x18, 24x24, 42x42, 60x60, 80x80 and 100x100 mm{sup 2}). Radiographic and radiochromic films, diode and ionization chambers were used for data acquisition. MC dose calculations in a water phantom were used to validate the MC simulations using comparisons with measured data. Gamma index criteria 2%/2 mm were used to evaluate the accuracy of MC calculations. MC calculated data show an excellent agreement for field sizes from 18x18 to 100x100 mm{sup 2}. Gamma analysis shows that in average, 95% and 100% of the data passes the gamma index criteria for these fields, respectively. For smaller fields (12x12 and 6x6 mm{sup 2}) only 92% of the data meet the criteria. Total scatter factors show a good agreement (<2.6%) between MC calculated and measured data, except for the smaller fields (12x12 and 6x6 mm{sup 2}) that show a error of 4.7%. MC dose calculations are accurate and precise for clinical treatment planning up to a field size of 18x18 mm{sup 2}. Special care must be taken for smaller fields.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RF-Plasma Source Commissioning in Indian Negative Ion Facility

The Indian program of the RF based negative ion source has started off with the commissioning of ROBIN, the inductively coupled RF based negative ion source facility under establishment at Institute for Plasma research (IPR), India. The facility is being developed under a technology transfer agreement with IPP Garching. It consists of a single RF driver based beam source (BATMAN replica) coupled to a 100 kW, 1 MHz RF generator with a self excited oscillator, through a matching network, for plasma production and ion extraction and acceleration. The delivery of the RF generator and the RF plasma source without the accelerator, has enabled initiation of plasma production experiments. The recent experimental campaign has established the matching circuit parameters that result in plasma production with density in the range of 0.5-1x10{sup 18}/m{sup 3}, at operational gas pressures ranging between 0.4-1 Pa. Various configurations of the matching network have been experimented upon to obtain a stable operation of the set up for RF powers ranging between 25-85 kW and pulse lengths ranging between 4-20 s. It has been observed that the range of the parameters of the matching circuit, over which the frequency of the power supply is stable, is narrow and further experiments with increased number of turns in the coil are in the pipeline to see if the range can be widened. In this paper, the description of the experimental system and the commissioning data related to the optimisation of the various parameters of the matching network, to obtain stable plasma of required density, are presented and discussed.

43 PARTICLE ACCELERATORS↗

Commissioning of a microprobe-XRF beamline (BL-16) on Indus-2 synchrotron source

We report commissioning of the microprobe-XRF beamline on Indus-2 synchrotron source. The beamline has been recently made operational and is now open for the user's experiments. The beamline comprises of Si(111) double crystal monochromator and Kirkpatrick-Baez focusing optics. The beamline covers wide photon energy range of 4 - 20 keV using both collimated and micro-focused beam modes. The design details and the first commissioning results obtained using this beamline are presented.

43 PARTICLE ACCELERATORS↗

Commissioning of soft and deep X-ray lithography beamline on Indus-2

Soft and Deep x-ray lithography (SDXRL) beamline is commissioned on Indus-2. The beamline can be operated between 1.5 to 20 keV and in white beam mode. Beamline consists of two x-ray mirrors, slits, Be-windows, beam diagnostics and filters assemblies and radiation safety systems. A custom built X-ray scanner is used to create 3-D high aspect ratio micro structures. The paper reports the commissioning results of this beamline.

43 PARTICLE ACCELERATORS↗