Managing Complex Space Missions Like the James Webb Space Telescope

Program Management Summary; Organizational structure is established. Roles and responsibilities are well defined: a) All major contracts are in place. b) All foreign partners are in place, operating under signed Memoranda of Understanding (MOUs). c) Partners include GSFC, NGST, Ball, ITT, ATK, STScI, ESA, CSA, UAz, LM, JPL, MSFC, ARC, JSC, etc. All enabling technologies are at Technical Readiness Level-6. Earned Value Management is being applied to all major contracts consistent with Agency guidance. Schedules are baselined and the project critical path is understood/managed. Budget with reserves established. Liens and threats system in use. Formal Configuration Management (CM) processes are in place. Project-level schedules are maintained within the CM system. Formal Risk Management processes are in place. Requirements are stable and flowed down. Project metrics are established and tracked monthly: a) Includes technical as well as cost and schedule metrics. b) Changes as well as trends are reported each month.

Sabelhaus, Phil↗

Data Management as a Cluster Middleware Centerpiece

Through earth and space modeling and the ongoing launches of satellites to gather data, NASA has become one of the largest producers of data in the world. These large data sets necessitated the creation of a Data Management System (DMS) to assist both the users and the administrators of the data. Halcyon Systems Inc. was contracted by the NASA Center for Computational Sciences (NCCS) to produce a Data Management System. The prototype of the DMS was produced by Halcyon Systems Inc. (Halcyon) for the Global Modeling and Assimilation Office (GMAO). The system, which was implemented and deployed within a relatively short period of time, has proven to be highly reliable and deployable. Following the prototype deployment, Halcyon was contacted by the NCCS to produce a production DMS version for their user community. The system is composed of several existing open source or government-sponsored components such as the San Diego Supercomputer Center s (SDSC) Storage Resource Broker (SRB), the Distributed Oceanographic Data System (DODS), and other components. Since Data Management is one of the foremost problems in cluster computing, the final package not only extends its capabilities as a Data Management System, but also to a cluster management system. This Cluster/Data Management System (CDMS) can be envisioned as the integration of existing packages.

Zero, Jose↗

Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

Source record↗

Hierarchthis: An Interactive Interface for Identifying Mission-Relevant Components of the Advanced Multi-Mission Operations System

Even though NASA's space missions are many and varied, there are some tasks that are common to all of them. For example, all spacecraft need to communicate with other entities, and all spacecraft need to know where they are. These tasks use tools and services that can be inherited and reused between missions, reducing systems engineering effort and therefore reducing cost.The Advanced Multi-Mission Operations System, or AMMOS, is a collection of multimission tools and services, whose development and maintenance are funded by NASA. I created HierarchThis, a plugin designed to provide an interactive interface to help customers identify mission-relevant tools and services. HierarchThis automatically creates diagrams of the AMMOS database, and then allows users to show/hide specific details through a graphical interface. Once customers identify tools and services they want for a specific mission, HierarchThis can automatically generate a contract between the Multimission Ground Systems and Services Office, which manages AMMOS, and the customer. The document contains the selected AMMOS components, along with their capabilities and satisfied requirements. HierarchThis reduces the time needed for the process from service selections to having a mission-specific contract from the order of days to the order of minutes.

Advanced Multi-Mission Operations System (AMMOS)↗

Engine Validation of Noise and Emission Reduction Technology Phase I

This final report has been prepared by Honeywell Aerospace, Phoenix, Arizona, a unit of Honeywell International, Inc., documenting work performed during the period December 2004 through August 2007 for the NASA Glenn Research Center, Cleveland, Ohio, under the Revolutionary Aero-Space Engine Research (RASER) Program, Contract No. NAS3-01136, Task Order 8, Engine Validation of Noise and Emission Reduction Technology Phase I. The NASA Task Manager was Dr. Joe Grady of the NASA Glenn Research Center. The NASA Contract Officer was Mr. Albert Spence of the NASA Glenn Research Center. This report is for a test program in which NASA funded engine validations of integrated technologies that reduce aircraft engine noise. These technologies address the reduction of engine fan and jet noise, and noise associated with propulsion/airframe integration. The results of these tests will be used by NASA to identify the engineering tradeoffs associated with the technologies that are needed to enable advanced engine systems to meet stringent goals for the reduction of noise. The objectives of this program are to (1) conduct system engineering and integration efforts to define the engine test-bed configuration; (2) develop selected noise reduction technologies to a technical maturity sufficient to enable engine testing and validation of those technologies in the FY06-07 time frame; (3) conduct engine tests designed to gain insight into the sources, mechanisms and characteristics of noise in the engines; and (4) establish baseline engine noise measurements for subsequent use in the evaluation of noise reduction.

Weir, Don↗

Assessment of MSFC's supervisory training programs and courses

Courses and special programs to train supervisors at Marshall Space Flight Center (MSFC) were to determine the adequacy of the present MSFC Supervisory Training Program and to recommend changes, if appropriate. The content, procedures, and student evaluations of the required Office of Personnel Management (OPM) 80 hours training for supervisors, the optional 120 hours, the MSFC Management Development Program (MDP), NASA's Management Education Program (MEP), various OPM and special contract programs, pertinent procedural guidelines, regulations, and letters, as well as various MSFC computer reports which indicate who took what training were analyzed. Various interviews with MSFC personnel involved in training are included. Recommendations consist of: (1) the choice of courses selected for the basic required OPM 80 hours be improved; (2) the optional 120 hours be discontinued and a shorter module be developed dealing with managerial decision making and human relations skills; (3) the MDP and MEP be continued as at present; and (4) that a broad array of developmental strategies be incorporated to provide a variety of opportunities for supervisory improvement.

Brindley, T. A.↗

International ultraviolet explorer observatory operations

This volume contains the Final Report for the International Ultraviolet Explorer (IUE) Observatory Operations contract, NAS5-28787. The report summarizes the activities of the IUE Observatory over the 13-month period from November 1985 through November 1986 and is arranged in sections according to the functions specified in the Statement of Work (SOW) of the contract. In order to preserve numerical correspondence between the technical SOW elements specified by the contract and the sections of this report, project management activities (SOW element 0.0.) are reported here in Section 7, following the reports of technical SOW elements 1.0 through 6.0. Routine activities have been summarized briefly whenever possible; statistical compilations, reports, and more lengthy supplementary material are contained in the Appendices.

Source record↗

The Fifth Annual NASA/Contractors Conference on Quality and Productivity. Quality: A Commitment to the Future

The report is a summary of the 5th NASA/Contractors Conference on Quality and Productivity. The theme was 'Quality - A Commitment to the Future'. The summary report highlights the key points: commitment to quality, strategic and long-range planning, quality commitment, risk management, teaming, quality measurement, creating a quality environment, contract incentives, software quality and reliability.

Source record↗

From Research to Flight: Surviving the TRL Valley of Death for Robotic and Human Space Exploration

There must be a plan or opportunities for flight validation: a) To reduce the bottleneck of new technologies at the TRL Valley of Death; b) To allow frequent infusion of new technologies into flight missions. Risk must be tolerated for new technology flight experiments. Risk must also be accepted on early-adopting missions to enable new capabilities. Fundamental research is critical to taking the next giant leap in the scientific exploration of space. Technology push is often required to meet current mission requirements. Technology management requires more than issuing NRAs and overseeing contracts.

Johnson, Les↗

From Research to Flight: Surviving the TRL Valley of Death for Robotic and Human Exploration

Fundamental research is critical to taking the next giant leap in the scientific exploration of space. NASA should be pushing the envelope and asking "what if?" .. Technology push enables new capabilities. When NASA began, everything was enabling. .. Technology pull is often required to meet current mission requirements. Technology management requires more than issuing NRAs and overseeing contracts. Continuous assessment, peer review, and system systems studies are vital to credible TRL advancement. A strategy for taking technology R&D to new heights will lead to discoveries at far-reaching destinations..

Johnson, Les↗

The application of total quality management principles to spacecraft mission operations

By now, the philosophies of Total Quality Management have had an impact on every aspect of American industrial life. The trail-blazing work of Deming, Juran, and Crosby, first implemented in Japan, has 're-migrated' across the Pacific and now plays a growing role in America's management culture. While initially considered suited only for a manufacturing environment, TQM has moved rapidly into the 'service' areas of offices, sales forces, and even fast-food restaurants. The next logical step has also been taken - TQM has found its way into virtually all departments of the Federal Government, including NASA. Because of this widespread success, it seems fair to ask whether this new discipline is directly applicable to the profession of spacecraft operations. The results of quality emphasis on OAO Corporation's contract at JPL provide strong support for Total Quality Management as a useful tool in spacecraft operations.

Sweetin, Maury↗

Project Management of the Capsule Parachute Assembly System (CPAS)

Since the time of contract award of the Orion Crew Exploration Vehicle in 2006, NASA has spearheaded the design, development, test and evaluation of the Orion aerodynamic decelerator system through a Government Furnished Equipment project in the Engineering Directorate of the Johnson Space Center. This paper will describe the Project structure and organization, the interfaces to the major stakeholders, the processes applied, and a few major budget, schedule and technical challenges overcome.

Johnson, Chris J.↗

Noise Measurements of the VAIIPR Fan

This final report has been prepared by Honeywell Aerospace, Phoenix, Arizona, a unit of Honeywell International, Inc., documenting work performed during the period September 2004 through November 2005 for the National Aeronautics and Space Administration (NASA) Glenn Research Center, Cleveland, Ohio, under the Revolutionary Aero-Space Engine Research (RASER) Program, Contract No. NAS3- 01136, Task Order 6, Noise Measurements of the VAIIPR Fan. The NASA Task Manager was Dr. Joe Grady, NASA Glenn Research Center, Mail Code 60-6, Cleveland, Ohio 44135. The NASA Contract Officer was Mr. Albert Spence, NASA Glenn Research Center, Mail Code 60-6, Cleveland, Ohio 44135. This report focuses on the evaluation of internal fan noise as generated from various inflow disturbances based on measurements made from a circumferential array of sensors located near the fan and sensors upstream of a serpentine inlet.

Mendoza, Jeff↗

Trades, Architecture, and Design of the Joint Augmented Reality Visual Informatics (Joint AR) Product

Future expeditions will enable exploration and study of the planetary surfaces of the Moon and Mars by performing extravehicular activity (EVA) operations. Present-day International Space Station (ISS) EVA operations require an intricate and tight choreography of crew, space suits, tools, systems, and flight teams to plan, train, and execute with limited advanced informatics. Additionally, EVA operations, aside from the Apollo Lunar surface missions, have predominately focused on maintenance and construction tasks where success criteria are clearly measurable. However, future exploration missions expect to enable crew to carry out scientific objectives in increasingly Earth-independent ways. In this paper, the Joint Augmented Reality Visual Informatics System (Joint AR) characterizes the design space for developing a modular augmented reality (AR) device for a spacesuit form factor that can support crew decision-making for EVA. This paper highlights the project’s experience with a product-focused management style and use-case centered systems engineering approach to iteratively design, build, and test. The Joint AR product features were defined via trade studies and market analysis of previous EVA display efforts, various AR components such as optics, commercial AR systems, light engines, data interfaces, graphics engine software and analog test beds. We outline the defining architectural design decisions, including safety criticality considerations, suit mounting interfaces, computer architectures, and partnership contracting mechanisms. The outcomes of these studies, architecture decisions, and management requirements result in a recommended design which is the Joint AR product. We discuss the evolution, development of these system components, and what work remains. We hope to share a unified understanding of various design decisions and how they impact the future of crew members’ access to data during Lunar and Martian EVAs. This ongoing effort can enable a community-wide discovery process toward realizing necessary AR features and capabilities for future missions.

Augmented Reality↗

Aircraft/Air Traffic Management Functional Analysis Model: Technical Description

The Aircraft/Air Traffic Management Functional Analysis Model, Version 2.0 (FAM 2.0), is a discrete event simulation model designed to support analysis of alternative concepts in air traffic management and control. FAM 2.0 was developed by the Logistics Management Institute (LMI) under a National Aeronautics and Space Administration (NASA) contract. This document provides a technical description of FAM 2.0 and its computer files to enable the modeler and programmer to make enhancements or modifications to the model. Those interested in a guide for using the model in analysis should consult the companion document, Aircraft/Air Traffic Management Functional Analysis Model, Version 2.0 Users Manual.

Etheridge, Melvin↗

Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

Johnstone, Paul M.↗

Thermal storage for industrial process and reject heat

Industrial production uses about 40% of the total energy consumed in the United States. The major share of this is derived from fossil fuel. Potential savings of scarce fuel is possible through the use of thermal energy storage (TES) of reject or process heat for subsequent use. Results of study contracts awarded by the Department of Energy (DOE) and managed by the NASA Lewis Research Center have identified three especially significant industries where high temperature TES appears attractive - paper and pulp, iron and steel, and cement. Potential annual fuel savings with large scale implementation of near-term TES systems for these three industries is nearly 9 million bbl of oil.

Duscha, R. A.↗

Streamlining: Reducing costs and increasing STS operations effectiveness

The development of streamlining as a concept, its inclusion in the space transportation system engineering and operations support (STSEOS) contract, and how it serves as an incentive to management and technical support personnel is discussed. The mechanics of encouraging and processing streamlining suggestions, reviews, feedback to submitters, recognition, and how individual employee performance evaluations are used to motivation are discussed. Several items that were implemented are mentioned. Information reported and the methodology of determining estimated dollar savings are outlined. The overall effect of this activity on the ability of the McDonnell Douglas flight preparation and mission operations team to support a rapidly increasing flight rate without a proportional increase in cost is illustrated.

Petersburg, R. K.↗