Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Measure Guideline: Optimizing the Configuration of Flexible Duct Junction Boxes

This measure guideline offers additional recommendations to heating, ventilation, and air conditioning (HVAC) system designers for optimizing flexible duct, constant-volume HVAC systems using junction boxes within Air Conditioning Contractors of America (ACCA) Manual D guidance (Rutkowski, H. Manual D -- Residential Duct Systems, 3rd edition, Version 1.00. Arlington, VA: Air Conditioning Contractors of America, 2009.). IBACOS used computational fluid dynamics software to explore and develop guidance to better control the airflow effects of factors that may impact pressure losses within junction boxes among various design configurations (Beach, R., Prahl, D., and Lange, R. CFD Analysis of Flexible Duct Junction Box Design. Golden, CO: National Renewable Energy Laboratory, submitted for publication 2013). These recommendations can help to ensure that a system aligns more closely with the design and the occupants' comfort expectations. Specifically, the recommendations described herein show how to configure a rectangular box with four outlets, a triangular box with three outlets, metal wyes with two outlets, and multiple configurations for more than four outlets. Designers of HVAC systems, contractors who are fabricating junction boxes on site, and anyone using the ACCA Manual D process for sizing duct runs will find this measure guideline invaluable for more accurately minimizing pressure losses when using junction boxes with flexible ducts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measure Guideline: Guide to Attic Air Sealing

The Guide to Attic Air Sealing was completed in 2010 and although not in the standard Measure Guideline format, is intended to be a Measure Guideline on Attic Air Sealing. The guide was reviewed during two industry stakeholders meetings held on December 18th, 2009 and January 15th, 2010, and modified based on the comments received. Please do not make comments on the Building America format of this document. The purpose of the Guide to Attic Air Sealing is to provide information and recommendations for the preparation work necessary prior to adding attic insulation. Even though the purpose of this guide is to save energy - health, safety and durability should not be compromised by energy efficiency. Accordingly, combustion safety and ventilation for indoor air quality are addressed first. Durability and attic ventilation then follow. Finally, to maximize energy savings, air sealing is completed prior to insulating. The guide is intended for home remodelers, builders, insulation contractors, mechanical contractors, general contractors who have previously done remodeling and homeowners as a guide to the work that needs to be done.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measure Guideline: Guide to Attic Air Sealing

The purpose of this measure guideline is to provide information and recommendations for the preparation work necessary prior to adding attic insulation. Even though the purpose of this guide is to save energy, health, safety, and durability should not be compromised by energy efficiency. Accordingly, combustion safety and ventilation for indoor air quality are addressed first. Durability and attic ventilation then follow. Finally, to maximize energy savings, air sealing is completed prior to insulating. The guide is intended for home remodelers, builders, insulation contractors, mechanical contractors, general contractors who have previously done remodeling and homeowners as a guide to the work that needs to be done.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Alternatives Analysis Amchitka Island Mud Pit Cap Repair, Amchitka, Alaska January 2016

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) manages the Nevada Offsites program, which includes a series of reclaimed drilling mud impoundments on Amchitka Island, Alaska (Figure 1). Navarro Research and Engineering, Inc. is the Legacy Management Support contractor (the Contractor) for LM. The Contractor has procured Tetra Tech, Inc. to provide engineering support to the Amchitka mud pit reclamation project. The mud pit caps were damaged during a 7.9-magnitude earthquake that occurred in 2014. The goals of the current project are to investigate conditions at the mud pit impoundments, identify feasible alternatives for repair of the cover systems and the contents, and estimate relative costs of repair alternatives. This report presents descriptions of the sites and past investigations, existing conditions, summaries of various repair/mitigation alternatives, and direct, unburdened, order-of-magnitude (-15% to +50%) associated costs.

54 ENVIRONMENTAL SCIENCES↗

Research and Testing of Power Use of HPC Workload of Participant's HPC System

This CRADA (1) facilitates relocation of the Board of Trustees of the Colorado School of Mines, for and on behalf of the Colorado School of Mines, (MINES or Participant) International Business Machines Corporation (IBM) supercomputing system into the National Renewable Energy Laboratory's (NREL or Contractor) Energy Systems Integration Facility (ESIF). This CRADA (1) facilitates testing High Performance Computing (HPC) application platform portability, scalability, electrical energy use, and performance for applications critical to each organization; (2) facilitates use of the existing facility electrical and thermal data collection systems at Contractor ESIF in support of characterizing HPC workload power use characterization; and (3) facilitates addition of application power use data on the Participant IBM supercomputing system into the Contractor ESIF Time Series data system to use/re-use existing methodology to profile application power use.

97 MATHEMATICS AND COMPUTING↗

Preliminary Hyde Memorial State Park Modular Pumped Hydro Energy Storage Sizing Study

Hyde Memorial State Park has lost grid supplied power and has been running on a diesel generator for some time now. The powerline that feeds the park is a state owned, 5 mile underground extension from the PNM service connection point. The line has decayed over the past 30 plus years and due to the location (much of it running under the road) the cost of repair and the logistics of closing the road are not good options. In June 2019 through a state contractor, the State of New Mexico Energy, Minerals and Natural Resources Department completed a renewable energy microgrid feasibility study to see if it was technically and economically feasible to operate the park without future grid power. The study looked at solar plus battery storage and a propane generator as a possible option. New Mexico State Parks Division has indicated their wish to move forward with the microgrid project which will now go out to one of the state’s energy services performance contractors. The contractor will have to finalize the feasibility study and develop a complete list of construction costs. Given, the lack of long-term O&M data on the battery, as part of the next phase of the project the State of New Mexico Energy, Minerals and Natural Resources Department asked Los Alamos National Laboratory to preliminary examine the potential for pumped hydro as an alternative to batteries.

13 HYDRO ENERGY↗

Site Environmental Report for 2018 Sandia National Laboratories, California

Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE's National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology & Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. DOE and its management and operating contractor for Sandia are committed to safeguarding environmental protection, compliance, and sustainability and to ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This Site Environmental Report for 2018 was prepared in accordance with DOE Order 231.1 B, Environment, Safety and Health Reporting (DOE 2012). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2018, unless noted otherwise. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

Lighting Technology Energy Solutions (LiTES) (Final Technical Report)

The Lighting Technologies Energy Solutions (LiTES) Program Final Technical Report is a collaborative effort between NextEnergy, Consumers Energy, DTE Energy (DTE) and the Detroit Joint Apprentice Training Center (DJATC) to evaluate customer and contractor experiences deploying advanced/networked lighting controls systems (ALC/NLC). The LiTES Program, funded by the US Department of Energy (DOE), sought to reduce energy use in small and medium commercial buildings (SMCB) by accelerating the adoption of ALC/NLC through contractor training and technology deployment. Leveraging recommendations already outlined by the Design Lights Consortium Commercial Advanced Lighting Controls (DLC CALC) project, NextEnergy led an effort to train contractors, evaluate the experience of ALC/NLC demonstration projects, identify opportunities to reduce market barriers, and accelerate the increased adoption of ALC/NLC technologies within SMCB. The LiTES Program defined SMCB as commercial buildings under 100,000 square feet. The LiTES Program efforts also included evaluating current ALC/NLC utility incentives, piloting ALC/NLC incentives specific to SMCB, and identifying opportunities to better align utility incentives with current ALC/NLC technology to support accelerating the adoption of ALC/NLC in SMCB. This report shares the survey results and M&V data findings, including energy savings, market barriers, experience of installations, impact of incentives/financing programs and provides recommendations for the increased deployment of ALC/NLC systems in small and medium commercial buildings. Utility survey results, incentive alternatives and recommendations, including a cost benefit analysis outlining energy and economic impacts of the provided ALC/NLC incentives on SMCB projects are also provided.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Site Environmental Report for Sandia National Laboratories California (2019)

Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE's National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology & Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. DOE and its management and operating contractor for Sandia are committed to safeguarding environmental protection, compliance, and sustainability and to ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This Site Environmental Report for 2019 was prepared in accordance with DOE Order 231.1B, Environment, S afro and Health &potting (DOE 2012). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2019, unless noted otherwise. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2020, Sandia National Laboratories, California

Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE's National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology & Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. DOE and its management and operating contractor for Sandia are committed to safeguarding environmental protection, compliance, and sustainability and to ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This Site Environmental Report for 2020 was prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOE 2012). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2020, unless noted otherwise. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

Assessing the New Home Market Opportunity: Case Study and Cost Modeling for Solar and Storage in 2030

Residential solar and storage markets are growing in the United States. With approximately 1 million new homes constructed every year, this represents a significant opportunity for solar and storage installations. Some homebuilders have begun to build new homes with solar and storage included as a standard offering. It is not clear how solar and storage is incorporated into the new construction process and at what cost. Further, it is unclear what barriers or opportunities exist to scale this model nationwide. To fill this gap in the literature, this research conducts a case study of Mandalay Homes' new solar and storage community in Arizona to gather lessons learned. From this foundation, we further generate a set of pathways to reduce install costs and expand solar and storage market penetration in this sector. To model existing and 2030 solar and storage costs, we use the National Renewable Energy Laboratory's (NREL's) bottom-up cost model. This modeling is further informed by 12 interviews conducted with new home builders, solar contractors, and other subject matter expert organizations. Our case study analysis generated three key considerations for other homebuilders including: 1. Educating local permitting, inspection, and in some cases utility officials on solar and storage products, designs, and code compliant building practices may be required. The need for education may decline as more local governments and utilities review and approve solar and storage projects. 2. Incorporating solar and storage systems into the homebuilding process can add complexity and related coordination challenges. This does not need to result in home construction delays, but can result in costly contractor "dry runs" to construction sites. 3. Deploying solar and storage at the time of new construction has significant economies of scale, which can improve the value proposition of the systems. The case study, extant literature, and interviews were used to model both existing and future solar and storage installation costs at time of new construction. Here, we find three key cost reduction opportunities relating to solar and battery storage hardware, customer acquisition, and overhead. If future contractors can maximize the cost reduction opportunities outlined here, residential new construction costs could decline by 8 - 25% by 2030, depending on the modeled scenario. Though we expect costs to decline through 2030, it is unclear which of these scenarios may ultimately appear. Interviewees further identified a variety of barriers across each cost category that could temper the savings shown here. At the same time, interviewees described several pathways to scale the new construction solar and storage market, beyond installation cost savings. Interviewees confirmed that changes in finance, rate design, resilience policies, deployment mandates, and DER aggregation could all support more market adoption than seen today. These findings suggest that there are significant opportunities to expand new construction markets and this research can serve as a baseline to assess progress in this segment through 2030.

14 SOLAR ENERGY↗

Independent Review of Non-Destructive Assay for the K-25/K-27 D&D Project: November 30-December 3, 2004, Oak Ridge, TN

The DOE with concurrence from the D&D contractor has chartered an assessment of the methods and procedures used to obtain the original NDA results of holdup deposits at the K-25 and K-27 uranium gaseous diffusion facilities in Oak Ridge. The assessment has been performed by an external review team with the participation of the D&D contractor, DOE, and DOE/OR. This document is the final report for the assessment. The DOE provided the charter for this review. The review team spent a week in Oak Ridge attending meetings and participating in discussions with expert contractor staff. Substantial additional input for the review came from numerous written materials, unpublished and published. This final report of observations, findings, and recommendations in areas defined by the charter is based on information from the meetings, discussions, and documents. The assessment of the Review Team is that the DOE/OR and BJC approach in using historical NDA data for the D&D of K-25 and K-27 is appropriate and generally acceptable. Resolving issues, addressing findings, and implementing the recommendations documented in this report will reconcile specific technical concerns.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects (Final Technical Report)

The number of commercial coal, gas, and nuclear projects built over the past 100 years number in the thousands. As such, there is a large database, available to a wide range of commercial engineering contractors, on proven designs. In essence, unsuccessful designs have, through generations of iterations, been identified and then deleted from further consideration. In contrast, the number of commercial parabolic trough projects using nitrate salt for the thermal storage media is perhaps 60. Further, the number of commercial central receiver projects using nitrate salt as the working fluid is on the order of 20, including estimates for China. Given the relative immaturity of salt technology, and commercial pressures to successfully bid new solar projects into a mature electricity market, solar projects often promise more than has been delivered. The Design Basis Document / Owner’s Technical Specification is a first step in the iteration process. The report describes the successful features of commercial projects, outlines a range equipment and system failures in projects that didn’t operate as intended, and provides a draft set of design changes intended to correct the known problems. The product of the study is 3 volumes of technical material; one volume is on parabolic trough technologies; a second is on central receiver technologies, and the third is on potential design changes to parabolic trough and central receiver projects. The 3 volumes, which total some 590 pages, can be found at https://www.solardynllc.com/csp-plant-technologies. One of the principal topics in the report is the use of functional or prescriptive specifications. Functional specifications describe what the equipment needs to do, consistent with the minimum legal requirements of the local jurisdictions. The details of how this is to be accomplished is developed by the engineering contractor. Prescriptive specifications, which are developed by the Owner, prescribe to the engineering contractor how the functional requirements are to be met. This arrangement ensures that the favorable experience from a previous project is repeated. One example is the design code for the hot salt tank in central receiver projects. The closest design basis is API Standard 650 Welded Steel Tanks for Oil Storage. However, the maximum design temperature in API 650 is 260 °C. As such, solar projects have typically adopted a hybrid Code approach, in which allowable material stresses are taken from ASME Section II Materials. Further, since the tanks experience daily changes in temperature and in (static) pressure, and since portions of the tank can operate at stresses beyond the elastic range, the low cycle fatigue life of the tank is conducted using the rules of Section VIII Division 2. However, in a recent study by NREL, the principal damage mechanism was identified as creep rather than fatigue. Further, design stresses permitted under Section VIII Division 2, corresponding to a fatigue life of 30 years, result in projected creep lifetimes of only 2 to 5 years. An alternate design approach, prescribed by the Owner, would be based on Code sections intended for high temperature service in the creep regime. A candidate is Section III Division 5. Granted, this is a nuclear code section, and it’s use would not likely be mandated by local jurisdictions. However, the effects of creep have been deemed to be of sufficient importance that one nuclear project developer, and one central receiver project developer, have stipulated in the tank design specification that the equipment be designed to the requirements of Section III Division 5.

14 SOLAR ENERGY↗

Flexible Fuel Electric Hybrid Glass Furnace Demonstration

The furnace contractor completed General Arrangement (GA) layouts and Piping and Instrumentation Diagrams (P&ID) for both furnaces during this reporting period. Preliminary equipment lists accompanied this work. Control system architecture in progress. Key furnace design elements and deliverables on track to be complete by end of phase. The facilities design and integration contractor completed a 3D scan and modeling of the facility. The work during this period focused on preliminary design with a focus on overall project scope and feasibility. This key work supports the overall project deliverables for 30% preliminary engineering and Preliminary Design Report (PDR) which are on track to be complete by the end of the phase. These deliverables are approximately 50% complete through the end of this reporting period. The batch house operations design contractor continues development of site plan and General Arrangement (GA) layout to support the 30% preliminary engineering and design package. This work is 60% complete by the end of this reporting period and is on track to be complete by the end of the phase.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Staged Z-Pinch Modeling with Hydra and Chicago Codes (CRADA Final Report)

This was a collaborative effort between Lawrence Livermore National Security, LLC (“Contractor”), as manager and operator of Lawrence Livermore National Laboratory (“LLNL”) and Magneto Inertial Fusion Technologies, Inc. ("MIFTI" or "Participant"), to develop staged Z-pinch (SZP) modeling with HYDRA and CHICAGO codes. The contractor performed numerical simulations of the SZP to reproduce and validate Participant’s MACH2 simulations. Contractor used the state-of-the-art, radiation-magneto-hydrodynamic code HYDRA, as well as the hybrid particle-in-cell code CHICAGO. This work helped assess the physical and numerical uncertainties associated with the simulations and the overall fusion scheme. HYDRA is a well-established and validated code. This work has helped to independently assess the SZP concept to give confidence to the Participant and to the broader fusion community.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2022

This report describes the monitoring of areas revegetated by various contractors on the Hanford Site. Revegetation sites include those revegetated by the River Corridor Closure Contractor and CH2M Hill Plateau Remediation Company that were transitioned to Mission Support Alliance (MSA) in 2017. These sites, along with sites revegetated by MSA between 2017 and 2020, were transitioned to Hanford Mission Integration Solutions (HMIS) in 2021. HMIS performs revegetation monitoring activities for these transitioned sites and for sites revegetated by HMIS and other contractors in subsequent years to determine revegetation site success. This report contains data collected in 2022 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 53 sites selected to be representative sites for areas planted between the years of fiscal year (FY) 2007 and FY 2022.

54 ENVIRONMENTAL SCIENCES↗

Application for Permit to Operate a Class II Solid Waste Disposal Site at the Nevada Test Site - U10c Disposal Site

The Nevada Test Site (NTS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NTS and National Security Technologies LLC (NSTec) is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The site will be used for the disposal of refuse, rubbish, garbage, sewage sludge, pathological waste, Asbestos-Containing Material (ACM), industrial solid waste, hydrocarbon-burdened soil, hydrocarbon-burdened demolition and construction waste, and other inert waste (hereafter called permissible waste). Waste containing free liquids or regulated under Subtitle C of the Resource Conservation and Recovery Act (RCRA) will not be accepted for disposal at the site. Waste regulated under the Toxic Substance Control Act (TSCA), excluding Polychlorinated Biphenyl [PCB], Bulk Product Waste (see Section 6.2.5) and ACM (see Section 6.2.2.2) will not be accepted for disposal at the site. The disposal site will be used as the sole depository of permissible waste which is: (1) Generated by entities covered under the U.S. Environmental Protection Agency (EPA) Hazardous Waste Generator Identification Number for the NTS; (2) Generated at sites identified in the Federal Facilities Agreement and Consent Order (FFACO); (3) Sensitive records and media, including documents, vugraphs, computer disks, typewriter ribbons, magnetic tapes, etc., generated by NNSA/NSO or its contractors; (4) ACM generated by NNSA/NSO or its contractors according to Section 6.2.2.2, as necessary; (5) Hydrocarbon-burdened soil and solid waste from areas covered under the EPA Hazardous Waste Generator Identification Number for the NTS; (6) Other waste on a case-by-case concurrence by NDEP/BFF. The generator of permissible waste is responsible for preparing documentation related to waste acceptance criteria, waste characterization, and load verification. Waste and Water (WW) personnel are responsible for operating the disposal site and reviewing documentation to determine if the waste is acceptable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NorthernSTAR Project Overcoat: Exterior Insulation Strategies for 1.5-Story Roof Applications in Cold Climates

This is a repository for all NorthernSTAR Overcoat insulation retrofit projects. Both houses received Overcoat insulation retrofit on roof only, performed by Cocoon Insulation. 1 - St. Louis Park house - St. Louis Park, MN 2 - Edina house - Edina, MN In this second study, the team wished to analyze the before and after air-tightness data from roof only ETMMS retrofits on 1.5-story homes in cold and very cold climates. To identify homes to analyze, we reached out to our national network of energy professionals, home performance contractors, and general contractors who had expressed interest in promoting roof-only External Thermal Moisture Management System (ETMMS) to clients. Five projects by three contractors were submitted for consideration as they were being done to mitigate severe ice dams for homeowners. Only two of the five projects followed a roof only ETMMS protocol. Data from the other three projects, however, were reviewed with the air-tightness data of 250 roof-only, interior-applied energy retrofits on 1.5-story homes provided by three NorthernSTAR industry partners. These data represent homes in the general market as well as homes that were part of the state of Minnesota weatherization program.

adhered applied membrane↗