Search NASA⌕ Search

SEARCH · Search NASA

Results for “Cassini mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Visible and infrared mapping spectrometer for exploration of comets, asteroids, and the Saturnian system of rings and moons

Consideration is given to a visible and infrared mapping spectrometer (VIMS) developed by American, Italian, and French scientists and engineers as a facility instrument for the Comet Rendezvous Asteroid Flyby (CRAF) mission and as a candidate facility instrument for the Cassini mission to explore Saturn and its rings and moons. VIMS is characterized by 0.35-5.2 micron spectral range with a nominal spatial resolution of 0.5 mrad and spectral resolutions of 7 nm at 0.35-1.0 micron wavelength and 16 nm at 1.0-5.2 micron wavelength.

Juergens, David W.↗

Effects of 18 O Exchange on Neutron Emission Rates of Aging 238 PuO 2 LWRHUs

The Lightweight Radioisotope Heater Unit (LWRHU) provides about 1 Watt of thermal power to critical electrical and mechanical systems in the extreme temperatures of space, maintaining the operating temperature of the spacecraft’s scientific and general operating equipment. Los Alamos National Laboratory (LANL) designed and tested the LWRHU in the 1970s through early 1980s. The first production campaign at LANL was in the early 1980s in support of the Galileo mission in which over 100 LWRHUs were manufactured. In the mid-1990s, almost 200 LWRHUs were manufactured in support of the Cassini mission. After the primary Cassini manufacturing campaign, the Department of Energy (DOE) approved the fabrication of more than 10 additional LWRHUs as spares in 1998. The LWRHU assembly contains the following components: a fuel pellet, a vented capsule, a pyrolytic graphite insulator, and a fine-weave pierced fabric (FWPF) graphite aeroshell. The fuel pellet is a hot-pressed 238 PuO 2 cylindrical pellet that is sintered to create a ceramic pellet. The pellet is encapsulated in a platinum-rhodium encapsulation. The welded fueled clad is placed inside a pyrolytic graphite thermal insulation to protect the fuel from the heat produced in reentry events. The exterior layer of the LWRHU assembly is the FWPF aeroshell. Before sintering, PuO 2 granules are heated in a furnace at temperatures greater than or equal to 700°C under an enriched 16 O atmosphere in order to reduce trace quantities of 18 O. Because 18 O undergoes an (α,n) reaction, 18 O needs to be removed as much as possible to meet radiation emission requirements set by the Jet Propulsion Laboratory (JPL) and the National Aeronautics and Space Administration (NASA), as well as other agencies. The relative abundances of the oxygen isotopes are indicated by neutron emission rate (NER) measurements. LWRHUs are vented with a sintered platinum frit vent (George 1986). During extraterrestrial operation, the vent in the cladding allows helium from the decay of plutonium to escape and relieves pressure from the system while preventing the solids from escaping (Rinehart 1996, Tate 1982 & 1985). This vent is protected during manufacture by a platinum-30 rhodium cover. The capsule vent is activated by milling a 0.025-inch diameter hole through the protective cover to a nominal depth of 0.015 inches, generally immediately before the LWRHU is loaded into the aeroshell (George 1986). Prior to long-term storage, LWRHUs are vented and thus potentially allow infiltration of 18 O from the ambient atmosphere. Although NER decreases with age due to the reduction in emitted alpha particles, it might be expected that NER reduction is mitigated by the exchange of 18 O. However, this is not necessarily the case and no trend was observed relating NER to age other than the natural decay of 238 Pu (Mulford 2021). The most probable and dominant factor for determining specific NER was manufacturing discrepancies between individual units. It is important to understand the lack of observed 16 O- 18 O exchange and to compare LWRHU pellets as much as possible.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NASA mission planning for space nuclear power

An evaluation is conducted of those aspects of the Space Exploration Initiative which stand to gain from the use of nuclear powerplants. Low-power, less than 10 kW(e) missions in question encompass the Comet Rendezvous Asteroid Flyby, the Cassini mission to Saturn, the Mars Network mission, a solar probe, the Mars Rover Sample Return mission, the Rosetta comet nucleus sample return mission, and an outer planets orbiter/probe. Reactor power yielding 10-100 kW(e) can be used by advanced rovers and initial lunar and Martian outposts, as well as Jovian and Saturnian grand tours and sample-return missions.

Bennett, Gary L.↗

Types of Public Engagement for a Multi-Year Mission: The Interstellar Probe

How do we engage the public with a 50+ year mission? Scientists face challenges in effectively interacting with the public [1-4], along with the ever-changing nature of such a long-duration mission and updating of results. The Interstellar Probe initiative may benefit from an education and public engagement team for the purpose of professional development for scientists, exploring different tools for engagement, and outreach opportunities for a wide swath of communication. Some examples of such public engagement can follow the resources and engagement as that from the Lunar and Planetary Institute (LPI), Impact Earth, the Toolbox for Research and Exploration (TREX), and even previous mission initiatives and engagement with the public, such as the Cassini mission [4-7]. This abstract simply outlines the different types of public engagement that the Interstellar Probe could potentially develop and eventually undertake. Specifically, there are 4 main themes to explore: Public, Visual, Audio, and Research. Inclusivity should also be a factor on how to better engage the public through a multi-year mission

C Ahrens↗

Cassini distributed instrument operations – what we’ve learned since Saturn orbit insertion

The Cassini mission to Saturn is complex with 12 science teams conducting distributed operations across the United States and Europe. Each Team includes scientists from around the world who actively participate in operations, including observation design, instrument commanding, downlink processing, and archiving. This represents a change in how JPL complex deep-space missions have been operated. Since Saturn Orbit Insertion (SOI), the Cassini Project has spent 17 months conducting science operations and has gained realworld experience that has tested the assumptions and rationale for this approach. We have learned that many of the expected benefits have been realized, but there were numerous unexpected challenges as well. This paper will discuss the lessons learned from the Cassini Tour experience to date. It will revisit the assumptions and rationale behind the distributed instrument operations design and will describe the results, good and bad, of implementing this method of operations. We will describe how Instrument Teams are structured, their roles and responsibilities, what challenges they faced going into orbital operations (the “tour”) and what creative solutions were proposed when funding limitations and schedule milestones prevented optimum solutions. We will also discuss the problems that have been encountered both on the ground and with the instruments, how these problems and anomalies were overcome, and what was learned along the way about the characteristics of distributed instrument operations.

Woncik, Pam↗

The Mariner Mark II program

The Mariner Mark II spacecraft is a modular design that can be inexpensively reconfigured for different missions beyond the inner solar system. The first three missions will be described. The Comet Rendezvous Asteroid Flyby mission has a February 1993 launch to comet Tempel 2. The Cassini mission has a May 1995 launch to Saturn and Titan. The third mission is a Comet Nucleus Sample Return launch in 1998.

Draper, Ronald F.↗

A Multi-Mission Approach to Spacecraft Analysis

This paper describes the design of the JPL institutional Multi-Mission Spacecraft Analysis System (MSAS) and its initial adaptation to the Cassini mission.

spacecraft analysis multi-mission approach↗

Cassini Attitude and Articulation Control Subsystem Fault Protection Challenges During Saturn Proximal Orbits

NASA's Cassini Spacecraft, launched on October 15th, 1997 arrived at Saturn on June 30th, 2004, is the largest and most ambitious interplanetary spacecraft in history. As the first spacecraft to achieve orbit at Saturn, Cassini has collected science data throughout its four-year prime mission (2004-08), and has since been approved for a first and second extended mission through 2017. As part of the final extended mission, Cassini will begin an aggressive and exciting campaign of high inclination low altitude flybys within the inner most rings of Saturn, skimming Saturn's outer atmosphere, until the spacecraft is finally disposed of via planned impact with the planet. This final campaign, known as the proximal orbits, presents unique fault protection related challenges, the details of which are discussed in this paper.

Bates, David M.↗

Cassini Operational Sun Sensor Risk Management During Proximal Orbit Saturn Ring Plane Crossings

NASA's Cassini Spacecraft, launched on October 15th, 1997 which arrived at Saturn on June 30th, 2004, is the largest and most ambitious interplanetary spacecraft in history. As the first spacecraft to achieve orbit at Saturn, Cassini has collected science data throughout its four-year prime mission (2004–08), and has since been approved for a first and second extended mission through 2017. As part of the final extended missions, Cassini will begin an aggressive and exciting campaign of high inclination, low altitude flybys within the inner most rings of Saturn, skimming Saturn’s outer atmosphere, until the spacecraft is finally disposed of via planned impact with the planet. This final campaign, known as the proximal orbits, requires a strategy for managing the Sun Sensor Assembly (SSA) health, the details of which are presented in this paper.

fault protection↗

Upcoming planetary missions and the applicability of high temperature superconductor bolometers

Past and present planetary exploration is briefly reviewed, and the planned 1996 Cassini mission to Saturn and Titan is examined. The CIRS experiment aboard Cassini, which will retrieve information on the atmospheres of Titan and Saturn, is discussed. Ongoing efforts to build a high-sensitivity, high-Tc bolometer that would greatly improve detection in Titan's atmosphere are addressed.

Brasunas, J.↗

An overview of NASA's projected mission requirements for space nuclear systems

The near-term ongoing NASA space nuclear program is the Cassini mission to Saturn which will use three radioisotope thermoelectric generators (RTGs). Beyond that NASA is studying a Pluto Fast Flyby mission which will challenge the space power community to produce a low-mass RTG. Another candidate RTG mission is the Mars Environmental Survey (MESUR) mission to emplace a number of probes on the surface of Mars to obtain a more global survey of the planet than was accomplished with the two Viking Landers. Looking toward the 21st century, there are a number of exciting planetary missions, such as the Jupiter Grand Tour, Outer Planet Orbiters/Probes, comet/asteroid rendezvous/sample return, which are enabled or greatly enhanced by nuclear reactor power coupled with electric propulsion.

Bennett, Gary L.↗

Space Nuclear Power Public and Stakeholder Risk Communication

The 1986 Challenger accident coupled with the Chernobyl nuclear reactor accident increased public concern about the safety of spacecraft using nuclear technology. While three nuclear powered spacecraft had been launched before 1986 with little public interest, future nuclear powered missions would see significantly more public concern and require NASA to increase its efforts to communicate mission risks to the public. In 1987 a separate risk communication area within the Launch Approval Planning Group of the Jet Propulsion Laboratory was created to address public concern about the health, environmental, and safety risks of NASA missions. The lessons learned from the risk communication strategies developed for the nuclear powered Galileo, Ulysses, and Cassini missions are reviewed in this paper and recommendations are given as to how these lessons can be applied to future NASA missions that may use nuclear power systems and other potentially controversial NASA missions.

Galileo↗

Saturn PRobe Interior and aTmosphere Explorer (SPRITE)

The Vision and Voyages Planetary Decadal Survey identified a Saturn Probe mission as one of the high priority New Frontiers mission targets[1]. Many aspects of the Saturn system will not have been fully investigated at the end of the Cassini mission, because of limitations in its implementation and science instrumentation. Fundamental measurements of the interior structure and noble gas abundances of Saturn are needed to better constrain models of Solar System formation, as well as to provide an improved context for exoplanet systems. The SPRITE mission will fulfill the scientific goals of the Decadal Survey Saturn probe mission. It will also provide ground truth for quantities constrained by Cassini and conduct new investigations that improve our understanding of Saturn's interior structure and composition, and by proxy, those of extrasolar giant planets.

PRobe↗

Small space reactor power systems for unmanned solar system exploration missions

A preliminary feasibility study of the application of small nuclear reactor space power systems to the Mariner Mark II Cassini spacecraft/mission was conducted. The purpose of the study was to identify and assess the technology and performance issues associated with the reactor power system/spacecraft/mission integration. The Cassini mission was selected because study of the Saturn system was identified as a high priority outer planet exploration objective. Reactor power systems applied to this mission were evaluated for two different uses. First, a very small 1 kWe reactor power system was used as an RTG replacement for the nominal spacecraft mission science payload power requirements while still retaining the spacecraft's usual bipropellant chemical propulsion system. The second use of reactor power involved the additional replacement of the chemical propulsion system with a small reactor power system and an electric propulsion system. The study also provides an examination of potential applications for the additional power available for scientific data collection. The reactor power system characteristics utilized in the study were based on a parametric mass model that was developed specifically for these low power applications. The model was generated following a neutronic safety and operational feasibility assessment of six small reactor concepts solicited from U.S. industry. This assessment provided the validation of reactor safety for all mission phases and generatad the reactor mass and dimensional data needed for the system mass model.

Bloomfield, Harvey S.↗

Ensuring Cassini's End-of-Mission Propellant Margins

The Cassini spacecraft is in its final years. On September 15, 2017, Cassini will plunge deep into Saturn's atmosphere never to reemerge; thus concluding its second extended mission and 13 years in orbit around the ringed planet. As of October 2014, the spacecraft is four years in to its seven-year, second extended mission, the Cassini Solstice Mission (CSM). With three years left and only 2.5% of its loaded bipropellant and 37% of its loaded monopropellant remaining, the Cassini project actively manages the predicted end-of-mission propellant margins to maintain a high confidence in the spacecraft's ability to complete the CSM as designed.

Sturm, Erick J., II↗

Design Enhancement and Improved Post-Actuation Test Method for a 1/4 inch Normally Closed Pyro Valve

The NASA/JPL Cassini mission to Saturn will launch in October, 1997 and arrive at Saturn in the year 2004 with a 4 year mission to orbit the planet. The main propulsion thrust vector and attitude control for the spacecraft is supplied by the Cassini Propulsion Module Subsystem (C-PMS). This system will use numerous ordnance-actuated, normally-closed (NC) pyro valves to perform mission critical tasks over the 11 year mean mission duration (NMD). The proper operation of this NC valve requires it to isolate fluid flow until commanded open. Once open, the valve must allow an unobstructed flow path and seal internally to prevent leakage external to the valve. This paper documents a design evolution to a qualified, Viking heritage design with improvements in design details that control external leakage to levels that support the planetary mission of this spacecraft. In addition, it addresses an improved post-actuation leak test technique, used to better detect gas leakage past the valve's primary metal-to-metal internal seal.

Cassini↗

Countdown to the 21st century in planetary exploration

The '90s promise to be an exciting decade for planetary exploration, providing a steady stream of challenges and discoveries stretching well into the 21st century. Four major planetary missions - Voyager, Magellan, Galileo, and Ulysses - are already in flight, while the Mars Observer, Comet Rendezvous/Asteroid Flyby, and Cassini missions are well along in their design, development, test, and evaluation phases and will launch in the early to mid-'90s. Studies continue for new missions such as Lunar Observer, Solar Probe, and Mars Environmental Survey, as well as for the space Exploration Initiative. Issues common to many of these missions - current and future - include budgetary concerns, launch vehicles, longer lifecycles, international cooperation, new technology developments, and multimission operations.

Casani, John R.↗

Cassini Radar EQM Model: Instrument Description and Performance Status

The spaeccraft of the Cassini Mission is planned to be launched towards Saturn in October 1997. The mission is designed to study the physical structure and chemical composition of Titan. The results of the tests performed on the Cassini radar engineering qualification model (EQM) are summarized. The approach followed in the verification and evaluation of the performance of the radio frequency subsystem EQM is presented. The results show that the instrument satisfies the relevant mission requirements.

Borgarelli, L.↗