Search NASA⌕ Search

SEARCH · Search NASA

Results for “Commercial Services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Specifying Calibration of Energy-Measuring Equipment

Instruments and standards need to be calibrated periodically to ensure that their use yields accurate measurements. Calibration needs, however, vary in sophistication, based on user expectations. This white paper reviews calibration terminology and standards, and describes best practices that have been developed for a) calibrating measurement equipment to ensure some known level of accuracy, and b) accrediting calibration service providers. Calibration is discussed in the context of metrological traceability, and excerpts from laboratory scopes of accreditation are shared to reveal the diversity of terminology and format among them. In an effort to aid those who currently calibrate measuring equipment or who have new or changing needs for calibrating measuring equipment, rationale is provided for why a specification might be used to request calibration services that meet specific test needs. Given the growing interest in using data to manage the energy consumption of systems, and the increasing number and variety of systems (e.g., building, computing) that can report such information, use cases requiring energy data are used to facilitate further discussion and provide examples. Commercially available service providers who are accredited for energy-measuring equipment calibration are compared and contrasted, and a specification template that might be used for requesting this calibration is presented. The specification template should be tailored to meet each user’s needs. To illustrate, an example set of energy-measuring-equipment test conditions (reflecting the planned usage of the device to be calibrated) is used to develop a customized calibration specification, and commercially available service providers are assessed in terms of their qualifications for calibration to that particular implementation of the specification template.

47 OTHER INSTRUMENTATION↗

The Effect of Predicted Vehicle Displacement on Ground Crew Task Performance and Hardware Design

NASA continues to explore new launch vehicle concepts that will carry astronauts to low- Earth orbit to replace the soon-to-be retired Space Transportation System (STS) shuttle. A tall vertically stacked launch vehicle (> or =300 ft) is exposed to the natural environment while positioned on the launch pad. Varying directional winds and vortex shedding cause the vehicle to sway in an oscillating motion. Ground crews working high on the tower and inside the vehicle during launch preparations will be subjected to this motion while conducting critical closeout tasks such as mating fluid and electrical connectors and carrying heavy objects. NASA has not experienced performing these tasks in such environments since the Saturn V, which was serviced from a movable (but rigid) service structure; commercial launchers are likewise attended by a service structure that moves away from the vehicle for launch. There is concern that vehicle displacement may hinder ground crew operations, impact the ground system designs, and ultimately affect launch availability. The vehicle sway assessment objective is to replicate predicted frequencies and displacements of these tall vehicles, examine typical ground crew tasks, and provide insight into potential vehicle design considerations and ground crew performance guidelines. This paper outlines the methodology, configurations, and motion testing performed while conducting the vehicle displacement assessment that will be used as a Technical Memorandum for future vertically stacked vehicle designs.

Atencio, Laura Ashley↗

Thermal & Fluids Analysis and the NASA Launch Services Program

This presentation provides the What, Where, Why, and How of the thermal and fluids analysis disciplines within the Launch Services Program (LSP). The LSP manages all commercial launch services to match NASA science mission payloads to the appropriate launch system. The Flight Analysis Division within the LSP provides multi disciplinary analysis support of these flight systems to characterize payload and launch vehicle environments from payload mate to upper stage through on orbit separation. The Thermal Analysis and Fluids Analysis teams are two distinct groups within the Flight Analysis Division of the LSP who cover a wide array of standard and non standard analytical tasks. These teams offer a significant benefit to both the payload design and integration team and the launch vehicle supplier. These benefits, along with the tools and methods are described in this talk to inform engineers and analysts from both sides of the launch system interface how the LSP Thermal and Fluids Analysis teams can benefit the success of their mission.

Fortenberry, Cindy↗

ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with the ACTS satellite. The ACTS experiment's program proposed to validate Ka-band satellite and ground station technology. demonstrate future telecommunication services. demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals (Part 1) and the lessons learned throughout their six year operation including the inclined orbit phase of operations (Full Report). An overview of the Ka-band technology and components developed for the ACTS ground stations is presented. Next. the performance of the ground station technology and its evolution during the ACTS campaign are discussed to illustrate the technical tradeoffs made during the program and highlight technical advances by industry to support the ACTS experiments program and terminal operations. Finally. lessons learned during development and operation of the user terminals are discussed for consideration of commercial adoption into future Ka-band systems. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector based offset-fed antenna systems ranging in size from 0.35m to 3.4m antenna diameter. Gateway earth stations included two systems, referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET). The NGS provides tracking, telemetry, and control (TT&C) and Time Division Multiple Access (TDMA) network control functions. The LET supports technology verification and high data rate experiments. The ground stations successfully demonstrated many services and applications at Ka-band in three different modes of operation: circuit switched TDMA using the satellite on-board processor, satellite switched SS-TDMA applications using the on-board Microwave Switch Matrix (MSM), and conventional transponder (bent-pipe) operation. Data rates ranged from 4.8 kbps up to 622 Mbps. Experiments included: 1) low rate (4.8- 1 00's kbps) remote data acquisition and control using small earth stations, 2) moderate rate (1-45 Mbps) experiments included full duplex voice and video conferencing and both full duplex and asymmetric data rate protocol and network evaluation using mid-size ground stations, and 3) link characterization experiments and high data rate (155-622 Mbps) terrestrial and satellite interoperability application experiments conducted by a consortium of experimenters using the large transportable ground stations.

Reinhart, Richard C.↗

The future of very large subsonic transports

The Very Large Subsonic Transport (VLST) is a multi-use commercial passenger, commercial cargo, and military airlifter roughly 50% larger than the current Lockheed C-5 and Boeing 747. Due to the large size and cost of the VLST, it is unlikely that the commercial market can support more than one aircraft production line, while declining defense budgets will not support a dedicated military VLST. A successful VLST must therefore meet airline requirements for more passenger and cargo capacity on congested routes into slot-limited airports and also provide a cost effective heavy airlift capacity to support the overseas deployment of US military forces. A successful VLST must satisfy three key missions: commercial passenger service with nominal seating capacity at a minimum of 650 passengers with a range capability of 7,000 to 10,000 miles; commercial air cargo service for containerized cargo to support global manufacturing of high value added products, 'just-in-time' parts delivery, and the general globalization of trade; and military airlift with adequate capacity to load current weapon systems, with minimal break-down, over global ranges (7,000 to 10,000 miles) required to reach the operational theater without need of overseas bases and midair refueling. The development of the VLST poses some technical issues specific to large aircraft, but also key technologies applicable to a wide range of subsonic transport aircraft. Key issues and technologies unique to the VLST include: large composite structures; dynamic control of a large, flexible structure; aircraft noise requirements for aircraft over 850,000 pounds; and increased aircraft separation due to increased wake vortex generation. Other issues, while not unique to the VLST, will critically impact the ability to build an efficient and affordable aircraft include: active control systems: Fly-By-Light/Power-By-Wire (FBL/PBW); high lift systems; flight deck associate systems; laminar flow; emergency egress; and modular design. The VLST will encounter severe restrictions on weight, ground flotation, span, length, and door height to operate at current airports/bases, gates, and cargo loading systems. One option under consideration is for a sea-based VLST, either a conventional seaplane or Wing-In-Ground effect (WIG) vehicle, which would allow greater operational flexibility, while introducing other design challenges such as water impact loads and salt-water corrosion. Lockheed Martin is currently developing a floatplane version of the C-130 Hercules which will provide experience with a modern sea-based aircraft. In addition to its own ongoing research activities, Lockheed Martin is also participating in the NASA Advanced Subsonic Technology, High Speed Research (HSR), and other programs which address some of the technologies needed for the VLST. The VLST will require NASA and US aerospace companies to work together to develop new capabilities and technologies for make the VLST a viable part of transportation beyond 2000.

Justice, R. Steven↗

ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with ACTS. The ACTS experiments program proposed to validate Ka-band satellite and ground-station technology, demonstrate future telecommunication services, demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals and the lessons learned throughout their 6-year operation, including the inclined orbit phase-of-operations. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector-based offset-fed antenna systems with antennas ranging in size from 0.35 to 3.4 in. in diameter. Gateway earth stations included two systems referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET).

Reinhart, Richard C.↗

System-Level Experimental Validations for Supersonic Commercial Transport Aircraft Entering Service in the 2018-2020 Time Period

This report describes the work conducted by The Boeing Company under American Recovery and Reinvestment Act (ARRA) and NASA funding to experimentally validate the conceptual design of a supersonic airliner feasible for entry into service in the 2018 to 2020 timeframe (NASA N+2 generation). The report discusses the design, analysis and development of a low-boom concept that meets aggressive sonic boom and performance goals for a cruise Mach number of 1.8. The design is achieved through integrated multidisciplinary optimization tools. The report also describes the detailed design and fabrication of both sonic boom and performance wind tunnel models of the low-boom concept. Additionally, a description of the detailed validation wind tunnel testing that was performed with the wind tunnel models is provided along with validation comparisons with pretest Computational Fluid Dynamics (CFD). Finally, the report describes the evaluation of existing NASA sonic boom pressure rail measurement instrumentation and a detailed description of new sonic boom measurement instrumentation that was constructed for the validation wind tunnel testing.

Magee, Todd E.↗

System-Level Experimental Validations for Supersonic Commercial Transport Aircraft Entering Service in the 2018-2020 Time Period

This report describes the work conducted under NASA funding for the Boeing N+2 Supersonic Experimental Validation project to experimentally validate the conceptual design of a supersonic airliner feasible for entry into service in the 2018 -to 2020 timeframe (NASA N+2 generation). The primary goal of the project was to develop a low-boom configuration optimized for minimum sonic boom signature (65 to 70 PLdB). This was a very aggressive goal that could be achieved only through integrated multidisciplinary optimization tools validated in relevant ground and, later, flight environments. The project was split into two phases. Phase I of the project covered the detailed aerodynamic design of a low boom airliner as well as the wind tunnel tests to validate that design (ref. 1). This report covers Phase II of the project, which continued the design methodology development of Phase I with a focus on the propulsion integration aspects as well as the testing involved to validate those designs. One of the major airplane configuration features of the Boeing N+2 low boom design was the overwing nacelle. The location of the nacelle allowed for a minimal effect on the boom signature, however, it added a level of difficulty to designing an inlet with acceptable performance in the overwing flow field. Using the Phase I work as the starting point, the goals of the Phase 2 project were to design and verify inlet performance while maintaining a low-boom signature. The Phase II project was successful in meeting all contract objectives. New modular nacelles were built for the larger Performance Model along with a propulsion rig with an electrically-actuated mass flow plug. Two new mounting struts were built for the smaller Boom Model, along with new nacelles. Propulsion integration testing was performed using an instrumented fan face and a mass flow plug, while boom signatures were measured using a wall-mounted pressure rail. A side study of testing in different wind tunnels was completed as a precursor to the selection of the facilities used for validation testing. As facility schedules allowed, the propulsion testing was done at the NASA Glenn Research Center (GRC) 8 x 6-Foot wind tunnel, while boom and force testing was done at the NASA Ames Research Center (ARC) 9 x 7-Foot wind tunnel. During boom testing, a live balance was used for gathering force data. This report is broken down into nine sections. The first technical section (Section 2) covers the general scope of the Phase II activities, goals, a description of the design and testing efforts, and the project plan and schedule. Section 3 covers the details of the propulsion system concepts and design evolution. A series of short tests to evaluate the suitability of different wind tunnels for boom, propulsion, and force testing was also performed under the Phase 2 effort, with the results covered in Section 4. The propulsion integration testing is covered in Section 5 and the boom and force testing in Section 6. CFD comparisons and analyses are included in Section 7. Section 8 includes the conclusions and lessons learned.

Magee, Todd E.↗

In-service inspection methods for graphite-epoxy structures on commercial transport aircraft

In-service inspection methods for graphite-epoxy composite structures on commercial transport aircraft are determined. Graphite/epoxy structures, service incurred defects, current inspection practices and concerns of the airline and manufacturers, and other related information were determind by survey. Based on this information, applicable inspection nondestructive inspection methods are evaluated and inspection techniques determined. Technology is developed primarily in eddy current inspection.

Phelps, M. L.↗

The Integration of Wi-Fi Location-Based Services to Optimize Energy Efficient Commercial Building Operations

This project investigated and demonstrated the use of Wi-Fi Location-Based Services (LBS) to perform occupancy sensing in commercial buildings. Wi-Fi LBS can be used to detect the presence of Wi-Fi enabled mobile devices and laptops that accompany occupants as they move through the building. These signals can be used to determine occupant presence, head count, and location. When integrated with the building automation system, this emerging technology approach can be used to manage other connected systems such as lighting and HVAC to reduce energy usage in the building and improve occupant comfort. An open source location detection algorithm was developed, which uses data collected from three or more Wi-Fi access points to determine the presence and estimate the location of mobile devices and laptops. Access points can detect Wi-Fi enabled devices even if they are not connected to the existing Wi-Fi network. Building occupancy is determined based on the presence, location, and movement of these devices through the space. From lab and small-scale in-situ testing, the Location Detection Algorithm (LDA) was found to be accurate to within 10 feet and could be further refined by tuning the algorithm for the specific space characteristics such as layout and obstructions (walls, furniture, etc.). An open source method to integrate the occupancy data with existing building automations systems was investigated. The Wi-Fi occupancy sensing approach was then demonstrated and validated at commercial buildings located in Saint Paul, MN; Madison, WI; New York City; and Fort Worth, TX.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Kickstarting a New Era of Lunar Industrialization via Campaign of Lunar COTS Missions

To support the goals of expanding our human presence and current economic sphere beyond LEO, a new plan was constructed for NASA to enter into partnerships with industry to foster and incentivize a new era of lunar industrialization. For NASA to finally be successful in achieving sustainable human exploration missions beyond LEO, lessons learned from our space history have shown that it is essential for current program planning to include affordable and economic development goals as well as address top national priorities to obtain much needed public support. In the last 58 years of NASA's existence, only Apollo's human exploration missions beyond LEO were successful since it was proclaimed to be a top national priority during the 1960's. However, the missions were not sustainable and ended abruptly in 1972 due to lack of funding and insufficient economic gain. Ever since Apollo, there have not been any human missions beyond LEO because none of the proposed program plans were economical or proclaimed a top national priority. The proposed plan outlines a new campaign of low-cost, commercial-enabled lunar COTS (Commercial Orbital Transfer Services) missions which is an update to the Lunar COTS plan previously described. The objectives of this new campaign of missions are to prospect for resources, determine the economic viability of extracting those resources and assess the value proposition of using these resources in future exploration architectures such as Mars. These missions would be accomplished in partnership with commercial industry using the wellproven COTS Program acquisition model. This model proved to be very beneficial to both NASA and its industry partners as NASA saved significantly in development and operational costs, as much as tenfold, while industry partners successfully expanded their market share and demonstrated substantial economic gain. Similar to COTS, the goals for this new initiative are 1) to develop and demonstrate cost-effective, cis-lunar commercial services, such as lunar transportation, lunar mining and lunar ISRU operations; 2) enable development of an affordable and economical exploration architecture for future missions to Mars and beyond; and 3) to incentivize the creation of new lunar markets through use of lunar resources for economic benefit to NASA, commercial industry and the international community. These cost-effective services would not only enable NASA to economically and sustainably achieve its human exploration missions to the Moon, Mars and beyond but it would also kickstart a new era of lunar industrialization. This paper will describe the goals, objectives and approach for implementing this new campaign of missions. It will also describe the potential benefits and progress that can be accomplished with these low-cost, Lunar COTS missions. Lastly, a preliminary economic analysis approach is proposed for understanding the cost and potential return on investment in the use of lunar resources to reach the goal of lunar industrialization and an expanded and sustainable human presence into cis-lunar space and beyond.

Lunar Exploration↗

Space Transformation -- Localizing the Remote and Connecting the Isolated

In motivating the Space Transformation theme for this year’s 4S symposium, the organizers provided the following context, “Transformation of economies are driven by a change in values and accelerated by new technologies.” These words rang particularly true when I read them at the beginning of the holiday season. Like so many others, I was in the early phases of my Christmas shopping procrastination campaign, and I’d just been reflecting on how Amazon Prime was the transformational tool I’d been waiting for. Basic limiting principles of time and space, supply and demand, were all but erased by the Amazon Prime phenomenon. Coupled with emerging 3D printing and other adaptive manufacturing technologies, a transformation from deliberate planning to “think it … have it” had occurred, empowering me to procrastinate longer than I’d ever dreamed possible. The organizers went on to ponder, “Will space transformation also affect society?”, just as our team at the Air Force Research Lab’s (AFRL) Center for Rapid Innovation (CRI) were working alongside partners within our larger Integrated Capabilities Directorate, NASA’s Flight Opportunities and Small Spacecraft Technology programs, and DARPA’s Luna-10 program to develop technologies and execute demonstration missions that leverage the space domain to genuinely connect even the most remote and austere domains on the timeline of need. Picking apart the miracle that is Amazon prime, where does the model fail, and why? More relevantly to the theme of this year’s symposium, how can the space domain be used to overcome its limitations and minimize its weaknesses? Perhaps it is best assessed in the context of Use Cases. What are the Amazon delivery cost, schedule, and cargo limiters to the Amundsen-Scott South Pole Research Station, or the Lunar South Pole Research Station? This paper will explore enabling infrastructure that allows Amazon prime to thrive and assess the transformational enabling technologies that would be necessary to extend that miracle to the truly remote or the truly austere. Localizing the Remote • First, it will evaluate the ability of the on-going AFRL Rocket Cargo and Space Initiatives Ringside Seats systems, coupled with Astrobotic’s Xodiak and Xogdor capabilities, developed to support the NASA Flight Opportunities Program (FOP), to supply orbital/suborbital delivery to both improved and austere sites on the Earth and Moon. • Then, it will add the surface terminal distribution leg, with an examination of Lunar Outpost’s Mobile Autonomous Prospecting Platform (MAPP), equipped with Mobile Autonomous Robotic Swarm (MARS) software, and Intuitive Machine’s Hopper, developed with support of AFRL and NASA’s Commercial Lunar Payload Services (CLPS) program. Connecting the Isolated From there, it will focus on the destination, asking what implied destination services are required to support highly assured autonomous delivery. • Specifically, it will highlight Astrobotic’s Skymage mesh-networked publish and subscribe communication and navigation service, as well as AFRL’s on-going developments of radioisotope and reactor nuclear-sourced thermoelectric power generation and distribution systems under development under the Joint Emergent Technology Supplying On-orbit Nuclear Power (JETSON) program by Lockheed Martin, Westinghouse, Intuitive Machines, and Zeno Power, to provide the power service to locations well off the grid. • Finally, the paper will connect to the “human machine”. What connects the remote or in-situ human consumer to the remote domain? What connects the diverse international government and commercial services to each other? The former will focus on AFRL’s OraCloud feeding their Space Defense Control and Characterization System (SDCCS) and Lunar Station’s MoonHacker systems, while the latter will focus on the BlueHalo/Tensor LunX Technology Platform for the Cislunar Commodity Marketplace. In 1984, Krafft Ehricke famously remarked that, “If God wanted man to become a spacefaring species, He would have given man a Moon.” This paper is not about the Moon, but is about humans as a spacefaring species, shedding the pesky land/air limitations of the Amazon Prime model … so that we can all live a procrastinator’s “think it … have it” existence.

Charles Finley↗

NASA Enterprise Managed Cloud Computing (EMCC): Delivering an Initial Operating Capability (IOC) for NASA use of Commercial Infrastructure-as-a-Service (IaaS)

In 2016, Ames supported the NASA CIO in delivering an initial operating capability for Agency use of commercial cloud computing. This presentation provides an overview of the project, the services approach followed, and the major components of the capability that was delivered. The presentation is being given at the request of Amazon Web Services to a contingent representing the Brazilian Federal Government and Defense Organization that is interested in the use of Amazon Web Services (AWS). NASA is currently a customer of AWS and delivered the Initial Operating Capability using AWS as its first commercial cloud provider. The IOC, however, designed to also support other cloud providers in the future.

IT Governance for Cloud Computing↗

Building an Economical and Sustainable Lunar Infrastructure to Enable Lunar Industrialization

A new concept study was initiated to examine the architecture needed to gradually develop an economical, evolvable and sustainable lunar infrastructure using a public/private partnerships approach. This approach would establish partnership agreements between NASA and industry teams to develop a lunar infrastructure system that would be mutually beneficial. This approach would also require NASA and its industry partners to share costs in the development phase and then transfer operation of these infrastructure services back to its industry owners in the execution phase. These infrastructure services may include but are not limited to the following: lunar cargo transportation, power stations, communication towers and satellites, autonomous rover operations, landing pads and resource extraction operations. The public/private partnerships approach used in this study leveraged best practices from NASA's Commercial Orbital Transportation Services (COTS) program which introduced an innovative and economical approach for partnering with industry to develop commercial cargo services to the International Space Station. This program was planned together with the ISS Commercial Resupply Services (CRS) contracts which was responsible for initiating commercial cargo delivery services to the ISS for the first time. The public/private partnerships approach undertaken in the COTS program proved to be very successful in dramatically reducing development costs for these ISS cargo delivery services as well as substantially reducing operational costs. To continue on this successful path towards installing economical infrastructure services for LEO and beyond, this new study, named Lunar COTS (Commercial Operations and Transport Services), was conducted to examine extending the NASA COTS model to cis-lunar space and the lunar surface. The goals of the Lunar COTS concept are to: 1) develop and demonstrate affordable and commercial cis-lunar and surface capabilities, such as lunar cargo delivery and surface power generation, in partnership with industry; 2) incentivize industry to establish economical and sustainable lunar infrastructure services to support NASA missions and initiate lunar commerce; and 3) encourage creation of new space markets for economic growth and benefit. A phased-development approach was also studied to allow for incremental development and demonstration of capabilities needed to build a lunar infrastructure. This paper will describe the Lunar COTS concept goals, objectives and approach for building an economical and sustainable lunar infrastructure. It will also describe the technical challenges and advantages of developing and operating each infrastructure element. It will also describe the potential benefits and progress that can be accomplished in the initial phase of this Lunar COTS approach. Finally, the paper will also look forward to the potential of a robust lunar industrialization environment and its potential effect on the next 50 years of space exploration.

Zuniga, Allison F.↗

Concept for a commercial space station laboratory

The concept of a privately owned and operated fee-for-service laboratory as an element of a civil manned space station, envisioned as the venture of a group of private investors and an experienced laboratory operator to be undertaken with the cooperation of NASA is discussed. This group would acquire, outfit, activate, and operate the labortory on a fee-for-service basis, providing laboratory services to commercial firms, universities, and government agencies, including NASA. This concept was developed to identify, stimulate, and assist potential commercial users of a manned space station. A number of the issues which would be related to the concept, including the terms under which NASA might consider permitting private ownership and operation of a major space station component, the policies with respect to international participation in the construction and use of the space station, the basis for charging users for services received from the space station, and the types of support that NASA might be willing to provide to assist private industry in carrying out such a venture are discussed.

Wood, P. W.↗

LunaNet Position, Navigation, and Timing Services and Signal, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. September 2022 introduced the National Aeronautics and Space Administration’s (NASA) Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever commercial mission, launched by a commercial launch service provider, aiming to land on the lunar surface. The NASA Artemis programme plans initial crewed landings and traverses in 2025, supported by the Lunar Gateway, followed by regular launches to build the lunar systems (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with Commercial Lunar Payload Services (CLPS, (NASA, n.d.)) to deliver science and technology to the Moon, with launches starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) programme plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target the Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, and surface crew and rovers). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This includes a description of the high-level LANS concept and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Lunanet Position, Navigation, and Timing Services and Signals, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. In September 2022 the National Aeronautics and Space Administration (NASA) introduced the Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever mission launched by a commercial launch service provider aiming to land on the lunar surface. The NASA Artemis program plans initial crewed landings and surface traverses in 2025, supported by the Lunar Gateway. Regular launches will follow to build the lunar systems for a sustained presence as presented in the Artemis Plan (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with commercial providers through the Commercial Lunar Payload Services program (CLPS, (NASA, n.d.)) will deliver science and technology demonstration missions to the Moon starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) program plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services, that may be combined with onboard sensors. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, surface crew, rovers, and deployed science payloads). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that would be provided by a system that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This paper includes a description of the high-level LANS concept, and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗