Search NASA⌕ Search

SEARCH · Search NASA

Results for “Commercial Vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

International Space Station Environmental Control and Life Support System Status: 2014-2015

The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year and the impacts of the international partners' activities on them, covering the period of time between March 2014 and February 2015. The ISS continued permanent crew operations including the continuation of six crew members being on ISS. Work continues on the commercial crew vehicles, and work to try and extend ISS service life.

Williams, David E.↗

International Space Station Environmental Control and Life Support System Previous Year Status for 2013 - 2014

The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year and the impacts of the international partners' activities on them, covering the period of time between March 2013 and February 2014. The ISS continued permanent crew operations including the continuation of six crew members being on ISS. Work continues on the commercial crew vehicles, and work to try and extend ISS service life.

Williams, David E.↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying conceptual architectures for a "Proving Ground" near the Moon or in high lunar orbit to conduct human space exploration missions that bridge the gap between today's operations with the International Space Station (ISS) and future human exploration of Mars beginning in the 2030s. This paper describes the framework of a concept of operations ("Conops") for candidate activities in the Proving Ground. The Conops discusses broad goals that the Proving Ground might address, such as participation from commercial entities, support for human landings on the Moon, use of mature technologies, and growth of capability through a steady cadence of increasingly ambitious piloted missions. Additional Proving Ground objectives are outlined in a companion paper. Key elements in the Conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System (SLS) heavy-lift rocket. Potential additions include a new space suit, commercial launch vehicles and logistics carriers, Solar Electric Propulsion (SEP) stages to move elements between different orbits and eventually take them on excursions to deep space, a core module with multiple docking ports, a habitation block, and robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. A module providing advanced regenerative life support functions could launch to the ISS, and later move to the Proving Ground. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The Conops describes notional missions chosen to guide the design of the architecture and its elements. One such mission might be the delivery of a approximately 10-t Transit Habitat element, comanifested with Orion on a Block 1B SLS launcher, to the Proving Ground. In another mission, the architecture might participate in direct human exploration of an asteroidal boulder brought to high lunar orbit by the Asteroid Redirect Mission. The Proving Ground stack could serve as a staging point and tele-operation center for robotic and piloted Moon landings. With the addition of a SEP stage, the architecture could support months-long excursions within and beyond the Earth's sphere of influence, possibly culminating in a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to quantify the risk of landing deconditioned crews on Mars. In a conceptual mission particularly stressing to system design, Proving Ground elements could transit to Mars orbit. Other possible design-driving operations include relocation of the stack with no crew on board, the unpiloted journey of the advanced life support module from ISS to the lunar vicinity, excursions to other destinations in near-Earth space, and additional support for Mars exploration in conjunction with the Evolvable Mars Campaign. The Proving Ground Conops concludes with a discussion of aborts and contingency operations

Love, Stanley G.↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying a "Proving Ground" near the Moon to conduct human space exploration missions in preparation for future flights to Mars. This paper describes a concept of operations ("conops") for activities in the Proving Ground, focusing on the construction and use of a mobile Cislunar Transit Habitat capable of months-long excursions within and beyond the Earth-Moon system. Key elements in the conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System heavy-lift rocket. Potential additions include commercial launch vehicles and logistics carriers, solar electric propulsion stages to move elements between different orbits and eventually take them on excursions to deep space, a node module with multiple docking ports, habitation and life support blocks, and international robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The conops describes "case studies" of notional missions chosen to guide the design of the architecture and its elements. One such mission is the delivery of a ~10-ton pressurized element, co-manifested with an Orion on a Block 1B Space Launch System rocket, to the Proving Ground. With a large solar electric propulsion stage, the architecture could enable a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to safely quantify the risk of landing deconditioned crews on Mars. The conops also discusses aborts and contingency operations. Early return to Earth may be difficult, especially during later Proving Ground missions. While adding risk, limited-abort conditions provide needed practice for Mars, from which early return is likely to be impossible.

Love, Stanley G.↗

Towards an Aero-Propulso-Servo-Elasticity Analysis of a Commercial Supersonic Transport

This paper covers the development of an aero-propulso-servo-elastic (APSE) model using computational fluid dynamics (CFD) and linear structural deformations. The APSE model provides the integration of the following two previously developed nonlinear dynamic simulations: a variable cycle turbofan engine and an elastic supersonic commercial transport vehicle. The primary focus of this study is to provide a means to include relevant dynamics of a turbomachinery propulsion system into the aeroelastic studies conducted during a vehicle design, which have historically neglected propulsion effects. A high fidelity CFD tool is used here for the integration platform. The elastic vehicle neglecting the propulsion system serves as a comparison of traditional approaches to the APSE results. An overview of the methodology is presented for integrating the propulsion system and elastic vehicle. Static aeroelastic analysis comparisons between the traditional and developed APSE models for a wing tip detection indicate that the propulsion system impact on the vehicle elastic response could increase the detection by approximately ten percent.

aeroservoelasticity↗

Preliminary Computational Study for Future Tests in the NASA Ames 9 foot' x 7 foot Wind Tunnel

The NASA Advanced Air Vehicles Program, Commercial Supersonics Technology Project seeks to advance tools and techniques to make over-land supersonic flight feasible. In this study, preliminary computational results are presented for future tests in the NASA Ames 9 foot x 7 foot supersonic wind tunnel to be conducted in early 2016. Shock-plume interactions and their effect on pressure signature are examined for six model geometries. Near- field pressure signatures are assessed using the CFD code USM3D to model the proposed test geometries in free-air. Additionally, results obtained using the commercial grid generation software Pointwise Reigistered Trademark are compared to results using VGRID, the NASA Langley Research Center in-house mesh generation program.

Pearl, Jason M.↗

The Safety Course Design and Operations of Composite Overwrapped Pressure Vessels (COPV)

Following a Commercial Launch Vehicle On-Pad COPV (Composite Overwrapped Pressure Vessels) failure, a request was received by the NESC (NASA Engineering and Safety Center) June 14, 2014. An assessment was approved July 10, 2014, to develop and assess the capability of scanning eddy current (EC) nondestructive evaluation (NDE) methods for mapping thickness and inspection for flaws. Current methods could not identify thickness reduction from necking and critical flaw detection was not possible with conventional dye penetrant (PT) methods, so sensitive EC scanning techniques were needed. Developmental methods existed, but had not been fully developed, nor had the requisite capability assessment (i.e., a POD (Probability of Detection) study) been performed.

Saulsberry, Regor↗

Managing Requirements-Documents to Data

Managing Requirements on long term projects like International Space Station (ISS) can go thru many phases, from initial product development to almost over 20 years of operations and sustainment. Over that time many authorized changes have been made to the requirement set, that apply to any new systems that would visit the ISS today, like commercial cargo/crew vehicles or payloads. Explore the benefits of managing requirements in a database while satisfying traditional documents needs for contracts and stakeholder/user consumption that are not tied into the database.

Orr, Kevin↗

Much Lower Launch Costs Make Resupply Cheaper than Recycling for Space Life Support

The development of commercial launch vehicles by SpaceX has greatly reduced the cost of launching mass to Low Earth Orbit (LEO). Reusable launch vehicles may further reduce the launch cost per kilogram. The new low launch cost makes open loop life support much cheaper than before. Open loop systems resupply water and oxygen in tanks for crew use and provide disposable lithium hydroxide (LiOH) in canisters to remove carbon dioxide. Short human space missions such as Apollo and shuttle have used open loop life support, but the long duration International Space Station (ISS) recycles water and oxygen and removes carbon dioxide with a regenerative molecular sieve. These ISS regenerative and recycling life support systems have significantly reduced the total launch mass needed for life support. But, since the development cost of recycling systems is much higher than the cost of tanks and canisters, the relative cost savings have been much less than the launch mass savings. The Life Cycle Cost (LCC) includes development, launch, and operations. If another space station was built in LEO, resupply life support would be much cheaper than the current recycling systems. The mission most favorable to recycling would be a long term lunar base, since the resupply mass would be large, the proximity to Earth would reduce the need for recycling reliability and spares, and the launch cost would be much higher than for LEO due to the need for lunar transit and descent propulsion systems. For a ten-year lunar base, the new low launch costs make resupply cheaper than recycling systems similar to ISS life support.

launch costs↗

Analysis of Near Rectilinear Halo Orbit Insertion with a 40-kW Solar Electric Propulsion System

This paper examines low thrust trajectories for delivery of a 40-kW solar electric propulsion spacecraft and potential additional payload to a desired NRHO. One option considered is a trans-lunar injection launch as a co-manifested payload on the Space Launch System. For this option, a reference trajectory is designed and a scan of launch dates is completed to understand the propellant mass sensitivity. A 15-day period cyclical variation in required propellant is observed that is attributed to solar gravity effects. A second option considered is to launch on a smaller commercial launch vehicle to a less energetic elliptical orbit and use SEP to spiral out to NRHO. For this option, analysis is completed to understand the trades between delivered mass to NRHO, total propellant required, time of flight, and solar array degradation. Results show that, while launching to lower altitudes can deliver greater payload mass to NRHO, significant solar array degradation can be observed.

Trajectory↗

Analysis of Near Rectilinear Halo Orbit Insertion with a 40-kW Solar Electric Propulsion System

This paper examines low thrust trajectories for delivery of a 40-kW solar electric propulsion spacecraft and potential additional payload to a desired NRHO. One option considered is a trans-lunar injection launch as a co-manifested payload on the Space Launch System. For this option, a reference trajectory is designed and a scan of launch dates is completed to understand the propellant mass sensitivity. A 15-day period cyclical variation in required propellant is observed that is attributed to solar gravity effects. A second option considered is to launch on a smaller commercial launch vehicle to a less energetic elliptical orbit and use SEP to spiral out to NRHO. For this option, analysis is completed to understand the trades between delivered mass to NRHO, total propellant required, time of flight, and solar array degradation. Results show that, while launching to lower altitudes can deliver greater payload mass to NRHO, significant solar array degradation can be observed.

Mccarty, Steven L.↗

NASA Undergraduate Student Instrument (USIP) Project--Lessons Learned

NASA offers real-world experiences, with the goal of developing students’ skills and capabilities in science, technology, engineering and math, skills critical to building a STEM-literate workforce and achieving the nation's exploration goals. In 2016, the NASA Science Mission Directorate (SMD) and the Office of Education National Space Grant Program (OE Space Grant) awarded $8 million through the Undergraduate Student Instrument Project (USIP) to 47 student teams to conduct hands-on research with 23 of the projects being CubeSat projects. The USIP student teams proposed science or technology experiments that are relevant to NASA missions, and the platform to fly their payload. The platforms include sounding rockets, scientific and hand-held balloons, aircraft, suborbital reusable and commercial launch vehicles, and CubeSats launched as a secondary payload on an orbital vehicle. The mission management for USIP was the responsibility of NASA Goddard Space Flight Centers Wallops Flight Facility (WFF) in Virginia. The university faculty supporting USIP attest to the benefits students are receiving in the hands-on aspects of the projects, as well as the real-world problem resolution. The USIP university teams are receiving an authentic NASA educational experience that will encourage the students to be part of NASA’s or the Nations’ future workforce and leaders.

Winterton, Joyce L.↗

A Conceptual Design Study for an Unmanned, Reusable Cargo Lunar Lander

Motivated by the aggressive timeline of NASA’s Artemis Program, the feasibility of evolving a mid-sized, reusable and refuelable cargo lunar lander technology demonstrator into the descent element of the three- stage human lander was assessed with the goal of forming synergies between both acquisition programs. Requirements for such a concept are that it must be deployed on commercial launch vehicles that are expected to enter into service consistent with Artemis’ timeline. In order to assess this concept’s feasibility, a physics-based analysis of alternatives was conducted where mission and vehicle architectures are traded side-by-side. Mission trades considered include the impacts of traveling to near-rectilinear halo orbit quickly versus slowly; vehicle trades include fuel and oxidizer tank configurations, number of engines, and propellant combinations, as well as several technology options, e.g. reduced and zero boil-off strategies. Results and discussions are presented to facilitate the consideration of this concept. lunar lander, systems analysis, multidisciplinary design and analysis, space systems, analysis of alternatives,

Robertson, Bradford↗

A Permanent Human Lunar Surface Presence Enabled by a CLV Class JUMP Lander

There are compelling advantages of a human presence on the surface of the Moon, as evidenced partly by the preponderance of lunar surface architectures that have existed throughout NASA, industry, and academia since the Apollo program. This paper specifically advocates and illustrates an example of a permanent human lunar surface presence enabled by a commercial launch vehicle (CLV) class Joinable Undercarriage to Maximize Payload (JUMP) lunar lander. The paper will discuss purposes for such a surface presence, including SPD-1 fulfillment, global collaboration, US industry advancement, US government leadership in spaceflight, a Mars dress rehearsal, Mars collaborative exploration, and lunar village development. An architectural description will be presented, including site selection, primary elements, and surface configuration. Element and lander allocation to CLV and Space Launch System (SLS) rockets will be discussed in terms of launch vehicle selection philosophy and allocation to specific launch manifests. This will enable a presentation of a lunar campaign spanning the period from 2026 to 2056. In conclusion, various aspects of the architecture will be suggested for further study.

Howard, Robert L., Jr.↗

Basics of Mixer-Ejectors for Quiet Propulsion

A series of numerical and experimental studies were undertaken to take a fresh look at how a mixer-ejector exhaust system might provide noise reduction for the LTO operation of a commercial supersonic vehicle. Historical understandings of aero and acoustic performance were challenged and new details of noise reduction mechanisms were uncovered. New CFD-based noise prediction tools, applied to conceptual designs, predicted noise reductions of 3-5EPNdB for a few percent thrust loss. Recommendations from the study include validation of the acoustic prediction method, and using it to refine variants of practical nozzle systems for low noise exhaust systems that perform well both acoustically and aerodynamically.

jet noise↗

An Initial Concept for a JUMP Mating Mechanism

Lunar landers currently under development for crew and cargo missions to the Moon are limited by the available boosters to launch them from Earth. Most landers are being developed for commercial launch vehicles (CLVs) in the Falcon Heavy / Vulcan / New Glenn / Atlas V class, limiting their performance with many lunar surface studies consequently restricted to 5-10 metric ton payloads. The JUMP Lander (Joinable Undercarriage to Maximize Payload) attempts to overcome this limitation by performing an in-space mating, linking multiple landers together. This research provides an initial proof of concept demonstration that two or more CLV-launched lunar landers can be mated in-space to produce a larger lander with greater payload capacity. Multiple rockets have been connected hundreds if not thousands of times in spaceflight history. An example is the space shuttle. The External Tank-Orbiter interface is an example where the 100-ton Orbiter is bolted to the side of the External Tank. This example serves as a concept metaphor for JUMP where a system of bolts is used as the mating system. This paper performs a high-level sizing analysis of the bolt, including the structural connection to each lander and the physical dimensions of the bolt, given the projected lander and payload masses. It sizes the necessary motors to perform the in-space mating and describes the motor to bolt integration. It describes the mounting and translation for the bolt-motor assembly, including structural supports, physical stops, and range of travel. It discusses active-active and active-passive implementations for the mating system and post-mating options to jettison no-longer-needed components of the assembly, including a discussion of benefits of jettisoning or not jettisoning. Finally, forward work for the mating mechanism and overall JUMP Lander concept is described.

Lunar Lander↗

Noise of Internally Mixed Exhaust Systems With External Plug For Supersonic Transport Applications

Internally mixed exhaust systems produce more noise than would be expected from an equivalent fully mixed flow. This ‘excess noise’ has never been fully explained and has not been researched recently as it is not as much of a problem for high bypass-ratio exhaust systems. Commercial supersonic vehicles, however, will use more moderate bypass ratio engines. Their exhaust systems will also likely feature external plugs to improve boat tail angle for cruise performance. Thus the problem of excess noise will need to be addressed along with the impacts of having an external plug. Recently, acoustic tests of dual-stream jet flows from both internal and external plug nozzles have been conducted. Measurements of noise from flows with an axisymmetric splitter and lobed forced mixer were made. These measurements show the baseline ‘excess noise’ previously found in forced mixer exhaust systems, and show how this noise source differs depending upon the plug geometry. Background-oriented schlieren measurements acquired simultaneously document the differences in shock structures over the transonic flow regime tested. The far-field acoustic measurements indicate that an external plug can slightly reduce the mixing noise of the jet plume when the flow is completely mixed, e.g. when the core and bypass streams have the same temperature and the flow is a single-stream jet. However, when the flow is not fully mixed, e.g. the usual case of an internally mixed exhaust system, the plug seems to amplify the ‘excess noise’ associated with the mixer. This additional noise source presents a challenge for nozzle designers wanting to use internally mixed exhaust systems with external plug nozzles.

Jet noise↗

Automated Software for Crewed Spacecraft - Bridging the Gap from Sci Fi to Reality

With a voice command or a few taps on the console, the spacecraft pivots on a dime at high velocity and gently docks to an orbiting space platform. This is the image most people have of the complex software computations and integrated hardware performance necessary for a spacecraft to successfully perform an automated launch, rendezvous, and docking. Today’s reality is that while computer operations are advancing rapidly, science fiction over-simplifies and over-sells current capabilities. This paper discusses the integration of spacecraft computer automation into the operation of one of the United States’ new Commercial Crew vehicles - the Boeing CST-100 Starliner. Lessons learned by the Boeing Mission Operations team, a unique private-public partnership with NASA, from conceptual design through real-time operation of the first test flight will be discussed along with evolution of the system in preparation for the second uncrewed test flight. Focus will center on how operations has learned to use the automated software to their advantage while also knowing how to adjust the automation in response to spacecraft or mission anomalies.

Robert C. Dempsey↗