Search NASA⌕ Search

SEARCH · Search NASA

Results for “Continuous phase transition”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Using Satellite Observations of Lightning and Precipitation to Diagnose the Behavior of Deep Convection in Tropical Cyclones Traversing the Midlatitudes

This study uses a unique combination of geostationary and low-Earth orbiting satellite-based lightning and precipitation observations, respectively, to examine the evolution of deep convection during the tropical cyclone (TC) lifecycle. The study spans the 2018-2021 Atlantic Basin hurricane seasons and is unique as it provides the first known analysis of total lightning (intra-cloud and cloud-to-ground) observed in TCs through their extratropical transition and post-tropical cyclone (PTC) phases. We consider the TC lifecycle stage, geographic location (e.g., land, coast, and ocean), shear strength, and quadrant relative to the storm motion and environmental shear vectors. Total lightning maxima are found in the forward right quadrant relative to storm motion and downshear of the TC center, consistent with previous studies using mainly cloud-to-ground lightning. Increasing environmental shear focuses the lightning maxima to the downshear right quadrant with respect to the shear vector in tropical storm phases. Vertical profiles of radar reflectivity from the Global Precipitation Measurement mission show that super electrically active convective precipitation features (>75 flashes) within the PTC phase of TCs have deeper mixed phase depths and higher reflectivity at -10°C than other phases, indicating the presence of more intense convection. Differences in the net convective behavior observed throughout TC evolution manifest in both the TC-scale frequency of lightning-producing cells and the intensity variations amongst individual convective cells. The combination of continuous lightning observations and precipitation snapshots improves our understanding of convective scale processes in TCs, especially in PTC phases, as they traverse the tropics and mid-latitudes.

Lightning↗

The delayed-detonation model of Type Ia supernovae. 2: The detonation phase

The investigation, by use of two-dimensional numerical hydrodynamics simulations, of the 'delayed detonation' mechanism of Khokhlov for the explosion of Type Ia supernovae is continued. Previously we found that the deflagration is insufficient to unbind the star. Expansion shuts off the flame; much of this small production of iron group nuclei occurs at lower densities, which reduces the electron-capture problem. Because the degenerate star has an adiabatic exponent only slightly above 4/3, the energy released by deflagration drives a pulsation of large amplitude. During the first expansion phase, adiabatic cooling shuts off the burning, and a Rayleigh-Taylor instability then gives mixing of high-entropy ashes with low-entropy fuel. During the first contraction phase, compressional heating reignites the material. The burning was allowed to develop into a detonation in these nonspherical models. The detonation grows toward spherical symmetry at late times. At these densities (rho approx. 10(exp 7) to 10(exp 8) g cm(exp -3)), either Ni-56 or nuclei of the Si-Ca group are the dominant products of the burning. The bulk yields are sensitive to the density of the star when the transition to detonation occurs. The relevance of the abundances, velocities, mixing, and total energy release to the theory and interpretation of Type Ia supernovae is discussed.

Arnett, David↗

Converter Compressor Building, SWMU 089, Hot Spot Areas 1, 2, and 5 Operations, Maintenance, and Monitoring Report, Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from operation of the air sparging (AS) interim measure (IM) for Hot Spot (HS) Areas 1, 2, and 5 at the Converter Compressor Building (CCB) located at Kennedy Space Center (KSC), Florida. The objective of the IM at CCB HS Areas 1, 2, and 5 is to decrease concentrations of volatile organic compounds (VOCs) in groundwater in the treatment zones via AS to levels that will enable a transition to a monitored natural attenuation (MNA) phase. This OMMR presents system operations and maintenance (O&M) information and performance monitoring results since full-scale O&M began in June 2014 (2 months after initial system startup in April 2014), including quarterly performance monitoring events in July and October 2014 and January and May 2015. Based on the results to date, the AS system is operating as designed and is meeting the performance criteria and IM objective. The performance monitoring network is adequately constructed for assessment of IM performance at CCB HS Areas 1, 2, and 5. At the March 2014 KSC Remediation Team (KSCRT) Meeting, team consensus was reached for the design prepared for expansion of the system to treat the HS 4 area, and at the November 2014 KSCRT Meeting, team consensus was reached that HS 3 was adequately delineated horizontally and vertically and for selection of AS for the remedial approach for HS 3. At the July 2015 KSCRT meeting, team consensus was reached to continue IM operations in all zones until HSs 3 and 4 is operational, once HS 3 and 4 zones are operational discontinue operations in HS 1, 2, and 5 zones where concentrations are less than GCTLs to observe whether rebounding conditions occur. Team consensus was also reached to continue quarterly performance monitoring to determine whether operational zones achieve GCTLs and to continue annual IGWM of CCB-MW0012, CCBMW0013, and CCB-MW0056, located south of the treatment area. The next performance monitoring event is scheduled for July 2015.

Converter Compressor Building↗

Q-Thruster Breadboard Campaign Project

Dr. Harold "Sonny" White has developed the physics theory basis for utilizing the quantum vacuum to produce thrust. The engineering implementation of the theory is known as Q-thrusters. During FY13, three test campaigns were conducted that conclusively demonstrated tangible evidence of Q-thruster physics with measurable thrust bringing the TRL up from TRL 2 to early TRL 3. This project will continue with the development of the technology to a breadboard level by leveraging the most recent NASA/industry test hardware. This project will replace the manual tuning process used in the 2013 test campaign with an automated Radio Frequency (RF) Phase Lock Loop system (precursor to flight-like implementation), and will redesign the signal ports to minimize RF leakage (improves efficiency). This project will build on the 2013 test campaign using the above improvements on the test implementation to get ready for subsequent Independent Verification and Validation testing at Glenn Research Center (GRC) and Jet Propulsion Laboratory (JPL) in FY 2015. Q-thruster technology has a much higher thrust to power than current forms of electric propulsion (~7x Hall thrusters), and can significantly reduce the total power required for either Solar Electric Propulsion (SEP) or Nuclear Electric Propulsion (NEP). Also, due to the high thrust and high specific impulse, Q-thruster technology will greatly relax the specific mass requirements for in-space nuclear reactor systems. Q-thrusters can reduce transit times for a power-constrained architecture.

White, Harold↗

Hydrodynamics of Two-Phase Flows through Porous Media in Microgravity: Packed Bed Reactor Experiment onboard of the International Space Station

The objective of the Packed Bed Reactor Experiment was to develop a fundamental understanding of the hydrodynamics of two-phase flow with no phase transition through porous media in microgravity. This work describes two experimental campaigns flown on the International Space Station (ISS) that were designed to achieve the objective. This work presents the results on flow patterns observed, two-phase flow pressure drop in porous media, and the impact of capillary effects on pressure drop at various gas and liquid flow rates. This work is the first to present predictive correlations of the two-phase friction factor for the different regimes identified based on the superficial liquid and gas velocity in microgravity, the first to hypothesize the different regimes based on the change in slope of the pressure gradient versus flow rate plots, the first to address the effects of the capillarity on the pressure gradient and the first to measure column holdup and assess the effective porosity based on the packing and the trapped gas bubbles. Experimental data on pressure drop in gas (N2) – liquid (water) flow show the presence of four different flow regimes in microgravity. Dispersed bubble flow (DB) and pulse (P) flow regimes are detected at high liquid flow rates, whereas at low liquid flow rates “large bubble” or elongated bubble (LB) and “gas channeling” (GC) regimes are observed. For these different flow regimes, different two-phase flow friction factor and pressure gradient correlations are presented for the first time as a function of the gas and liquid modified Reynolds numbers and Suratman number. Within the viscous-capillary (V-C) regime, it is found that the capillary contribution is the dominant force that contributes to the pressure drop for the wetting case (glass). However, for the non-wetting packing (Teflon), the viscous contribution dominates. It was found that the gas hold-up and pressure drop are functions of bed history at low liquid and gas flow rates with the magnitude of the hysteresis decreasing with increasing flow rates. PBRE-2 results show that the capillary force is a strong function of the superficial liquid velocity but is a much weaker function of the superficial gas velocity and varies inversely with the particle diameter. Within the Viscous-Capillary (V-C) regime, over 90% of the pressure gradient is attributed to the capillary contribution in the gas continuous regime. However, in the large bubble regime, the viscous and capillary contributions were comparable. After the completion of PBRE-2 with glass spherical beads, another bed packed with alumina was installed. Pressure gradient data for the alumina packed bed (PBRE-Water Recovery) were transferred to the PI and were not analyzed by the authors of this work. The Packed Bed Reactor Experiment concluded its on-orbit operation after two successful campaigns of testing in 2017 and in 2021. The flight hardware was brought back from orbit and is being reconditioned for a series of future experiments referred to as PBRE-WRS in support of water recovery (WRS). The WRS series consists of testing different two-phase fluid system components and packed beds to assess their pressure gradient characteristics, which will be used for designing packed bed reactors for various applications relevant to life support. Although there is so much relevance of the experimental results obtained from the two PBRE campaign in microgravity to life support, these findings also apply to other applications that involve two phase flow in porous medium such as fuel cells, transport of nutrient to plants in space and other chemical and materials processing that involve two phase flows. These systems operate differently in microgravity because, due to the lack of buoyancy, the density difference between the phases becomes irrelevant and no longer leads to phase separation.

Packed Bed↗

In-Flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit (LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end June 30, 2016. To date the IPS has been operated for approximately 48,458 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through the completion of Dawn’s primary mission.

Garner, Charles E.↗

In-flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit )LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end in the summer of 2016. To date the IPS has been operated for over 48,454 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through June 2016.

Garner, Charles E.↗

Characteristics of Whipple Shield Performance in the Shatter Regime

Between the onset of projectile fragmentation and the assumption of rear wall failure due to an impulsive load, multi-wall ballistic limit equations are linearly interpolated to provide reasonable yet conservative predictions of perforation thresholds with conveniently simple mathematics. Although low velocity and hypervelocity regime predictions are based on analytical expressions, there is no such scientific foundation for predictions in the intermediate (or shatter) regime. As the debris flux in low earth orbit (LEO) becomes increasingly dominated by manmade pollution, the profile of micrometeoroid and orbital debris (MMOD) risk shifts continually towards lower velocities. For the International Space Station (ISS), encounter velocities below 7 km/s now constitute approximately 50% of the penetration risk. Considering that the transition velocity from shatter to hypervelocity impact regimes described by common ballistic limit equations (e.g. new non-optimum Whipple shield equation [1]) occurs at 7 km/s, 50% of station risk is now calculated based on failure limit equations with little analytical foundation. To investigate projectile and shield behavior for impact conditions leading to projectile fragmentation and melt, a series of hypervelocity impact tests have been performed on aluminum Whipple shields. In the experiments projectile diameter, bumper thickness, and shield spacing were kept constant, while rear wall thickness was adjusted to determine spallation and perforation limits at various impact velocities and angles. The results, shown in Figure 1 for normal and 45 impacts, demonstrated behavior that was not sufficiently described by the simplified linear interpolation of the NNO equation (also shown in Figure 1). Hopkins et al. [2] investigated the performance of a nominally-identical aluminum Whipple shield, identifying the effects of phase change in the shatter regime. The results (conceptually represented in Figure 2) were found to agree well with those obtained in this study at normal incidence, suggesting that shielding performance in the shatter regime could be well described by considering more complex phase conditions than currently implemented in most BLEs. Furthermore, evidence of these phase effects were found in the oblique test results, providing the basis for an empirical description of these effects that can be applied in MMOD risk assessment software. In this paper, results of the impact experiments are presented, and characteristics of target damage are evaluated. A comparison of intermediate velocity impact failure mechanisms in current BLEs are discussed and compared to the findings of the experimental study. Risk assessment calculations have been made on a simplified structure using currently implemented penetration equations and predicted limits from the experimental program, and the variation in perceived mission risk is discussed. It was found that ballistic limit curves that explicitly incorporated phase change effects within the intermediate regime lead to a decrease in predicted MMOD risk for ISS-representative orbits. When considered for all Whipple-based shielding configurations onboard the ISS, intermediate phase change effects could lead to significant variations in predicted mission risk.

Ryan, Shannon↗

Soil Respiration Phenology Improves Modeled Phase of Terrestrial Net Ecosystem Exchange in Northern Hemisphere

In the northern hemisphere, terrestrial ecosystems transition from net sources of CO2 to the atmosphere in winter to net ecosystem carbon sinks during spring. The timing (or phase) of this transition, determined by the balance between ecosystem respiration (RECO) and primary production, is key to estimating the amplitude of the terrestrial carbon sink. We diagnose an apparent phase bias in the RECO and net ecosystem exchange (NEE) seasonal cycles estimated by the Terrestrial Carbon Flux (TCF) model framework and investigate its link to soil respiration mechanisms. Satellite observations of vegetation canopy conditions, surface meteorology, and soil moisture from the NASA SMAP Level 4 Soil Moisture product are used to model a daily carbon budget for a global network of eddy covariance flux towers. Proposed modifications to TCF include: the inhibition of foliar respiration in the light (the Kok effect); a seasonally varying litterfall phenology; an O2 diffusion limitation on heterotrophic respiration (RH); and a vertically resolved soil decomposition model. We find that RECO phase bias can result from bias in RECO magnitude and that mechanisms which reduce northern spring RECO, like substrate and O2 diffusion limitations, can mitigate the phase bias. A vertically resolved soil decomposition model mitigates this bias by temporally segmenting and lagging RH. Applying these model enhancements at Continuous Soil Respiration (COSORE) sites verifies their improvement of RECO and NEE skill compared to in situ observations (up to ∆RMSE = −0.76 g C m−2 d −1 35 ). Ultimately, these mechanisms can improve prior estimates of NEE for atmospheric inversion studies.

Soil respiration↗

Challenges and Solutions for Precision Solar Pointing on the ISS for the TSIS Instrument

The International Space Station offers an attractive platform for external payloads in many regards, but its large, complex structure is challenging for payloads that require precise, unobstructed pointing. As an instrument that measures solar irradiance on a continual basis, the TSIS payload was designed to robustly account for these ISS challenges and is now performing its mission on the ISS with great success.This paper first describes how TSIS was able to measure the ISS background jitter using High-rate Fine Sun Sensor data that was taken during passive solar transits through its field of view. The measurements showed that ISS jitter at the TSIS location on ELC-3 Site 5 is relatively benign with less than 4 arcseconds 1 at frequencies less than 0.5 Hz. This value is lower than previous estimates but agrees well with recent measurements from other external payloads, including OPALS and SAGE III. Because TSIS was designed to be robust to base motion jitter, it has achieved less than 4 arcseconds 1 of pointing error, which provides an extremely precise pointing platform for the solar irradiance measurements. The other challenging ISS characteristic is its large, complex structure that obscures solar viewing at sunrise and sunset from the zenith-facing location of TSIS. Although TSIS was able to predict solar viewing durations during the design phase with relatively high accuracy, the exact timing and causes of obscuration were difficult to predict and understand after TSIS began operating on the ISS. To aid in the understanding of blockage by ISS structure, detailed obscuration maps were created using HFSS measurements that clearly show the exact gimbal angles where blockage occurs and the specific structural features of the ISS that cause the blockage. These maps have helped TSIS to maximize its solar tracking durations each orbit, which has supported the mission in meeting its science objectives.

background jitter↗

Capillary Channel Flow (CCF) EU2-02 on the International Space Station (ISS): An Experimental Investigation of Passive Bubble Separations in an Open Capillary Channel

It would be signicantly easier to design fluid systems for spacecraft if the fluid phases behaved similarly to those on earth. In this research an open 15:8 degree wedge-sectioned channel is employed to separate bubbles from a two-phase flow in a microgravity environment. The bubbles appear to rise in the channel and coalesce with the free surface in much the same way as would bubbles in a terrestrial environment, only the combined effects of surface tension, wetting, and conduit geometry replace the role of buoyancy. The host liquid is drawn along the channel by a pump and noncondensible gas bubbles are injected into it near the channel vertex at the channel inlet. Control parameters include bubble volume, bubble frequency, liquid volumetric flow rate, and channel length. The asymmetrically confined bubbles are driven in the cross-flow direction by capillary forces until they at least become inscribed within the section or until they come in contact with the free surface, whereupon they usually coalesce and leave the flow. The merging of bubbles enhances, but does not guarantee, the latter. The experiments are performed aboard the International Space Station as a subset of the Capillary Channel Flow experiments. The flight hardware is commanded remotely and continuously from ground stations during the tests and an extensive array of experiments is conducted identifying numerous bubble flow regimes and regime transitions depending on the ratio and magnitude of the gas and liquid volumetric flow rates. The breadth of the publicly available experiments is conveyed herein primarily by narrative and by regime maps, where transitions are approximated by simple expressions immediately useful for the purposes of design and deeper analysis.

fluid dynamics↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

Flexible high speed codec

The project's objective is to develop an advanced high speed coding technology that provides substantial coding gains with limited bandwidth expansion for several common modulation types. The resulting technique is applicable to several continuous and burst communication environments. Decoding provides a significant gain with hard decisions alone and can utilize soft decision information when available from the demodulator to increase the coding gain. The hard decision codec will be implemented using a single application specific integrated circuit (ASIC) chip. It will be capable of coding and decoding as well as some formatting and synchronization functions at data rates up to 300 megabits per second (Mb/s). Code rate is a function of the block length and can vary from 7/8 to 15/16. Length of coded bursts can be any multiple of 32 that is greater than or equal to 256 bits. Coding may be switched in or out on a burst by burst basis with no change in the throughput delay. Reliability information in the form of 3-bit (8-level) soft decisions, can be exploited using applique circuitry around the hard decision codec. This applique circuitry will be discrete logic in the present contract. However, ease of transition to LSI is one of the design guidelines. Discussed here is the selected coding technique. Its application to some communication systems is described. Performance with 4, 8, and 16-ary Phase Shift Keying (PSK) modulation is also presented.

Boyd, R. W.↗

Oscillatory/Chaotic Thermocapillary Flow Induced by Radiant Heating

There is a continuing need to understand the fluid physics occurring under low gravity conditions in processes such as crystal growth, materials processing, and the movement of bubbles or droplets. The fluid flow in such situations is often caused by a gradient in interfacial tension. If a temperature gradient is created due to a heat source, the resulting flow is called thermocapillary flow, a special case of Marangoni Convection. In this study, an experimental investigation was conducted using silicone oil in cylindrical containers with a laser heat source at the free surface. It was desired to determine the conditions under which steady, axisymmetrical thermocapillary flow becomes unstable and oscillatory three-dimensional flow states develop. The critical Marangoni number for each observed oscillatory state was measured as a function of the container aspect ratio and the dynamic Bond number, a measure of buoyant force versus ii thermocapillary force. Various oscillatory modes were observed during three- dimensional convection, and chaotic flow was reached in one test condition. The critical Marangoni numbers are compared with those measured in previous studies, and the power spectra and phase trajectories of the instantaneous surface temperature distributions are used to characterize the routes of transitions to the chaotic flow state. Results show that only superharmonic modes appear in the routes to chaos while infinite number of subharmonic modes occur in flow transitions for pure Rayleigh convection.

DeWitt, Kenneth J.↗

Design Limit Loads and Verification Approach for the TESS Observatory

The Transiting Exoplanet Survey Satellite (TESS) is a NASA Explorer mission. The TESS Observatory is scheduled to launch on Falcon 9 in April 2018. This presentation covers the process used to define and update design limit loads for the observatory, instrument, and components throughout the life of the program. The limit loads that drove the need for a SoftRide isolation system are highlighted. The testing performed to qualify the observatory for launch loads at the instrument and observatory level is also detailed. In addition, exchanges with the launch vehicle provider in terms of loads predictions and hardware for test are discussed along with the associated issues encountered and lessons learned. The loads development and verification success on TESS was a team effort. Orbital ATK is the spacecraft provider, NASA GSFC provides project management and technical oversight, the instrument is managed by MIT Kavli Institute and the instrument cameras are built and tested by MIT Lincoln Laboratory. Since the instrument was designed in parallel with the spacecraft, the instrument design limit loads were developed in partnership with NASA and the instrument team. The three teams collaborated on a regular basis starting in the early design phase and continuing through observatory level testing.

Limit Loads↗

Voyager Interstellar Mission: Challenges of Flying a Very Old Spacecraft on a Very Long Mission

Two Voyager spacecraft were launched in 1977. After the successful flybys of Jupiter and Saturn by both Voyagers and Uranus and Neptune by Voyager 2, the mission has been extended for another 30 years in search of the transition region between the dominance of the solar energy and interstellar energy. The Voyager Interstellar Mission (VIM) started on January 1, 1990. It can be characterized by several factors including extremely long communication distances, aging hardware, reduced staffing levels and difficulty in obtaining Deep Space Network (DSN) resources necessitated by the increasing distance between the spacecraft and Earth. The mission was redesigned to compensate for such factors while maximizing the science return. After 25 years of VIM and several significant science discoveries, both Voyager spacecraft are still functioning well and the Voyager flight team is preparing for an even longer mission - until the year 2025 and beyond. In order to work around the challenges and to continue the mission even further, the team has been implementing numerous changes, mainly through flight software modifications and hardware reconfiguration. The major drivers for the changes are two-fold: resource constraints (such as decreasing power output and difficulty in obtaining the necessary DSN coverage) and anomalies due to the aging hardware. The majority of changes occur through flight software modifications so the state of the on-board responses is appropriate for the changing space environment and mission phase, and the flight software is compatible in allowing the maximum data gathering. The on-board flight software routines such as baseline sequence, fault protection routines, the High Gain Antenna POINTing to Earth (HPOINT) table, and long-term events table need to be maintained through flight software updates. The changes also occur through hardware reconfiguration such as selecting the backup Hybrid Buffer Interface Circuits (HYBIC) or attitude propulsion thrusters. This paper will describe the challenges of VIM and what has been done to overcome or mitigate those challenges. The primary focus will be the major flight software changes made during VIM and the changes that are in store for the near future in preparation for continuing the extended mission, from the originally projected year of 2020 out to the year 2025 and possibly beyond.

Matsumoto, Sun Kang↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗