Search NASA⌕ Search

SEARCH · Search NASA

Results for “Cost and Performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Unmanned space project management: Surveyor and lunar orbiter

An analysis of the management of two major NASA projects, Surveyor and Lunar Orbiter is presented. The analysis reflects the comments and criticisms of many NASA officials who were responsible for various phases of the projects as well as comments by knowledgeable persons outside NASA. Findings are submitted with respect to; (1) environment, (2) role of individuals, (3) teamwork, (4) roles and missions, (5) organization, and (6) cost performance.

Kloman, E. H.↗

Study of Alternate Space Shuttle Concepts. Volume 2, Part 2: Concept Analysis and Definition

This is the final report of a Phase A Study of Alternate Space Shuttle Concepts by the Lockheed Missiles & Space Company (LMSC) for the National Aeronautics and Space Administration George C. Marshall Space Flight Center (MSFC). The eleven-month study, which began on 30 June 1970, is to examine the stage-and-one-half and other Space Shuttle configurations and to establish feasibility, performance, cost, and schedules for the selected concepts. This final report consists of four volumes as follows: Volume I - Executive Summary, Volume II - Concept Analysis and Definition, Volume III - Program Planning, and Volume IV - Data Cost Data. This document is Volume II, Concept Analysis and Definition.

Source record↗

Space shuttle/payload interface analysis. (Study 2.4) Volume 4: Business Risk and Value of Operations in Space (BRAVO). Part 2: User's manual

The BRAVO User's Manual is presented which describes the BRAVO methodology in terms of step-by-step procedures, so that it may be used as a tool for a team of analysts performing cost effectiveness analyses on potential future space applications. BRAVO requires a relatively general set of input information and a relatively small expenditure of resources. For Vol. 1, see N74-12493; for Vol. 2, see N74-14530.

Source record↗

Noise reduction programs for DC-8 and DC-9 airplanes

A summary review is presented of the results of current and recently completed noise-reduction programs for DC-8 and DC-9 airplanes. The relationship of these programs to other efforts by Douglas to develop quieter CTOL airplanes is briefly outlined. The engine/nacelle concepts studied were: (1) application of nacelle acoustic treatment, (2) variable-area exhaust nozzles, (3) jet exhaust noise suppressors, and (4) engines with larger-diameter new front fans. Acoustic analyses leading to the selection of certain engine/nacelle configurations are described, as well as design constraints which limit the noise reduction capability of certain designs. Acoustic design features of the modified engine/nacelles are discussed along with estimates of the changes in aircraft community noise levels, as well as estimates of the changes in aircraft weight, performance, cost, and operational restrictions.

Frasca, R. L.↗

Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix E: EOS program supporting system trade data. Part 2: System trade studies no. 9 - 19

The relative merits of several international data acquisition (IDA) alternatives for the Earth Observatory Satellite (EOS) are established and rated on a cost effectiveness basis. The primary alternatives under consideration are: (1) direct transmission to foreign ground stations, (2) a wideband video tape recorder system for collection of foreign data and processing and distribution from the United States, and (3) a tracking and data relay satellite (TDRS) system for the relay of foreign data to the United States for processing and distribution. A requirements model is established for the analysis on the basis of the heaviest concentration of agricultural areas around the world. The model, the orbit path and the constraints of EOS and data volume summaries are presented. Alternative system descriptions and costs are given in addition to cost-performance summaries.

Source record↗

The pioneer projects: Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗

The Pioneer Projects - Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of various organizational elements of the project are described. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗

Systems cost/performance analysis (study 2.3). Volume 2, appendix A: Data base

Data on selected payload equipments (components) which were collected for the purpose of exercising the systems cost performance model are reported in an appendix. The reader should be aware that, although most of the data are accurate, approximations based on engineering judgment and experience are used wherever actual data were unavailable. The approximations are justified by the objective of the study which was to develop a cost/performance model. Assuming that the model is successfully developed and is accepted for use by a body of users, the data base should be expanded and the approximations replaced by actual data.

Source record↗

Minimum energy, liquid hydrogen supersonic cruise vehicle study

The potential was examined of hydrogen-fueled supersonic vehicles designed for cruise at Mach 2.7 and at Mach 2.2. The aerodynamic, weight, and propulsion characteristics of a previously established design of a LH2 fueled, Mach 2.7 supersonic cruise vehicle (SCV) were critically reviewed and updated. The design of a Mach 2.2 SCV was established on a corresponding basis. These baseline designs were then studied to determine the potential of minimizing energy expenditure in performing their design mission, and to explore the effect of fuel price and noise restriction on their design and operating performance. The baseline designs of LH2 fueled aircraft were than compared with equivalent designs of jet A (conventional hydrocarbon) fueled SCV's. Use of liquid hydrogen for fuel for the subject aircraft provides significant advantages in performance, cost, noise, pollution, sonic boom, and energy utilization.

Brewer, G. D.↗

Space shuttle orbital maneuvering engine platelet injector program

A platelet-face injector for the fully reusable orbit maneuvering system OMS on the space shuttle was evaluated as a means of obtaining additional design margin and low cost. Performance, heat transfer, and combustion stability were evaluated over the anticipated range of OMS operating conditions. The effects of acoustic cavity configuration on combustion stability, including cavity depth, open area, inlet contour, and other parameters, were investigated using sea level bomb tests. Prototype injector and chamber behavior was evaluated for a variety of conditions; these tests examined the effects of film cooling, helium saturated propellants, chamber length, inlet conditions, and operating point, on performance, heat transfer and engine transient behavior. Helium bubble ingestion into both propellant circuits was investigated, as was chugging at low pressure operation, and hot and cold engine restart with and without a purge.

Source record↗

Addendum report to atmospheric science facility pallet-only mode space transportation system payload feasibility study, volume 3, revision A

The feasibility of accomplishing selected atmospheric science mission using a pallet-only mode was studied. Certain unresolved issues were identified. The first issue was that of assuring that the on-board computer facility was adequate to process scientific data, control subsystems such as instrument pointing, provide mission operational program capability, and accomplish display and control. The second issue evolved from an investigation of the availability of existing substitute instruments that could be used instead of the prime instrumentation where the development tests and schedules are incompatible with the realistic budgets and shuttle vehicle schedules. Some effort was expended on identifying candidate substitute instruments, and the performance, cost, and development schedule trade-offs found during that effort were significant enough to warrant a follow-on investigation. This addendum documents the results of that follow-on effort, as it applies to the Atmospheric Sciences Facility.

Source record↗

Shuttle user analysis (study 2.2). Volume 3: Business risk and value of operations in space (BRAVO). Part 2: User's manual

The purpose of the BRAVO User's Manual is to describe the BRAVO methodology in terms of step-by-step procedures. The BRAVO methodology then becomes a tool which a team of analysts can utilize to perform cost effectiveness analyses on potential future space applications with a relatively general set of input information and a relatively small expenditure of resources. An overview of the BRAVO procedure is given by describing the complete procedure in a general form.

Source record↗

System consideration, design approach and test of a low gain spherical coverage antenna for large space vehicles

A fixed beam array antenna approach is proposed to meet the omnidirectional receiving and transmitting requirements of LST (Large Space Telescope). The proposed method uses an antenna of known performance and scales the size and frequency to conform with the LST 1/5-th scale model. The simplification that the approach provides over switching antenna elements on board the LST or switching from the ground by frequency diversity makes it worthy of consideration against the factors of performance, cost, reliability, and operations complexity. For LST applications, the system capabilities, requirements, and margins are summarized. The areas to be covered by further investigations into the proposed LST antenna are noted.

Ferguson, R. E.↗

New model framework and structure and the commonality evaluation model

The development of a framework and structure for shuttle era unmanned spacecraft projects and the development of a commonality evaluation model is documented. The methodology developed for model utilization in performing cost trades and comparative evaluations for commonality studies is discussed. The model framework consists of categories of activities associated with the spacecraft system's development process. The model structure describes the physical elements to be treated as separate identifiable entities. Cost estimating relationships for subsystem and program-level components were calculated.

Source record↗

Energy Conversion Alternatives Study (ECAS)

ECAS compared various advanced energy conversion systems that can use coal or coal-derived fuels for baseload electric power generation. It was conducted in two phases. Phase 1 consisted of parametric studies. From these results, 11 concepts were selected for further study in Phase 2. For each of the Phase 2 systems and a common set of ground rules, performance, cost, environmental intrusion, and natural resource requirements were estimated. In addition, the contractors defined the state of the associated technology, identified the advances required, prepared preliminary research and development plans, and assessed other factors that would affect the implementation of each type of powerplant. The systems studied in Phase 2 include steam systems with atmospheric- and pressurized-fluidized-bed boilers; combined cycle gas turbine/steam systems with integrated gasifiers or fired by a semiclean, coal derived fuel; a potassium/steam system with a pressurized-fluidized-bed boiler; a closed-cycle gas turbine/organic system with a high-temperature, atmospheric-fluidized-bed furnace; a direct-coal-fired, open- cycle magnetohydrodynamic/steam system; and a molten-carbonate fuel cell/steam system with an integrated gasifier. The sensitivity of the results to changes in the ground rules and the impact of uncertainties in capital cost estimates were also examined.

Source record↗