Designer's unified cost model

A conceptual and preliminary designers' cost prediction model has been initiated. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state of the art preliminary design tools and computer aided design programs is being evaluated. The goal of this task is to establish theoretical cost functions that relate geometric design features to summed material cost and labor content in terms of process mechanics and physics. The output of the designers' present analytical tools will be input for the designers' cost prediction model to provide the designer with a data base and deterministic cost methodology that allows one to trade and synthesize designs with both cost and weight as objective functions for optimization. The approach, goals, plans, and progress is presented for development of COSTADE (Cost Optimization Software for Transport Aircraft Design Evaluation).

Freeman, William T.↗

Designers' unified cost model

The Structures Technology Program Office (STPO) at NASA LaRC has initiated development of a conceptual and preliminary designers' cost prediction model. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state-of-the-art preliminary design tools and computer aided design programs is being evaluated. The goal of this task is to establish theoretical cost functions that relate geometric design features to summed material cost and labor content in terms of process mechanics and physics. The output of the designers' present analytical tools will be input for the designers' cost prediction model to provide the designer with a database and deterministic cost methodology that allows one to trade and synthesize designs with both cost and weight as objective functions for optimization. This paper presents the team members, approach, goals, plans, and progress to date for development of COSTADE (Cost Optimization Software for Transport Aircraft Design Evaluation).

Freeman, W.↗

Cost model relationships between textile manufacturing processes and design details for transport fuselage elements

Textile manufacturing processes offer potential cost and weight advantages over traditional composite materials and processes for transport fuselage elements. In the current study, design cost modeling relationships between textile processes and element design details were developed. Such relationships are expected to help future aircraft designers to make timely decisions on the effect of design details and overall configurations on textile fabrication costs. The fundamental advantage of a design cost model is to insure that the element design is cost effective for the intended process. Trade studies on the effects of processing parameters also help to optimize the manufacturing steps for a particular structural element. Two methods of analyzing design detail/process cost relationships developed for the design cost model were pursued in the current study. The first makes use of existing databases and alternative cost modeling methods (e.g. detailed estimating). The second compares design cost model predictions with data collected during the fabrication of seven foot circumferential frames for ATCAS crown test panels. The process used in this case involves 2D dry braiding and resin transfer molding of curved 'J' cross section frame members having design details characteristic of the baseline ATCAS crown design.

Metschan, Stephen L.↗

Cost Models for MMC Manufacturing Processes

Processes for the manufacture of advanced metal matrix composites are rapidly approaching maturity in the research laboratory and there is growing interest in their transition to industrial production. However, research conducted to date has almost exclusively focused on overcoming the technical barriers to producing high-quality material and little attention has been given to the economical feasibility of these laboratory approaches and process cost issues. A quantitative cost modeling (QCM) approach was developed to address these issues. QCM are cost analysis tools based on predictive process models relating process conditions to the attributes of the final product. An important attribute, of the QCM approach is the ability to predict the sensitivity of material production costs to product quality and to quantitatively explore trade-offs between cost and quality. Applications of the cost models allow more efficient direction of future MMC process technology development and a more accurate assessment of MMC market potential. Cost models were developed for two state-of-the art metal matrix composite (MMC) manufacturing processes: tape casting and plasma spray deposition. Quality and Cost models are presented for both processes and the resulting predicted quality-cost curves are presented and discussed.

Elzey, Dana M.↗

TPS Materials and Costs for Future Reusable Launch Vehicles

There is considerable interest in developing new reusable launch vehicles (RLVs) for reducing the cost of transporting payload to and from orbit. This work reviews thirteen candidate thermal protection system (TPS) options currently available for RLVs. It is useful to begin with the current Shuttle TPS layout as a reference. The nose cap and wing leading edge , which reach the highest temperatures, are made of reinforced carbon-carbon (RCC) that is protected from oxidation by an external coating (about 0.020" thick) of silicon-carbide. Most of the windward surface is 9 lb/cubic ft ceramic tiles (LI-900) with a thin (about 0.012") coating of Reaction Cured Glass (RCG). The leeward side of the vehicle is covered largely by AFRSI, a quilted ceramic blanket, and FRSI, a polyamide felt. These four materials can be considered first generation reusable TPS. Since the time of the Shuttle design, considerable progress has been made advancing TPS technologies in terms of thermal performance, robustness, and cost. For each of the major systems, a second generation ceramic TPS has been developed, tested, and characterized. Metallic-based systems have also been developed. For applications requiring RCC in the past, advanced carbon-carbon (ACC) is now available. This material has better mechanical properties, somewhat higher temperature capability to 2900F and greatly increased oxidation resistance. New carbon fiber reinforced silicon-carbide matrix composites (C/SiCs) have shown additional improvement in properties over ACC with use temperatures to 3000F and above. For rigid tiles, NASA Ames has made two significant advancements. The first is a tile substrate called Alumina Enhanced Thermal Barrier, or AETB, that incorporates alumina fibers for improved dimensional stability at high temperatures, to 2600F and above. This material can be made to densities as low as 8 lb/cubic ft. The second is a coating preparation called Toughened Uni-piece Fibrous Insulation, or TUFT, that penetrates about 0.1 in. into the tile substrate. The resulting composite, with a functionally gradient density near the surface, provides orders of magnitude increased damage resistance compared with RCG coated LI-900, with only a small weight increase. The TPS that combines these two developments is called AETB-8/TUFI and has been adopted for high damage areas on the Shuttles. Two notable developments have occur-red in flexible ceramic blanket technology. The first is aluminoborosilicate-based fibers with use temperatures of 2200F and above," in comparison to quartz and silica fiber used in AFRSI which have multi-use temperature limits of 1200 to 1400F. Blankets incorporating these new high temperature fibers are referred to as AFRSI-HT. The second is an integral weaving techniques that produces a fluted core blanket with a smoother surface and greater resistance to aero-acoustic noise, to levels as high as 170 dB. This Ames innovation is called Tailorable Advanced Blanket Insulation, or TABI. Finally, for felt-based TPS, Boeing is developing Polybenzimidazole Blanket Insulation, or PBI, with a multi-use temperature limit of 1000F and above, in contrast to Shuttle FRSI which has a multi-use temperature limit of about 700F. 1.6 NASA Langley and BF Goodrich (formerly Rohr Corp.) have led the development of metallic-based TPS. This activity uses essentially three approaches: metallic tiles which encase a fibrous ceramic batting in a box fabricated largely from metallic honeycombs, typically Nickel based alloys; metallic honeycomb sheets, made of Nickel-based alloys, incorporating a fibrous back-side insulation encapsulated in a metallic foil bag, providing reduced weight; and metallic multi-wall, which is comprised of dimpled Titanium metal sheets, which are stacked and then diffusion bonded at contact points to form the TPS. The Nickel-based systems can be used up to temperatures of about 1800F, and the Titanium system to about 100F. These thirteen TPS materials have pros and cons to their usage in terms of temperature capability, weight, initial cost, and maintenance. Carbon-carbon and C/SiC systems have the highest temperature capability but are relatively expensive and heavy, requiring significant time, expertise, and costly facilities and tools for design and fabrication. Second generation ceramic tiles are relatively light, durable, simple to fabricate and easy to install; however, waterproofing is a concern. Blankets and felts are light, simple, inexpensive, and easy to install over curved vehicle surfaces, but durability and waterproofing are concerns. Metallics are robust and appear to have eliminated waterproofing, but they tend to be heavy and relatively expensive, requiring costly facilities and tools. If thin metal sheets are used to reduce weights, then issues arise from possible metal fatigue and corrosion caused by thermal cycling, pressure oscillations, and environmental exposure. For application to future RLVs, system analyses show that a significant component of the vehicle life cycle cost is from the TPS; however, it is difficult to quantify and to compare the potential savings of advanced systems without performing full vehicle designs using each of the different options. Because this entails a considerable effort and also tends to submerge TPS cost impacts under unrelated vehicle design assumptions, there is a clear need for a simpler quantitative method to evaluate the cost impact of different TPS options. To this end, this work introduces a TPS life-cycle cost parameter which is easily computed and applicable to generic RLVs.

Rasky, Dan J.↗

Development of Advanced Life Cycle Costing Methods for Technology Benefit/Cost/Risk Assessment

The overall objective of this three-year grant is to provide NASA Langley's System Analysis Branch with improved affordability tools and methods based on probabilistic cost assessment techniques. In order to accomplish this objective, the Aerospace Systems Design Laboratory (ASDL) needs to pursue more detailed affordability, technology impact, and risk prediction methods and to demonstrate them on variety of advanced commercial transports. The affordability assessment, which is a cornerstone of ASDL methods, relies on the Aircraft Life Cycle Cost Analysis (ALCCA) program originally developed by NASA Ames Research Center and enhanced by ASDL. This grant proposed to improve ALCCA in support of the project objective by updating the research, design, test, and evaluation cost module, as well as the engine development cost module. Investigations into enhancements to ALCCA include improved engine development cost, process based costing, supportability cost, and system reliability with airline loss of revenue for system downtime. A probabilistic, stand-alone version of ALCCA/FLOPS will also be developed under this grant in order to capture the uncertainty involved in technology assessments. FLOPS (FLight Optimization System program) is an aircraft synthesis and sizing code developed by NASA Langley Research Center. This probabilistic version of the coupled program will be used within a Technology Impact Forecasting (TIF) method to determine what types of technologies would have to be infused in a system in order to meet customer requirements. A probabilistic analysis of the CER's (cost estimating relationships) within ALCCA will also be carried out under this contract in order to gain some insight as to the most influential costs and the impact that code fidelity could have on future RDS (Robust Design Simulation) studies.

Yackovetsky, Robert↗

Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars

To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level activities.

Hunt, Charles D.↗

Parametric Cost Analysis: A Design Function

Parametric cost analysis uses equations to map measurable system attributes into cost. The measures of the system attributes are called metrics. The equations are called cost estimating relationships (CER's), and are obtained by the analysis of cost and technical metric data of products analogous to those to be estimated. Examples of system metrics include mass, power, failure_rate, mean_time_to_repair, energy _consumed, payload_to_orbit, pointing_accuracy, manufacturing_complexity, number_of_fasteners, and percent_of_electronics_weight. The basic assumption is that a measurable relationship exists between system attributes and the cost of the system. If a function exists, the attributes are cost drivers. Candidates for metrics include system requirement metrics and engineering process metrics. Requirements are constraints on the engineering process. From optimization theory we know that any active constraint generates cost by not permitting full optimization of the objective. Thus, requirements are cost drivers. Engineering processes reflect a projection of the requirements onto the corporate culture, engineering technology, and system technology. Engineering processes are an indirect measure of the requirements and, hence, are cost drivers.

Dean, Edwin B.↗

Air Force Reusable Booster System: A Quick-look, Design Focused Modeling and Cost Analysis Study

This paper presents a method and an initial analysis of the costs of a reusable booster system (RBS) as envisioned by the US Department of Defense (DoD) and numerous initiatives that form the concept of Operationally Responsive Space (ORS). This paper leverages the knowledge gained from decades of experience with the semi-reusable NASA Space Shuttle to understand how the costs of a military next generation semi-reusable space transport might behave in the real world - and how it might be made as affordable as desired. The NASA Space Shuttle had a semi-expendable booster, that being the reusable Solid Rocket MotorslBoosters (SRMlSRB) and the expendable cryogenic External Tank (ET), with a reusable cargo and crew capable orbiter. This paper will explore DoD concepts that invert this architectural arrangement, using a reusable booster plane that flies back to base soon after launch, with the in-space elements of the launch system being the expendable portions. Cost estimating in the earliest stages of any potential, large scale program has limited usefulness. As a result, the emphasis here is on developing an approach, a structure, and the basic concepts that could continue to be matured as the program gains knowledge. Where cost estimates are provided, these results by necessity carry many caveats and assumptions, and this analysis becomes more about ways in which drivers of costs for diverse scenarios can be better understood. The paper is informed throughout with a design-for-cost philosophy whereby the design and technology features of the proposed RBS (who and what, the "architecture") are taken as linked at the hip to a desire to perform a certain mission (where and when), and together these inform the cost, responsiveness, performance and sustainability (how) of the system. Concepts for developing, acquiring, producing or operating the system will be shown for their inextricable relationship to the "architecture" of the system, and how these too relate to costs. Design and technology features bear special relevance to early program research and development directions. Given the uncertainties involved in both their actual performance promise and their relation to costs of operational systems, this later relationship is also given special attention.

Zapata, Edgar↗

Data Service Provider Cost Estimation Tool

The Data Service Provider Cost Estimation Tool (CET) and Comparables Database (CDB) package provides to NASA s Earth Science Enterprise (ESE) the ability to estimate the full range of year-by-year lifecycle cost estimates for the implementation and operation of data service providers required by ESE to support its science and applications programs. The CET can make estimates dealing with staffing costs, supplies, facility costs, network services, hardware and maintenance, commercial off-the-shelf (COTS) software licenses, software development and sustaining engineering, and the changes in costs that result from changes in workload. Data Service Providers may be stand-alone or embedded in flight projects, field campaigns, research or applications projects, or other activities. The CET and CDB package employs a cost-estimation-by-analogy approach. It is based on a new, general data service provider reference model that provides a framework for construction of a database by describing existing data service providers that are analogs (or comparables) to planned, new ESE data service providers. The CET implements the staff effort and cost estimation algorithms that access the CDB and generates the lifecycle cost estimate for a new data services provider. This data creates a common basis for an ESE proposal evaluator for considering projected data service provider costs.

Fontaine, Kathy↗

The Economics of NASA Mission Cost Reserves

Increases in NASA mission costs are well-noted but not well-understood, and there is little evidence that they are decreasing in frequency or amount over time. The need to control spending has led to analysis of the causes and magnitude of historical mission overruns, and many program control efforts are being implemented to attempt to prevent or mitigate the problem (NPR 7120). However, cost overruns have not abated, and while some direct causes of increased spending may be obvious (requirements creep, launch delays, directed changes, etc.), the underlying impetus to spend past the original budget may be more subtle. Gaining better insight into the causes of cost overruns will help NASA and its contracting organizations to avoid .them. This paper hypothesizes that one cause of NASA mission cost overruns is that the availability of reserves gives project team members an incentive to make decisions and behave in ways that increase costs. We theorize that the presence of reserves is a contributing factor to cost overruns because it causes organizations to use their funds less efficiently or to control spending less effectively. We draw a comparison to the insurance industry concept of moral hazard, the phenomenon that the presence of insurance causes insureds to have more frequent and higher insurance losses, and we attempt to apply actuarial techniques to quantifY the increase in the expected cost of a mission due to the availability of reserves. We create a theoretical model of reserve spending motivation by defining a variable ReserveSpending as a function of total reserves. This function has a positive slope; for every dollar of reserves available, there is a positive probability of spending it. Finally, the function should be concave down; the probability of spending each incremental dollar of reserves decreases progressively. We test the model against available NASA CADRe data by examining missions with reserve dollars initially available and testing whether they are more likely to spend those dollars, and whether larger levels of reserves lead to higher cost overruns. Finally, we address the question of how to prevent reserves from increasing mission spending without increasing cost risk to projects budgeted without any reserves. Is there a "sweet spot"? How can we derive the maximum benefit associated with risk reduction from reserves while minimizing the effects of reserve spending motivation?

Whitley, Sally↗

Concepts for Life Cycle Cost Control Required to Achieve Space Transportation Affordability and Sustainability

Cost control must be implemented through the establishment of requirements and controlled continually by managing to these requirements. Cost control of the non-recurring side of life cycle cost has traditionally been implemented in both commercial and government programs. The government uses the budget process to implement this control. The commercial approach is to use a similar process of allocating the non-recurring cost to major elements of the program. This type of control generally manages through a work breakdown structure (WBS) by defining the major elements of the program. If the cost control is to be applied across the entire program life cycle cost (LCC), the approach must be addressed very differently. A functional breakdown structure (FBS) is defined and recommended. Use of a FBS provides the visibifity to allow the choice of an integrated solution reducing the cost of providing many different elements of like function. The different functional solutions that drive the hardware logistics, quantity of documentation, operational labor, reliability and maintainability balance, and total integration of the entire system from DDT&E through the life of the program must be fully defined, compared, and final decisions made among these competing solutions. The major drivers of recurring cost have been identified and are presented and discussed. The LCC requirements must be established and flowed down to provide control of LCC. This LCC control will require a structured rigid process similar to the one traditionally used to control weight/performance for space transportation systems throughout the entire program. It has been demonstrated over the last 30 years that without a firm requirement and methodically structured cost control, it is unlikely that affordable and sustainable space transportation system LCC will be achieved.

Rhodes, Russel E.↗

The Future Impact of Much Lower Launch Cost

For decades, the high cost of space launch has been the greatest limiting factor on the nu ber and size of space missions. Recently commercial rockets have reduced launch cost to about one-twentieth of the space shuttle cost. This provides opportunities for a matching reduction in the cost of space systems and more and more massive missions. High launch costs greatly increase the cost of developing space systems, since the need to reduce mass forces the use of light materials, high packaging densities, and fragile structures that are difficult to manufacture and test. Lower launch costs allow the use of more robust and well tested off-the-shelf systems. Increased mass can be used to increase single string reliability and also to provide spares and redundancy. A crewed mission can benefit from lower launch costs by using mass to provide more accepted fully hydrated food, additional hygiene water, laundry, radiation shielding, and even artificial gravity. The crew can be made healthier, safer, more comfortable, and more productive. Lower launch cost makes every space activity easier, whether it is science, human exploration, commercial including communications, weather, surveillance, and geo-positioning services, or the defense of similar military services. Most of the solar system is empty space, with the energy of the sun’s radiation passing through to the cold of deep space. The missing mass needed to support human activities is now much easier to provide.

Jones, Harry W.↗

Comparing Low-Cost Sensors with Ground-Based and Airborne In-Situ and Column Observations of NO2 and HCHO during the FRAPPE Field Campaign in Colorado, USA

Even in the presence of more reliable air quality tools, low-cost sensors have the benefit of recording data on highly localized spatial and temporal scales, allowing for multiple measurements within a single satellite pixel and on pixel boundaries. However, they are less accurate than their regulatory-grade counterparts, requiring regular co-locations with accepted instruments to ensure their validity. Thus, the addition of low-cost sensors to a field campaign – where reference-grade air quality instruments are abundant – not only provides ample opportunities for low-cost sensor co-location and calibration, but also allows the low-cost instruments to be used for sub-pixel validation, covering more surface area than the regulatory instruments alone with a network of sensors. During the summer of 2014, our low-cost sensor network was deployed during the Front Range Air Pollution and Photochemistry Experiment (FRAPPÉ) campaign conducted to sample the composition of air at and above ground level in northeastern Colorado, USA. The low-cost sensor platform included a suite of gas-phase sensors, notably NO2 and two generalized volatile organic compound (VOC) sensors, which were leveraged together to quantify speciated hydrocarbons such as formaldehyde. These key pollutants were chosen for their impacts on human health and climate change, as well as their inclusion on the TEMPO satellite launching this year. Airborne campaign measurements included slant column optical observations of formaldehyde (HCHO), nitrogen dioxide (NO2), and ozone (O3). Myriad additional in-situ instruments described chemical composition up to approximately 5 km above surface level. Ground-based instrumentation included both stationary and mobile regulatory-grade instruments, which were used for sensor calibration. Machine learning techniques such as artificial neural networks (ANNs) were used to match the low-cost signals to that of the reference-grade instruments. Here, we compare calibrated low-cost sensor data collected at ground level in a variety of locations along Colorado’s Front Range to various data sources from the FRAPPÉ campaign to better understand how well airborne and regulatory ground-based measurements can be extrapolated to other locations. Further, as the slant column measurements act as satellite simulators, we explore how low-cost instruments can be used for satellite validation purposes. Comparisons among these different data types also have important implications in data fusion.

Kristen Okorn↗

Gaussian Process Regression Method for Costing SmallSat Bus Capabilities

NASA is responding to the growing interest in, andcapabilities of, small satellites for science applications with an increasingnumber and frequency of Announcements of Opportunityfor small satellite space missions. Estimating the probabilitythat these mission concepts will fit within the small cost capsof these opportunities is largely driven by the probability thatone of the burgeoning number of small satellite providers will beable to meet the payload’s accommodation requirements withinthe budget for the spacecraft. JPL has collected a databasecontaining technical specifications and cost of commerciallyavailable Smallsat buses across various vendors. The primarypurpose of the database is for use in JPL’s Team X architecturestudies to inform cost estimates of a spacecraft bus which fitsthe customer’s technical requirements for their payload andmission. Customer needs are often unique and don’t alignperfectly with an off-the-shelf commercial spacecraft bus, whichmotivates the need to develop a cost model across the continuoustechnical parameter space.Al’s Bus Cost Distribution Estimator (ABCDE) uses Gaussianprocess regression (GPR) to predict commercial Smallsat spacecraftbus cost based on a subset of a customer’s technicalrequirements (payload mass, payload power, delta V, pointingcontrol, and downlink rate). GPR is implemented in ABCDE asa Bayesian method which fits an implied multivariate regressionon the technical parameters and uses kriging to intentionally“overfit” the residuals. Overfitting the residuals allows costestimates to collapse in uncertainty closer to the data pointswhile maintaining larger uncertainty intervals in regions of parameterspace with fewer data records. The data used to fit thismodel is sensitive and represents cost estimates for off-the-shelfcommercial buses. GPR simultaneously protects the sensitivityof the database and uses the sparse nature of the database toaccount for uncertainty in cost in a useful way. For a givenset of customer technical requirements, the tool provides a costestimate distribution, the percentiles of which can be interpretedas a confidence level of finding a commercial bus under a specifiedcost cap. ABCDE dramatically pushes the boundaries ofspacecraft cost estimation models due to its Bayesian methodology(accounting for the maximum uncertainty in the underlyingregression), the mathematically advanced kriging methodology,and the novelty of its application in Team X architecture tradestudies.

Austin, Alex↗

Parametric Cost Modeling of a Mid-Lift-to-Drag Ratio Vehicle for Human Mars Entry, Descent, and Landing

Cost is one of the biggest obstacles to sending humans to Mars. However, spacecraft costs are typically estimated after the preliminary vehicle and mission concepts have been designed. By automating the cost estimation process, the effect of any change in vehicle or mission design on the mission cost can be determined more rapidly. This paper uses the tool SAPE-C (Systems Analysis for Planetary Entry, Descent, and Landing-Cost). SAPE-C integrates the cost modeling software SEER-H (System Estimation and Evaluation of Resources-Hardware) with a number of systems analysis tools and enables large design tradespace exploration early in the design process. SAPE-C is used to analyze several tradespaces of the Mid-Lift-to-Drag ratio rigid entry vehicle for human Mars missions. Key findings include quantifying the impacts of payload, vehicle length, and main engine specific impulse on the overall cost of the vehicle, and how the payload per lander and number of landers affects the cost of a campaign to Mars.

Mid L/D↗

Cost Validation Using PRICE H

PRICE H was introduced into the JPL cost estimation tool set circa 2003. It became more available at JPL when IPAO funded the NASA-wide site license for all NASA centers. PRICE H was mainly used as one of the cost tools to validate proposal grassroots cost estimates. Program offices at JPL view PRICE H as an additional crosscheck to Team X (JPL Concurrent Engineering Design Center) estimates. PRICE H became widely accepted ca, 2007 at JPL when the program offices moved away from grassroots cost estimation for Step 1 proposals. PRICE H is now one of the key cost tools used for cost validation, cost trades, and independent cost estimates.

cost estimation↗

Modeling Operations Costs for Human Exploration Architectures

Operations and support (O&S) costs for human spaceflight have not received the same attention in the cost estimating community as have development costs. This is unfortunate as O&S costs typically comprise a majority of life-cycle costs (LCC) in such programs as the International Space Station (ISS) and the now-cancelled Constellation Program. Recognizing this, the Constellation Program and NASA HQs supported the development of an O&S cost model specifically for human spaceflight. This model, known as the Exploration Architectures Operations Cost Model (ExAOCM), provided the operations cost estimates for a variety of alternative human missions to the moon, Mars, and Near-Earth Objects (NEOs) in architectural studies. ExAOCM is philosophically based on the DoD Architecture Framework (DoDAF) concepts of operational nodes, systems, operational functions, and milestones. This paper presents some of the historical background surrounding the development of the model, and discusses the underlying structure, its unusual user interface, and lastly, previous examples of its use in the aforementioned architectural studies.

cost estimating↗