Search NASA⌕ Search

SEARCH · Search NASA

Results for “DELTA LAUNCH VEHICLE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Systems engingeering for the Kepler Mission : a search for terrestrial planets

The Kepler mission will launch in 2007 and determine the distribution of earth-size planets (0.5 to 10 earth masses) in the habitable zones (HZs) of solar-like stars. The mission will monitor > 100,000 dwarf stars simultaneously for at least 4 years. Precision differential photometry will be used to detect the periodic signals of transiting planets. Kepler will also support asteroseismology by measuring the pressure-mode (p-mode) oscillations of selected stars. Key mission elements include a spacecraft bus and 0.95 meter, wide-field, CCD-based photometer injected into an earth-trailing heliocentric orbit by a 3-stage Delta II launch vehicle as well as a distributed Ground Segment and Follow-up Observing Program. The project is currently preparing for Preliminary Design Review (October 2004) and is proceeding with detailed design and procurement of long-lead components. In order to meet the unprecedented photometric precision requirement and to ensure a statistically significant result, the Kepler mission involves technical challenges in the areas of photometric noise and systematic error reduction, stability, and false-positive rejection. Programmatic and logistical challenges include the collaborative design, modeling, integration, test, and operation of a geographically and functionally distributed project. A very rigorous systems engineering program has evolved to address these challenges. This paper provides an overview of the Kepler systems engineering program, including some examples of our processes and techniques in areas such as requirements synthesis, validation & verification, system robustness design, and end-to-end performance modeling.

systems engineering↗

Operating the Dual-Orbiter GRAIL Mission to Measure the Moon's Gravity

NASA's mission to measure the Moon's gravity and determine the interior structure, from crust to core, has almost completed its 3-month science data collection phase. The twin orbiters of the Gravity Recovery and Interior Laboratory (GRAIL) mission were launched from Florida on September 10, 2011, on a Delta-II launch vehicle. After traveling for nearly four months on a low energy trajectory to the Moon, they were inserted into lunar orbit on New Year's Eve and New Year's Day. In January 2012 a series of circularization maneuvers brought the orbiters into co-planar near-circular polar orbits. In February a distant (75- km) rendezvous was achieved and the science instruments were turned on. A dual- frequency (Ka and S-band) inter-orbiter radio link provides a precise orbiter-to-orbiter range measurement that enables the gravity field estimation. NASA's Jet Propulsion Laboratory in Pasadena, CA, manages the GRAIL project. Mission management, mission planning and sequencing, and navigation are conducted at JPL. Lockheed Martin, the flight system manufacturer, operates the orbiters from their control center in Denver, Colorado. The orbiters together have performed 28 propulsive maneuvers to reach and maintain the science phase configuration. Execution of these maneuvers, as well as the payload checkout and calibration activities, has gone smoothly due to extensive pre-launch operations planning and testing. The key to the operations success has been detailed timelines for product interchange between the operations teams and proven procedures from previous JPL/LM planetary missions. Once in science phase, GRAIL benefitted from the payload operational heritage of the GRACE mission that measures the Earth's gravity.

Moon missions↗

Derivation of the sinusoidal sweep vibration test levels for the Cosmic Background Explorer (COBE)

The Cosmic Background Explorer (COBE) Observatory was successfully launched on November 18, 1989 using a Delta l expendable launch vehicle. Prior to launch, COBE was subjected to sinusoidal sweep vibration testing in each of three axes in the 15 Hz to 40 Hz region. The tests were used to qualify COBE for the sustained periodic oscillation events that were expected to occur in flight for the Delta l launch vehicle. These events were called pre-MECO (Main Engine Cutoff) POGO and MECO-POGO. Pre-MECO POGO is also commonly called mini-POGO. This paper will describe the process used to derive the sinusoidal sweep test levels and will present a comparison of the actual COBE flight data versus the derived test levels. The results show that the derived test levels were sufficient to encompass the levels measured in flight for the COBE mission.

Coladonato, Robert J.↗

Integration of Launch Vehicle Simulation/Analysis Tools and Lunar Cargo Lander Design

Simulation and analysis of vehicle performance is essential for design of a new launch vehicle system. It is more and more demand to have an integrated, highly efficient, robust simulation tool with graphical user interface (GUI) for vehicle performance and simulations. The objectives of this project are to integrate and develop launch vehicle simulation and analysis tools in MATLAB/Simulink under PC Platform, to develop a vehicle capable of being launched on a Delta-IV Heavy Launch Vehicle which can land on the moon with the goal of pre-implanting cargo for a new lunar mission, also with the capability of selecting other launch vehicles that are capable of inserting a payload into Trans-Lunar Injection (TLI). The vehicle flight simulation software, MAVERIC-II (Marshall Aerospace VEhicle Representation In 'C'), developed by Marshall Space Flight Center was selected as a starting point for integration of simulation/analysis tools. The goals are to convert MAVERIC-II from UNIX to PC platform and build input/output GUI s in the MATLAB environment, and then integrate them under MATLAB/Simulink with other modules. Currently, MAVERIC-II has been successfully converted from UNIX to PC using Microsoft Services for UNIX subsystem on PC. Input/Output GUI's have been done for some key input/output files. Calling MAVERIC-II from Simulink has been tested. Details regarding Lunar Cargo Lander Design are described in Part 2/2 of the paper on page X-1.

Shiue, Yeu-Sheng Paul↗

Orbit Determination Support for the Microwave Anisotropy Probe (MAP)

NASA's Microwave Anisotropy Probe (MAP) was launched from the Cape Canaveral Air Force Station Complex 17 aboard a Delta II 7425-10 expendable launch vehicle on June 30, 2001. The spacecraft received a nominal direct insertion by the Delta expendable launch vehicle into a 185-km circular orbit with a 28.7deg inclination. MAP was then maneuvered into a sequence of phasing loops designed to set up a lunar swingby (gravity-assisted acceleration) of the spacecraft onto a transfer trajectory to a lissajous orbit about the Earth-Sun L2 Lagrange point, about 1.5 million km from Earth. Because of its complex orbital characteristics, the mission provided a unique challenge for orbit determination (OD) support in many orbital regimes. This paper summarizes the premission trajectory covariance error analysis, as well as actual OD results. The use and impact of the various tracking stations, systems, and measurements will be also discussed. Important lessons learned from the MAP OD support team will be presented. There will be a discussion of the challenges presented to OD support including the effects of delta-Vs at apogee as well as perigee, and the impact of the spacecraft attitude mode on the OD accuracy and covariance analysis.

Bauer, Frank↗

Delta II Geotail Test D5040

This video presents live footage of the Delta II Expendable Launch Vehicle Geotail test. The Geotail Satellite was launched aboard Delta II to study the dynamics of the Earth's magnetotail over a wide range of distance. The mission lasted almost four years.

Source record↗

Space transportation - Options and opportunities

The development space transportation options to earth orbit and beyond are summarized. The performance of available launch systems is reviewed, including the Scout, Delta, Long March 3, Atlas Centaur, Ariane 3, Titan 34D, Proton, the Japanese M-3S-II, N-1, and H-1, and the Space Shuttle. Launch vehicle which are planned or are under development are examined, including the Conestoga, Industrial Launch Vehicle, Titan II, Delta II, H-II, Ariane 5, Titan IV, and the NASA/DOD Heavy Lift Launch Vehicle. Also, issues pertinent to the development of space transportation vehicles are considered, such as reliability, reduced unit cost, reduced lead time, and improved payload accommodations.

Loftus, J. P., Jr.↗

Mars Orbit Rendezvous Strategy for the Mars 2003/2005 Sample Return Mission

The primary objective of the Mars 2003/2005 Sample Return Project is to return Martian surface materials to Earth from two different sites by the year 2008. The baseline mission plan relies heavily on the use of a Mars orbit rendezvous strategy similar to the lunar orbit rendezvous scheme used for the Apollo missions. The 2003 mission consists of a single spacecraft comprised of a Lander, Rover, and Mars ascent vehicle (MAV). The 2003 mission will be launched on a Delta-III-class launch vehicle in May/June 2003 and arrive at Mars in December 2003/January 2004. The Lander deploys the Rover to collect surface samples from several sites and return them to the Lander where they are transferred to a sample canister onboard the MAV. The MAV is launched into a low Mars orbit (targeted for 600 km circular, 45 deg inclination) and releases the sample canister to await retrieval by an Orbiter launched in 2005. (The sample canister is a passive vehicle with no maneuvering capability.) The duration of Mars surface operations is at most about 90 days. The 2005 mission consists of two separate spacecraft: a Lander/Rover/MAV spacecraft identical to that used for the 2003 mission and an Orbiter carrying an Earth Entry Vehicle (EEV). Both spacecraft will be launched on a single Ariane-5 in August 2005 and arrive at Mars in July/August 2006. A second sample canister is delivered to Mars orbit using the same scenario as was used for the 2003 mission. The Orbiter uses aerocapture for insertion into Mars orbit (targeted for 250 x 1400 km, 45 deg inclination). During its approximately one-year stay at Mars, the Orbiter will search for and attempt to rendezvous first with the 2003 sample canister and then with the 2005 sample canister. After retrieval, each sample canister is transferred to the EEV. The Orbiter departs Mars in July 2007 and returns to Earth in October 2008 on a trajectory targeted for landing at the Utah Test and Training Range (UTTR). After deploying the EEV, the Orbiter performs a deflection maneuver to avoid reentry into Earth's atmosphere.

DAmario, Louis A.↗

Utility of Space Transportation System to Space Communication Community

A potentially cost effective technique was investigated of launching operational satellites into synchronous orbit using the space transportation system (STS). This technique uses an unguided spinning solid rocket motor as the means for boosting a satellite from a low altitude shuttle parking orbit into a synchronous transfer orbit. The spacecraft is then injected into a geosynchronous orbit by an apogee kick motor fired at transfer orbit apogee. The approach is essentially that used on all Delta and Atlas-Centaur launches of synchronous satellites with the shuttle orbiter performing the function of the first two stages of the Delta three stage launch vehicle and the perigee kick motor performing the function of the Delta third state. It is concluded that the STS can be useful to the space communication community as well as to other geostationary satellite system users if the recommended actions are implemented.

Bronstein, L. M.↗

Aerodynamic characteristics of Lockheed delta-body orbiter and stage-and-one-half launch vehicle

An experimental wind tunnel test program was conducted to investigate the subsonic through high supersonic aerodynamic characteristics of the Lockheed delta lifting body orbiter and stage-and-one-half launch vehicle. Analyses and results of these data are presented. A 0.01-scale model of the LS 200-5 system was designed and fabricated for testing in wind tunnels. Orbiter and launch configurations were tested over a speed range of Mach 0.6 to 2.0, whereas only the orbiter was tested over a speed range of Mach 2.3 to 4.6. Six-component force and moment data, base pressures, and schlieren photos were obtained at various angles-of-attack and sideslip. A 0.03-scale model of the orbiter was also designed, fabricated, and tested in a wind tunnel. Six-component force and moment data, base pressure, and a limited amount of tuft flow visualization data were obtained on a variety of configuration combinations.

Velligan, F. A.↗

Orbit Determination Support for the Microwave Anisotropy Probe (MAP)

THe microwave Anisotropy Probe (MAP) ia the second Medium Class Explorer (MIDEX) mission of the National Aeronautics and Space Administration (NASA). The main goal of the MAP observatory is to measure the temperature fluctuations, known as anisotropy, of the cosmic microwave background (CBG) radiation over the entire sky and to produce a map of the CMB anisotropies with an angular resolution of approximately 3 degrees. MAP was launched from the Cape Canaveral Air Force Station Complex 17 aboard a Delta II 7425-10 expendable launch vehicle at exactly 19:46:46.183 UTC on June 30, 20001. The spacecraft receiver a nominal direct insertion by the Delta expendable launch vehicle into a 185-km circular orbit with a 28.7 deg. inclination. MAP was than maneuvered into a sequence of phasing loops designed to set up a lunar gravity-assisted acceleration of the spacecraft onto a transfer trajectory to a lissajous orbit about the Earth-Sun L2 Lagrange point, about 1.5 million km from Earth. The science mission minimum lifetime is two years of observations at L2 with a desired lifetime of 4 years. The MAP transfer orbit consisted of 3.5 phasing loops.The MAP trajectory schematic all the way through L2 is shown. The first loop had a period of 7 days, the second and third loops were 10 days long, and the last half loop was 5 days. The periselene (i.e., lunar encounter or swingby) took place approximately 30 days after launch. After the periselene, the spacecraft cruised for approximately 60 days before it arrived in the vicinity of the L2 libration point. Two mid-course correction (MCC) maneuvers were performed to refine MAP's post-launch trajectory-one after periselene and one prior to arrival at vicinity of L2. Now that MAP is at its operational L2 lissajous orbit, the MAP satellite is commanded to perform occasional station-keeping (SK) maneuvers in order to maintain its orbit around L2. Because of its complex orbital characteristics, the mission provided a unique challenge to orbit determination (OD) support in many orbital regimes.

Truong, Son H.↗

Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix D: EOS configuration design data. Part 1: Spacecraft configuration

The results of structural studies of the Earth Observatory Satellite (EOS) which define the member sizes to meet the vehicle design requirements are presented. The most significant requirements in sizing the members are the stiffness required to meet the launch vehicle design frequencies both in the late al and in the longitudinal directions. The selected configurations, both baseline and preferred, for the Delta and Titan launch vehicles were evaluated for stiffness requirements. The structural idealization used to estimate the stiffness of each structural arrangement, was based on an evaluation of primary loads paths, effectivity of structural members, and estimated sizes for the preferred configurations. The study included an evaluation of the following structural materials: (1) aluminum alloys, (2) titanium alloys, (3) beryllium, (4) beryllium/aluminum alloy, and (5) composite materials.

Source record↗

Delta XTE Press Briefing

Live coverage of the pre-launch Delta X-Ray Timing Explorer (XTE) press briefing is presented. George Diller, NASA Public Affairs, introduces the panel. The panel consists of Floyd Curington, NASA Launch Manager, Kennedy Space Center; David Mitchell, Launch Vehicle Manager, NASA Goddard Space Flight Center; Dale Schulz, Mission Director, XTE Project Manager Goddard Space Flight Center; Dr. Hale Bradt, XTE Principle Investigator, Massachusetts Institute of Technology (MIT); and Joel Tumbiolo, Launch Weather Officer, Department of the Air Force. The launch of the Delta XTE spacecraft atop the Delta 230 expendable launch vehicle is discussed. Once lofted into orbit, the XTE spacecraft will embark on a two-year mission to carry out an in-depth study of x-ray sources in the universe. Floyd Curington gives the lift-off schedule, fueling, and countdown of the spacecraft. David Mitchell discusses the launch sequence and spacecraft separation. Dale Schulz presents viewcharts of the instrument side of the XTE. Dr. Hale will be studying compact stars such as light dwarfs, neutron stars and quasars. Joel Tumbiolo presents the weather forecast for the December 10, 1995 launch. The press briefing ends with a question and answer period.

Source record↗

Preliminary Analysis and Design of a Rocket Based Combined Cycle for Efficient Access to Space

Access to space is presently limited by cost. The cost of delivering a payload to low earth orbit (LEO) is on average $10,000 per pound of payload, in the United States. Much of this cost is incurred from the operation of vehicles developed with 30-40 year old technology. The old technology and design practices have resulted in expensive hardware and intensive maintenance requirements for current launch vehicles. In order to alleviate the cost factor, the technological advances throughout the next millennium must bring affordable development and a new invigorating desire to space exploration. National Aeronautical and Space Administration (NASA), Department of Defense (DOD), and private industry are addressing this issue by focusing on incremental improvements in the Earth- to Orbit (ETO) costs. These improvements have investigated two different approaches: 1) make space vehicles as inexpensive as possible (i.e. Evolved Expendable Launch Vehicle (EELV) and Delta IV) 2) make space vehicles as reusable as airplanes so that the initial cost of investment can be recaptured (i.e. Reusable Launch Vehicle (RLV), X-33, X-34, and X-37) These programs have made notable progress in new material, propulsion, structures, and avionics technologies, during the last 3-5 years. So far, these programs are targeted to reduce present costs by, as much as, five times the current cost. The year 2025 goal for continued space advancement is to have ETO costs reduced by a factor of ten (i.e., tenfold), as low as $100 - $200/lb payload. For the RLV, this goal translates into very low maintenance costs and higher expected reliability per flight must be obtained. Therefore, making higher launch rates possible. For the expendable vehicle, the cost of maintenance cost is minimal, but a greater reliability must exist to insure the payload; since, there would be no way to recover the payload if the mission was to an abort or failure. Overall the cost of vehicle, payload and operations of an expendable may be too high compared to those of the RLV.

Harris, Lawanna↗

Mission Design and Analysis for Suborbital Intercept and Fragmentation of an Asteroid with Very Short Warning Time

Small near-Earth objects (NEOs) approximately 50-150 m in size are far more numerous (hundreds of thousands to millions yet to be discovered) than larger NEOs. Small NEOs, which are mostly asteroids rather than comets, are very faint in the night sky due to their small sizes, and are, therefore, difficult to discover far in advance of Earth impact. Furthermore, even small NEOs are capable of creating explosions with energies on the order of tens or hundreds of megatons (Mt). We are, therefore, motivated to prepare to respond effectively to short warning time, small NEO impact scenarios. In this paper we explore the lower bound on actionable warning time by investigating the performance of notional upgraded Intercontinental Ballistic Missiles (ICBMs) to carry Nuclear Explosive Device (NED) payloads to intercept and disrupt a hypothetical incoming NEO at high altitudes (generally at least 2500 km above Earth). We conduct this investigation by developing optimal NEO intercept trajectories for a range of cases and comparing their performances. Our results show that suborbital NEO intercepts using Minuteman III or SM-3 IIA launch vehicles could achieve NEO intercept a few minutes prior to when the NEO would strike Earth. We also find that more powerful versions of the launch vehicles (e.g., total delta V of approximately 9.5-11 km/s) could intercept incoming NEOs several hours prior to when the NEO would strike Earth, if launched at least several days prior to the time of intercept. Finally, we discuss a number of limiting factors and practicalities that affect whether the notional systems we describe could become feasible.

near- Earth object↗

Propulsive Small Expendable Deployer System (ProSEDS)

The Propulsive Small Expendable Deployer System (ProSEDS) space experiment will demonstrate the use of an electrodynamic tether propulsion system to generate thrust in space by decreasing the orbital altitude of a Delta II Expendable Launch Vehicle (ELV) second stage. ProSEDS, which is planned to fly in 2001, will use the flight proven Small Expendable Deployer System (SEDS) to deploy a tether (5km bare wire plus 10 km spectra or dyneema) from a Delta II second stage to achieve approximately 0.4N drag thrust. ProSEDS will utilize the tether-generated current to provide limited spacecraft power. The ProSEDs instrumentation includes a Langmuir probe and Differential Ion Flux Probe, which will determine the characteristics of the ambient ionospheric plasma. Two Global Positioning System (GPS) receivers will be used (one on the Delta and one on the endmass) to help determine tether dynamics and to limit transmitter operations to occasions when the spacecraft is over selected ground stations, The flight experiment is a precursor to the more ambitious electrodynamic tether upper stage demonstration mission, which will be capable of orbit raising, lowering and inclination changes-all using electrodynamic thrust. An immediate application of ProSEDS technology is for the deorbit of spent satellites for orbital debris mitigation. In addition to the use of this technology to provide orbit transfer and debris mitigation it may also be an attractive option for future missions to Jupiter and any other planetary body with a magnetosphere.

Ballance, Judy↗

Space Transportation Infrastructure Supported By Propellant Depots

A space transportation infrastructure is described that utilizes propellant depots to support all foreseeable missions in the Earth-Moon vicinity and deep space out to Mars. The infrastructure utilizes current expendable launch vehicles such as the Delta IV Heavy, Atlas V, and Falcon 9, for all crew, cargo, and propellant launches to orbit. Propellant launches are made to a Low-Earth-Orbit (LEO) Depot and an Earth-Moon Lagrange Point 1 (L1) Depot to support new reusable in-space transportation vehicles. The LEO Depot supports missions to Geosynchronous Earth Orbit (GEO) for satellite servicing, and to L1 for L1 Depot missions. The L1 Depot supports Lunar, Earth-Sun L2 (ESL2), Asteroid, and Mars missions. A Mars Orbital Depot is also described to support ongoing Mars missions. New concepts for vehicle designs are presented that can be launched on current 5-meter diameter expendable launch vehicles. These new reusable vehicle concepts include a LEO Depot, L1 Depot, and Mars Orbital Depot based on International Space Station (ISS) heritage hardware. The high-energy depots at L1 and Mars orbit are compatible with, but do not require, electric propulsion tug use for propellant and/or cargo delivery. New reusable in-space crew transportation vehicles include a Crew Transfer Vehicle (CTV) for crew transportation between the LEO Depot and the L1 Depot, a new reusable Lunar Lander for crew transportation between the L1 Depot and the lunar surface, and a Deep Space Habitat (DSH) to support crew missions from the L1 Depot to ESL2, Asteroid, and Mars destinations. A 6 meter diameter Mars lander concept is presented that can be launched without a fairing based on the Delta IV heavy Payload Planners Guide, which indicates feasibility of a 6.5 meter fairing. This lander would evolve to re-usable operations when propellant production is established on Mars. Figure 1 provides a summary of the possible missions this infrastructure can support. Summary mission profiles are presented for each primary mission capability. These profiles are the basis for propellant loads, numbers of vehicles/stages and launches for each mission capability. Data includes the number of launches required for each mission utilizing current expendable launch vehicle systems, and concluding remarks include ideas for reducing the number of launches through incorporation of heavy-lift launch vehicles, solar electric propulsion, and other transportation support concepts.

Smitherman, David↗

Propulsive Small Expendable Deployer System (ProSEDS)

The Propulsive Small Expendable Deployer System (ProSEDS) space experiment will demonstrate the use of an electrodynamic tether propulsion system to generate thrust in space by decreasing the orbital altitude of a Delta 11 Expendable Launch Vehicle second stage. ProSEDS, which is planned on an Air Force GPS Satellite replacement mission in June 2002, will use the flight proven Small Expendable Deployer System (SEDS) to deploy a tether (5 km bare wire plus 10 km non-conducting Dyneema) from a Delta 11 second stage to achieve approx. 0.4N drag thrust. ProSEDS will utilize the tether-generated current to provide limited spacecraft power. The ProSEDS instrumentation includes Langmuir probes and Differential Ion Flux Probes, which will determine the characteristics of the ambient ionospheric plasma. Two Global Positioning System (GPS) receivers will be used (one on the Delta and one on the endmass) to help determine tether dynamics and to limit transmitter operations to occasions when the spacecraft is over selected ground stations. The flight experiment is a precursor to the more ambitious electrodynamic tether upper stage demonstration mission, which will be capable of orbit raising, lowering and inclination changes-all using electrodynamic thrust. An immediate application of ProSEDS technology is for the removal of spent satellites for orbital debris mitigation. In addition to the use of this technology to provide orbit transfer and debris mitigation it may also be an attractive option for future missions to Jupiter and any other planetary body with a magnetosphere.

Curtis, Leslie↗