Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Energy Resources, Interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Interconnection Standard Grid-Support Function Evaluations Using an Automated Hardware-in-the-Loop Testbed

Grid operators are increasingly turning to advanced grid-support functions in distributed energy resources (DER) to assist with distribution circuit voltage regulation, bulk system frequency control, and power system protection. The U.S. DER certification standard, Underwriters Laboratories (UL) 1741, was revised in September 2016 to add test procedures for multiple grid-support functions. Sandia National Laboratories, SunSpec Alliance, and growing community of collaborators have undertaken a multiyear effort to create an open-source system validation platform (SVP) that automates DER interconnection and interoperability test procedures by communicating with grid simulators, photovoltaic (PV) simulators, data acquisition systems, and interoperable equipment under test. However, the power hardware required for generating the test conditions may be untenable for many organizations. In this paper, we discuss development of the SVP testing capabilities for UL 1741 tests utilizing a controller hardware-in-the-loop testbed that precludes the need for power hardware using a 34.5 kW Austrian Institute of Technology smart grid controller. Finally, analysis of normal ramp rate, soft start ramp rate, specified power factor, volt-VAr, and frequency-watt advanced grid functions, and the effectiveness of the UL 1741 test protocols are included.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts of Demand-Side Resources on Electric Transmission Planning

Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies were independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.

99 GENERAL AND MISCELLANEOUS↗

Advanced Platform for Development and Evaluation of Grid Interconnection Systems Using Hardware-in-the-Loop: Part III – Grid Interconnection System Evaluator

This paper describes a Grid Interconnection System Evaluator (GISE) that leverages hardware-in-the-loop (HIL) simulation techniques to rapidly evaluate the grid interconnection standard conformance of an ICS according to the procedures in IEEE Std 1547.1. The architecture and test sequencing of this evaluation tool, along with a set of representative ICS test results from three different photovoltaic (PV) inverters, are presented. The GISE adds to the National Renewable Energy Laboratory's (NREL) evaluation platform that now allows for rapid development of ICS control algorithms using controller HIL (CHIL) techniques, the ability to test the dc input characteristics of PV-based ICSs through the use of a PV simulator capable of simulating real-world dynamics using power HIL (PHIL), and evaluation of ICS grid interconnection conformance.

14 SOLAR ENERGY↗

A Practical Approach to Inertia Assessment: Analyzing New York's Grid Response to Real Events

The non-uniform distribution of inverter-based resources (IBRs) such as solar and wind energy leads to the formation of weakly coupled regions within the broader interconnection. This highlights the urgency of investigating regional dynamics. This paper proposes a practical framework for estimating regional inertia using actual event measurements from the New York (NY) region. The regional frequency is determined using measurement data from frequency disturbance recorders (FDRs) deployed across NY. The rate-of-change of frequency (RoCoF) is estimated using a hybrid methodology that combines the benefits of both moving and non-moving window techniques. By utilizing the power mismatch value and the estimated RoCoF, various inertia metrics such as regional RoCoF, inertia arrival time, and inertia percentage relative to the interconnection inertia are calculated. The identified confirmed-events that took place between 2017–2022 in NY are used in the study. This assessment of inertia using real event data reveals the true behavior of the grid under stress. The results indicate that as the generation mix in NY evolves with the rise of IBRs, both the RoCoF levels and the regional inertia undergo significant changes.

Dulal, Saurav [University of Tennessee, Knoxville ↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility Perspective on Protection Challenges with High Penetration of IBRs

Utilities have seen rapid increase in Solar, Wind, and Battery Energy Storage Resources that interconnect to their electric system through Inverters. Inverter-Based Resources (IBRs) have fault current characteristics that are unlike the fault current response of traditional rotating-machine-based generators, which is well known and repeatable. IBR’s non-traditional fault current behavior is due to the IBR control scheme, which is configured to provide a clean AC output but also protect the inverter’s sensitive power electronics devices from damage, one source of which is overcurrent. This results in low fault current magnitude, low or no negative sequence current injection, the variability of sequence component currents, the variability of voltage with respect to current angles, and the lack of inertia. The control scheme also results in a fault current response that can vary between manufactures and between models of the same manufacturer. High penetration of IBRs can adversely affect the protection schemes applied in areas with high penetration of IBRs. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems. This is mainly because the existing protection elements and practices have been designed based on the fault current response of conventional rotating machines. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This report / presentation identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. Instead of facing on one issue, this report looks broadly on all the challenges that system protection has experienced with high penetration of IBRs. Based on the IBR response from various utilities during real fault events and gathering perspective from different utility SMEs via questionnaire, the report summarizes on gathered data and internal experiences.

14 SOLAR ENERGY↗

Interconnection Requirements for Renewable Generation and Energy Storage in Island Systems: Puerto Rico Example: Preprint

On September 20, 2017, Hurricane Maria made landfall in Puerto Rico, incapacitating the central power system and leaving the entire island without power. To ensure the long-term recovery of Puerto Rico's electric power grid in the most secure and resilient way, the U.S. Department of Energy funded research to develop recommendations for a cohesive new framework of interconnection standards for utility-scale renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This paper provides a summary of work conducted by the National Renewable Energy Laboratory to analyze and address many shortcomings and areas of improvement to help the Puerto Rico Electric Power Authority (PREPA) establish minimum technical requirements for interconnecting single-technology and hybrid renewable generation because of their importance for PREPA system security and impacts on future integrated resource planning scenarios. Results and findings presented in this paper are important for any island power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Eastern Frequency Response Study

This study was specifically designed to investigate the frequency response of the Eastern Interconnection that results from large loss-of-generation events of the type targeted by the North American Electric Reliability Corp. Standard BAL-003 Frequency Response and Frequency Bias Setting (NERC 2012a), under possible future system conditions with high levels of wind generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Review on Protection Challenges on Transmission Lines Connected to Inverter Based Resources

The increased penetration of inverter-based resources (IBRs) connected to transmission grids is challenging how traditional electric power systems operate. Such systems were originally designed based on the dominant presence of synchronous generators. Some main challenges include the increased concerns about system stability due to the reduced system inertia caused by IBRs and the reduced protection reliability caused by the non-deterministic fault current response of IBRs. The protection relays’ algorithms have been designed and validated based on well-known fault current characteristics of synchronous generations, while the short-circuit responses of IBRs heavily depend on their vendor-specific control schemes, which are mainly set to protect inverter semiconductor switches and DC components. The magnitude of short current that IBRs contribute is typically between 1.1–1.5 times the rated current that may behave unstably and incoherently with the voltages. The control scheme of the IBRs also controls the active (P) and reactive (Q) support during system voltage sag and swell conditions. These characteristics challenge not only protective relay schemes but also existing short-circuit software tools to correctly model IBRs for fault studies and protection coordination analyses. Utilities, university researchers, research institutes, and relay manufacturers have performed studies to investigate different aspects of high IBR penetration. Almost all studies support 1) creating international and national standards to regulate the IBRs, 2) revising engineering tools to address shortcomings, and 3) adjusting the protective relay settings to resolve protection problems. This paper summarizes the studies and research conducted in recent years to quantify the impact of IBR penetration on transmission line protection and to identify potential solutions to improve the dependability and reliability of grid protection systems.

14 SOLAR ENERGY↗

A Review on Protection Challenges of Transmission Lines Connected to Inverter-Based Resources

Utilities, university researchers, research institutes, and relay manufacturers have performed studies to investigate different aspects of high IBR penetration. Almost all studies support 1) creating international and national standards to regulate the IBRs, 2) revising engineering tools to address shortcomings, and 3) adjusting the protective relay settings to resolve protection problems. This paper summarizes the studies and research conducted in recent years to quantify the impact of IBR penetration on transmission line protection and to identify potential solutions to improve the dependability and reliability of grid protection systems.

14 SOLAR ENERGY↗

Recommendations for Data-in-Transit Requirements for Securing DER Communications

With the adoption of Distributed Energy Resource (DER) interoperability standards, common communication protocols are now being deployed between power system operators and DER devices. In 2018, a revision to the US interconnection and interoperability standard, Institute of Electrical and Electronics Engineers (IEEE) Std. 1547, required DER equipment to have an IEEE 2030.5, IEEE 1815, or SunSpec Modbus communication exchange interface. This change supports the future transition to secure connection and exchange of information between the DER equipment and implementing parties, such as grid operators. Adoption of standardized communication protocols and associated information models is a critical step toward interoperability between power system operators and DER, such as photovoltaic (PV) and energy storage systems. However, security requirements for these standardized communication protocols are not comprehensive, resulting in non-standard and vendor-specific implementation that may leave DER equipment susceptible to cyberattacks. This paper examines the data-in-flight security requirements for standardized DER communication protocols, per IEEE 1547-2018 revision, as it relates to device authentication, key management, and encryption. The state of the art for these security features is also explored, addressing their impact on communication and performance of low-cost single board computers, which are typical of DER devices. In conclusion, a recommendation is provided to adopt a common set of communication requirements, which are intended to achieve interoperability and implement data security over DER network pathways, while ensuring reliable, secure, and real-time information delivery.

42 ENGINEERING↗

High-Level Assessment of Grid Infrastructure in Southeast Asia to Support Regional Interconnections

The purpose of this slide deck is to provide an overview of the benefits of interregional transmission and to assess the specific transmission landscape of Southeast Asia, with respect to potential interconnections between Singapore and neighboring countries. This analysis also explores the distribution of renewable resources and electricity demand in ASEAN (the Association of Southeast Asian Nations) as well as current and anticipated interregional transmission, in order to inform future interconnection plans.

ASEAN↗

Experimental Evaluation of Load Rejection Over-Voltage from Grid-Tied Solar Inverters

This paper investigates the impact of load rejection over-voltage (LRO) from commercially available grid-tied photovoltaic (PV) solar inverters. LRO can occur when a local feeder or breaker opens and the power output from a distributed energy resource exceeds the load power. Simplified models of current controlled inverters can over-predict over-voltage magnitudes, thus it is useful to quantify testing. The load rejection event was replicated using a hardware testbed at the National Renewable Energy Laboratory (NREL), and a set of commercially available PV inverters was tested to quantify the impact of LRO for a range of generation-to-load ratios. The magnitude and duration of the over-voltage events are reported in this paper along with a discussion of characteristic inverter output behavior. The results for the inverters under test showed that maximum over-voltage magnitudes were less than 200 percent of nominal voltage, and much lower in many test cases. These research results are important because utilities that interconnect inverter-based DER need to understand their characteristics under abnormal grid conditions.

14 SOLAR ENERGY↗

Cybersecurity Certification Recommendations for Interconnected Grid Edge Devices and Inverter Based Resources

Escalating deployment of PV and grid-edge devices on the distribution grid has increased the sustainability and efficiency of the electric grid. However, the increasing number of distributed energy resources (DERs) deployed creates a heightened cyber-physical interdependency on the distribution grid and thus creates more vectors for cyber-attacks to exploit through information and communication technology (ICT) systems and networks. For example, control signal packets can be modified, intercepted, or corrupted due to vulnerabilities in communication protocols used by microgrid controllers and grid edge devices for power control. Therefore, to mitigate and prevent cyber-attacks on grid edge devices and the inverter-based resources connected to the distribution grid, the U.S. Department of Solar Energy Technologies Office (SETO) awarded funding to the National Renewable Energy Laboratory and Sandia National Laboratory (SNL) to research, develop, and harmonize cybersecurity standards for Photovoltaic (PV) systems and for other kinds of DERs. To help develop a standard for DER cybersecurity, NREL established certification recommendations and test cases, in consensus with the solar industry and UL, for ensuring intrinsic design security for DERs. These recommendations were developed to bolster the cybersecure functionalities such as TLS, MAC, CRL, session resumption/renegotiation, and password, system, and service security management within the DER devices. The proposed test cases verify authentication, authorization, confidentiality, and data integrity for data and communications of DERs that use Transmission Control Protocol/Internet Protocol (TCP/IP). They were also developed to protect DER communications from eavesdropping, replay, man-in-the-middle, denial of service (DoS), spoofing through security certificates, least-privilege violation, and brute-force credentials. This report, which has been validated and reviewed by UL, expands upon those test cases to provide DER cybersecurity certification recommendations which increase DER resiliency and help to mitigate cyber-attacks. UL's collaboration with NREL and approval of this document will accelerate the adoption of a UL standard for DER cybersecurity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Relaying for Distribution and Microgrids Evolving from Radial to Bidirectional Power Flow

As distributed energy resources (DERs) achieve higher penetration levels in distribution systems, the normal flow of power (and fault current) is no longer unidirectional, from substation source to load (or fault). The increased importance of DERs has also led to revisions in the DER interconnection standards, particularly voltage regulation and ride-through, with publication of a new IEEE Standard 1547 2018. These changes have complicated normal distribution system operation, and they will also complicate distribution system protection. The U.S. Department of Energy undertook a review of the protection state of the art for this new environment in order to identify gaps and propose near-term solutions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solution techniques for transient stability-constrained optimal power flow – Part II

Transient stability-constrained optimal power flow is an important emerging problem with power systems pushed to the limits for economic benefits, dense and larger interconnected systems, and reduced inertia due to expected proliferation of renewable energy resources. In this study, two more approaches: single machine equivalent and computational intelligence are presented. Also discussed are various application areas, and future directions in this research area. In conclusion, a comprehensive resource for the available literature, publicly available test systems, and relevant numerical libraries is also provided.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Protective Relaying for Distribution and Microgrids Evolving from Radial to Bi-Directional Power Flow

As distributed energy resources (DER) achieve higher penetration levels in distribution systems, the normal flow of power (and fault current) is no longer unidirectional, from substation source to load (or fault). The increased importance of DER has also led to pending revisions in the DER interconnection standards, particularly voltage regulation and ride-through, with publication of a new IEEE Standard 1547 expected in early 2018. These changes have complicated normal distribution system operation, and they will also complicate distribution system protection. The U. S. Department of Energy undertook a review of protection state-of-the-art for this new environment in order to identify gaps and propose near-term solutions.

McDermott, Tom↗