Search NASA⌕ Search

SEARCH · Search NASA

Results for “EV charging planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Fleet Efficiency and Electrification Technical Assistance and Tools

Private enterprises, transit agencies, and governments around the world rely on NREL to evaluate their fleet electrification needs. From testing vehicle charging equipment in the lab, to working with fleets to adopt new types of vehicles, to helping agencies develop electric vehicle (EV) plans, NREL transportation analysts address a range of electrification challenges.

ADVANCED PROPULSION SYSTEMS↗

Long-Term Scenarios of Transportation Decarbonization

Achieving a net-zero emissions economy by 2050 requires aggressive curbing of transportation emissions, currently the largest source of U.S. greenhouse gas (GHG) emissions and the fastest growing source of emissions in many countries. Transportation, a heterogeneous sector with many different passenger and freight travel modes and applications, will require a portfolio of solutions to decarbonize. To inform how to achieve significant emissions reductions in U.S. passenger and freight mobility, researchers used the Transportation Energy and Mobility Pathway Options (TEMPO) model to explore many transformation pathways under expert-informed bounding ranges of assumptions on future travel behavior, technology advancements, and policies. Researchers performed more than 2,000 simulations to explore possible transformation pathways and found that a combination of technological, behavioral, and policy strategies enables a staggering 89% reduction in transportation GHG emissions by 2050. Key is the rapid adoption of zero-emission electric vehicles (EVs) for all on-road passenger and freight applications, alongside a simultaneous decarbonization of electricity (supported by managed charging and proper planning). Managing travel demand growth can ease the transition by reducing the requisite amount of clean electricity and sustainable fuels supply.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Enhancing the EVI-X National Framework to Address Emerging Questions on Charging Infrastructure Deployment

As national investments in EV charging infrastructure accelerate, this project advances the state-of-the-art in infrastructure analysis to better inform deployment strategies. It enhances NLR's EVI-X Suite, a set of tools supporting national network planning, local site design, and financial evaluation. These capabilities will position VTO to provide timely analysis to the DOT/DOE Joint Office, and to guide the strategic buildout of the national charging network. EVI-X development is closely coordinated with other VTO-funded efforts to ensure consistent, integrated use of key inputs and outputs, including EV adoption scenarios from TEMPO and infrastructure designs developed through EVs@Scale.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Systemwide Considerations for Electrification of Transportation in Islands and Remote Locations

Electric vehicles (EVs) represent an important socio-economic development opportunity for islands and remote locations because they can lead to reduced fuel imports, electricity storage, grid services, and environmental and health benefits. This paper presents an overview of opportunities, challenges, and examples of EVs in islands and remote power systems, and is meant to provide background to researchers, utilities, energy offices, and other stakeholders interested in the impacts of electrification of transportation. The impact of uncontrolled EV charging on the electric grid operation is discussed, as well as several mitigation strategies. Of particular importance in many islands and remote systems is taking advantage of local resources by combining renewable energy and EV charging. Policy and economic issues are presented, with emphasis on the need for an overarching energy policy to guide the strategies for EVs growth. The key conclusion of this paper is that an orderly transition to EVs, one that maximizes benefits while addressing the challenges, requires careful analysis and comprehensive planning.

33 ADVANCED PROPULSION SYSTEMS↗

NUCLEON Satellite Mission. Status and Plans

The main objective of the NUCLEON satellite mission is direct measurements of the elemental energy spectra of high-energy (10(exp 11) - 10(exp 15) eV) cosmic rays with Kinematic Lightweight Energy Meter (KLEM) device. The design of the instrument has been corrected to increase geometry factor and improve charge resolution. The special mechanical and electronic systems have been developed for installation of the experimental apparatus in a regular Russian satellite. It is planned to launch the NUCLEON instrument in 2006.

Bashindzhagyan, G.↗

Siting and sizing of public–private charging stations impacts on household and electric vehicle fleets

To facilitate the provision of electric vehicle charging stations (EVCS) in urban areas, this study investigates the benefits of co-locating fleet-owned chargers with public charging stations to enable construction incentives and cord-sharing cost savings. Shared EVCS can serve charging demand from both user types: private (household) EV owners and those managing fleet vehicles – like shared and fully automated EV (SAEV) fleets. Using POLARIS to simulate all person-travel across the 6-county Austin, Texas region, new EVCS were sited and sized with DC fast-charging (DCFC) plugs to lower operating and construction costs while providing public + private (PP) service across an 81-square-mile core geofence (where 200 SAEVs were active) over 24-hour days. When co-location is permitted, 115 DCFC cords were added to the 23 existing (publicly available) stations to enable SAEVs and household EVs (HHEVs) charging access, within the geofence. Each 250-mile-range SAEV was simulated to travel an average of 330 miles per day, serve over 92 person-trips, and recharge 2.7 times a day (for 2.4 h per session). The new DCFC plugs were primarily added to public EVCS at shopping centers and schools, and in residential settings along freeways. The average plug served 4.8 EVs per day. Most co-located PP EVCS permitted immediate (no-wait) charging, except for 2 stations along freeways that averaged 8 min of wait time to begin charging. In conclusion, the co-location strategy lowered fleet owners’ initial EVCS construction costs by 12 % (thanks to cord-sharing to avoid cord duplication), while reducing SAEV wait times to just 3.1 min (versus 10.7 min if SAEV managers had to build and operate their own EVCS).

EV charging modeling↗

An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advancing Federal Infrastructure Through Innovation: Selecting Electric Vehicle Charging Infrastructure Wisely

The Biden Administration's issuance of Executive Orders directly addressing and accelerating Federal fleet electrification places an onus on both fleet and facility managers. This panel will help fleet and facility personnel understand how to select EVSE infrastructure in terms of implementation, energy management, and costs of procurement, installation/deployment, and electricity. The panel will cover technology aspects to include managed EVSE, bi-directional charging, implications on local electrical systems and storage needs in certain cases to buffer power demand. Discussion will include various considerations relevant to ensuring adequate EVSE, balancing infrastructure needs, and upgrades with fleet needs. The panelists will discuss how to provide sufficient infrastructure support, including which stakeholders to involve, procurement impediments, easement locations, and requirements that arise during the design and implementation process.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Results from "Charging Needs for Electric Semi-Trailer Trucks"

This data set includes modeling results from “Charging Needs for Electric Semi-Trailer Trucks” including charging demand distributions and charging speed requirements for the multiple scenarios and semi-trailer truck operating segments described in the study. Please cite as: Borlaug, B., Moniot, M., Birky, A., Alexander, M., and Muratori, M., Charging needs for electric semi-trailer trucks, Renew. Sust. Energ. Transit. (2022), 2, https://doi.org/10.1016/j.rset.2022.100038.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spatial Impacts of Electric Vehicle Charging on Power Grid Stability: A Downtown Atlanta Case Study

The rapid increase in electric vehicle (EV) charging demand poses a potential risk to power grid stability, particularly as the spatial distribution of this demand remains underexplored. Existing research often focuses on technical optimization models while overlooking the geographic and human dynamics that affect energy consumption. This study addresses this gap by incorporating mobility data to estimate both building energy use and EV charging demand while also considering geographic factors for a better understanding of grid load. Using agent-based simulations and the Open-Source Distribution System Simulator, the study evaluates the effect of various EV penetration scenarios on grid voltage and unbalance. The results show that, although voltage remains within acceptable limits at lower EV penetration rates, significant voltage drop and unbalance occur as EV penetration exceeds 40%, particularly in residential areas with high charging demand. This study offers a framework for integrating spatial analysis and mobility data in power network simulations, providing insights for future EV infrastructure planning.

Pan, Melrose [ORNL] (ORCID:000000031627448X)↗

Transportation and electricity systems integration via electric vehicle charging-as-a-service: A review of techno-economic and societal benefits

Here, in support of global decarbonization efforts, the adoption of electric vehicles is proceeding rapidly across transportation sectors, population groups, and regions. However, access to electric vehicle charging infrastructure remains sparse and inequitable, and technical, economic, and procedural challenges have encumbered its expansion. Charging-as-a-service, which can mitigate cost and effort risks of charging equipment ownership, adds a means of meeting many of these challenges. As charging-as-a-service has not been analyzed or addressed in the scholarly literature, we synthesize media, marketing, and analogous scholarly publications to categorize and describe the functions asserted by existing charging-as-a-service vendors. We demonstrate and quantify the benefits of many of these functions via four example business cases, sited at a detached residence, a multi-unit dwelling, a consumer-facing business, and a commercial fleet depot. Outcomes show that savings and revenues realized via charging-as-a-service can reduce charging costs, beneficially shape grid loads, and make charging installation economical where it otherwise would not be. Discussion highlights the need to deploy charging-as-a-service in cooperation with initiatives promoting societal benefits, including charging access equity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Understanding Fleet Charging Needs [Slides]

Through the U.S. Department of Energy's Energy to Communities (E2C) program, National Laboratory of the Rockies, other national laboratory experts, and select organizations provide Expert Match - free, short-term technical assistance to address near-term energy challenges and questions. Expert Match is for community stakeholders who have decision-making power or influence in their community but need access to additional energy expertise to inform key upcoming decisions. This Expert Match request supported Prince William County, VA with information about fleet charging and telematics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EVs@Scale NextGen Profiles: EVSE Characterization 2024

As part of the U.S. Department of Energy's EVs@Scale consortium, the Next-Generation Profiles (NextGen Profiles) project presents analysis and results from the characterization of high-power conductive and wireless charging infrastructure. High power charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. EVSE characterization was conducted over a wide range of DC output current and DC voltage charging for nominal and off-nominal test conditions. Test plans and procedures were developed and refined to define the test configurations and requirements, measurement parameters, and test procedures used throughout NextGen Profiles testing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Managing Increased Electric Vehicle Shares on Decarbonized Bulk Power Systems

Transportation electrification and power sector decarbonization - the convergence of these two trends present a complex planning problem requiring realistic, region-specific modeling and analysis to ensure that both can happen rapidly and cost effectively. This project, funded through the U.S. Department of Energy's Vehicle Technologies Office, models the evolution of the U.S. bulk power system (through 2050) in response to large-scale EV charging across all on-road vehicle segments. We will assess the opportunity and value of demand-side flexibility (i.e., "smart" charging) for reducing energy costs, increasing renewable generation shares, and managing future EV loads on the bulk power system. Overall, this study aims to provide an improved understanding of least-cost solutions for managing EV load growth on the grid and will make high-resolution EV load data sets publicly available for further analysis.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

EVI-Rental: A Scalable Model to Quantify the Impact of Rental Car Electrification

This fact sheet describes the Electric Vehicle Infrastructure - Rental Car (EVI-Rental) tool, a flexible and comprehensive simulation tool that addresses key questions about the charging demand, infrastructure needs, and business impacts of adding growing numbers of electric vehicles (EVs) to rental fleets. To validate the EVI-Rental model, the Athena research team conducted a case study at Dallas-Fort Worth International Airport (DFW) to understand the impact of state-of-charge requirements, different charger types and charging schedules, solar power generation, and behind-the-meter storage on a fully electrified rental car fleet.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Grid Impact Analysis of Heavy-Duty Electric Vehicle Charging Stations

This paper presents a grid impact analysis of heavy-duty electric vehicle (EV) charging stations. In this work, heavy-duty EVs have battery capacities high enough to provide a range of 250-500 miles on a single charge, such as long-haul trucks. Heavy-duty EVs will require extremely fast charging rates to reduce charging time and will induce very high charging loads (at the multiple-megawatt scale) if several vehicles charge at the same time. Therefore, analysis is needed to understand the impact of charging station loads on the electric power grid and set the baseline for developing mitigation plans and necessary system upgrades. We develop a systematic procedure to analyze the potential impact of the placement of charging stations on the grid. Charging load is modeled using a DC fast-charging station model. A voltage load sensitivity matrix approach is leveraged to investigate the challenges of placing charging stations on the feeder. Given the charging load profiles and suggested charging station locations, time-series simulations are performed on various connection points on the feeder to understand the impact. The analysis is performed on both the IEEE 34-bus system and a realistic feeder from California. Initial mitigation solutions are developed based on insights from this analysis.

47 OTHER INSTRUMENTATION↗

National Zero-Emission Freight Corridor Strategy

The United States has committed to decarbonizing freight transportation by advancing the deployment of commercial zero-emission medium- and heavy-duty vehicles (ZEMHDVs) and infrastructure. It is pursuing this goal by leveraging historic federal and private investments, policies, and partnerships. Through the U.S. National Blueprint for Transportation Decarbonization1 and the Global Memorandum of Understanding for Zero-Emission Medium- and Heavy-Duty Vehicles,2 the United States has committed to identifying viable pathways and implementation actions that promote at least 30% ZE-MHDV sales by 2030, with a goal of 100% by 2040. These actions, along with the investments laid out in the Bipartisan Infrastructure Law and Inflation Reduction Act, put the nation on a path to advancing transportation and infrastructure solutions that are better for freight movement, our communities, the environment, and the economy. Providing ubiquitous and convenient access to electric vehicle (EV) charging and hydrogen refueling along our nation’s freight corridors, and at truck depots within freight hubs, is key to successfully deploying ZE-MHDVs. Consistent with its charge in the Bipartisan Infrastructure Law, 3 the Joint Office of Energy and Transportation (Joint Office), in collaboration with the U.S. Department of Energy (DOE), Department of Transportation, and the Environmental Protection Agency, has developed the National Zero-Emission Freight Corridor Strategy (Strategy). The Strategy guides infrastructure deployment to meet growing market demands; catalyze public and private investment; and support utility and regulatory planning and action at local, state, and regional levels.

33 ADVANCED PROPULSION SYSTEMS↗