Search NASA⌕ Search

SEARCH · Search NASA

Results for “Early Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Development of low mass optical readout for high data bandwidth systems.

At Argonne National Laboratory the High Energy Physics and Center for Nanoscale Materials Divisions are working on a project to develop a new generation of detector readout using high speed data transfer optical devices that can be implemented in particle physics or for long distances. Free-space communications devices offer the potential for reductions in mass, power, and cost of data paths for on-board trigger and readout of tracking detectors. The project involves three areas of study: light modulation, the design and construction of MEMS optical devices, and the control systems for maintaining precise laser light positioning. We demonstrate an optical link in air over one meter and with low error rate at 1 Gb/s. We demonstrate steering of an optical beam over a meter with a precision of 5 micrometers utilizing a MEMS mirror and reflected light in the feedback loop. For early testing, light modulation tests with a fiber link using Li-Niobate modulators and a data generation and error checking chip are done at 1 Gb/s. Many companies and universities are developing modulators which will be incorporated into CMOS chips. We are doing radiation hardness studies for one of the materials involved. Laser light will need to be steered on to and kept centered on the detector in the presence of thermal or mechanical motion, etc. This steering will be controlled by MEMS mirrors. Polycrystalline and crystalline silicon based mirror designs are being studied. We review the current status of the project and outline plans for the future development of the system.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Sci—Fri PM: Dosimetry — 03: Delta4 diode absolute dose response for large and small target volume IMRT QA

The goal of this project was to quantify the over-response/under-response of the Delta4 diodes for Helical Tomotherapy plans on extreme target volume sizes. A custom Delta4 phantom quarter with a hole to insert an ionisation chamber (IC) close to the center of the phantom have been used to acquire simultaneous IC and diodes absolute dose measurements. Eight plans for different target volumes were created from 20cm to 1cm diameter. Diodes dose measurements in the target were compared with IC measurement, to quantify absolute dose accuracy. IC measurements show a good agreement with planned dose (±2%). Diode measurements demonstrate a good agreement with IC for regular target size of 5 and 10cm (0 to 1%). For larger targets, an over-response is observed for FW 25mm and 10mm (2 to 3%). for small target of 1cm diameter, a major under-response is observed for FW 25mm and 10mm (−8 and −36%). The over-response could to be due to the extra amount of scattered radiation and the opposite for under-response. Although this scatter hypothesis still has to be proven, early testing demonstrates an over-response of 40%/20% of the central diodes compare to IC when an open helical rotational beam is delivered 75mm/25mm away from the center of the phantom. These results are in agreement with the real patient Delta4 DQA results at our center.

60 APPLIED LIFE SCIENCES↗

EGS Collab Testbed 2: Laser Scanned 4100 L Drift Map

The EGS Collab project is evaluating a site for Experiment 2 (hydraulic fracturing/shearing) at a depth of 1.25 km in the Sanford Underground Research Facility (SURF) on the 4100 Level. Two early test holes were drilled in an alcove (formerly known as Battery Charging Station) near Yates Shaft. Recently, we conducted a laser survey around the Testbed 2 to capture the details of the drift. This submission package includes the laser scanned drift map around the Testbed 2. The drift map data are presented in AutoCAD (*dxf), Leapfrog mesh (*.msh), and point cloud (*.csv) file formats. Note: The coordinate system used is local Homestake Mine Coordinate (HMC) system from an old gold mine that was in operation for over 100 years.

15 GEOTHERMAL ENERGY↗

SECARB 3D VSP Data

Vertical Seismic Profile data collected in 2009 and 2010 as part of SECARB Phase III Early Test at Cranfield oilfield in Mississippi to determine CO2 induced change from seismic response. Data divided into 3D VSP and Offset VSP folders. Associated Publications: Daley, T. M., Hendrickson, J., & Queen, J. H. (2014). Monitoring CO2 Storage at Cranfield, Mississippi with Time-Lapse Offset VSP – Using Integration and Modeling to Reduce Uncertainty. Energy Procedia, 63, 4240-4248. doi:10.1016/j.egypro.2014.11.459

3D VSP↗

Advanced Instrumentation, Information and Control (II&C) Research and Development Facility Buildout and Project Execution of LWRS II&C Pilot Projects 1 and 3

The U.S. Department of Energy (DOE) is sponsoring research, development, and deployment on light water reactor sustainability (LWRS), in which the Idaho National Laboratory (INL) is working closely with nuclear utilities to develop technologies and solutions to help ensure the safe operational life extension of current reactors. As technologies are introduced that change the operation of the plant, the LWRS pilot projects can help identify their best-advanced uses and help demonstrate the safety of these technologies. In early testing of operator performance given these emerging technologies will ensure the safety and usability of systems prior to large-scale deployment and costly verification and validation at the plant. The aim of these collaborations, demonstrations, and approaches are intended to lessen the inertia that sustains the current status quo of today's II&C systems technology, and to motivate transformational change and a shift in strategy to a long-term approach to II&C modernization that is more sustainable. Research being conducted under Pilot Project 1 regards understanding the conditions and behaviors that can be modified, either through process improvements and/or technology deployment, to improve the overall safety and efficiency of outage control at nuclear facilities. The key component of the research in this pilot project is accessing the delivery of information that will allow researchers to simulate the control room, outage control center (OCC) information, and plant status data. The simulation also allows researchers to identify areas of opportunity where plant operating status and outage activities can be analyzed to increase overall plant efficiency. For Pilot Project 3 the desire is to demonstrate the ability of technology deployment and the subsequent impact on maximizing the 'Collective Situational Awareness' of the various stakeholders in a commercial nuclear power plant. Specifically, the desire is to show positive results in plant status control, information management, knowledge management, and 'Real-Time-Truth' as it relates to the current plant conditions. The following report includes two attachments; each attachment represents Pilot Project 1 and 3. The two attachments also provide a report on two distinct milestones that were completed and are described below: M3L11IN06030307 - Complete initiation of two pilot projects. Complete initiation of pilot projects on real-time configuration management and control to overcome limitations with existing permanent instrumentation and real-time awareness of plant configurations; two candidate projects that consider low-cost wireless technology for in situ configuration monitoring and candidate technologies and an information architecture for outage management and control will be initiated with utilities. M3L11IN06030309 - Complete data collection, R&D plans, and agreements needed to conduct the two pilot projects. Complete data collection conducted at pilot project utilities to support real-time configuration management and outage control center pilot studies conducted; R&D plan for pilot projects produced and needed agreements established to support R&D activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Screening Of Residues From Acidification And Copper-Catalyzed Peroxide Oxidation Of Tank 48H Simulant

This study evaluated the residues generated from copper-catalyzed peroxide oxidation (CCPO) of Tank 48H simulant. The first step of the CCPO calls for pH adjustment of the simulant, and early testing used either 15wt% or 50wt % nitric acid to reach a slurry pH of between 12 and 5. Residues obtained by ambient temperature pH adjustment with 50wt % nitric acid followed by oxidation with 50 wt % hydrogen peroxide at 35, 50, and 65°C (from a recently conducted Copper Catalyzed Peroxide Oxidation or CCPO) were also analyzed. Slurry samples at pH 7 or lower especially made from adding nitric acid at the process equivalent of one gallon per minute had the largest enthalpy of decomposition. The thermogravimetric characteristics of some samples from the CCPO test generated at pH 9 or lower exhibited rapid weight loss. Taken together, residues generated at pH 9 or lower may be classified as energetic upon decomposition in confined spaces or under adiabatic conditions. Therefore, additional testing is recommended with larger (up to 50mL) samples in an adiabatic calorimeter. To minimize risk of formation of energetic byproducts, an intermediate slurry pH of 9 or greater is recommended following the acidification step in the CCPO and prior to start of peroxide addition. In practice, process temperature needs to reach 150°C or greater to decompose residues obtained a pH 9 or lower which is unlikely. Oxidation temperature had no significant effect on the thermal characteristics of the final residues generated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ER@CEBAF: A test of 5-pass energy recovery at CEBAF

Jefferson Lab personnel have broad expertise in the design, commissioning, and operation of multiple energy recovery linacs (ERLs): the CEBAF Front-End Test (early 1990s), CEBAF-ER (2003), the IR Free Electron Laser (FEL) Demo, the IR FEL Upgrade, and the UV FEL Driver (1997-2014). Continued development of this core competency has led to this collaborative proposal to explore the forefronts of ERL technology at high energy in a unique expansion of CEBAF capability to a 5-pass ERL with negligible switchover time and programmatic impact to the CEBAF physics program. Such a capability would enable world-class studies of open issues in high-energy ERL beam dynamics that are relevant to future facilities such as electron-ion colliders (EICs). This proposal requests support from the CEBAF Program Advisory Committee to seek funding for hardware installation, and a prospective 12 days of beam time circa Fall 2018 for commissioning this high-energy multi-pass ERL experiment in CEBAF.

43 PARTICLE ACCELERATORS↗

Southeast Regional Carbon Sequestration Partnership (SECARB): Analyze Data Collected, Revise Surface Monitoring Plan to Maximize Benefit and Continue Data Collection

Objectives of the shallow groundwater study at the Cranfield site since 2008, as a part of the SECARB Phase III early test, were to 1) assess potential impacts of CO 2 leakage on groundwater quality; and 2) test and develop monitoring technologies for CO 2 leakage detection. The study did not intend to seek CO2 leakage signals via monitoring groundwater chemistry in the Cranfield shallow aquifer. Instead, quarterly or semi-annually groundwater sampling from the shallow aquifer was used to characterize spatial and temporal variations in geochemical parameters because CO 2 injection into the deep reservoir started in 2008.

01 COAL, LIGNITE, AND PEAT↗

SECARB Pre-Injection Results

Project assessment on the Early Test is led by BEG. The Project Assessment Review was conducted by the Project Team members for the near-surface September 16 and a permitting or, what would for the deep subsurface September 23, 2008 at the Bureau of Economic Geology, with a focus on examining the status and results of information that is needed to proceed with designing engineering and deploying characterization and monitoring tools. The schedule and attendance lists are presented below. Specific detailed content presented at the review is now undergoing revision to update and finalize the following milestones: Phase III milestone 9.1.1. g “Subsurface Monitoring Plan and subparts a, b, c, d, e, f, and h, Assessment of Feasibility, Cost & Likely Success of Cross-Well EM, cross well acoustic, CASSM, VSP, borehole logging, repeat seismic, geochemical monitoring, and related methods and backup and archival methods; Phase III 4.1.1a Upgrade Geologic Model for Phase III Project Team; Phase III 4.1.3a Simulation Reports for Predicting Reservoir Performance. For ease in end-of-year review the content of these milestones is not repeated in this report.

01 COAL, LIGNITE, AND PEAT↗

SECARB Review of Interim Results

Assessment of data collected by the Early Test is led by BEG with collaboration from LBNL and LLNL. This process is iterative, with the following steps: 1. Data collection (reported in task 9.1.4.a); 2. Data archive (S. Clift, BEG); 3. Data quality control, correction and annotation; 4. Data processing (typically many steps); 5. Preliminary interpretation; 6. Input of preliminary data into models; 7. Joint inversion of multi-physics data sets. It is important to subject results to as they proceed through these steps. Interim reviews have been conducted by sponsors and partners (Table 1). These reports provided timely status update in the results of various analysis Each set of results will have its own report and publication(s) presenting the key details when analysis is sufficiently mature.

01 COAL, LIGNITE, AND PEAT↗

SECARB Regional Project Assessment

The SECARB Cranfield Early Test Project was designed to safely demonstrate large-scale, long-term CO 2 injection and storage in a CO 2 -enhanced oil recovery (EOR) operation and associated saline reservoir. Storage during EOR operations has the potential to offset commercial costs, holding a significant promise for future large-scale deployment in the southeastern United States. Denbury Onshore LLC began CO 2 -EOR operations in July 2008 at the Cranfield oilfield located east of Natchez, Mississippi (Figure 1). The location offered an ideal setting to investigate storage monitoring at a commercial CO 2 -EOR operation. The field team, led by the Gulf Coast Carbon Center of the Bureau of Economic Geology at the University of Texas at Austin, deployed the largest suite of monitoring, verification, accounting (MVA) technologies to collect data to assess long-term CO 2 utilization and storage. The CO 2 injection interval is within the 3,000-meter-deep fluvial lower Tuscaloosa Formation, a large and regionally extensive saline reservoir, at a broad four-way structural closure that defines the Cranfield oilfield. Tests were conducted in the oil-producing area as well as in the non-oil-producing brine aquifer. The CO 2 used during EOR operation was transported via pipeline from the Jackson Dome, a natural source of CO 2 . The study focused on four integrated research areas: (1) the High-Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” CO 2 injection occurred at the HiVIT and the DAS (Figure 2 and Figure 3). The DAS was located down-dip of the oil-water interface of the Cranfield oilfield. The well layout included one injection well and two down-dip observation wells. The team was the first of the regional partnerships to monitor more than 1 million metric tons of CO 2 . At the end of the project, the team monitored more than 11 million metric tons of CO 2 injected and 5 million metric tons of CO 2 stored. The Cranfield Project was the fifth project worldwide, and the first such project in the United States, to reach this CO 2 injection volume while being monitored to demonstrate storage effectiveness.

01 COAL, LIGNITE, AND PEAT↗

Image-optimized Coronal Magnetic Field Models

We have reported previously on a new method we are developing for using image-based information to improve global coronal magnetic field models. In that work, we presented early tests of the method, which proved its capability to improve global models based on flawed synoptic magnetograms, given excellent constraints on the field in the model volume. In this follow-up paper, we present the results of similar tests given field constraints of a nature that could realistically be obtained from quality white-light coronagraph images of the lower corona. We pay particular attention to difficulties associated with the line-of-sight projection of features outside of the assumed coronagraph image plane and the effect on the outcome of the optimization of errors in the localization of constraints. We find that substantial improvement in the model field can be achieved with these types of constraints, even when magnetic features in the images are located outside of the image plane.

79 ASTRONOMY AND ASTROPHYSICS↗