Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fermilab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Fast Adaptive Neural Control of Resonant Extraction at Fermilab

We present progress on the development of a machine learning (ML) regulation system for third-order resonant extraction of the beam delivered to the Mu2e experiment at Fermilab. We consider classical and ML-based controllers optimized on semi-analytic simulations and provide performance comparisons for several models. Additionally, we discuss the efficiency of each model in training, which has implications for future work on adaptive control. We also discuss progress on developing optimized implementations of ML models for edge-based inference.

Whitbeck, A. [Fermilab] (ORCID:0000000342245164)↗

FPGA-Based Spill Regulation System for the Muon Delivery Ring at Fermilab

The Muon to Electron Experiment (Mu2e) requires a uniform beam profile from the Muon Delivery Ring to meet their experimental needs. A specialized Spill Regulation System (SRS) has been developed to help achieve consistent spill uniformity. The system is based on a custom-designed carrier board featuring an Arria 10 SoC, capable of executing real-time feedback control. The FPGA processes beam pulses of approximately 200 ns every 1.695 $μ$s, allowing for continuous monitoring of the extracted spill intensity through fast bunch integration. The system directly controls three quadrupole magnets, which work in conjunction with sextupole magnets to achieve third-order resonant extraction. Furthermore, the board interfaces with Fermilab's Accelerator Control Network (ACNET), enabling operators to modify spill regulation settings in real-time via the control network while providing diagnostic waveforms. These waveforms help operators monitor the process and fine-tune the feedback mechanisms. This paper presents an overview of the board's architecture and its initial progress toward regulating beam extraction. This initial version of the regulation system aims to evaluate baseline performance to inform future system improvements.

Berlioz, J. R. [Fermilab]↗

Design of a Non-Invasive Laser-based Beam Profile Monitor System for the New Fermilab PIP-II Superconducting H- Linac

As part of the new Proton Improvement Plan (PIP-II), Fermilab is undertaking the development of a new 800 MeV, 2 mA H- superconducting RF linac to replace its present normal conducting 400 MeV linac. The PIP-II linac consists of a series of superconducting RF cryomodules from 2.1 MeV to 800 MeV. To limit the potential damage to the superconducting RF cavities, PIP-II will utilize non-invasive laser-based monitors (laserwires) to obtain beam profiles via photoionization. This paper will present the design of this PIP-II laserwire system including the picosecond pulsed laser, optical transport line, 13 individual laserwire stations, laser feedback and timing controls.

Scarpine, V. [Fermilab]↗

Fast Adaptive Neural Control of Resonant Extraction at Fermilab

We present the development of a machine learning (ML) based regulation system for third-order resonant beam extraction in the Mu2e experiment at Fermilab. Classical and ML-based controllers have been optimized using semi-analytic simulations and evaluated in terms of regulation performance and training efficiency. We compare several controller architectures and discuss the integration of neural control into an adaptive framework. We also present progress on surrogate models that predict the controller response given a spill intensity and controller action history. To enable real-time deployment, we report progress on implementing low-latency, edge-based inference suitable for hardware-constrained environments. Our results demonstrate the feasibility and advantages of ML-based control in managing complex, time-varying physical systems, with broader implications for accelerator operations and other domains requiring fast, adaptive regulation.

Berlioz, Jose Rene [Fermilab]↗

Status of the Slow Extraction Commissioning for the Mu2e Experiment at Fermilab

We present the current status of slow-extraction commissioning for the Mu2e experiment at Fermilab. The system employs third-integer resonant extraction of 8 GeV protons from the Delivery Ring to deliver a uniform, slow-spilled beam to the production target. During recent commissioning periods, we achieved stable optics, reproducible injection and energy matching, and consistent multi-spill operation. The sextupole circuits and fast-ramping quadrupoles were exercised near nominal resonance conditions, yielding promising extraction performance. A prototype spill-regulation system based on the ARIA-10 SoC was commissioned with integrated diagnostics, demonstrating closed-loop operation and establishing the framework for PID- and RFKO-based control. These commissioning results lay the foundation for achieving precision-regulated, high-quality slow extraction in upcoming Mu2e operations.

Narayanan, A. [Fermilab]↗

FPGA-Based Spill Regulation System for the Muon Delivery Ring at Fermilab

The Muon to Electron Experiment (\acrshort{Mu2e}) requires a uniform beam profile from the Muon Delivery Ring to meet their experimental needs. A specialized Spill Regulation System (\acrshort{SRS}) has been developed to help achieve consistent spill uniformity. The system is based on a custom-designed carrier board featuring an Arria 10 SoC, capable of executing real-time feedback control. The FPGA processes beam pulses of approximately 200 ns every 1.695 microseconds, allowing for continuous monitoring of the extracted spill intensity through fast bunch integration. The system directly controls three quadrupole magnets, which work in conjunction with sextupole magnets to achieve third-order resonant extraction. Furthermore, the board interfaces with Fermilab s Accelerator Control Network (ACNET), enabling operators to modify spill regulation settings in real-time via the control network while providing diagnostic waveforms. These waveforms help operators monitor the process and fine-tune the feedback mechanisms. This paper presents an overview of the board's architecture and its initial progress toward regulating beam extraction. This initial version of the regulation system aims to evaluate baseline performance to inform future system improvements.

Berlioz, Jose Rene [Fermilab]↗

Fast Adaptive Neural Control of Resonant Extraction at Fermilab

We present progress on the development of a machine learning (ML) regulation system for third-order resonant extraction of the beam delivered to the Mu2e experiment at Fermilab. We consider classical and ML-based controllers optimized on semi-analytic simulations and provide perfor- mance comparisons for several models. Additionally, we discuss the efficiency of each model in training, which has implications for future work on adaptive control. We also discuss progress on developing optimized implementations of ML models for edge-based inference.

Whitbeck, A. [Fermilab]↗

Design of a non-invasive laser-based beam profile monitor system for the new Fermilab PIP-II superconducting H- linac

As part of the new Proton Improvement Plan (PIP-II), Fermilab is undertaking the development of a new 800 MeV, 2 mA H- superconducting RF linac to replace its present normal conducting 400 MeV linac. The PIP-II linac consists of a series of superconducting RF cryomodules from 2.1 MeV to 800 MeV. To limit the potential damage to the superconducting RF cavities, PIP-II will utilize non-invasive laser-based monitors (laserwires) to obtain beam profiles via photoionization. This paper will present the design of this PIP-II laserwire system including the picosecond pulsed laser, optical transport line, 13 individual laserwire stations, laser feedback and timing controls. The paper also describes the signal detection system and operation of the profile measurements.

Scarpine, Victor [Fermilab]↗

Fermilab PIP-II CDS & CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗

Surrogate Modelling of 3rd Integer Resonant Extraction at Fermilab Delivery Ring

We present an ongoing work in which a surrogate model is being developed to reproduce the response dynamics of the third-integer resonant extraction process in the Delivery Ring (DR) at Fermilab. This effort is in pursuit of smoothly extracting circulating beam to the Mu2e Experiment s production target, wherein the goal is to extract a uniform slice of the circulating $1e12$ protons in the DR over 25,000 turns (43~ms). The DR contains 3 harmonic sextupoles which excite a third-integer resonance as well as three fast, tune-ramping quadrupole magnets which drive the horizontal tune towards the $29/3$ resonance. In our initial work the surrogate model trains on a semi-analytical simulation provided in the same format as live data. Using Reinforcement Learning (and other potential ML methods), the trained surrogate acts as the environment in which a simple ML control agent could learn to dynamically adjust the quadrupole ramp at 430 break points within the 43 microsecond spill window. The control agent will be hosted on a dedicated Arria 10 FPGA, introducing its own requirements on control agent architecture. In this work we report the accuracy and fidelity of surrogate models in comparison to the response dynamics of the physics simulator.

Narayanan, Aakaash [Fermilab] (ORCID:0000000157944↗

Optimization and Performance Characterization of the Second Generation Fermilab Constant Fraction Discriminator Readout ASIC

We present the optimization and performance characterization of the second-generation Fermilab Constant Fraction Discriminator ASIC (FCFD), designed for the readout of AC-coupled low-gain avalanche detector (LGAD) strip-sensors. The FCFD is explicitly engineered to be insensitive to signal-amplitude variations, thereby removing the need for time-walk correction that is required in other LGAD time-stamping readout ASICs. This updated version, referred to as FCFD1.1, incorporates several enhancements over the first iteration to address key challenges in AC-coupled LGAD front-end design. We outline the primary readout-ASIC design considerations for these applications, describe the methodology used to evaluate critical sensor and system parameters, and summarize the additionally implemented features. Performance measurements using injected charge signals and minimum-ionizing particles in test-beams demonstrate a time resolution of approximately 40 ps and a position resolution of roughly \SI{15}{\micro\meter} when tested with beam particles uniformly over the active area of the sensor.

Apresyan, Artur [Fermilab] (ORCID:0000000261860130↗

Fermilab PIP-II CDS and CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗

The Fermilab CMTF cryogenic distribution remote control system

The Cryomodule Test Facility (CMTF) is able to provide the necessary test bed for measuring the performance of Superconducting Radio Frequency (SRF) cavities in a cryomodule (CM). The CMTF have seven 300 KW screw compressors, two liquid helium refrigerators, and two Cryomodule Test Stands (CMTS). CMTS1 is designed for 1.3 GHz cryomodule operating in a pulsed mode (PM) and CMTS2 is for cryomodule operating in Half-Wave (HW) and Continuous Wave (CW) mode. Based on the design requirement, each subsystem has to be far away from each other and be placed in distant locations. Therefore choosing Siemens Process Control System 7-400, DL205 PLC, Synoptic and Fermilab ACNET are the ideal choices for CMTF cryogenic distribution real-time remote control system. This paper presents a method which has been successfully used by many Fermilab distribution cryogenic real-time remote control systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Fermilab proton accelerator complex status and improvement plans

Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a n umber of fixed target experiments. Routine operation with a world-record 700kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as the result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power to 900 – 1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40-years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to >2.4MW after replacement of the existing 8 GeV Booster synchrotron. In this article we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades.

43 PARTICLE ACCELERATORS↗

Optical stochastic cooling at Fermilab’s IOTA ring

Stochastic cooling (SC) constitutes one of the greatest conceptual and technological achievements in particle beam cooling. Numerous SC systems have been built in the microwave regime and used to extend the science reach of accelerator facilities worldwide. The ability to sense and correct the particle ensemble using high-bandwidth feedback systems is at the core of the concept. Here, we describe the first realization of SC at optical frequencies and bandwidths. The demonstration was recently carried out at Fermilab’s integrable optics test accelerator (IOTA) storage ring using the transit-time method of optical stochastic cooling (OSC) and achieved an integrated system bandwidth of approximately 20 THz, which is more than 2000 times that of conventional SC systems. This demonstration establishes the foundation for more advanced OSC experiments with high-gain amplification, currently underway at Fermilab, and the eventual application of OSC to colliders and other accelerator facilities.

Jarvis, Jonathan D. [Fermilab]↗

An Agile/XP software development process for modernizing the accelerator control system at Fermilab

Fermilab is undergoing the most ambitious upgrade to its accelerator control system of the 21st century. As part of the ACORN project, hundreds of legacy control system applications written in C/C++ will be re-imagined and developed from the ground up. In addition, applications to support Fermilab’s new super-conducting linear accelerator are already under construction. To manage the development of modern controls applications, the Controls department has adopted an Agile software development process based on eXtreme Programming. In this paper we will describe our process and detail our experience applying it to the development of two case studies.

Diamond, John [Fermilab]↗

A simulation of the Fermilab Main Injector dual power amplifier cavities

The Fermilab Main Injector accelerating cavities have sparking issues when they are run at voltages higher than those required by the PIP-II project. This is a problem Fermilab is working on as planning begins for the next upgrade to the accelerator complex. One of the methods being used to address the issue is the development of a CST Microwave Studio simulation to accurately model the PIP-II dual power amplifier cavities and identify which part(s) of the cavity is causing sparking to develop. The model will also be used to determine if changes to the cavity geometry may allow the cavity to be used at higher voltages before sparking occurs.

Stevenson, Susanna [Fermilab] (ORCID:0009000891261↗

Slip-stacking Dynamics for High-Power Proton Beams at Fermilab

Slip-stacking is a particle accelerator configuration used to store two particle beams with different momenta in the same ring. The two beams are longitudinally focused by two radiofrequency (RF) cavities with a small frequency difference between them. Each beam is synchronized to one RF cavity and perturbed by the other RF cavity. Fermilab uses slip-stacking in the Recycler so as to double the power of the 120 GeV proton beam in the Main Injector. This dissertation investigates the dynamics of slip-stacking beams analytically, numerically and experimentally. In the analytic analysis, I find the general trajectory of stable slip-stacking particles and identify the slip-stacking parametric resonances. In the numerical analysis, I characterize the stable phase-space area and model the particle losses. In particular, I evaluate the impact of upgrading the Fermilab Booster cycle-rate from 15 Hz to 20 Hz as part of the Proton Improvement Plan II (PIP-II). The experimental analysis is used to verify my approach to simulating slip-stacking loss. I design a study for measuring losses from the longitudinal single-particle dynamics of slip-stacking as a function of RF cavity voltage and RF frequency separation. I further propose the installation of a harmonic RF cavity and study the dynamics of this novel slip-stacking configuration. I show the harmonic RF cavity cancels out parametric resonances in slip-stacking, reduces emittance growth during slip-stacking, and dramatically enhances the stable phase-space area. The harmonic cavity is expected to reduce slip-stacking losses to far exceed PIP-II requirements. These results raise the possibility of extending slip-stacking beyond the PIP-II era.

43 PARTICLE ACCELERATORS↗