Search NASA⌕ Search

SEARCH · Search NASA

Results for “Gas network operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Study of Different Formulations for the Multiperiod Blending Problem Applied to Lithium Recovery from Produced Water

We present several formulations to solve the MPBP for the recovery of REE/CMs from produced water and propose a decomposition approach thatleverages strategies in general disjunctive programming to enhance its performance. We compare these proposed formulations/strategies via two illustrative case studies on recovering lithium from a network of produced water sources.

Ovalle, Daniel↗

High-temperature high-pressure microfluidic system for rapid screening of supercritical CO 2 foaming agents

CO 2 foam helps to increase the viscosity of CO 2 flood fluid and thus improve the process efficiency of the anthropogenic greenhouse gas’s subsurface utilization and sequestration. Successful CO 2 foam formation mandates the development of high-performance chemicals at close to reservoir conditions, which in turn requires extensive laboratory tests and evaluations. This work demonstrates the utilization of a microfluidic reservoir analogue for rapid evaluation and screening of commercial surfactants (i.e., Cocamidopropyl Hydroxysultaine, Lauramidopropyl Betaine, Tallow Amine Ethoxylate, N,N,N' Trimethyl-N'-Tallow-1,3-diaminopropane, and Sodium Alpha Olefin Sulfonate) based on their performance to produce supercritical CO 2 foam at high salinity, temperature, and pressure conditions. The microfluidic analogue was designed to represent the pore sizes of the geologic reservoir rock and to operate at 100 °C and 13.8 MPa. Values of the pressure drop across the microfluidic analogue during flow of the CO 2 foam through its pore network was used to evaluate the strength of the generated foam and utilized only milliliters of liquid. The transparent microfluidic pore network allows in-situ quantitative visualization of CO 2 foam to calculate its half-life under static conditions while observing if there is any damage to the pore network due to precipitation and blockage. The microfluidic mobility reduction results agree with those of foam loop rheometer measurements, however, the microfluidic approach provided more accurate foam stability data to differentiate the foaming agent as compared with conventional balk testing. The results obtained here supports the utility of microfluidic systems for rapid screening of chemicals for carbon sequestration or enhanced oil recovery operations.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Comparison of source-location algorithms for atmospheric samplers

Numerous algorithms have been developed to determine the source characteristics for an atmospheric release, e.g., (Bieringer et al., 2017). This study compares three models that have been applied to the data collected by the International Monitoring System operated by the Comprehensive Nuclear-Test-Ban Treaty Preparatory Commission to estimate source event parameters. Each model uses a different approach to estimate the parameters. A deterministic model uses a possible source region (PSR) approach (Ringbom et al., 2014) that is based on the correlation between predicted and measured sample values. An unnamed model developed at Pacific Northwest National Laboratory (herein called BAYEST) uses a Bayesian formulation (Eslinger et al., 2019; Eslinger et al., 2020; Eslinger and Schrom, 2016). The FREAR model uses a different Bayesian formulation (De Meutter and Hoffman, 2020; De Meutter et al., 2021; Pieter De Meutter, 2021). The performance of the three source-location models is evaluated with 100 synthetic release cases for the single xenon isotope, 133 Xe. The release cases resulted in detections in a fictitious network with 120 noble gas samplers. All three source-location models use the same sampling data. The two Bayesian models yield more accurate location estimates than the deterministic PSR model, with FREAR having slightly better location performance than BAYEST. Samplers with collection periods of 3, 6, 8, 12, and 24-h were used. Results from BAYEST show that location accuracy improves with each reduction in sample collection length. The BAYEST model is slightly better for estimating the start time of the release. The PSR model has about the same spread in start times as the FREAR model, but the PSR results have a better average start time. The Bayesian source-location algorithms give more accurate results than the PSR approach, and provide release magnitude estimates, while the base PSR model does not estimate the release magnitude. This investigation demonstrates that a reasonably dense sampling grid will sometimes yield poor location and time estimates regardless of the model. The poor estimates generally coincide with cases where there is a much larger distance between the release point and the first detecting sampler than the average sampler spacing.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

PLC Vulnerabilities and Mitigations

Programmable Logic Controllers (PLCs) are used extensively in many high-importance industrial and nonindustrial settings including controlling elevators, manufacturing machines, and utility facilities such as power and natural gas, however cybersecurity protection for them has been neglected. Within recent years, PLCs have been put under more security scrutiny and experts have advocated for changes from the addition of protocol encryption and network segmentation to intrusion detection systems on the PLCs themselves. While PLC security is critical, a large portion of the PLCs available today will never receive these changes due to being legacy or the difficulty of overhauling the security on existing systems. Due to the infeasibility of applying many recommended security measures towards currently available machines, we aim to provide realistic and affordable best practices for hardening PLCs. We will first conduct security analysis and consider attack vectors within our target PLC. Once we’ve analyzed the device’s security, we will evaluate a variety of mitigation methods and create guidelines to effectively reduce the threat posed by PLC attacks with minimal disruption to operations.

42 ENGINEERING↗

FORCE Development Status Update: Vertical Integration and Benchmarking of System Dynamics

Recent efforts to establish effective models for grid energy analysis, especially given the increase in variable renewable energy (VRE) sources and the economic challenges faced by traditional nuclear energy, have generated new technological considerations. One effort to improve the economic viability of nuclear power involves investigating integrated energy systems (IES) which include secondary energy systems that introduce flexibility and secondary market possibilities to existing and perceived future nuclear energy generation technologies. To analyze the technical and economic potential of IES, the Framework for Optimization of Resources and Economics (FORCE) tool suite was developed through a collaboration among national laboratories. Within the FORCE tool suite, the Holistic Energy Resource Optimization Network (HERON) provides algorithms for analyzing the long-term viability of potential IES technologies, while HYBRID provides algorithms and models to achieve high-resolution analysis of coupling physics over a short time period. Continued maturing of the FORCE tool suite requires further interconnections between the various tools in the suite in order to ensure consistent analysis. Analyses performed by applying HYBRID to transient process modeling should be easily harvestable as inputs to HERON analyses. The first item in this status update is a demonstration of an automated data pipeline for loading data from HYBRID into HERON analyses. Application of HYBRID results to HERON, as part of using the FORCE tool suite, relies on robust modeling assumptions for the various models included in HYBRID. The second result of this status update is the benchmarking and validation of cost and operational data, with a particular focus on natural gas energy generators. These generators are benchmarked with a focus on contrasting them with proposed thermal energy storage (TES) technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Connecting Electric Vehicle Charging Infrastructure to Commercial Buildings

Electric vehicles (EVs) are growing in popularity and gaining meaningful market share with record sales year over year in the last decade. EV charging equipment, also known as EV chargers (EVC) or EV supply equipment (EVSE), must proportionally match the growing number of new EVs on the road for a comparable experience to gas-powered vehicles. The majority of EV charging currently happens at residential buildings. However, demand for EV charging at commercial buildings will significantly increase with wider mainstream EV adoption and as businesses return to more normal operation following COVID-19 pandemic disruptions. Charging equipment can include various sub-systems like power conditioning module, control software, safety devices, metering, communication, cooling, connectors, and its wiring. EV charging at commercial buildings could be used for public, workplace, and commercial fleet charging. This document aims to describe how EVC can be connected to commercial buildings, including considerations for facility managers, and the effects that charging will have on the buildings electrical distribution system. More specifically, this resource provides an overview of: understanding EV charging basics: how charging equipment connects to the building and to EVs; required infrastructure updates needed at the building site to connect EVC to existing distribution systems; network strategies for cost-effective operation; metering and utility considerations for billing and incentives; charging equipment ownership options; future trends in EVC connection to buildings.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Subsurface Characterization of Hydraulic Fracture Test Site-2 (HFTS-2), Delaware Basin

Hydraulic Fracturing Test Site-2 (HFTS-2) is a field-based research experiment performed in the Wolfcamp Formation of the Permian (Delaware) Basin. This paper focuses on integration, advanced geological characterization, and 3D subsurface modeling of the comprehensive HFTS-2 dataset. The study showcases a multidisciplinary reservoir characterization approach that incorporates geology, petrophysics, geochemistry, geomechanics, microseismic, and subsurface engineering analysis. Subsurface characterization of organic-rich mudstone formations requires understanding complex hydraulic fracture network growth in relation to inherent lithology, geomechanical properties, and interaction with pre-existing natural fractures. This paper presents a characterization workflow incorporating pre- and post-stimulation subsurface data, unique to the HFTS-2 dataset. The study integrated: (1) rock properties from logs, cores, and thin sections; (2) natural and hydraulic fracture descriptions from cores and image logs; (3) local and regional stresses; (4) geomechanics; (5) microseismic; (6) fiber optic (FO) and bottomhole pressure gauge (BHPG) response; and (7) produced fluids analysis. During a stimulation treatment, creation of the stimulated rock volume (SRV) is influenced by several subsurface factors. Key contributing factors include structural context, stress conditions, lithology, facies architecture, pre-existing natural fractures, and geomechanical properties. The HFTS-2 subsurface data integration indicates that the SRV is comprised of a complex juxtaposition of hydraulic fracture swarms, as evidenced by image logs analysis, core description, and microseismic monitoring. The HFTS-2 microseismic event density was used to generate 3D heat maps that serve as a representative SRV footprint, corroborated by secondary datasets. These maps were further integrated with petrophysical and geomechanical characteristics, as well as responses from FO and BHPG, to estimate the lateral and vertical dimensions of the effective fractures. The geological characterization for the HFTS-2 dataset combined with 3D modeling for petrophysical and geomechanical properties provides a strong foundation for subsurface simulation and optimization studies. Downloaded from http://onepetro.org/URTECONF/proceedings-pdf/21URTC/1-21URTC/D011S005R001/2477501/urtec-2021-5243-ms.pdf/1 by Carol Worster on 28 February 2022 URTeC 5243 The workflow improved our understanding of HFTS-2 hydraulic fracture propagation and characteristics in relation to offset pressure depletion and interaction with pre-existing natural fractures. Analysis showed that fracture geometry varies by stage and by well, and a complex fracture network is generated with varying fracture density. The multidisciplinary workflow presented herein for integration and characterization serves as a foundation to evaluate completion efficiency and estimate areal and vertical stimulation and depletion extent for the project. Furthermore, the workflow and learnings can also be transferred to other unconventional plays.

58 GEOSCIENCES↗

Modeling and Analysis of a Polyphase Wireless Power Transfer System for EV Charging Applications

Extreme fast charging is an emerging technology targeting to significantly decrease charging times of electric vehicles to 10–20 minutes, similar to an interstate gas refueling practice. High-power wireless power transfer (WPT) systems with polyphase electromagnetic couplers can be an attractive solution for these applications due to the very high surface power density of polyphase coils with reduced ripple current characteristics on both the primary and secondary sides that result in more compact designs with reduced dc bus bar capacitor requirements. In addition, WPT systems offer automated charging process, which can be an enabling technology for connected and automated vehicles, with high-efficiency, convenience, safety, and flexibility. This study presents a matrix representation of a mathematical model for a three-phase WPT system with series-series connected three-phase resonant compensation networks. Nonzero interphase mutual inductances between the same side phase windings are considered for tuning to obtain a circuit model for parametric sensitivity. Simulation and experimental results presented for a 50-kW experimental prototype to demonstrate the operation of the polyphase WPT system.

Zeng, Rong↗

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AUTOIGNITION DELAY TIMES FOR REFORMATE GAS MIXTURES FROM METHANE GAS ENGINES

Methane slip is a prominent issue in natural gas reciprocating engines that are used in transportation and marine applications. The incomplete combustion that results in methane slip can be resolved with the introduction of hydrogen within the combustion mixture to improve methane oxidation and further enable combustion within the engine crevices where methane has previously remained unreacted. Steam methane reforming (SMR) is a common method used to produce hydrogen and can be used to design an onboard device to reduce methane slip from reciprocating engines. The development of this reformer device requires the validation of high-fidelity chemical kinetic models at the low temperatures of the crevice volumes of these engines. In this work, auto-ignition data is obtained using a shock tube at lean (φ—0.714 or λ—1.4) and stoichiometric (φ, λ = 1) equivalence ratios spanning a temperature range of 1042–1234 K at the 80-bar operating pressure of the test engine. Blends of methane, hydrogen, and reformate products from the SMR reaction are shock-heated in synthetic air, with the ignition delay time measured using an OH* chemiluminescence detector at 310 nm and a CH* detector at 430 nm. The experimental results are compared to several state-of-the-art chemical kinetic mechanisms from the literature. In general, most of the mechanisms show very good agreement with experiments at higher temperatures, with simulation results showing little deviation from experiments at lower temperatures. A sensitivity analysis was conducted, and the results reveal that the reaction H2 + CH3O2 = H + CH3O2H has a very significant role in determining low-temperature ignition delay times (IDTs) of SMR mixtures. These findings provide valuable insights into the chemical kinetics governing methane reformate combustion and contribute to the optimization of onboard reformer designs aimed at mitigating methane slip in natural gas-fueled engines.

Fraze, Matthew↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

Practical CO2—WAG Field Operational Designs Using Hybrid Numerical-Machine-Learning Approaches

Machine-learning technologies have exhibited robust competences in solving many petroleum engineering problems. The accurate predictivity and fast computational speed enable a large volume of time-consuming engineering processes such as history-matching and field development optimization. The Southwest Regional Partnership on Carbon Sequestration (SWP) project desires rigorous history-matching and multi-objective optimization processes, which fits the superiorities of the machine-learning approaches. Although the machine-learning proxy models are trained and validated before imposing to solve practical problems, the error margin would essentially introduce uncertainties to the results. In this paper, a hybrid numerical machine-learning workflow solving various optimization problems is presented. By coupling the expert machine-learning proxies with a global optimizer, the workflow successfully solves the history-matching and CO2 water alternative gas (WAG) design problem with low computational overheads. The history-matching work considers the heterogeneities of multiphase relative characteristics, and the CO2-WAG injection design takes multiple techno-economic objective functions into accounts. This work trained an expert response surface, a support vector machine, and a multi-layer neural network as proxy models to effectively learn the high-dimensional nonlinear data structure. The proposed workflow suggests revisiting the high-fidelity numerical simulator for validation purposes. The experience gained from this work would provide valuable guiding insights to similar CO2 enhanced oil recovery (EOR) projects.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EMT data generation

The integration of inverter-based resources (IBRs) in power systems is accelerating, bringing with it significant benefits such as reduced greenhouse gas emissions, improved grid resilience, and increased energy independence. Despite these advantages, the widespread adoption of IBRs introduces several challenges, including issues related to grid stability, increased operational complexity, and the need for updated regulatory frameworks. To address these challenges, IEEE released Standard 2800 in 2022, which sets forth the necessary interconnection capabilities and performance criteria for IBRs connected to transmission and sub-transmission systems. This standard outlines the performance requirements to ensure the reliable integration of IBRs into the bulk power system. Furthermore, in 2023, the North American Electric Reliability Corporation (NERC) published a reliability guideline for electromagnetic transient (EMT) modeling of BPS-connected IBRs. This guideline provides recommendations for developing EMT model requirements, performing model quality checks, and implementing verification practices specifically for EMT models representing BPS-connected inverter-based resources in reliability studies conducted by transmission planners and planning coordinators. These standards and guidelines have a profound impact on EMT studies for transmission networks, influencing system stability analyses, grid recovery and resynchronization processes, fault ride-through evaluations, protection and coordination strategies, advanced control methodologies, and the inclusion of IBRs in transient models of transmission networks. As a result, the generation of EMT data is crucial for conducting various transient-based studies to understand the impact of IBRs. EMT data generation use cases serve as the basis for scenarios in event detection and identification use cases, providing comprehensive details about EMT data generation for transmission grids with inverter-based resources. These use cases supply sufficient training and validation datasets for subsequent EMT analysis algorithms.

Xia, Qianxue↗

Resource Characterization to Estimate Potential for Electricity Co-Production at Blackburn Oil Field, Nevada

The U.S. Department of Energy estimates that an annual average of 25 billion barrels of hot water are produced from oil and gas wells within the United States. The thermal energy available in the co-produced water stream is usually discarded, as the produced waters are considered an inconvenience by the operators and are disposed of using injection wells. However, utilizing organic Rankine cycle (ORC) generators, a vast amount of thermal energy can be captured and converted into electricity (albeit at relatively low efficiency due to the low temperatures). The National Renewable Energy Laboratory (NREL), in collaboration with Transitional Energy and Grant Canyon Oil & Gas, evaluated the feasibility of geothermal co-production of electricity by utilizing existing oil wells in Blackburn oil field in Nevada. The once prolific Blackburn oil field is located in Pine Valley, approximately 45 miles east-southeast of Elko, Nevada. Currently, the wells targeting the highly fractured Devonian Nevada dolomite reservoir are operating at a water cut ratio of more than 99%, with individual fluid (oil and water) production rates reaching 7.4 L/s (4,021 BBL/day). Analysis of publicly available data showed that the combination of the suitable wells' maximum historical production rates reached 22.90 L/s. The production from these wells occurs naturally and the wells are choked (and even shut down) by the operator to mitigate excessive water production, indicating a strong reservoir recharge and future opportunity to increase the water production for geothermal electricity generation. The main goal of this study was to evaluate the productivity of the existing wells, the performance of the reservoir, the surface network, and the operational constraints in order to achieve 1 MWe of electricity production from the field's water production. Utilizing the GEOPHIRES tool, we have determined that a twofold to threefold increase in the total fluid production, compared to the historical production under artificial restraint (choke), is required to reach a 1-MWe net target output for a low-temperature ORC system with air-cooled condensers. Lower flow rates would be required when utilizing water-based condensers instead of air-cooled condensers. However, that would require a constant supply of cold water, which may be challenging given the arid environment of the project site.

Blackburn↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Considerations for AMI-Based Operations for Distribution Feeders

More than $5 billion in investments in advanced metering infrastructure (AMI) technologies, AMI deployments, as pervasive secondary network voltage monitoring systems, provide opportunities for utility operations and controls. This paper focuses on the considerations for AMI-based tools and techniques as the industry moves toward operationalizing such large data sets. Phase identification is a first such tool. Numerous distribution network analysis, monitoring, and control applications - including volt/volt-ampere reactive control, state estimation, and distribution automation - require accurate phase connectivity information in the system models. The phase connectivity database maintained by utilities is inaccurate because of a significant amount of missing data, restoration activities, and network reconfiguration. Existing phase identification techniques that estimate phase connectivity work well in distribution feeders that have low or no photovoltaic (PV) generation; however, they fail to identify the phases accurately when considerable PV generation is present. This work addresses the phase identification problem in the presence of high PV generation using statistical analysis methods. Further, insights into the AMI data requirements for this application in terms of data window length and resolution are provided using sensitivity analysis performed on an actual distribution feeder model of San Diego Gas & Electric Company. The results of this study show that the phase connectivity, even in the presence of high PV generation, can be accurately identified using statistical analysis of AMI data of 1 day.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗