Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Cost-Effective Telemetry and Command Ground Systems Automation Strategy for the Soil Moisture Active Passive (SMAP) Mission

Soil Moisture Active Passive (SMAP) is an Earth-orbiting, remote-sensing NASA mission slated for launch in 2014.[double dagger] The ground data system (GDS) being developed for SMAP is composed of many heterogeneous subsystems, ranging from those that support planning and sequencing to those used for real-time operations, and even further to those that enable science data exchange. A full end-to-end automation of the GDS may result in cost savings during mission operations, but it would require a significant upfront investment to develop such comprehensive automation. As demonstrated by the Jason-1 and Wide-field Infrared Survey Explorer (WISE) missions, a measure of "lights-out" automation for routine, orbital pass ground operations can still reduce mission cost through smaller staffing of operators and limited work hours. The challenge, then, for the SMAP GDS engineering team is to formulate an automated operations strategy--and corresponding system architecture--to minimize operator intervention during operations, while balancing the development cost associated with the scope and complexity of automation. This paper discusses the automated operations approach being developed for the SMAP GDS. The focus is on automating the activities involved in routine passes, which limits the scope to real-time operations. A key subsystem of the SMAP GDS--NASA's AMMOS Mission Data Processing and Control System (AMPCS)--provides a set of capabilities that enable such automation. Also discussed are the lights-out pass automations of the Jason-1 and WISE missions and how they informed the automation strategy for SMAP. The paper aims to provide insights into what is necessary in automating the GDS operations for Earth satellite missions.

remote-sensing↗

Telemetry ground system development via the component approach

NASA's deployment of major space projects such as the Earth Observing System (EOS) will demand increased functionality and ground-based telemetry processing performance well above current capabilities. At the NASA/Goddard Space Flight Center, custom hardware and software components have been developed and combined into a unique architecture to address this problem. The hardware components utilize Application Specific Integrated Circuits (ASIC's) developed specifically to support NASA's telemetry data systems needs and designed to handle data rates up to 300 Mbps. A generalized set of software components, called the Telemetry Processing Control Environment facilitate the rapid construction of control and monitoring functions for the ground-based telemetry processing systems. This combination of hardware and software elements enables rapid construction of flexible, cost-effective telemetry processing systems capable of meeting the performance requirements facing NASA in the coming decade.

Thorn, Karen E.↗

Space Station Freedom ground systems program - A survey

The key facilities identified to support Space Station Freedom Program (SSFP) integrated operations and their SSFP roles are described in detail. The ground infrastructure, which must be able to support both assembly and long-term operations, will consist of ground facilities, support systems, and the associated planning and management procedures. During 1992 the SSFP is conducting a major program review of the ground infrastructure including the definition of all facility and support system functional capabilities, interfaces, and data-flow requirements. Operations functionality and interface verification tests are being identified, and operations readiness dates are being set.

Accola, A.↗

Human-in-the-Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chamber) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere of 8 psi total pressure and 32% oxygen concentration, life support systems (food, air, water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international partners.

Henninger, Donald L.↗

Human in the Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chambers) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere capable of 14.7 to 8 psi total pressure and 21 to 32% oxygen concentration, life support systems (food, air, and water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon, Mars). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international, industrial and academic partners.

Henninger, Donald L.↗

Large-Scale Cryogenic Testing of Launch Vehicle Ground Systems at the Kennedy Space Center

The development of a new launch vehicle to support NASA's future exploration plans requires significant redesign and upgrade of Kennedy Space Center's (KSC) launch pad and ground support equipment systems. In many cases, specialized test equipment and systems will be required to certify the function of the new system designs under simulated operational conditions, including propellant loading. This paper provides an overview of the cryogenic test infrastructure that is in place at KSC to conduct development and qualification testing that ranges from the component level to the integrated-system level. An overview of the major cryogenic test facilities will be provided, along with a detailed explanation of the technology focus area for each facility

Ernst, E. W.↗

The Post Office communication system ground station at Goonhilly, Cornwall

The initial purpose of the Post Office satellite system earth station at Goonhilly Downs, Cornwall, is to obtain information on the performance of experimental communication satellite systems; such information will be of great importance to the designers of systems for commercial operation. To facilitate this dissemination the UK and USA Governments prepared and signed, in February 1961, a Memorandum of Understanding regarding collaboration between the British Post Office and the United States National Aeronautics and Space Administration (NASA) on the testing of experimental communication satellites to be launched by NASA. The first phase of the tests covered Projects Telstar and Relay, both active satellites.

COMMUNICATIONS SATELLITE↗

Ground System PRA Data Availability Case Study

Presentation to support a Summit/TIM with various Stakeholders (Ground and Flight) to perform a GAP analysis associated with ground and spacecraft maintenance, maintainability, and availability activities in order to identify missing Agency planning and guidance materials.

Physics of Failure↗

Propulsion system ground testing

The objective is to provide management visibility relative to the roles of simulation and propulsion system testing for future development programs through assessment of current propulsion related simulation capabilities and review of contributions from propulsion system test programs. The presentation is represented by viewgraphs.

Wood, Charles C.↗

Performance results of Grumman prototype Space Station Space Erectable Radiator System ground test articles

The paper addresses individual-radiator performance results of the prototype Space Erectable Radiator System (SERS) in both ambient and thermal vacuum environments. The radiator design utilizing a two-phase fluid loop is outlined, along with SERS design requirements, radiator panel hardware, and whiffletree clamp hardware providing a dry-contact interface of the SERS panel with the heat exchanger of the thermal bus. It is observed that throughout integrated thermal-bus tests, SERS panels managed the load demands whether interfacing with twin condensers, in parallel-flow configuration, or with shear-flow condensers, in a cross-flow configuration. It is found that the insulation losses in the integrated and stand-alone test points are approximately 2 to 6 pct. The motorized whiffletree clamp is seen as performing satisfactorily during remote operations as well as maintaining 28,800-lb force throughout the test duration without requiring further adjustments.

Gisondo, Francine↗

Ground System Development at the Morehead State University for Interplanetary Smallsat Missions

As more small satellites are used for interplanetary research and exploration, more ground antennas with sufficiently large aperture are needed to support the increased demand in deep space communication. The 21-m ground antenna at the Morehead State University in Kentucky, United States is under development to upgrade its telemetry, tracking and command capability at X-band. The system architecture is based on a hybrid design that combines commercially available products with specialized equipment developed for the National Aeronautic and Aerospace Administration’s Deep Space Network. This architecture produces a low-cost and geographically diverse system, connecting elements at the Morehead State University and those of the DSN at the Jet Propulsion Laboratory in Pasadena, California. The architecture makes Morehead antenna appears as one of the DSN nodes, albeit with a different performance metrics due to difference in aperture size. Its operation is geared for automation, with automated data retrieval of information needed for configuring the ground station for spacecraft tracking. An incremental testing approach is used to verify system capabilities as various components are deployed into the system.

Kruth, Jeff↗

(abstract) Mars Pathfinder Active Thermal Control System: Ground and Flight Performance of a Mechanically Pumped Cooling Loop

A key element of the Mars Pathfinder thermal control system is the Heat Rejection System (HRS). The HRS of Mars Pathfinder is designed to actively control the temperatures of the various parts of the spacecraft.This is achieved by mechanically circulating single-phase Freon 11 liquid through the lander and cruise electronics box heat exchangers and transferring the heat to an external radiator on the cruise stage. This is the first time in spacecraft history that a mechanically pumped cooling loop has been used on a long duration spacecraft mission. Many lessons have been learned during the testing and ground and flight operation of the HRS. This paper will present the performance of the mechanically pumped cooling loop during the ground and flight operations. Based on the lessons learned from this experience, recommendations on the design and operation of the pumped cooling loops for future space missions will be made.

Mars↗

Improving Security of Ground System Software

An estimated 84% of all security breaches are application-related, not firewall violations. To what extent is your organization focused on addressing security issues in its software? Software plays a critical role in mission success, and software similarly plays a role in mission security. However, software can introduce vulnerabilities to the system, such as use of a COTS product that has a backdoor, or a hole in the security of the system deliberately left in place by designers or maintainers. The motivations for such holes are not always sinister, but can provide a means for malicious intrusion into the mission. Students will learn an approach to securing ground software within the context of federal information systems. Federal requirements, coding standards, tool usage will be discussed as part of the solution to securing software.

Bailey, Brandon↗

The XRS Low Temperature Cryogenic System: Ground Performance Test Results

The X-Ray Spectrometer (XRS) instrument is part of the Astro-E mission scheduled to launch early in 2000. Its cryogenic system is required to cool a 32-element square array of x-ray microcalorimeters to 60-65 mK over a mission lifetime of at least 2 years. This is accomplished using an adiabatic demagnetization refrigerator (ADR) contained within a two-stage superfluid helium/solid neon cooler. Goddard Space Flight Center is providing the ADR and helium dewar. The flight system was assembled in Sept. 1997 and subjected to extensive thermal performance tests. This paper presents test results at both the system and component levels. In addition, results of the low temperature topoff performed in Japan with the engineering unit neon and helium dewars are discussed.

Breon, Susan↗

1-G Human Factors for Optimal Processing and Operability of Ground Systems Up to CxP GOP PDR

This slide presentation reviews the development and use of a process and tool for developing these requirements and improve the design for ground operations. A Human Factors Engineering Analysis (HFEA) Tool was developed to create a dedicated subset of requirements from the FAA requirements for each subsystem. As an example the use of the human interface with an actuator motor is considered.

Stambolian, Damon B.↗

Ground Systems Development Environment (GSDE) interface requirements analysis: Operations scenarios

This report is a preliminary assessment of the functional and data interface requirements to the link between the GSDE GS/SPF (Amdahl) and the Space Station Control Center (SSCC) and Space Station Training Facility (SSTF) Integration, Verification, and Test Environments (IVTE's). These interfaces will be involved in ground software development of both the control center and the simulation and training systems. Our understanding of the configuration management (CM) interface and the expected functional characteristics of the Amdahl-IVTE interface is described. A set of assumptions and questions that need to be considered and resolved in order to complete the interface functional and data requirements definitions are presented. A listing of information items defined to describe software configuration items in the GSDE CM system is included. It also includes listings of standard reports of CM information and of CM-related tools in the GSDE.

Church, Victor E.↗