Search NASA⌕ Search

SEARCH · Search NASA

Results for “High Performance Building Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Technology Demonstration Missions

Technology Demonstration Missions (TDM) is in its third year of execution, being initiated in 2010 and baselined in January of 2012. There are 11 projects that NASA Marshall Space Flight Center (MSFC) has contributed to or led: (1) Evolvable Cryogenics (eCryo): Cyrogenic Propellant Storage and Transfer Engineering Development Unit (EDU), a proof of manufacturability effort, used to enhance knowledge and technology related to handling cryogenic propellants, specifically liquid hydrogen. (2) Composites for Exploration Upper Stage (CEUS): Design, build, test, and address flight certification of a large composite shell suitable for the second stage of the Space Launch System (SLS). (3) Deep Space Atomic Clock (DSAC): Spaceflight to demo small, low-mass atomic clock that can provide unprecedented stability for deep space navigation. (4) Green Propellant Infusion Mission (GPIM): Demo of high-performance, green propellant propulsion system suitable for Evolved Expendable Launch Vehicle (EELV) Secondary Payload Adapter (ESPA)-class spacecraft. (5) Human Exploration Telerobotics (HET): Demonstrating how telerobotics, remote control of a variety of robotic systems, can take routine, highly repetitive, dangerous or long-duration tasks out of human hands. (6) Laser Communication Relay Demo (LCRD): Demo to advance optical communications technology toward infusion into deep space and near Earth operational systems, while growing the capabilities of industry sources. (7) Low Density Supersonic Decelerator (LDSD): Demo new supersonic inflatable decelerator and parachute technologies to enable Mars landings of larger payloads with greater precision at a wider range of altitudes. (8) Mars Science Laboratory (MSL) Entry Descent & Landing Instrumentation (MEDLI): Demo of embedded sensors embedded in the MSL heat shield, designed to record the heat and atmospheric pressure experienced during the spacecraft's high-speed, hot entry in the Martian atmosphere. (9) Solar Electric Propulsion (SEP): 50-kW class spacecraft that uses flexible blanket solar arrays for power generation and an electric propulsion system that delivers payload from low-Earth orbit to higher orbits. (10) Solar Sail Demonstration (SSD): Demo to validate sail deployment techniques for solar sails that are propelled by the pressure of sunlight. (11) Terrestrial HIAD Orbit Reentry (THOR): Demo of a 3.7-m Hypersonic Inflatable Aerodynamic Decelerator (HIAD) entry vehicle to test second generation aerothermal performance and modeling.

McDougal, John↗

Analysis of Alternative Architectures for Cargo Lunar Landers

NASA’s Human Landing System (HLS) program has been working with commercial partners to develop human-class lunar landers to return the first American woman and next American man to the lunar surface in the mid 2020’s. In an effort to expand human presence beyond low Earth orbit, NASA’s Artemis program aims to facilitate a sustainable, long-term human presence in cis-lunar space. A component of this will require significant infrastructure to be delivered to the lunar surface. Delivering this infrastructure will require a significant lander capability that has yet to be developed. A thorough understanding of cargo lunar lander architectures is required such that select alternatives can be identified that best support the Artemis program’s objective of sustainability. The goal of this study is to aid NASA and its partners in the understanding of the cargo lunar lander trades space, as well as identify potential robust alternatives. The results will support NASA as it moves forward with key activities such as requirements formulation, agency strategic planning, and potential cargo lunar lander procurements. The study builds off of recent work performed by the Human Landing System program’s Architecture and Systems Analysis group to encompass a broad trade space of cargo lunar lander architecture alternatives. The current trade space as depicted by the morphological matrix and mission graph in Fig. 1 and Fig. 2, respectively, includes key alternative options that have become highly relevant due to current HLS activities and include on-orbit refueling, active cryogenic fluid management, Earth orbit aggregation, and global lunar access. The authors believe that there is also a statistically relevant impact of lander-payload configuration on the primary structure of the vehicle that could greatly impact alternative selection. Because of this, several conceptual lander-payload configurations will be evaluated to determine the level of impact. The current set of conceptual configurations are shown in Fig. 3 and Fig. 4. To aid the conceptual evaluation of these configurations, a catalogue of notional payloads has been developed that represent a wide range of masses and volumes that are expected to be delivered in support of a sustained human lunar presence, including pressurized and unpressurized rovers, surface habitats, power systems, and other support infrastructure. In order to execute this study in a timely fashion, a similar approach to that utilized in a similar 2019 study focused on 2024 human lunar sorties will be employed [1]. The team utilized a novel architecture synthesis framework currently being developed by NASA/MSFC to evaluate over 600,000 lunar lander architectures over a two month time frame [2]. From this large data set, varying ground rules and assumptions were applied as filters to explore the trade space to identify alternatives which exhibited robustness, as measured by launch vehicle payload margin, to absorb the natural growth that occurs during design maturation. The set of Earth-Moon system Delta-Vs assumed from the 2019 study, shown in Fig. 5, will be repurposed to accelerate model formulation for this effort. Additionally, current efforts in collaboration with the Georgia Institute of Technology’s Aerospace System Design Lab will be integrated to provide probabilistic modeling of the cargo lunar lander architectures to aid in identifying robust design alternatives [3]. The approach will help minimize potential impacts due to large levels of uncertainty inherent to pre phase-A conceptual design. By leveraging these past and present studies and partnerships, a highly detailed set of data can be generated in a short time period to aid NASA in the coming years to support the goal of a sustained human lunar presence.

Architectures↗

Development of the Surface Management System Integrated with CTAS Arrival Tools

The Surface Management System (SMS) developed by NASA Ames Research Center in coordination with the Federal Aviation Administration (FAA) is a decision support tool to help tower traffic coordinators and Ground/Local controllers in managing and controlling airport surface traffic in order to increase capacity, efficiency, and flexibility. SMS provides common situation awareness to personnel at various air traffic control facilities such as airport traffic control towers (ATCT s), airline ramp towers, Terminal Radar Approach Control (TRACON), and Air Route Traffic Control Center (ARTCC). SMS also provides a traffic management tool to assist ATCT traffic management coordinators (TMCs) in making decisions such as airport configuration and runway load balancing. The Build 1 of the SMS tool was installed and successfully tested at Memphis International Airport (MEM) and received high acceptance scores from ATCT controllers and coordinators, as well as airline ramp controllers. NASA Ames Research Center continues to develop SMS under NASA s Strategic Airspace Usage (SAU) project in order to improve its prediction accuracy and robustness under various modeling uncertainties. This paper reports the recent development effort performed by the NASA Ames Research Center: 1) integration of Center TRACON Automation System (CTAS) capability with SMS and 2) an alternative approach to obtain airline gate information through a publicly available website. The preliminary analysis results performed on the air/surface traffic data at the DFW airport have shown significant improvement in predicting airport arrival demand and IN time at the gate. This paper concludes with recommendations for future research and development.

Jung, Yoon C.↗

A Cost Effective System Design Approach for Critical Space Systems

NASA-JSC required an avionics platform capable of serving a wide range of applications in a cost-effective manner. In part, making the avionics platform cost effective means adhering to open standards and supporting the integration of COTS products with custom products. Inherently, operation in space requires low power, mass, and volume while retaining high performance, reconfigurability, scalability, and upgradability. The Universal Mini-Controller project is based on a modified PC/104-Plus architecture while maintaining full compatibility with standard COTS PC/104 products. The architecture consists of a library of building block modules, which can be mixed and matched to meet a specific application. A set of NASA developed core building blocks, processor card, analog input/output card, and a Mil-Std-1553 card, have been constructed to meet critical functions and unique interfaces. The design for the processor card is based on the PowerPC architecture. This architecture provides an excellent balance between power consumption and performance, and has an upgrade path to the forthcoming radiation hardened PowerPC processor. The processor card, which makes extensive use of surface mount technology, has a 166 MHz PowerPC 603e processor, 32 Mbytes of error detected and corrected RAM, 8 Mbytes of Flash, and I Mbytes of EPROM, on a single PC/104-Plus card. Similar densities have been achieved with the quad channel Mil-Std-1553 card and the analog input/output cards. The power management built into the processor and its peripheral chip allows the power and performance of the system to be adjusted to meet the requirements of the application, allowing another dimension to the flexibility of the Universal Mini-Controller. Unique mechanical packaging allows the Universal Mini-Controller to accommodate standard COTS and custom oversized PC/104-Plus cards. This mechanical packaging also provides thermal management via conductive cooling of COTS boards, which are typically designed for convection cooling methods.

Abbott, Larry Wayne↗

Free-Flight Test Results of Scale Models Simulating Viking Parachute/Lander Staging

This report presents the results of Viking Aerothermodynamics Test D4-34.0. Motion picture coverage of a number of Scale model drop tests provides the data from which time-position characteristics as well as canopy shape and model system attitudes are measured. These data are processed to obtain the instantaneous drag during staging of a model simulating the Viking decelerator system during parachute staging at Mars. Through scaling laws derived prior to test (Appendix A and B) these results are used to predict such performance of the Viking decelerator parachute during staging at Mars. The tests were performed at the NASA/Kennedy Space Center (KSC) Vertical Assembly Building (VAB). Model assemblies were dropped 300 feet to a platform in High Bay No. 3. The data consist of an edited master film (negative) which is on permanent file in the NASA/LRC Library. Principal results of this investigation indicate that for Viking parachute staging at Mars: 1. Parachute staging separation distance is always positive and continuously increasing generally along the descent path. 2. At staging, the parachute drag coefficient is at least 55% of its prestage equilibrium value. One quarter minute later, it has recovered to its pre-stage value.

Polutchko, Robert J.↗

Internship in Augmented and Virtual Reality - Rapid Model Import Tool

The integration of virtual and augmented reality, sometimes called mixed reality, is an emerging technology which will likely skyrocket overnight much in the way smartphones did a decade ago. Kennedy Space Center's Augmented and Virtual Reality (AVR) Lab is developing a Rapid Model Import Tool (RMIT) to create a quick and efficient way to bring NASA's complex engineering 3D models into virtual and augmented environments. The long-term objective is to create a tool that will ultimately benefit KSC engineers. Its various uses within NASA can potentially span from astronaut training, to marketing, to public outreach, to name a few. Unity is a prolific cross-platform game engine that allows users to build high quality 2D and 3D games for desktop, mobile, web, and game console platforms. It is perhaps also the most widely used software for virtual reality game development. At the AVR lab, we are looking at alternative uses of Unity to build tools for NASA engineers to perform design, development, testing, and training on spacecraft, rocket delivery systems, ground support equipment, and facilities at KSC. As an intern for the RMIT project, I am charged with the task of performing research on Unity-compatible file types to develop an efficient, affordable, preservative process to bring models from CATIA 3D engineering software into the Unity environment. With a tool called the NASA Enterprise Visualization Application (NEVA), developed by the Boeing Design Visualization group at KSC, we are able to easily convert CATIA's design models to. DAE (also known as COLLADA) and .OBJ file formats. I first reduce the polygon count of the model within CATIA itself, make any necessary tweaks to reduce the model further, and then export using NEVA. The .OBJ or. DAE files that I am left with are then converted by another intern to a Unity-compatible file format using a custom Python script. I have generated extensive documentation of this process in a NEVA User Guide. By the end of this semester, we will have built a solid framework for RMIT based on a thorough understanding of virtual reality specifications and file requirements, allowing future software development teams to go forward with development on the custom tool.

Leap Motion↗

NASA Glenn Research Center Support of the ASRG Project

A high efficiency radioisotope power system is being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company (LMSSC) to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with DOELockheed Martin to produce ASC-F flight units, and one with GRC for the production of ASC-E3 engineering unit pathfinders that are built to the flight design. In support of those contracts, GRC provided testing, materials expertise, government furnished equipment, inspections, and related data products to DOELockheed Martin and Sunpower. The technical support includes material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests have been performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests have been used to characterize performance under operating conditions that are representative of various mission conditions. Technology transfers enhanced contractor capabilities for specialized production processes and tests. Despite termination of flight ASRG contract, NASA continues to develop the high efficiency ASC conversion technology under the ASC-E3 contract. This paper describes key government furnished services performed for ASRG and future tests used to provide data for ongoing reliability assessments.

Technology Transfer↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

DSN research and technology support

Continuing remote controlled pulsar observations are noted, along with routine observations of 22 pulsars. Preliminary installation of equipment for planned unattended operation of the Venus Station is reported, along with extensive measurements and performance evaluation of the 26-m antenna. Support of the X-band radar at the Mars Station (DSS 14), and stability and reliability testing of the DSS 13 receiving system is reported. Klystron testing and other DSN support activities of the DSN High-Power Transmitter Maintenance Facility are noted, along with energy conservation modifications to two buildings at DSS 13. Radio Science experiment support included Planetary Radio Astronomy, Pulsar Rotation Constancy, Interstellar Microwave Spectroscopy, and Very Long Baseline Interferometry observations. An increased schedule of clock synchronization transmissions, planned on five-day centers, is noted, as 39 transmissions were made to Australia, DSS 43, and Spain, DSS 63.

Jackson, E. B.↗

Tutorial: Clock and Clock Systems Performance Measures

This tutorial contains basic material - familiar to many. This will be used as a foundation upon which we will build - bringing forth some new material and equations that have been developed especially for this tutorial. These will provide increased understanding toward parameter estimation of clock and clock system's performance. There is a very important International Telecommunications Union (ITU) handbook being prepared at this time which goes much further than this tutorial has time to do. I highly recommend it as an excellent resource document. The final draft is just now being completed, and it should be ready late in 1996. It is an outstanding handbook; Dr. Sydnor proposed to the ITU-R several years ago, and is the editor with my assistance. We have some of the best contributors in the community from around the world who have written the ten chapters in this handbook. The title of the handbook is 'Selection and use of Precise Frequency and Time Systems'. It will be available from the ITU secretariat in Geneva, Switzerland, but NAVTEC Seminars also plans to be a distributor.

Allan, David W.↗

An analysis of Space Shuttle countdown activities: Preliminaries to a computational model of the NASA Test Director

Before all systems are go just prior to the launch of a space shuttle, thousands of operations and tests have been performed to ensure that all shuttle and support subsystems are operational and ready for launch. These steps, which range from activating the orbiter's flight computers to removing the launch pad from the itinerary of the NASA tour buses, are carried out by launch team members at various locations and with highly specialized fields of expertise. The liability for coordinating these diverse activities rests with the NASA Test Director (NTD) at NASA-Kennedy. The behavior is being studied of the NTD with the goal of building a detailed computational model of that behavior; the results of that analysis to date are given. The NTD's performance is described in detail, as a team member who must coordinate a complex task through efficient audio communication, as well as an individual taking notes and consulting manuals. A model of the routine cognitive skill used by the NTD to follow the launch countdown procedure manual was implemented using the Soar cognitive architecture. Several examples are given of how such a model could aid in evaluating proposed computer support systems.

John, Bonnie E.↗

OMC Compressor Case

This report summarizes efforts expended in the development of an all-composite compressor case. Two pre-production units have been built, one utilizing V-CAP and one utilizing AFR-700B resin systems. Both units have been rig tested at elevated temperatures well above design limit loads. This report discusses the manufacturing processes, test results, and Finite Element Analysis performed. The V-CAP unit was funded by NASA-Lewis Research Center in 1994 under contract number NAS3- 27442 for Development of an All-Composite OMC Compressor Case. This contract was followed by an Air Force study in 1996 to build and identical unit using the AFR-700B resin system in place of the V-CAP system. The second compressor case was funded under U.S. Air Force contract F33615-93-D-5326, Advanced Materials for Aerospace Structures Special Studies (AMAS3), Delivery Order 0021 entitled "Advanced Polymeric Composite Materials and Structures Technology for Advanced High Temperature Gas Turbine Engines.' Initial studies using the V-CAP resin system were undertaken in 1993 under a NASA Lewis contract (NAS3-26829). A first prototype unit was developed in a joint program between Textron-Lycoming (now Allied Signal) and Brunswick (now Lincoln Composites). This unit included composite end closures using low density, high temperature molded end closures. The units was similar in size and shape to a titanium case currently used on the PT-21 0 engine and was funded as part of the integrated High Performance Turbine Engine Technology (EHPTET) initiative of DOD and NASA.

Humphrey, W. Donald↗

Imaging spectrometry of the Earth and other solar system bodies

Imaging spectrometry is a relatively new tool for remote sensing of the Earth and other bodies of the solar system. The technique dates back to the late 1970's and early 1980's. It is a natural extension of the earlier multi-spectral imagers developed for remote sensing that acquire images in a few, usually broad spectral bands. Imaging spectrometers combine aspects of classical spectrometers and imaging systems, making it possible to acquire literally hundreds of images of an object, each image in a separate, narrow spectral band. It is thus possible to perform spectroscopy on a pixel-by-pixel basis with the data acquired with an imaging spectrometer. Two imaging spectrometers have flown in space and several others are planned for future Earth and planetary missions. The French-built Phobos Infrared Spectrometer (ISM) was part of the payload of the Soviet Mars mission in 1988, and the JPL-built Near Infrared Mapping Spectrometer (NIMS) is currently en route to Jupiter aboard the Galileo spacecraft. Several airborne imaging spectrometers have been built in the past decade including the JPL-built Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) which is the only such sensor that covers the full solar reflected portion of the spectrum in narrow, contiguous spectral bands. NASA plans two imaging spectrometers for its Earth Observing System, the Moderate and the High Resolution Imaging Spectrometers (MODIS and HIRIS). A brief overview of the applications of imaging spectrometry to Earth science will be presented to illustrate the value of the tool to remote sensing and indicate the types of measurements that are required. The system design for AVIRS and a planetary imaging spectrometer will be presented to illustrate the engineering considerations and challenges that must be met in building such instruments. Several key sensor technology areas will be discussed in which miniaturization and/or enhanced performance through micromachining and nanofabrication may allow smaller, more robust, and more capable imaging spectrometers to be built in the future.

Vane, Gregg↗

Parallel runway requirement analysis study. Volume 1: The analysis

The correlation of increased flight delays with the level of aviation activity is well recognized. A main contributor to these flight delays has been the capacity of airports. Though new airport and runway construction would significantly increase airport capacity, few programs of this type are currently underway, let alone planned, because of the high cost associated with such endeavors. Therefore, it is necessary to achieve the most efficient and cost effective use of existing fixed airport resources through better planning and control of traffic flows. In fact, during the past few years the FAA has initiated such an airport capacity program designed to provide additional capacity at existing airports. Some of the improvements that that program has generated thus far have been based on new Air Traffic Control procedures, terminal automation, additional Instrument Landing Systems, improved controller display aids, and improved utilization of multiple runways/Instrument Meteorological Conditions (IMC) approach procedures. A useful element to understanding potential operational capacity enhancements at high demand airports has been the development and use of an analysis tool called The PLAND_BLUNDER (PLB) Simulation Model. The objective for building this simulation was to develop a parametric model that could be used for analysis in determining the minimum safety level of parallel runway operations for various parameters representing the airplane, navigation, surveillance, and ATC system performance. This simulation is useful as: a quick and economical evaluation of existing environments that are experiencing IMC delays, an efficient way to study and validate proposed procedure modifications, an aid in evaluating requirements for new airports or new runways in old airports, a simple, parametric investigation of a wide range of issues and approaches, an ability to tradeoff air and ground technology and procedures contributions, and a way of considering probable blunder mechanisms and range of blunder scenarios. This study describes the steps of building the simulation and considers the input parameters, assumptions and limitations, and available outputs. Validation results and sensitivity analysis are addressed as well as outlining some IMC and Visual Meteorological Conditions (VMC) approaches to parallel runways. Also, present and future applicable technologies (e.g., Digital Autoland Systems, Traffic Collision and Avoidance System II, Enhanced Situational Awareness System, Global Positioning Systems for Landing, etc.) are assessed and recommendations made.

Ebrahimi, Yaghoob S.↗

Cooperative GN&C development in a rapid prototyping environment

The Navigation, Control and Aeronautics Division (NCAD) at NASA-JSC is exploring ways of producing Guidance, Navigation and Control (GN&C) flight software faster, better, and cheaper. To achieve these goals NCAD established two hardware/software facilities that take an avionics design project from initial inception through high fidelity real-time hardware-in-the-loop testing. Commercially available software products are used to develop the GN&C algorithms in block diagram form and then automatically generate source code from these diagrams. A high fidelity real-time hardware-in-the-loop laboratory provides users with the capability to analyze mass memory usage within the targeted flight computer, verify hardware interfaces, conduct system level verification, performance, acceptance testing, as well as mission verification using reconfigurable and mission unique data. To evaluate these concepts and tools, NCAD embarked on a project to build a real-time 6 DOF simulation of the Soyuz Assured Crew Return Vehicle flight software. To date, a productivity increase of 185 percent has been seen over traditional NASA methods for developing flight software.

Bordano, Aldo↗

Investigation of Near Shannon Limit Coding Schemes

Turbo codes can deliver performance that is very close to the Shannon limit. This report investigates algorithms for convolutional turbo codes and block turbo codes. Both coding schemes can achieve performance near Shannon limit. The performance of the schemes is obtained using computer simulations. There are three sections in this report. First section is the introduction. The fundamental knowledge about coding, block coding and convolutional coding is discussed. In the second section, the basic concepts of convolutional turbo codes are introduced and the performance of turbo codes, especially high rate turbo codes, is provided from the simulation results. After introducing all the parameters that help turbo codes achieve such a good performance, it is concluded that output weight distribution should be the main consideration in designing turbo codes. Based on the output weight distribution, the performance bounds for turbo codes are given. Then, the relationships between the output weight distribution and the factors like generator polynomial, interleaver and puncturing pattern are examined. The criterion for the best selection of system components is provided. The puncturing pattern algorithm is discussed in detail. Different puncturing patterns are compared for each high rate. For most of the high rate codes, the puncturing pattern does not show any significant effect on the code performance if pseudo - random interleaver is used in the system. For some special rate codes with poor performance, an alternative puncturing algorithm is designed which restores their performance close to the Shannon limit. Finally, in section three, for iterative decoding of block codes, the method of building trellis for block codes, the structure of the iterative decoding system and the calculation of extrinsic values are discussed.

Kwatra, S. C.↗

ISRU-Based Robotic Construction Technologies For Lunar And Martian Infrastructures

Economically viable and reliable building systems and tool sets are being sought, examined and tested for extraterrestrial infrastructure buildup. This project utilizes a unique architecture weaving the robotic building construction technology with designs for assisting rapid buildup of initial operational capability Lunar and Martian bases. The project intends to develop and test methodologies to construct certain crucial infrastructure elements in order to evaluate the merits, limitations and feasibility of adapting and using such technologies for extraterrestrial application. High priority infrastructure elements suggested by our NASA advisors to be considered include landing pads and aprons, roads, blast walls and shade walls, thermal and micrometeorite protection shields and dust-free platforms utilizing the well-known insitu resource utilization (ISRU) strategy. Current extraterrestrial settlement buildup philosophy holds that in order to minimize the materials needed to be flown in, at great transportation costs, strategies that maximize the use of locally available resources must be adopted. Tools and heavy equipment flown as cargo from Earth are proposed to build required infrastructure to support future missions and settlements on the Moon and Mars. Several unique systems including the Lunar Electric Rover, the unpressurized Chariot rover, the versatile light-weight crane and Tri-Athlete cargo transporter as well as the habitat module mockups and a new generation of spacesuits are undergoing coordinated tests at NASAs D-RATS. This project intends to draw up a detailed synergetic plan to utilize these maturing systems coupled with modern robotic fabrication technologies based primarily on 3D Printing, tailored for swift and reliable Lunar and Martian infrastructure development. This project also intends to increase astronaut safety, improve buildup performance, ameliorate dust interference and concerns, and reduce time-to-commission, all in an economic manner. The goal stated in our Phase I proposal was a high fidelity demonstration at D-RATS to be conducted at the conclusion of the Phase II study. In the course of the Phase I study, however, it became clear that such demonstration was neither possible (due to the maximum Phase II budget limitation and the cost of NASA assets and related overhead expenses to support such demonstrations), nor necessary (due to NASA's low TRL expectation of Phase II results). These important facts were revealed to us only after interacting with the NIAC administrators and meetings with potential future partners at JPL and KSC. Accordingly, it was decided by the team that in order to make best use of resources we should investigate novel directions in the adaptation of our fabrication technologies by using in-house laboratories and to produce truly useful technologies and data, and then proceed with high fidelity demonstration at a later opportunity when sufficient resources become available. Furthermore, we have recognized that in addition to our building scale 3D printing technology called Contour Crafting, variations of some of our other fabrication technologies under development are suitable for construction of infrastructure elements such as regolith based ceramic tiles and hence we have decided to include some related preliminary research in this Phase II proposal.

Extraterrestrial↗