Search NASA⌕ Search

SEARCH · Search NASA

Results for “Highlights”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

STS-106 Mission Highlights Resource Tape

An overview of the STS-106 mission is given through footage of the activities of the first flight days of the mission, starting with flight day one and ending with flight day eight. The crewmembers of Atlantis, Commander Terrence Wilcutt, Pilot Scott Altman, and Mission Specialists Daniel Burbank, Edward Lu, Richard Mastracchio, Yuri Malenchenko, and Boris Morukov, are seen during various prelaunch activities, such as during the ceremonial breakfast, suit up, and boarding Atlantis. The launch is seen, as are the rendezvous and docking of the Orbiter to the International Space Station (ISS) and the spacewalks performed on flight day three by Lu and Malenchenko. Activities for flight days 9-12 can be seen on 'STS-106 Mission Highlights Resource Tape, Part 2 of 2' (internal ID 2001072040).

Source record↗

STS-106 Mission Highlights Resource Tape

A continuation of 'STS-106 Mission Highlights Resource Tape, Part 1 of 2' (internal ID 2001072041), footage shows the activities of flight days 9-12, including the undocking of Atlantis from the International Space Station (ISS) and the landing of the Space Shuttle.

Source record↗

STS-100 Mission Highlights Resource Tape

A continuation of 'STS-100 Mission Resource Tape, Part 1 of 4' (internal ID 2001117677), this video shows highlights from flight days four through six, including footage of the installation of the Canadarm (ISS' robotic arm) on the International Space Station (ISS), the spacewalks involved in this process, and the robotic arm lifting the Rafaello Multipurpose Logistics Module from the payload bay of Endeavour. The activities of flight days 6 (continued) - 11 can be found on 'STS-100 Mission Resource Tape, Part 3 of 4' (internal ID 2001117680) and 'STS-100 Mission Resource Tape, Part 4 of 4' (internal ID 2001117681).

Source record↗

TRMM: Status of Precipitation Estimates and Science Highlights

As a part of NASA's Earth System Enterprise, the Tropical Rainfall Measuring Mission (TRMM) seeks to understand the mechanisms through which changes in tropical rainfall influence global circulation. Over the past 3 years, TRMM has contributed significantly towards reducing uncertainty in satellite estimates of rainfall in the Tropics, where almost 67% of the Earth's rain falls. TRMM has provided knowledge related to the climatology, seasonality, and variation of tropical rainfall; the mesoscale structure of rain-producing systems; and the physics of precipitation. An overview of these results will be presented. Additionally, a summary of research highlights will be presented focusing on application of TRMM data to topics such as hurricane monitoring, climate analysis, forecasting, microphysics, environmental impacts, and El Nino/La Nina. Examples and plans for operational use of TRMM data in tropical cyclone monitoring and other applications will also be given.

Shepherd, J. Marshall↗

TRMM Science Highlights and Status of Precipitation Estimates on Monthly and Finder Time Scales

The Tropical Rainfall Measuring Mission (TRMM) has completed three years in orbit. A summary of research highlights will be presented focusing on application of TRMM data to topics ranging from climate analysis, through improving forecasts, to microphysical research. Monthly surface rainfall estimates over the ocean based on different instruments on TRMM currently differ by 20%. The difference is not surprising considering the different type of observations available for the first time from TRMM with both the passive and active microwave sensors. Resolving this difference will strengthen the validity and utility of ocean rainfall estimates and is the topic of ongoing research utilizing various facets of the TRMM validation and field experiment programs. The TRMM rainfall estimates are intercompared among themselves and with other estimates, including those of the standard, monthly Global Precipitation Climatology Project (GPCP) analysis. The GPCP analysis agrees roughly in magnitude with the passive microwave-based TRMM estimates which is not surprising considering GPCP over-ocean estimates are based on passive microwave observations. A three year TRMM rainfall climatology is presented based on the TRMM merged product, including anomaly fields related to the changing ENSO situation during the mission. Results of merging TRMM, other passive microwave observations, and geosynchronous infrared rainfall estimates into a global, tropical 3-hour time resolution analysis will also be described.

Adler, Robert↗

TRMM: Science Highlights and Status of Precipitation Estimates on Monthly and Finer Time Scales

The Tropical Rainfall Measuring Mission (TRMM) has completed three years in orbit. A summary of research highlights will be presented focusing on application of TRMM data to topics ranging from climate analysis, through improving forecasts, to microphysical research. Monthly surface rainfall estimates Over the ocean based on different instruments on TRMM currently differ by 20%. The difference is not surprising considering the different type of observations available for the first time from TRMM with both the passive and active microwave sensors. Resolving this difference will strengthen the validity and utility of ocean rainfall estimates and is the topic of ongoing research utilizing various facets of the TRMM validation and field experiment programs. The TRMM rainfall estimates are intercompared among themselves and with other estimates, including those of the standard, monthly Global Precipitation Climatology Project (GPCP) analysis. The GPCP analysis agrees roughly in magnitude with the passive microwave-based TRMM estimates which is not surprising considering GPCP over-ocean estimates are based on passive microwave observations. A three-year TRMM rainfall climatology is presented based on the TRMM merged product, including anomaly fields related to the changing ENSO situation during the mission. Results of merging TRMM, other passive microwave observations, and geosynchronous infrared rainfall estimates into a global, tropical 3-hour time resolution analysis will also be described.

Adler, Robert↗

TRMM: Status of Precipitation Estimates, Science Highlights, and 3-Hour Global, Tropical Precipitation Estimates

The Tropical Rainfall Measuring Mission (TRMM) has completed more than three years in orbit. A summary of research highlights will be presented focusing on application of TRMM data to topics ranging from climate analysis, through improving forecasts, to microphysical research. Examples and plans for operational use of TRMM data in tropical cyclone and other applications will be given. The status of precipitation estimates from different instruments and algorithms will be described. Monthly surface rainfall estimates over the ocean based on different instruments on TRMM currently differ by 20% in overall mean. In addition, time changes in global ocean rainfall between El Nino and La Nina conditions show a difference in sign between the active and passive microwave products. These differences are not surprising considering the different type of observations available for the first time from TRMM with both the passive and active microwave sensors. Resolving the differences will strengthen the validity and utility of ocean rainfall estimates. The TRMM rainfall estimates are intercompared among themselves and with other estimates, including those of the standard, monthly Global Precipitation Climatology Project (GPCP) analysis. The GPCP analysis agrees roughly in magnitude with the passive microwave-based TRMM estimates which is not surprising considering GPCP over-ocean estimates are based on passive microwave observations. A three-year TRMM rainfall climatology is presented, including anomaly fields related to the changing ENSO situation during the mission. Results of using TRMM information to calibrate other passive microwave observations and geosynchronous infrared rainfall estimates and then merging them those estimates into a global, tropical 3-hour time resolution analysis will also be described.

Adler, Robert↗

TRMM Science Highlights and 3-hr Quasi-global Precipitation Estimates

The Tropical Rainfall Measuring Mission (TRMM) has completed more than four years in orbit. A summary of research highlights will be presented focusing on application of TRMM data to topics ranging over climate analysis, improving forecasts, precipitation processes and non-precipitation applications. One focus of the talk will be the quasi-global TRMM real-time merged rainfall analysis with 3-hr resolution, which uses TRMM to calibrate estimates from other polar-orbit and geosynchronous satellites. These rainfall estimates provide useful information for applications for assimilation into numerical models and for hydrological studies. The status of precipitation estimates from different TRMM instruments and algorithms will be described. Monthly surface rainfall estimates over the ocean based on different instruments on TRMM currently differ by 20% in overall mean. In addition, time changes in global ocean rainfall between El Nino and La Nina conditions show differences between the active and passive microwave products. Improved versions of algorithms will shortly resolve most of these differences. The TRMM rainfall estimates are intercompared among themselves and with other estimates, including those of the standard, monthly Global Precipitation Climatology Project (GPCP) analysis. A four-year TRMM rainfall climatology is presented, including anomaly fields related to the changing ENSO situation during the mission. The evolution of precipitation analysis incorporating Advanced Microwave Scanning Radiometer (AMSR) data on AQUA and ADEOS II and eventually data from the Global Precipitation Mission (GPM) will also be described.

Adler, Robert F.↗

1999 NCCS Highlights

The NASA Center for Computational Sciences (NCCS) is a high-performance scientific computing facility operated, maintained and managed by the Earth and Space Data Computing Division (ESDCD) of NASA Goddard Space Flight Center's (GSFC) Earth Sciences Directorate. The mission of the NCCS is to advance leading-edge science by providing the best people, computers, and data storage systems to NASA's Earth and space sciences programs and those of other U.S. Government agencies, universities, and private institutions. Among the many computationally demanding Earth science research efforts supported by the NCCS in Fiscal Year 1999 (FY99) are the NASA Seasonal-to-Interannual Prediction Project, the NASA Search and Rescue Mission, Earth gravitational model development efforts, the National Weather Service's North American Observing System program, Data Assimilation Office studies, a NASA-sponsored project at the Center for Ocean-Land-Atmosphere Studies, a NASA-sponsored microgravity project conducted by researchers at the City University of New York and the University of Pennsylvania, the completion of a satellite-derived global climate data set, simulations of a new geodynamo model, and studies of Earth's torque. This document presents highlights of these research efforts and an overview of the NCCS, its facilities, and its people.

Bennett, Jerome↗

STS-111 Flight Day 4 Highlights Replay

The most significant highlights of flight day 4 of STS-111 are the lifting of the Leonardo Multi Purpose Logistics Module (MPLM) out of Endeavour's payload bay, and its temporary attachment to the Unity module of the International Space Station (ISS). The lifting and attachment are shown. Also shown is the testing of cameras on the CANADARM2 robotic arm on the ISS, an ISS extravehicular activity (EVA) suit, and an interview with the outgoing Expedition 4 crew of the ISS. Earth views include the ISS and Earth limb, and cloud formations.

Source record↗

STS-111 Flight Day 10 Highlights Replay

The most important highlight of flight day 10 of STS-111 was the undocking of the Leonardo Multi Purpose Logistical Module (MPLM) from the Unity module of the International Space Station (ISS). The undocking is shown, as is Leonardo resting in Endeavour's payload bay. The video also includes an interview, and footage of the West Africa and the Atlantic Ocean, Gibraltar and the Mediterranean Sea, Italy, Mexico and the Pacific Ocean, Hispanola, an unknown land mass, and unknown mountains.

Source record↗

STS-107 Crew Choice Television Highlights

The STS-107 flight day highlights begin with a shot inside the flight deck of the Space Shuttle Columbia where Commander Rick Husband, Pilot William McCool, and Mission Specialists David Brown and Kalpana Chawla are seated. The actual liftoff of the Space Shuttle Columbia is shown with Mission Specialists Michael Anderson and Laurel Clark, and Payload Specialist Ilan Ramon seated on the middeck of the spacecraft. Mission Specialist David Brown exits his seat to take pictures of the external tank while Michael Anderson also prepares to take photographs. A beautiful shot of the orbiter flying over Egypt is presented. A view of the Spacehab Research Double Module is shown where crystals are growing in microgravity. Laurel Clark is also shown working on the Bioreactor experiment. Michael Anderson is shown performing various breathing experiments in space. This video shows the last flight of STS-107 during ascent as the crew is seated in the flight deck and middeck of the Space Shuttle Columbia.

Source record↗

STS-112 Mission Highlights Resource, Part 3 of 3

The STS-112 Mission begins with a view of the center radiator on the S(1) Truss. A good view of the International Space Station's (ISS) Destiny Laboratory, Soyuz Crew Return Vehicle and Quest Airlock are shown from a video camera located at the end of the S(1) Truss Segment. The ISS Canadarm 2 is shown getting in position for spacewalk three. Highlights of flight day eight begin with Pilot Pam Melroy and Mission Specialist Fyodur Yurchikhin shown inside of the Quest Airlock closing the hatch as spacewalkers David Wolf and Piers Sellers move in the outer compartment of the Airlock to begin Extravehicular Activity 3 (EVA 3). During EVA 3, Dave Wolf and Piers Sellers are installing spool positioning devices on ammonia lines located on the ISS. Robot Arm Operators Peggy Whitson and Sandy Magnus are shown reviewing procedures for operating the robot arm. A view of Piers Seller climbing back into the Quest Airlock is presented. During flight day nine, robot arm operators Pam Melroy, Jeff Ashby and Peggy Whitson are in the process of removing spacesuits worn by David Wolf and Piers Sellers. A final farewell of the nine crewmembers shown inside of the Destiny Laboratory is presented during flight day ten. The undocking of Space Shuttle Atlantis from the International Space Station is shown on flight day eleven. This presentation ends on flight day 12 with a view of head up displays and the actual landing of the Space Shuttle Atlantis.

Source record↗

AHS Technical Committee Highlights: Test and Evaluation

The AHS technical committee for Test and Evaluation is comprised of representatives from industry and government rotorcraft technology development centers. The committee considers many aspects of rotorcraft and VTOL testing, including the evaluation of components and subsystems. In addition, the committee seeks to evaluate the effectiveness of new procedures and operational solutions to problems that are encountered in the low-speed flight regime for both land and ship-based environments. This article presents the test and evaluation committee highlights for 98-99. Though by no means comprehensive, the article includes significant efforts related to test and evaluation contributed by the committee members for their respective organizations.

Jacklin, Stephen A.↗

STS-113 Mission Highlights Resource Tape Flight Days 1-3. Tape: 1 of 4

This video, part 1 of 4, shows the activities of the crew of Space Shuttle Endeavour during flight days 1-3 of STS-113. The crew consists of Commander Jim Wetherbee, Pilot Paul Lockhart, Mission Specialists Michael Lopez-Alegria and John Herrington. With them were the Expedition 6 crewmembers of the International Space Station (ISS), Ken Bowersox, Nikolai Budarin, and Don Pettit. Pre-launch procedures are shown, and the rain-delayed night launch is shown from several camera angles. On flight day 2 there was a check out of the Canadarm on Endeavour, and some intravehicular activity. Flight day 3 highlights the docking of Endeavour and the ISS, and preparation for an extravehicular activity (EVA) the following day. Earth views include the English Channel at night with a close-up of London, the coast of Ecuador, and some views of Endeavour with the Earth in the background.

Source record↗

Highlights of 10-Year Remote Sensing Industry Analysis

A background and highlights of a 10 year remote sensing industry analysis are provided.Included are the following:Training, educational analysis, staff levels, and end-users analysis, market drivers, market segments,application areas, spatial resolution needs, use of image types.

Rabin, Ron↗

STS-107 Mission Highlights Resource, Part 3 of 4

This video, Part 3 of 4, shows the activities of the STS-107 crew during flight days 9 through 12 of the Columbia orbiter's final flight. The crew consists of Commander Rick Husband, Pilot William McCool, Payload Commander Michael Anderson, Mission Specialists David Brown, Kalpana Chawla, and Laurel Clark, and Payload Specialist Ilan Ramon. On flight day 9 David Brown and other crew members are at work on experiments in the Spacehab research module, and imagery is shown from the Mediterranean Israeli Dust Experiment (MEIDEX) on a pass over North Africa and the Horn of Africa. Ilan Ramon narrates part of the footage from flight day 10, and intravehicular activities of the astronauts onboard Columbia are shown, as well as views of the Gulf of Aden, and Lake Chad, which is seen with the back of the orbiter in the foreground. Rick Husband narrates the footage from day 11, which includes cleaning duties and maintenance, as well as an excellent view of the Sinai Peninsula, Israel, and Jordan, as well as the Mediterranean Sea, Red Sea, and Gulf of Aqaba. The highlight of flight day 12 is a conversation between Columbia's crew and the crew of the International Space Station (ISS). A special section of Earth views at the end of the video shows: 1) Atlantic Ocean, Strait of Gibraltar, Mediterranean Sea, Iberian Peninsula, Morocco, and Algeria; 2) Baja Peninsula; 3) Cyprus and Mediterranean Sea; 4) Florida; 5) Earth limb and Pacific Ocean; 6) North Carolina Outer Banks, Cape Hatteras, and Atlantic Ocean; 7) Houston with zoom out to Texas and Louisiana; 8) Mt. Vesuvius (Italy); 9) Earth limb and Atlantic Ocean; 10) Earth limb and terminator, and Pacific Ocean; 11) Saudia Arabia, Yemen, Oman, and Arabian Sea.

Source record↗