Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

NNSA Public Affairs Program Plan

The plan is based on various implementation plans and strategies that define ongoing activities. If significant updates, such as changes or additions to goals and messaging occur, Sandia will submit an updated plan to the Contracting Officer for approval.

99 GENERAL AND MISCELLANEOUS↗

High performance processors for real-time flight simulation

In order to meet the requirements of the NASA Langley Research Center for simulating the increased complexity and higher performance of modern aircraft, a flight simulation computing system with very high scalar performance is needed. The requirements and proposed response, probable areas of difficulty, planned implementation, and current status and plans are reviewed. A solution utilizing centralized minisupercomputers coupled with a proven real-time network technology will provide engineers and research scientists with the tools required for high-performance flight simulation. Subsequent to testing and verification of the initial simulation, general-purpose configuration management software with a nonconfiguration dependent serial highway driver software will be integrated to support any arbitrary combination of simulation sites.

Cleveland, Jeff I., II↗

The application of automated operations at the Institutional Processing Center

The JPL Institutional and Mission Computing Division, Communications, Computing and Network Services Section, with its mission contractor, OAO Corporation, have for some time been applying automation to the operation of JPL's Information Processing Center (IPC). Automation does not come in one easy to use package. Automation for a data processing center is made up of many different software and hardware products supported by trained personnel. The IPC automation effort formally began with console automation, and has since spiraled out to include production scheduling, data entry, report distribution, online reporting, failure reporting and resolution, documentation, library storage, and operator and user education, while requiring the interaction of multi-vendor and locally developed software. To begin the process, automation goals are determined. Then a team including operations personnel is formed to research and evaluate available options. By acquiring knowledge of current products and those in development, taking an active role in industry organizations, and learning of other data center's experiences, a forecast can be developed as to what direction technology is moving. With IPC management's approval, an implementation plan is developed and resources identified to test or implement new systems. As an example, IPC's new automated data entry system was researched by Data Entry, Production Control, and Advance Planning personnel. A proposal was then submitted to management for review. A determination to implement the new system was made and elements/personnel involved with the initial planning performed the implementation. The final steps of the implementation were educating data entry personnel in the areas effected and procedural changes necessary to the successful operation of the new system.

Barr, Thomas H.↗

Earth observing system implementation

The Earth Observing System (EOS) is a planned major earth science program initiative using the Polar Platforms of the Space Station. The Polar Platform resource capabilities will allow a multi-disciplinary, long term mission life approach to future earth science measurements. The EOS will be the subject of an Announcement of Opportunity (AO) in 1986. The EOS concept and the planned implementation approach is outlined.

Donohoe, M. J.↗

Application of mobile digital communications in law enforcement, an introductory planning guide

A set of planning guidelines for the application of digital communications techniques to law enforcement use is presented. Some essential characteristics of digital techniques and their applications are outlined, as are some principles of system analysis, evaluation, and planning. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with respect to this application problem. Information on law enforcement digital communications systems and equipment and a list of vendor sources are given in appendices.

Sohn, R. L.↗

A Tool for Planning Near-Term Waste Transfers at the Hanford Site - 18491

Washington River Protection Solutions, LLC is developing a software tool designed to simulate near-term waste affecting activities at the Hanford Site. The tool will allow for timely planning and evaluation of near-term operational activities, as well as facilitate feedback incorporation from the field to enable rapid iteration of various planning scenarios for a Multi-Year Operating Plan. Implementation of this tool in the Multi-Year Operating Plan planning process will support building a better connection between execution of daily activities and long-term mission objectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program

At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.

Johnstone, Paul M.↗

INL Human Performance Improvement Guide, GDE-863

Guidance on Integrating Human Performance Improvement including guidance on Developing Area Specific Implementation Plans, Tool Usage, and Building the Capacity for Resiliency aka Failing Safely.

99 GENERAL AND MISCELLANEOUS↗

Status of SFR Codes and Methods QA Implementation

This report details development of the SAS4A/SASSYS-1 SQA Program and describes the initial stages of Program implementation planning. The provisional Program structure, which is largely focused on the establishment of compliant SQA documentation, is outlined in detail, and Program compliance with the appropriate SQA requirements is highlighted. Additional program activities, such as improvements to testing methods and Program surveillance, are also described in this report. Given that the programmatic resources currently granted to development of the SAS4A/SASSYS-1 SQA Program framework are not sufficient to adequately address all SQA requirements (e.g. NQA-1, NUREG/BR-0167, etc.), this report also provides an overview of the gaps that remain the SQA program, and highlights recommendations on a path forward to resolution of these issues. One key finding of this effort is the identification of the need for an SQA program sustainable over multiple years within DOE annual R&D funding constraints.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SU-F-T-504: Non-Divergent Planning Method for Craniospinal Irradiation

Purpose: Traditional Craniospinal Irradiation (CSI) planning techniques require careful field placement to allow optimal divergence and field overlap at depth, and measurement of skin gap. The result of this is a necessary field overlap resulting in dose heterogeneity in the spinal canal. A novel, nondivergent field matching method has been developed to allow simple treatment planning and delivery without the need to measure skin gap. Methods: The CSI patient was simulated in the prone, and a plan was developed. Bilateral cranial fields were designed with couch and collimator rotation to eliminate divergence with the upper spine field and minimize anterior divergence into the lenses. Spinal posterior-to-anterior fields were designed with the couch rotated to 90 degrees to allow gantry rotation to eliminate divergence at the match line, and the collimator rotated to 90 degrees to allow appropriate field blocking with the MLCs. A match line for the two spinal fields was placed and the gantry rotated to equal angles in opposite directions about the match line. Jaw positions were then defined to allow 1mm overlap at the match line to avoid cold spots. A traditional CSI plan was generated using diverging spinal fields, and a comparison between the two techniques was generated. Results: The non-divergent treatment plan was able to deliver a highly uniform dose to the spinal cord with a cold spot of only 95% and maximum point dose of 115.8%, as compared to traditional plan cold spots of 87% and hot spots of 132% of the prescription dose. Conclusion: A non-divergent method for planning CSI patients has been developed and clinically implemented. Planning requires some geometric manipulation in order to achieve an adequate dose distribution, however, it can help to manage cold spots and simplify the shifts needed between spinal fields.

60 APPLIED LIFE SCIENCES↗

2014 Fermilab Laboratory Directoed Research \& Development Annual Report

After initiation by the Fermilab Laboratory Director, a team from the senior Laboratory leadership and a Laboratory Directed Research and Development (LDRD) Advisory Committee developed an implementation plan for LDRD at Fermilab for the first time. This implementation was captured in the approved Fermilab 2014 LDRD Program Plan and followed directions and guidance from the Department of Energy (DOE) order, DOE O 413.2B, a “Roles, Responsibilities, and Guidelines, …” document, and examples of best practices at other DOE Office of Science Laboratories. At Fermilab, a FY14 midyear Call for Proposals was issued. A LDRD Selection Committee evaluated those proposals that were received and provided a recommendation to the Laboratory Director who approved seven LDRD projects. This Annual Report focuses on the status of those seven projects and provides an overview of the current status of LDRD at Fermilab. The seven FY14 LDRD approved projects had a date of initiation late in FY14 such that this report reflects approximately six months of effort approximately through January 2015. The progress of these seven projects, the subsequent award of six additional new projects beginning in FY15, and preparations for the issuance of the FY16 Call for Proposals indicates that LDRD is now integrated into the overall annual program at Fermilab. All indications are that LDRD is improving the scientific and technical vitality of the Laboratory and providing new, novel, or cutting edge projects carried out at the forefront of science and technology and aligned with the mission and strategic visions of Fermilab and the Department of Energy.

99 GENERAL AND MISCELLANEOUS↗

Upper Atmospheric Research Satellite (UARS) ground data system - The first operational data system for the Mission to Planet Earth

The initiation of the National Aeronautics and Space Administration (NASA) Mission to Planet Earth was realized with the activation of the Upper Atmosphere Research Satellite (LIARS) in mid-September 1991 following deployment from the Shuttle Transport System (STS) - 48. The UARS provides the first comprehensive study of the chemistry and dynamics of the upper atmosphere. The UARS ground data system provides the capabilities required to support upper atmospheric studies in a timely and flexible manner. The UARS ground data system policy and implementation plan incorporated by the UARS Project team provided the flexibility necessary to be able to respond to changing priorities and requirements and to permit the ground data system to evolve far beyond initial expectations. This paper describes the policies and plans in place during the initial design and implementation phases and provides an overview of the UARS ground data system. The paper then addresses the changing UARS ground data system design and implementation priorities, the early mission experiences instrumental in the achievement of higher than expected goals, and a brief look at the future for UARS, the first Mission to Planet Earth.

Herring, Ellen L.↗

Application of computer-aided dispatch in law enforcement: An introductory planning guide

A set of planning guidelines for the application of computer-aided dispatching (CAD) to law enforcement is presented. Some essential characteristics and applications of CAD are outlined; the results of a survey of systems in the operational or planning phases are summarized. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Detailed descriptions of typical law enforcement CAD systems, and a list of vendor sources, are given in appendixes.

Sohn, R. L.↗

Application of automatic vehicle location in law enforcement: An introductory planning guide

A set of planning guidelines for the application of automatic vehicle location (AVL) to law enforcement is presented. Some essential characteristics and applications of AVL are outlined; systems in the operational or planning phases are discussed. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. A detailed description of a typical law enforcement AVL system, and a list of vendor sources are given in appendixes.

Hansen, G. R.↗

Reports From EXPORTS Modeling and Data-Mining Activities

EXPORTS -EXport Processes in the Ocean from RemoTe Sensing is NASA’s large field campaign focusing on development of a predictive understanding of the export, fate and carbon cycle impacts of the global net primary production. This co-funded program (NSF, private funding1, and international participation) was conceived in 2013, with EXPORTS Science plan published in 2016 (Siegel et al 2016, EXPORTS Writing Team 2015) and its implementation plan finalized in 2016 (EXPORTS Science Definition Team 2016). More details are presented in Siegel et al (2021). EXPORTS campaign is structured as a multiyear effort (Figure 1). It started with “Pre-EXPORTS” modeling and data-mining activity followed by a first phase with two major field programs and a second synthesis and modeling phase. The “Pre-EXPORTS” projects, total of 6 of them (Table 1), funded under A.3 Ocean Biology and Biogeochemistry 2015 call, helped to plan the field campaign (Resplandy et al 2019, Rousseaux & Gregg 2017), and supporting further global synthesis with datasets mined from the literature (e.g. Bisson et al (2020), Bisson et al (2018), Kramer and Siegel (2019)), directly responding to objectives outlined in Science Plan (see section 6 in Team (2015)) and Implementation team (see Figure 1 in Team (2016)). This document presents a compilation of the final reports of the Pre-EXPORTS funded projects, in hope of synthesizing the outcomes, and insuring the legacy of this program. Each of these reports contains a list of published papers, and reader should refer to them to see results in details.

Brandi J. McCarty↗

Phased plan for the implementation of the time-resolving magnetic recoil spectrometer on the National Ignition Facility (NIF)

The time-resolving magnetic recoil spectrometer (MRSt) is a transformative diagnostic that will be used to measure the time-resolved neutron spectrum from an inertial confinement fusion implosion at the National Ignition Facility (NIF). It uses a CD foil on the outside of the hohlraum to convert fusion neutrons to recoil deuterons. An ion-optical system positioned outside the NIF target chamber energy-disperses and focuses forward-scattered deuterons. A pulse-dilation drift tube (PDDT) subsequently dilates, un-skews, and detects the signal. While the foil and ion-optical system have been designed, the PDDT requires more development before it can be implemented. Therefore, a phased plan is presented that first uses the foil and ion-optical systems with detectors that can be implemented immediately—namely CR-39 and hDISC streak cameras. These detectors will allow the MRSt to be commissioned in an intermediate stage and begin collecting data on a reduced timescale, while the PDDT is developed in parallel. A CR-39 detector will be used in phase 1 for the measurement of the time-integrated neutron spectra with excellent energy-resolution, necessary for the energy calibration of the system. Streak cameras will be used in phase 2 for measurement of the time-resolved spectrum with limited spectral coverage, which is sufficient to diagnose the time-resolved ion temperature. Simulations are presented that predict the performance of the streak camera detector, indicating that it will achieve excellent burn history measurements at current yields, and good time-resolved ion-temperature measurements at yields above 3 × 10 17 . The PDDT will be used for optimal efficiency and resolution in phase 3.

47 OTHER INSTRUMENTATION↗

Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan

A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.

Source record↗

An Asset-Based Approach to Tribal Community Energy Planning

Community energy planning is a vital component of successful energy resource development and project implementation. Planning can help tribes develop a shared vision and strategies to accomplish their energy goals. This paper explores the benefits of an asset-based approach to tribal community energy planning. While a framework for community energy planning and federal funding already exists, some areas of difficulty in the planning cycle have been identified. This paper focuses on developing a planning framework that offsets those challenges. The asset-based framework described here takes inventory of a tribe’s capital assets, such as: land capital, human capital, financial capital, and political capital. Such an analysis evaluates how being rich in a specific type of capital can offer a tribe unique advantages in implementing their energy vision. Finally, a tribal case study demonstrates the practical application of an asset-based framework.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗