Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integral test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Small Project Rapid Integration and Test Environment (SPRITE) An Innovation Space for Small Projects Design, Development, Integration, and Test

Over the past few years interest in the development and use of small satellites has rapidly gained momentum with universities, commercial, and government organizations. In a few years we may see networked clusters of dozens or even hundreds of small, cheap, easily replaceable satellites working together in place of the large, expensive and difficult-to-replace satellites now in orbit. Standards based satellite buses and deployment mechanisms, such as the CubeSat and Poly Pico-satellite Orbital Deployer (P-POD), have stimulated growth in this area. The use of small satellites is also proving to be a cost effective capability in many areas traditionally dominated by large satellites, though many challenges remain. Currently many of these small satellites undergo very little testing prior to flight. As these small satellites move from technology demonstration and student projects toward more complex operational assets, it is expected that the standards for verification and validation will increase.

Lee, Ashley↗

Building Automation System Replacement and Improvements during Concurrent Integration and Testing for the Spacecraft Systems Development and Integration Facility

The Spacecraft Systems Development and Integration Facility (SSDIF), the premier cleanroom for NASA Goddard Space Flight Center (GSFC), has gone through multiple iterations of changes to its building automation system (BAS). NASA flight projects require more stringent environmental controls for temperature, humidity, air exchange rates, and pressurization. This led to increasingly difficult circumstances with replacing and improving the BAS during Integration and Testing (I&T) operations. The SSDIF was partially transitioned to a new BAS during November and December of 2023. Transition occurred in a live environment, while regular I&T activities resumed for the Roman Space Telescope. This resulted in the development and execution of a comprehensive method of procedure. Strategies such as sequencing equipment transition, and using temporary controls for critical equipment, avoided detriments to cleanroom environment. While the new BAS was being built, data points on the previous system would become obsolete, leading to data gaps and uncertainties. Critical data points were distinguished and trended on the new system, providing key insights on equipment functionality, while the BAS was completed. Control hunting and environmental deviations were persistent cases with the SSDIF. In some instances, proportional-integral-derivative (PID) tuning was implemented on current logic to bring smooth PID loop hunting. In other situations, controls logic was completely altered by changing setpoints or sequences. This provided greater laminar flow, more stable pressurization, and improved temperature and humidity controls. This paper documents the transitionary procedure to a new BAS, the improvements made, and challenges faced when altering a BAS during I&T operations.

Cleanroom↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, th Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and grou handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, Jim↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, the Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and ground handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early as the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, J. L.↗

Strategies for Ground Based Testing of Manned Lunar Surface Systems

Integrated testing (such as Multi-Element Integrated Test (MEIT)) is critical to reducing risks and minimizing problems encountered during assembly, activation, and on-orbit operation of large, complex manned spacecraft. Provides the best implementation of "Test Like You Fly:. Planning for integrated testing needs to begin at the earliest stages of Program definition. Program leadership needs to fully understand and buy in to what integrated testing is and why it needs to be performed. As Program evolves and design and schedules mature, continually look for suitable opportunities to perform testing where enough components are together in one place at one time. The benefits to be gained are well worth the costs.

Beyer, Jeff↗

Wallops Flight Facility Integration and Testing Customer Handbook

The Wallops Integration and Testing Handbook is a guide for planning operations at Wallops testing facilities. It provides a summary of the capabilities and technical specifications of available facilities. This handbook prescribes the information to be provided by the user that will enable the integration and testing team to effectively plan for and support the facility user’s project. Note that each facility plans for availability based on current workloads/ mission schedules. For example, sounding rockets may have between 20 and 35 missions in work at one time. Also note that special training, such as cleanroom certification, electrostatic discharge (ESD) or confined space training may be required for entrance to some facilities.

Adam Hammoudi↗

The Assembly, Test, and Integration of LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelera-tor)

R.J. Bodkin Biography Mr. Bodkin worked in industry for a rapid prototype company focusing on UAVs and manned experimental aircraft. Later he served as the Inflation System Lead on IRVE-II and 3 and the Re-Entry Vehicle Lead for LOFTID at NASA Langley Research Center. Introduction: The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID), developed in partnership with United Launch Alliance (ULA) and flown in conjunction with the National Oceanic and Atmospheric Administration (NOAA) Joint Polar Satellite System-2 (JPSS-2) satellite, demonstrated Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology has progressed and is ready for mission infusion. LOFTID’s success demonstrates that aeroshells are not limited to the internal diame-ter of the launch vehicle payload fairing, allowing larger payloads to be deployed to the surfaces of planetary bodies with atmospheres. The challenges of assembling, integrating, and testing this revolutionary spacecraft will be dis-cussed as well as issues associated with doing this with a fixed launch date the project did not control. Assembly: Because LOFTID flew as a rideshare partner with JPSS-2, it was constrained with addi-tional schedule, milestone, and technical require-ments that were beyond the project’s control. As-sembly of the LOFTID hardware was challenged with the normal mechanical fit issues while also having to navigate the SARS-COVID-II pandemic. Challenges ranged from availability of team per-sonnel required on-site for vehicle assembly to dif-ficulties associated with team collaboration while working remotely and increased costs and lead times of components due to supply chain con-straints. Numerous additional challenges cascaded from the additional time required. Integration: LOFTID flew as a secondary pay-load to JPSS-2 in a mission-unique configuration, directly under JPSS-2 primary payload, inside the Payload Adapter that integrated JPSS-2 to the Atlas V launch vehicle. A mission unique Payload Adapt-er Separation System (PASS) was required to sepa-rate the Payload Adapter from the Launch Vehicle prior to the start of the LOFTID flight demonstra-tion. Development of this system was challenging due to a shortened development schedule resulting from the iterative nature of Payload Adapter devel-opment with the partners at ULA. Preparations to integrate the main segments of the LOFTID vehicle posed unique challenges of having to accommodate issues with a fixed launch date that led to some cre-ative solutions to the integration. The partnership agreement with ULA and JPSS-2 resulted in a mass simulator designed to be installed late in the inte-gration in the event the LOFTID vehicle was not ready in time.. Test: LOFTID testing was carried out in several phases. Some components were tested at the com-ponent level, others at the sub-system levels and then finally the integrated vehicle level. This culmi-nated with the Complete Systems Test (CST) per-formed in a vacuum chamber as one of the final checkouts prior to disassembly for re-packing of the aeroshell. CST challenges will be discussed as well as obstacles encountered post-CST. After CST, the vehicle was disassembled so the HIAD could be repacked, and the vehicle was reassembled for ac-ceptance vibration testing. Testing concluded with the fully assembled vehicle being shipped to the launch site for final testing and integrations with the Payload Adapter to JPSS-2 for launch and opera-tions. Conclusion: The challenges posed by the AI&T for LOFTID could inform the planetary community of some of the opportunities and challenges of de-veloping technologies on a rideshare with a rela-tively small budget.

R.J. Bodkin↗

An Overview of Integration and Test of the James Webb Space Telescope Integrated Science Instrument Module

The James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (approx.40K). The JWST Observatory architecture includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) element that contains four science instruments (SI) including a Guider. The SIs and Guider are mounted to a composite metering structure with outer dimensions of 2.1x2.2x1.9m. The SI and Guider units are integrated to the ISIM structure and optically tested at NASA/Goddard Space Flight Center as an instrument suite using a high-fidelity, cryogenic JWST telescope simulator that features a 1.5m diameter powered mirror. The SIs are integrated and aligned to the structure under ambient, clean room conditions. SI performance, including focus, pupil shear and wavefront error, is evaluated at the operating temperature. We present an overview of the ISIM integration within the context of Observatory-level construction. We describe the integration and verification plan for the ISIM element, including an overview of our incremental verification approach, ambient mechanical integration and test plans and optical alignment and cryogenic test plans. We describe key ground support equipment and facilities.

Drury, Michael↗

Hot-Fire Test Results of Liquid Oxygen/RP-2 Multi-Element Oxidizer-Rich Preburners

As part of the Combustion Stability Tool Development project funded by the Air Force Space and Missile Systems Center, the NASA Marshall Space Flight Center was contracted to assemble and hot-fire test a multi-element integrated test article demonstrating combustion characteristics of an oxygen/hydrocarbon propellant oxidizer-rich staged-combustion engine thrust chamber. Such a test article simulates flow through the main injectors of oxygen/kerosene oxidizer-rich staged combustion engines such as the Russian RD-180 or NK-33 engines, or future U.S.-built engine systems such as the Aerojet-Rocketdyne AR-1 engine or the Hydrocarbon Boost program demonstration engine. To supply the oxidizer-rich combustion products to the main injector of the integrated test article, existing subscale preburner injectors from a previous NASA-funded oxidizer-rich staged combustion engine development program were utilized. For the integrated test article, existing and newly designed and fabricated inter-connecting hot gas duct hardware were used to supply the oxidizer-rich combustion products to the oxidizer circuit of the main injector of the thrust chamber. However, before one of the preburners was used in the integrated test article, it was first hot-fire tested at length to prove it could provide the hot exhaust gas mean temperature, thermal uniformity and combustion stability necessary to perform in the integrated test article experiment. This paper presents results from hot-fire testing of several preburner injectors in a representative combustion chamber with a sonic throat. Hydraulic, combustion performance, exhaust gas thermal uniformity, and combustion stability data are presented. Results from combustion stability modeling of these test results are described in a companion paper at this JANNAF conference, while hot-fire test results of the preburner injector in the integrated test article are described in another companion paper.

Protz, C. S.↗

Fracture Testing of Integral Stiffened Structure

Laboratory testing was conducted to evaluate safety concerns for integrally-stiffened tanks that were found to have developed cracks during pressurization testing. Cracks occurred at fastener holes where additional stiffeners were attached to the integrally-stiffened tank structure. Tests were conducted to obtain material properties and to reproduce the crack morphologies that were observed in service to help determine if the tanks are safe for operation. Reproducing the cracking modes observed during pressurization testing required a complex loading state involving both a tensile load in the integrally-stiffened structure and a pin-load at a fastener hole.

Newman, John A.↗

Universal nondestructive mm-wave integrated circuit test fixture

Monolithic microwave integrated circuit (MMIC) test includes a bias module having spring-loaded contacts which electrically engage pads on a chip carrier disposed in a recess of a base member. RF energy is applied to and passed from the chip carrier by chamfered edges of ridges in the waveguide passages of housings which are removably attached to the base member. Thru, Delay, and Short calibration standards having dimensions identical to those of the chip carrier assure accuracy and reliability of the test. The MMIC chip fits in an opening in the chip carrier with the boundaries of the MMIC lying on movable reference planes thereby establishing accuracy and flexibility.

Romanofsky, Robert R.↗

Dish Stirling system integration and test progress report

The integration and check-out of a complete Dish Solar Stirling Thermal Power System is described. The preliminary results of the tests conducted thus far are presented. The results are very encouraging and show promise of high performance and efficiency. The outstanding performance and durability of the 4-95 Stirling engine was the highlight of this 6 month integration and test activity. Exposure to severe heat, dust, sand and wind during the summer months and heavy rains, high winds, including sand storms and freezing cold in recent months did affected the engine or the receiver in any noticable manner.

Haglund, R. A.↗

Space Station propulsion integrated propulsion test article

Viewgraphs on space station propulsion integrated propulsion test articles are presented. Topics covered include: integrated propulsion test article; phase 1 configuration description; phase 2 testing; and electrolysis unit development contracts.

Henderson, J.↗

A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

Delaney, Michael M.↗